|
---|
Category:Meeting Notice
MONTHYEARML19070A0962019-03-11011 March 2019 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18361A5452018-12-27027 December 2018 Notice of Public Webinar Meeting for Pilgrim Nuclear Power Station to Discuss the Decommissioning Process for Nuclear Power Reactors ML18073A1402018-03-14014 March 2018 Notice of Category 1 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML17179A0822017-06-28028 June 2017 Open Regulatory Conference July 13, 2017 ML17069A0942017-03-10010 March 2017 3/21/2017 - Notice of Category 1 Public Meeting - Annual Assessment and 95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station ML17020A0032017-01-19019 January 2017 1/31/2017 - Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station ML16090A2332016-03-30030 March 2016 4/13/2016 - Notice of Category 1 Public Meeting - Annual Assessment of Safety Performance at the Pilgrim Nuclear Power Station for 2015 IR 05000293/20150072015-06-22022 June 2015 Notice of Category 1 Public Meeting - Regulatory Conference to Discuss Preliminary White Finding and Associated Apparent Violation for Pilgrim Nuclear Power Station (IR 05000293/2015007) ML15062A0872015-03-0404 March 2015 3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting ML14098A3162014-04-0808 April 2014 5/1/2014 - Notice of Category 1 Public Meeting to Discuss Entergy Performance at Pilgrim Nuclear Power Station During Cy 2013 ML13336A8092013-12-0202 December 2013 Webinar to Discuss Independent Spent Fuel Storage Installation (ISFSI) Basics and Planned Use at the Pilgrim Nuclear Power Station ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13086A5902013-03-27027 March 2013 Revised: April 2, 2013 Notice of Public Meeting with Entergy Nuclear Operations, Inc. to Discuss Pilgrim'S Performance During FY12 ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13072A6782013-03-13013 March 2013 Notice of Public Meeting, April 2, 2013 ML12074A0832012-03-14014 March 2012 Notice of Meeting with Public to Discuss the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2011 ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1113102952011-05-11011 May 2011 Notice of Meeting with the Public to the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2010 ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1008201642010-03-23023 March 2010 Entergy Nuclear Operations (Entergy) Notice of Meeting with NRC ML1006805402010-03-0909 March 2010 Notice of Meeting with Pilgrim Nuclear Power Station to Discuss Safety Performance for Calendar Year 2009 and Nrc'S Role in Ensuring Safe Plant Operations ML0906807852009-03-0909 March 2009 Notice of Meeting to Discuss Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear Power Plant for Calendar Year 2008 and the Role of the Agency in Ensuring Safe Plant Operations ML0807100682008-03-10010 March 2008 Notice of Meeting with Entergy Nuclear Operations to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2007 ML0709204592007-03-30030 March 2007 Meeting with Entergy Nuclear Operations, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2006 ML0701706102007-01-17017 January 2007 Notice of Meeting Between NRC Staff & Entergy Management to Inform Entergy Management of Results of NRC Team Inspection Covering Scoping & Aging Management Portions of Pilgrim Nuclear Power Station Application for a Renewed License ML0700501532007-01-0808 January 2007 01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station ML0618104242006-06-30030 June 2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Powe ML0634703382006-05-0909 May 2006 E-mail: (Intergovernmental) Planners Event on Current Trends in Metroboston ML0611804242006-04-28028 April 2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA) ML0609403702006-04-0404 April 2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance ML0604405432006-02-13013 February 2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process ML0508401332005-03-29029 March 2005 Notice for Closed Pilgrim Predecisional Enforcement Conference Regarding Apparent Violations Involving Failures of Control Room Staff to Follow Pilgrim Procedures ML0507500032005-03-16016 March 2005 Revised - Pilgrim Annual Assessment Meeting Notice W/Nrc Slides ML0506203432005-03-0404 March 2005 3/24/05 Pilgrim Annual Assessment Meeting Notice ML0432304512004-11-19019 November 2004 Meeting with Entergy Nuclear Re Pilgrim I Nuclear Generating Station Regarding Relief Request Related to High Pressure Coolant Injection Pump Vibrations ML0406406452004-03-0404 March 2004 Notice of Meeting with Entergy Nuclear Operations, Inc. Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2003 ML0307000432003-03-10010 March 2003 Notice of Meeting with Entergy Nuclear Generation Co Re Nrc'S Annual Assessment of the Safety Performance at the Pilgrim Nuclear Power Station ML0219106652002-07-12012 July 2002 Meeting with Entergy Nuclear Operations, Inc. (ENO) on Safety Relief Valve Seismic Analysis Methodology for Pilgrim Nuclear Power Station ML0207301872002-03-14014 March 2002 Meeting with Entergy Nuclear Generation Company (Pilgrim) Re Results of Nrc'S Assessment of the Safety Performance at the Pilgrim Nuclear Power Station for the Period April 1, 2001 Through December 31, 2001 2019-03-11
[Table view] Category:Memoranda
MONTHYEARML22321A1042022-12-0101 December 2022 Lessons Learned Recommendations Effectiveness Review ML21060B1152021-03-31031 March 2021 Memo to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for Pilgrim ISFSI ML19274B6662019-11-13013 November 2019 Summary of Public Meeting Near the Pilgrim Nuclear Power Station Regarding the Establishment and Operation of Community Advisory Boards ML19182A3562019-07-23023 July 2019 Quarterly Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 - April 1 to June 30, 2019 ML18158A1302018-06-0707 June 2018 Evaluation - Memorandum Regarding Licensee Event Report Safety Significance Review in Response to Findings Associated with Inspection Procedure 95003; Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML18157A0402018-06-0606 June 2018 Inspection Procedure 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML18158A1332018-06-0606 June 2018 Extent of Condition Review in Response to Findings Associated with Inspection 95003: Evaluation of NRC Assessment and Inspection Processes at Pilgrim Nuclear Power Station ML16153A2762016-06-20020 June 2016 Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML14294A5712014-11-0404 November 2014 Memo - Transmittal of the Final Pilgrim Nuclear Power Station Accident Sequence Analysis ML14300A0962014-10-28028 October 2014 Staff Review of the Pilgrim Physical Security Plan (Revision 12) for the Independent Spent Fuel Storage Installation Security and Verification of ASM Incorporation (TAC L24940) ML14232A3012014-08-20020 August 2014 Memo s Wastler, Technical Assistance Request - Review of Physical Security Plan for the Pilgrim Nuclear Power Stations (TAC No. L24940) Docket Nos. 72-1044, 50-293 ML14086A2912014-04-22022 April 2014 Summary of Telephone Conference Regarding the Verbal Authorization of Relief Request PRR-25, Revision 1 ML13351A2732014-01-0909 January 2014 G20130846/LTR-13-0911 - James Brett, the New England Council Ltr. Chairman'S Recent Tour and the Council'S Support for the Pilgrim Nuclear Power Station - Response ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13267A2342013-08-30030 August 2013 G20130629 - Pilgrim Watch'S 2.206 Petition to Pilgrim'S Emergency Preparedness Plans (MF2656) ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13196A2202012-06-0606 June 2012 Memo from B. Balsam, NRR and D. Logan, NRR to J. Susco, NRR on Summary of Section 7 Consultation Activities Related to the National Marine Fisheries Service'S Final Rule to List the Atlantic Sturgeon ML12137A0602012-05-29029 May 2012 Nuclear Regulatory Commission'S Analysis of Entergy Nuclear Operations, Inc. Decommissioning Funding Status Report for Indian Point Nuclear Generating Station, Units 1, 2 & 3; and Pilgrim Nuclear Power Station ML12090A2122012-03-30030 March 2012 Referring Jones River Watershed Association Petition to Intervene and Request to File New Contentions, or in Alternative, Jones River Watershed Association and Pilgrim Water Motion to Reopen the Pilgrim Nuclear Power Station, Docket No. 50- ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML11174A3252011-06-30030 June 2011 Memo Forwarding of Supplement 2 to NUREG-1891, SER Related to the Lr of Pilgrim Nuclear Power Station, Docket No. 50-293, to the Advisory Committee on Reactor Safeguards ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1109700342011-04-19019 April 2011 Summary of Tele Conf Call Held on 4/6/11, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108206892011-04-19019 April 2011 February 24, 2011, Summary of Telephone Conference Call Held Between NRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1108202082011-04-11011 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between the USNRC and Entergy Nuclear Operations, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1100404192011-02-15015 February 2011 Summary of Telephone Conference Call Held on December 6, 2010, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operating, Inc., Concerning the Pilgrim Nuclear Power Station License Renewal Application (Tac No. MC9669) ML1018900452010-07-0808 July 2010 Notification of Information in the Matter of Pilgrim Nuclear Power Station ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML1029505722009-01-23023 January 2009 Task Interface Agreement - Evaluation of Application of Technical Specification 4.0.3, Surveillance Requirement Applicability, at Pilgrim ML0836601742009-01-23023 January 2009 TIA - Task Interface Agreement - Evaluation at Pilgrim of Application of TS 4.0.3, 12/31/08 ML1029505762009-01-23023 January 2009 Task Interface Agreement Evaluation of Application of Technical Specification 4.0.3, Surveillance Requirement Applicability, at Pilgrim ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0718400342007-07-0606 July 2007 ACRS Review of the Pilgrim Nuclear Power Station License Renewal Application - Safety Evaluation Report ML0713100692007-06-0808 June 2007 Summary of Conference Call on May 10, 2007, with Entergy Nuclear Operations, Inc., Regarding the Pilgrim License Renewal Application ML0708104422007-03-15015 March 2007 Request for Additional Information on Time-Limited Aging Analyses for the Reactor Vessel and Internals, Pilgrim Nuclear Power Station, License Renewal Application ML0706402522007-03-0606 March 2007 ACRS Review of the Pilgrim Nuclear Plant Station Renewal Application - Safety Evaluation Report ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0700501532007-01-0808 January 2007 01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station ML0634800242006-12-13013 December 2006 Drop-In Visit from Entergy (Pilgrim) ML0633406952006-11-28028 November 2006 Memorandum to Levin from Albert, Access to Security, Radiological, Vital and Protected Areas of the Pilgrim Nuclear Station ML0629104322006-11-17017 November 2006 Final Response to Task Interface Agreement 2006-01 Related to the Adequacy of Emergency Diesel Generator and Shutdown Transformer Load Testing at Pilgrim Nuclear Power Station ML0627605082006-11-0707 November 2006 Summary of Conference Call on September 25, 2006, with Entergy Nuclear Operations, Inc ML0628504072006-10-23023 October 2006 2006/10/23-Summary of Conference Call on October 10, 2006 with Entergy Nuclear Operations. Inc., to Clarify Information Sent to the NRC in Response to Requests for Additional Information Regarding the Pilgrim License Renewal Application ML0625801622006-09-15015 September 2006 Audit Trip Report Regarding Entergy Nuclear Operations Inc. License Renewal Application for Pilgrim Nuclear Power Station, Dated January 25, 2006 ML0617000552006-07-13013 July 2006 2006/07/13-Summary of Public Scoping Meetings Conducted Related to the Review of the Pilgrim Nuclear Power Station, License Renewal Application ML0618104242006-06-30030 June 2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Powe 2022-12-01
[Table view] |
Text
November 19, 2004 MEMORANDUM TO: Daniel S. Collins, Acting Chief, Section 2 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Robert J. Fretz, Project Manager, Section 2 /RA by Victor Nerses for/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC., PILGRIM NUCLEAR GENERATING STATION DATE & TIME: Wednesday, December 8, 2004 1:00 p.m. - 4:00 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room O-8B4 Rockville, Maryland PURPOSE: Technical discussions regarding Pilgrim Nuclear Generating Station relief request related to high pressure coolant injection pump vibrations.
CATEGORY 1:* This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
MEETING CONTACTS: Robert Fretz, NRR Tolani Owusu, NRR 301-415-1324 301-415-4117 RXF@nrc.gov TEO@nrc.gov
- Commission's Policy Statement on Enhancing Public Participation in NRC Meetings,"
(67 FR 36920), May 28, 2002.
PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC Entergy R. Fretz S. Bethay D. Terao B. Ford G. Bedi P. Harizi S. Unikewicz K. Poertner J. Huang T. Owusu Docket No. 50-293
Attachment:
Agenda cc w/att: See next page
Pilgrim Nuclear Power Station cc:
Mr. Michael Kansler Mr. John M. Fulton President Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Resident Inspector Mr. Steve Brennion U. S. Nuclear Regulatory Commission Supt., Regulatory & Industry Affairs Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.
Post Office Box 867 Pilgrim Nuclear Power Station Plymouth, MA 02360 600 Rocky Hill Road, M/S 1 Plymouth, MA 02360-5508 Chairman, Board of Selectmen 11 Lincoln Street Mr. Jack Alexander Plymouth, MA 02360 Manager, Reg. Relations and Quality Assurance Chairman, Duxbury Board of Selectmen Pilgrim Nuclear Power Station Town Hall 600 Rocky Hill Road 878 Tremont Street Plymouth, MA 02360-5599 Duxbury, MA 02332 Mr. David F. Tarantino Office of the Commissioner Nuclear Information Manager Massachusetts Department of Pilgrim Nuclear Power Station Environmental Protection 600 Rocky Hill Road One Winter Street Plymouth, MA 02360-5599 Boston, MA 02108 Ms. Jane Perlov Office of the Attorney General Secretary of Public Safety One Ashburton Place Executive Office of Public Safety 20th Floor One Ashburton Place Boston, MA 02108 Boston, MA 02108 Dr. Robert M. Hallisey, Director Mr. Stephen J. McGrail, Director Radiation Control Program Attn: James Muckerheide Commonwealth of Massachusetts Massachusetts Emergency Management Executive Offices of Health and Agency Human Services 400 Worcester Road 174 Portland Street Framingham, MA 01702-5399 Boston, MA 02114 Chairman Regional Administrator, Region I Nuclear Matters Committee U. S. Nuclear Regulatory Commission Town Hall 475 Allendale Road 11 Lincoln Street King of Prussia, PA 19406-1415 Plymouth, MA 02360
Pilgrim Nuclear Power Station cc:
Mr. William D. Meinert Mr. Brian OGrady Nuclear Engineer Vice President, Operations Support Massachusetts Municipal Wholesale Entergy Nuclear Operations, Inc.
Electric Company 440 Hamilton Avenue P.O. Box 426 White Plains, NY 10601 Ludlow, MA 01056-0426 Mr. John F. McCann Mr. Gary J. Taylor Director, Nuclear Safety Assurance Chief Executive Officer Entergy Nuclear Operations, Inc.
Entergy Operations 440 Hamilton Avenue 1340 Echelon Parkway White Plains, NY 10601 Jackson, MS 39213 Ms. Charlene D. Faison Mr. John T. Herron Manager, Licensing Sr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Michael J. Colomb Mr. Michael A. Balduzzi Director of Oversight Site Vice President Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. 440 Hamilton Avenue Pilgrim Nuclear Power Station White Plains, NY 10601 600 Rocky Hill Road Plymouth, MA 02360-5508 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. Stephen J. Bethay Pilgrim Nuclear Power Station Director, Nuclear Assessment 600 Rocky Hill Road Entergy Nuclear Operations, Inc. Mail Stop 66 Pilgrim Nuclear Power Station Plymouth, MA 02360-5508 600 Rocky Hill Road Plymouth, MA 02360-5508 Ms. Stacey Lousteau Treasury Department Mr. Bryan S. Ford Entergy Services, Inc.
Manager, Licensing 639 Loyola Avenue Entergy Nuclear Operations, Inc. New Orleans, LA 70113 Pilgrim Nuclear Power Station 600 Rocky Hill Road Ms. Deb Katz, Executive Director Plymouth, MA 02360-5508 Nuclear Security Coalition c/o Citizens Awareness Network Mr. Danny L. Pace Box 83 Vice President, Engineering Shelburne Falls, MA 01370 Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Pilgrim Nuclear Power Station cc:
Jim Sniezek 5486 Nithsdale Drive Salisbury, MD 21801 Mr. Kennety L. Graesser 38832 N. Ashley Drive Lake Villa, IL 60046 Mr. Ronald Toole 1282 Valley of Lakes Box R-10 Hazelton, PA 18202
AGENDA PILGRIM NUCLEAR GENERATING STATION HIGH PRESSURE COOLANT INJECTION PUMP VIBRATION MEETING DECEMBER 8, 2004
- 1. Introductions
2. Background
- relief request background
- 3. Corrective actions taken by Entergy
- 4. Technical basis for relief request
- 5. Break
- 6. Questions and answers/open discussion
- 7. Concluding remarks Attachment
ML043230451 OFFICE PDI-2/PM PDI-2/LA PDI-2/SC(A)
NAME VNerses for RFretz CRaynor VNerses for DCollins DATE 11/19/04 11/19/04 11/19/04