ML12074A083

From kanterella
Jump to navigation Jump to search
Notice of Meeting with Public to Discuss the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2011
ML12074A083
Person / Time
Site: Pilgrim
Issue date: 03/14/2012
From: Bellamy R
NRC/RGN-I/DRP/PB5
To:
Shared Package
ML12058A411 List:
References
12-011
Download: ML12074A083 (3)


Text

MN No.12-011 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 14, 2012 Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station Docket No: 50-293 Date/Time: Thursday, March 29, 2012 5:00 p.m. to 6:30 p.m.

Location: Plymouth Town Hall 11 Lincoln Street Plymouth, MA 02360

Purpose:

The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at Pilgrim Nuclear Power Station for 2011, as described in the annual assessment letter dated March 5, 2012. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: J. Clifford, Deputy Director, Division of Reactor Projects R. Bellamy, PhD, Chief, Division of Reactor Projects, Branch 5 G. Wilson, Chief, Division of Plant Licensing, Branch 1 M. Schneider, Senior Resident Inspector T. Setzer, Senior Project Engineer Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergys performance at Pilgrim Nuclear Power Station during calendar year 2011. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Pilgrim.

Meeting

Contact:

Ronald R. Bellamy, PhD, Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRCs annual assessment letter regarding Pilgrim Nuclear Power Stations performance during 2011 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML12061A235. ADAMS is accessible from the NRC website at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRCs annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by March 26, 2012, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by: /RA/

Ronald R. Bellamy, PhD, Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ

ML12074A083 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME JDeBoer/emk for RBellamy DATE 03/14/12 03/14/12