March 10, 2008 MN No.08-009 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station Docket No. 50-293 Date and Time: March 26, 2008, from 6:00 p.m. to 8:00 p.m.

Location: Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360

Purpose:

To discuss NRCs assessment of the safety performance of the Pilgrim Nuclear Power Station for calendar year 2007.

Attendees:

NRC: J. Clifford, Deputy Director, Division of Reactor Projects, Region I D. Roberts, Deputy Director, Division of Reactor Safety, Region I R. Powell, Chief, Projects Branch 5, Region I M. Schneider, Senior Resident Inspector N. Sieller, Acting Resident Inspector Entergy: K. Bronson, Site Vice President R. Smith, General Manager of Plant Operations S. Bethay, Director of Nuclear Safety Assurance B. Sullivan, Nuclear Engineering Director Public Participation*: This is a Category 1 Meeting. The public is invited to observe the meeting. After the business portion, but before the NRC adjourns, the public will have an opportunity to communicate with the NRC regarding Entergys performance at Pilgrim and the role of the agency in ensuring safe plant operations.

The NRCs Annual Assessment Letter for Pilgrim Nuclear Power Station can be located in ADAMS with Accession Number ML080630606. The slides for the meeting can be located in ADAMS with Accession Number ML080701135. ADAMS is accessible from the NRC Web Site at: http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

2 Meeting

Contact:

Raymond J. Powell, Chief, Projects Branch 5 (610) 337-6967 E-mail: rjp@nrc.gov

  • Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 19, 2008, via telephone to the NRC meeting contact.

Approved by:

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects cc w/encl:

Vice President, Operations, Entergy Nuclear Operations Senior Vice President, Entergy Nuclear Operations Vice President, Oversight, Entergy Nuclear Operations Senior Manager, Nuclear Safety & Licensing, Entergy Nuclear Operations Senior Vice President and COO, Entergy Nuclear Operations Assistant General Counsel, Entergy Nuclear Operations Director, Radiation Control Program, Commonwealth of Massachusetts W. Irwin, Chief, CHP, Radiological Health, Vermont Department of Health The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network W. Meinert, Nuclear Engineer J. Giarrusso, MEMA, SLO Commonwealth of Massachusetts, Secretary of Public Safety

3 Agenda NRCs Annual Assessment Meeting Pilgrim Nuclear Power Station March 26, 2007 6:00 - 8:00 pm Introduction .............................................................................................NRC (5 minutes)

Review of Reactor Oversight Process ....................................................NRC (10 minutes)

Discussion of Pilgrim Nuclear Power Station Performance .....................NRC (10 minutes)

Entergys Response and Remarks .................................................... Entergy (25 minutes)

Closing Remarks ......................................................................................NRC (5 minutes)

Short Break ...................................................................................................... (5 minutes)

NRC to address public questions ....................... NRC/Members of the Public (as needed)

3 Agenda NRCs Annual Assessment Meeting Pilgrim Nuclear Power Station March 26, 2007 6:00 - 8:00 pm Introduction .............................................................................................................NRC (5 minutes)

Review of Reactor Oversight Process ....................................................................NRC (10 minutes)

Discussion of Pilgrim Nuclear Power Station Performance ....................................NRC (10 minutes)

Entergys Response and Remarks .................................................................... Entergy (25 minutes)

Closing Remarks.......................................................................................................NRC (5 minutes)

Short Break ........................................................................................................................(5 minutes)

NRC to address public questions .......................................NRC/Members of the Public (as needed)

Distribution w/encl: (VIA E-MAIL)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER RESOURCES)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER RESOURCES)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Collins, RA M. Gamberoni, DRS R. Powell, DRP M. Dapas, DRA D. Roberts, DRS B. Norris, DRP G. West, RI OEDO D. Screnci, PAO N. Sieller, DRP J. Lubinski, NRR N. Sheehan, PAO G. Newman, DRP, Resident Inspector M. Kowal, NRR N. McNamara, SLO A. Ford, Resident OA J. Kim, PM, NRR M. McLaughlin, SLO Regional Administrator Secretary, RI J. Boska, NRR DRP Division Secretary, RI Deputy Regional Administrator Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Docket Room (w/concurrences) Region I Receptionist PMNS DOCUMENT NAME: T:\DRP\BRANCH5\Annual Assessment Meeting Notices\ROP 8 Annual Assessment\Pilgrim ROP 8 Annual Assessment Meeting Notice.doc SUNSI Review Complete: RJP (Reviewers Initials)

After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy ML080710068 OFFICE RI/DRP RI/DRP NAME BNorris/RJP For RPowell/RJP DATE 03/10/08 03/10/08 OFFICIAL RECORD COPY