Revised - Pilgrim Annual Assessment Meeting Notice W/Nrc Slides
ML050750003
Person / Time
Site: Pilgrim
Issue date: 03/16/2005
From: Anderson C
NRC/RGN-I/DRP/PB5
To:
Shared Package
ML050620264 List:
References
MN-05-004, Rev 1
Download: ML050750003 (5)


Text

MN No. 05-004Rev.1 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 16, 2005 Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station Docket No.: 50-293 Date/Time: March 24, 2005 at 1:00 p.m.

Location: John Carver Inn 25 Summer Street Plymouth, Massachusetts 02360

Purpose:

The NRC requested an Annual Assessment Meeting with Entergy to discuss NRCs assessment of the safety performance of Pilgrim Nuclear Power Station for calendar year 2004. NRCs assessment is documented in a letter dated March 2, 2005. The meeting is also intended to provide an opportunity for the NRC to engage interested stakeholders in discussions on Entergys performance at Pilgrim and the role of the agency in ensuring safe plant operations. Meeting Notice is re-issued to include NRC Annual Assessment Meeting Slides.

Attendees*:

NRC: J. Boska, Project Manager, NRR C. Anderson, Chief Projects Branch 5, Region I W. Raymond, Senior Resident Inspector at Pilgrim C. Welch, Resident Inspector at Pilgrim Licensee: M. Balduzzi, Site Vice President P. Dietrich, General Manager Plant Operations S. Bethay, Director of Safety Assurance Public Participation: This is a Category 1 Meeting. Following the business portion of the meeting, members of the public will have an opportunity to discuss Entergys performance at Pilgrim and the role of the NRC in ensuring safe operations at the plant.

NRCs assessment letter and meeting agenda (attachment to this notice) and the NRC Slides can be found in the ADAMS (Accession Number ML050610156, ML050750003 and ML050750002). ADAMS is accessible for the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Pilgrim Station can be found on the NRCs web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting

Contact:

Clifford Anderson, Chief Projects Branch 5 610-337-5227 E-mail: cja@nrc.gov.

Interested stakeholders may provide specific questions or topics of interest to the meeting contact prior to the meeting.

C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 21, 2005, via telephone to the NRC meeting contact.

/RA/ Donald Florek for Approved by: _______________________

Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects

3 cc w/encl:

G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.

J. T. Herron, Senior Vice President and Chief Operating Officer S. J. Bethay, Director, Nuclear Assessment D. L. Pace, Vice President, Engineering B. OGrady, Vice President, Operations Support J. F. McCann, Director, Nuclear Safety Assurance C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.

D. Tarantino, Nuclear Information Manager B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.

J. M. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.

S. Lousteau, Treasury Department, Entergy Services, Inc.

R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant R. Toole, PWR SRC Consultant C. McCombs, Acting Director, MEMA and Commonwealth of Massachusettts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist

4 Distribution (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)

Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)

Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)

Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)

Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)

S. Lee, RI EDO Coordinator J. Boska, Project Manager, NRR R. Ennis, NRR (Backup)

W. Lanning, DRS J. Lubinski, DRS K. Farrar, Regional Counsel D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA C. Anderson, DRP D. Florek, DRP W. Raymond, SRI - Pilgrim C. Welch, RI - Pilgrim A. Ford, DRP, Resident OA G. Matakas, ORA PMNS SISP Review Complete: Djf (Reviewers Initials)

DOCUMENT NAME: G:\BRANCH5\MEETINGS\Pilg EOC Meeting Notice 3-24-05.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /

NAME DFlorek CAnderson/DJF for DATE 03/16/05 03/16/05 03/ /05 03/ /05 03/ /05 OFFICIAL RECORD COPY

5 Annual Assessment Meeting Agenda:

C Introduction C Review of Reactor Oversight Process C National Summary of Plant Performance C Discussion of Plant Performance Results C Licensee Response and Remarks C NRC Closing Remarks C Break C NRC available to address public questions