|
---|
Category:Meeting Agenda
MONTHYEARML19070A0962019-03-11011 March 2019 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18127A0282018-05-0707 May 2018 Annual Assessment Meeting for Pilgrim Nuclear Power Station - Entergy Presentation Slides ML18073A1402018-03-14014 March 2018 Notice of Category 1 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML17179A0822017-06-28028 June 2017 Open Regulatory Conference July 13, 2017 ML17020A0032017-01-19019 January 2017 1/31/2017 - Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station ML16090A2332016-03-30030 March 2016 4/13/2016 - Notice of Category 1 Public Meeting - Annual Assessment of Safety Performance at the Pilgrim Nuclear Power Station for 2015 ML15208A4582015-07-0808 July 2015 July 8, 2015 - Pilgrim SRV Reg Conf Agenda ML15062A0872015-03-0404 March 2015 3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting ML14098A3162014-04-0808 April 2014 5/1/2014 - Notice of Category 1 Public Meeting to Discuss Entergy Performance at Pilgrim Nuclear Power Station During Cy 2013 ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML0906807852009-03-0909 March 2009 Notice of Meeting to Discuss Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear Power Plant for Calendar Year 2008 and the Role of the Agency in Ensuring Safe Plant Operations ML0807100682008-03-10010 March 2008 Notice of Meeting with Entergy Nuclear Operations to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2007 ML0709204592007-03-30030 March 2007 Meeting with Entergy Nuclear Operations, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2006 ML0705402052007-03-0101 March 2007 01/24/2007 Summary of Meeting with Pilgrim on the Draft Supplemental Environmental Impact Statement Regarding Pilgrim License Renewal Review ML0703305582007-01-24024 January 2007 Meeting Agenda for Public Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station ML0618104242006-06-30030 June 2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Powe ML0614201642006-05-17017 May 2006 Pilgrim Nuclear Power Station Environmental Scoping Meeting Handouts ML0634700722006-05-0202 May 2006 2006/05/02-(PD) Pilgrim Nuclear Power Station License Renewal Site Audit Off-Site Meetings May 2-4, 2006 Draft Meeting Notes ML0611804242006-04-28028 April 2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA) ML0634703242006-04-12012 April 2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 Meeting - Pilgrim NPS License Renewal (List for Kingston Meeting) ML0634703262006-04-12012 April 2006 2006/04/12-E-MAIL: (Intergovernmental) May 3 Meeting - Pilgrim NPS License Renewal (List for Duxbury Meeting) ML0609403702006-04-0404 April 2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance ML0604405432006-02-13013 February 2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process ML0507500032005-03-16016 March 2005 Revised - Pilgrim Annual Assessment Meeting Notice W/Nrc Slides ML0406406352004-03-0404 March 2004 Agenda for the Nrc'S Annual Assessment Meeting Pilgrim Nuclear Power Station ML17252A1551977-09-19019 September 1977 Summary of Meeting with Representatives of the Mark I Owner'S Group and GE to Discuss the Structural Acceptance Criteria for the Mark I Containment Ltp ML17252A1571977-09-14014 September 1977 Summary of Meeting Held with Representatives of the Mark I Owner'S Group to Discuss the Structural Acceptance Criteria for the Mark I Containment Long Term Program 2019-03-11
[Table view] Category:Meeting Notice
MONTHYEARML19070A0962019-03-11011 March 2019 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18361A5452018-12-27027 December 2018 Notice of Public Webinar Meeting for Pilgrim Nuclear Power Station to Discuss the Decommissioning Process for Nuclear Power Reactors ML18073A1402018-03-14014 March 2018 Notice of Category 1 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML17179A0822017-06-28028 June 2017 Open Regulatory Conference July 13, 2017 ML17069A0942017-03-10010 March 2017 3/21/2017 - Notice of Category 1 Public Meeting - Annual Assessment and 95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station ML17020A0032017-01-19019 January 2017 1/31/2017 - Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station ML16090A2332016-03-30030 March 2016 4/13/2016 - Notice of Category 1 Public Meeting - Annual Assessment of Safety Performance at the Pilgrim Nuclear Power Station for 2015 IR 05000293/20150072015-06-22022 June 2015 Notice of Category 1 Public Meeting - Regulatory Conference to Discuss Preliminary White Finding and Associated Apparent Violation for Pilgrim Nuclear Power Station (IR 05000293/2015007) ML15062A0872015-03-0404 March 2015 3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting ML14098A3162014-04-0808 April 2014 5/1/2014 - Notice of Category 1 Public Meeting to Discuss Entergy Performance at Pilgrim Nuclear Power Station During Cy 2013 ML13336A8092013-12-0202 December 2013 Webinar to Discuss Independent Spent Fuel Storage Installation (ISFSI) Basics and Planned Use at the Pilgrim Nuclear Power Station ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13086A5902013-03-27027 March 2013 Revised: April 2, 2013 Notice of Public Meeting with Entergy Nuclear Operations, Inc. to Discuss Pilgrim'S Performance During FY12 ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13072A6782013-03-13013 March 2013 Notice of Public Meeting, April 2, 2013 ML12074A0832012-03-14014 March 2012 Notice of Meeting with Public to Discuss the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2011 ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1113102952011-05-11011 May 2011 Notice of Meeting with the Public to the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2010 ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1008201642010-03-23023 March 2010 Entergy Nuclear Operations (Entergy) Notice of Meeting with NRC ML1006805402010-03-0909 March 2010 Notice of Meeting with Pilgrim Nuclear Power Station to Discuss Safety Performance for Calendar Year 2009 and Nrc'S Role in Ensuring Safe Plant Operations ML0906807852009-03-0909 March 2009 Notice of Meeting to Discuss Nrc'S Assessment of the Safety Performance of Pilgrim Nuclear Power Plant for Calendar Year 2008 and the Role of the Agency in Ensuring Safe Plant Operations ML0807100682008-03-10010 March 2008 Notice of Meeting with Entergy Nuclear Operations to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2007 ML0709204592007-03-30030 March 2007 Meeting with Entergy Nuclear Operations, Inc., to Discuss Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2006 ML0701706102007-01-17017 January 2007 Notice of Meeting Between NRC Staff & Entergy Management to Inform Entergy Management of Results of NRC Team Inspection Covering Scoping & Aging Management Portions of Pilgrim Nuclear Power Station Application for a Renewed License ML0700501532007-01-0808 January 2007 01/24/2007 Notice of Forthcoming Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Pilgrim Nuclear Power Station ML0618104242006-06-30030 June 2006 2006/06/30- 07/19/2006 Notice of Forthcoming Exit Meeting with Entergy Nuclear Operations, Inc., on License Renewal Scoping and Screening Methodology and the Aging Management Program / Aging Management Review Audits for Pilgrim Nuclear Powe ML0634703382006-05-0909 May 2006 E-mail: (Intergovernmental) Planners Event on Current Trends in Metroboston ML0611804242006-04-28028 April 2006 2006/04/28- 05/17/2006 Notice of Meeting to Discuss the Environmental Scoping Process for Pilgrim Nuclear Power Station, License Renewal Application (LRA) ML0609403702006-04-0404 April 2006 Public Meeting Notice for the Annual Assessment Meeting with Entergy (Pilgrim Station) to Discuss CY2005 Performance ML0604405432006-02-13013 February 2006 03/08/2006 Notice of Forthcoming Public Information Session for the U.S. Nuclear Regulatory Commission (NRC) Staff to Describe the License Renewal Process ML0508401332005-03-29029 March 2005 Notice for Closed Pilgrim Predecisional Enforcement Conference Regarding Apparent Violations Involving Failures of Control Room Staff to Follow Pilgrim Procedures ML0507500032005-03-16016 March 2005 Revised - Pilgrim Annual Assessment Meeting Notice W/Nrc Slides ML0506203432005-03-0404 March 2005 3/24/05 Pilgrim Annual Assessment Meeting Notice ML0432304512004-11-19019 November 2004 Meeting with Entergy Nuclear Re Pilgrim I Nuclear Generating Station Regarding Relief Request Related to High Pressure Coolant Injection Pump Vibrations ML0406406452004-03-0404 March 2004 Notice of Meeting with Entergy Nuclear Operations, Inc. Nrc'S Assessment of the Safety Performance of the Pilgrim Nuclear Power Station for Calendar Year 2003 ML0307000432003-03-10010 March 2003 Notice of Meeting with Entergy Nuclear Generation Co Re Nrc'S Annual Assessment of the Safety Performance at the Pilgrim Nuclear Power Station ML0219106652002-07-12012 July 2002 Meeting with Entergy Nuclear Operations, Inc. (ENO) on Safety Relief Valve Seismic Analysis Methodology for Pilgrim Nuclear Power Station ML0207301872002-03-14014 March 2002 Meeting with Entergy Nuclear Generation Company (Pilgrim) Re Results of Nrc'S Assessment of the Safety Performance at the Pilgrim Nuclear Power Station for the Period April 1, 2001 Through December 31, 2001 2019-03-11
[Table view] |
Text
MN No. 05-004Rev.1 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF LICENSEE MEETING March 16, 2005 Licensee: Entergy Nuclear Operations, Inc.
Facility: Pilgrim Nuclear Power Station Docket No.: 50-293 Date/Time: March 24, 2005 at 1:00 p.m.
Location: John Carver Inn 25 Summer Street Plymouth, Massachusetts 02360
Purpose:
The NRC requested an Annual Assessment Meeting with Entergy to discuss NRCs assessment of the safety performance of Pilgrim Nuclear Power Station for calendar year 2004. NRCs assessment is documented in a letter dated March 2, 2005. The meeting is also intended to provide an opportunity for the NRC to engage interested stakeholders in discussions on Entergys performance at Pilgrim and the role of the agency in ensuring safe plant operations. Meeting Notice is re-issued to include NRC Annual Assessment Meeting Slides.
Attendees*:
NRC: J. Boska, Project Manager, NRR C. Anderson, Chief Projects Branch 5, Region I W. Raymond, Senior Resident Inspector at Pilgrim C. Welch, Resident Inspector at Pilgrim Licensee: M. Balduzzi, Site Vice President P. Dietrich, General Manager Plant Operations S. Bethay, Director of Safety Assurance Public Participation: This is a Category 1 Meeting. Following the business portion of the meeting, members of the public will have an opportunity to discuss Entergys performance at Pilgrim and the role of the NRC in ensuring safe operations at the plant.
NRCs assessment letter and meeting agenda (attachment to this notice) and the NRC Slides can be found in the ADAMS (Accession Number ML050610156, ML050750003 and ML050750002). ADAMS is accessible for the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.
2 Additional information relative to the NRCs Annual Assessment process and the safety performance of Pilgrim Station can be found on the NRCs web site at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html Meeting
Contact:
Clifford Anderson, Chief Projects Branch 5 610-337-5227 E-mail: cja@nrc.gov.
Interested stakeholders may provide specific questions or topics of interest to the meeting contact prior to the meeting.
C Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than 2 business days prior to the meeting. Attendance by NRC personnel at this meeting should be made known by March 21, 2005, via telephone to the NRC meeting contact.
/RA/ Donald Florek for Approved by: _______________________
Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects
3 cc w/encl:
G. J. Taylor, Chief Executive Officer, Entergy Operations M. Kansler, President, Entergy Nuclear Operations, Inc.
J. T. Herron, Senior Vice President and Chief Operating Officer S. J. Bethay, Director, Nuclear Assessment D. L. Pace, Vice President, Engineering B. OGrady, Vice President, Operations Support J. F. McCann, Director, Nuclear Safety Assurance C. D. Faison, Manager, Licensing M. J. Colomb, Director of Oversight, Entergy Nuclear Operations, Inc.
D. Tarantino, Nuclear Information Manager B. S. Ford, Manager, Licensing, Entergy Nuclear Operations, Inc.
J. M. Fulton, Assistant General Counsel, Entergy Nuclear Operations, Inc.
S. Lousteau, Treasury Department, Entergy Services, Inc.
R. Walker, Department of Public Health, Commonwealth of Massachusetts The Honorable Therese Murray The Honorable Vincent deMacedo Chairman, Plymouth Board of Selectmen Chairman, Duxbury Board of Selectmen Chairman, Nuclear Matters Committee Plymouth Civil Defense Director D. OConnor, Massachusetts Secretary of Energy Resources J. Miller, Senior Issues Manager Office of the Commissioner, Massachusetts Department of Environmental Protection Office of the Attorney General, Commonwealth of Massachusetts Electric Power Division, Commonwealth of Massachusetts R. Shadis, New England Coalition Staff D. Katz, Citizens Awareness Network Chairman, Citizens Urging Responsible Energy J. Sniezek, PWR SRC Consultant R. Toole, PWR SRC Consultant C. McCombs, Acting Director, MEMA and Commonwealth of Massachusettts, SLO Designee Commonwealth of Massachusetts, Secretary of Public Safety Regional Administrator Secretary, RI Deputy Regional Administrator Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist
4 Distribution (Via E-Mail):
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR/ADPR (RIDSNRROD)
Director, Division of Regulatory Improvement Programs, NRR (RIDSNRRDRIP)
Director, Division of Inspection Program Management, NRR (RIDSNRRDIPM)
Director, Division of Licensing Project Management, NRR (RIDSNRRDLPM)
Project Directorate I-1 (PD1/2), NRR (RIDSNRRDIPMLPDI)
Asst. General Counsel Materials Litigation and Enforcement, OGC (RIDSOGCMAILCENTER)
S. Lee, RI EDO Coordinator J. Boska, Project Manager, NRR R. Ennis, NRR (Backup)
W. Lanning, DRS J. Lubinski, DRS K. Farrar, Regional Counsel D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA C. Anderson, DRP D. Florek, DRP W. Raymond, SRI - Pilgrim C. Welch, RI - Pilgrim A. Ford, DRP, Resident OA G. Matakas, ORA PMNS SISP Review Complete: Djf (Reviewers Initials)
DOCUMENT NAME: G:\BRANCH5\MEETINGS\Pilg EOC Meeting Notice 3-24-05.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP /
NAME DFlorek CAnderson/DJF for DATE 03/16/05 03/16/05 03/ /05 03/ /05 03/ /05 OFFICIAL RECORD COPY
5 Annual Assessment Meeting Agenda:
C Introduction C Review of Reactor Oversight Process C National Summary of Plant Performance C Discussion of Plant Performance Results C Licensee Response and Remarks C NRC Closing Remarks C Break C NRC available to address public questions