ML15093A225

From kanterella
Revision as of 02:14, 1 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Millstone, Unit 3 - Core Operating Limits Report, Cycle 17
ML15093A225
Person / Time
Site: Millstone Dominion icon.png
Issue date: 03/25/2015
From: Blakeney D B
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
15-129
Download: ML15093A225 (30)


Text

~Dominion Dominion Nuclear Connecticut, Inc.Rope Ferry Rd., Warerford, CT 06385Mailing Address:

P.O. Box 128Waterford, CT 06385dorn.comMAR 2 5 206.U.S. Nuclear Regulatory Commission Attention:

Document Control DeskWashington, DC 20555Serial No.NSS&L/MLC Docket No.License No.15-129RO50-423NPF-49DOMINION NUCLEAR CONNECTICUT, INC.MILLSTONE POWER STATION UNIT 3CORE OPERATING LIMITS REPORT, CYCLE 17In accordance with the Millstone Power Station Unit 3 (MPS3) Technical Specifications (TSs), Section 6.9.1.6.d, Dominion Nuclear Connecticut, Inc., hereby submits, asEnclosure 1, the Cycle 17 Core Operating Limits Report (COLR).The MPS3 COLR has been revised to incorporate the following:

1) Editorial changes to increment the Cycle number from 16 to 17.2) The addition of a footnote to indicate that the SHUTDOWN MARGIN requirements in COLR Sections 2.4.and 2.5 are based on cycle specific analyses performed byDominion.
3) The revision to a footnote to indicate that the requirements in COLR Section 2.14are based on cycle specific analyses performed by Dominion.
4) Cycle 17-specific changes to the W(Z) values.5) Cycle 17-specific changes to the burnup penalties for incore (FQ(Z)) surveillance.

The COLR has been incorporated into the MPS3 Technical Requirements Manual.If you have any questions or require additional information, please contact William D.Bartron at (860) 444-4301.

Sincerely, D. B. BlakeneyDirector, Nuclear Station Safety and Licensing

-Millstone Acij Serial No. 15-129Docket No. 50-423Core Operating Limits Report, Cycle 17Page 2 of 2

Enclosures:

(1)Commitments made in this letter: None.cc: U.S. Nuclear Regulatory Commission Region I2100 Renaissance BlvdSuite 100King of Prussia, PA 19406-2713 Mohan C. ThadaniNRC Senior Project ManagerU.S. Nuclear Regulatory Commission, Mail Stop 08 B1One White Flint North11555 Rockville PikeRockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station Serial No. 15-129Docket No. 50-423ENCLOSURE 1.CORE OPERATING LIMITS REPORT, CYCLE 17DOMINION NUCLEAR CONNECTICUT, INC.MILLSTONE POWER STATION UNIT 3 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTMILLSTONE UNIT 3CYCLE 17CORE OPERATING LIMITS REPORTMILLSTONE

-UNiT 3TRM 8.1-1LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable of ContentsSection Title Paqe1.0 CORE OPERATING LIMITS REPORT .....................................................................

8.1-42.0 O perating Lim its ..........................................................................................................

8.1-42.1 Safety Lim its (Specification 2.1.1) ..........................................................................

8.1-42.2 Limiting Safety System Settings (Specification 2.2.1)............................................

8.1-52.3 SHUTDOWN MARGIN -MODE 1 and 2 (Specification 3/4.1.1.1.1)

......................

8.1-62.4 SHUTDOWN MARGIN -MODE 3, 4 and 5 Loops Filled (Specification 3/4.1.1.1.2)8.1-6 2.5 SHUTDOWN MARGIN -MODE 5 Loops Not Filled (Specification 3/4.1.1.2)

........

8.1-62.6 Moderator Temperature Coefficient (Specification 3/4.1.1.3)

.................................

8.1-62.7 Shutdown Rod Insertion Limit (Specification 3/4.1.3.5)

.........................................

8.1-72.8 Control Rod Insertion Limits (Specification 3/4.1.3.6)

...................

8.1-72.9 AXIAL FLUX DIFFERENCE (Specification 3/4.2.1.1)

...................

8.1-72.10 Heat Flux Hot Channel Factor- FQ(Z) (Specification 3/4.2.2.1)

............................

8.1-72.11 Heat Flux Hot.Channel Factor Surveillance

-FQ(Z) (Specification 3/4.2.2.1.2)

.... 8.1-82.12 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor- FNAH(Specification 3/4.2.3.1)

.........................................................................................

8.1-82.13 DNB Parameters (Specification 3/4.2.5)

................................................................

8.1-92.14 Shutdown Margin Monitor Alarm Setpoint (Specification 3/4.3.5)

..........................

8.1-92.15 Refueling Boron Concentration (Specification 3/4.9.1.1)

.....................................

8.1-103.0 A nalytical M ethods ....................................................................................................

8.1-26MILLSTONE

-UNIT 3TRM 8.1-2LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTList of FiguresTitle PageFigure 1 Reactor Core Safety Lim it ...................................................................................

8.1-11Figure 2 Required SHUTDOWN MARGIN for MODE 3 ....................................................

8.1-12Figure 3 Required SHUTDOW N MARGIN for MODE 4 ....................................................

8.1-13Figure 4 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Filled ...............

8.1-14Figure 5 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Not Filled .........

8.1-15Figure 6 Control Rod Bank Insertion Limits versus THERMAL POWER ..........................

8.1-16Figure 7 AXIAL FLUX DIFFERENCE Limits as a Function of RATED THERMAL POWER8.1-17 Figure 8 K(Z) -Normalized FQ(Z) as a Function of Core Height .......................................

8.1-18List of TablesTable Title PageTable 1 RAOC W(Z) Function, Millstone Unit 3 -Cycle 17 -12/+9 AFD at 100% RTP.8.1-19 Table 2 Base Load W(Z) Function Millstone Unit 3 -Cycle 17 ................

8.1-21Table 3 Part Power (74% RTP, 150 MWD/MTU)

RAOC W(Z) Function Millstone Unit 3 -C ycle 17 ..........................................................................................................

8 .1-2 3Table 4 Burnup Penalty for Incore Millstone Unit 3 -Cycle 17 .....................................

8.1-25MILLSTONE

-UNIT 3TRMV 8.1-3LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTMillstone Unit 3Cycle 17CORE OPERATING LIMITS REPORT1.0 CORE OPERATING LIMITS REPORTThis CORE OPERATING LIMITS REPORT (COLR) for Millstone Unit 3 Cycle 17 hasbeen prepared in accordance with the requirements of Technical Specification 6.9.1.6.a.

The Technical Specifications affected by this report are listed below.2.1.1 Safety Limits2.2.1 Limiting Safety System Settings3/4.1.1.1.1 SHUTDOWN MARGIN -MODE 1 and 23/4.1.1.1.2 SHUTDOWN MARGIN -MODES 3,4 and 5 Loops Filled3/4.1.1.2 SHUTDOWN MARGIN -MODE 5 Loops Not Filled3/4.1.1.3 Moderator Temperature Coefficient 3/4.1.3.5 Shutdown Rod Insertion Limit3/4.1.3.6 Control Rod Insertion Limits3/4.2.1.1 AXIAL FLUX DIFFERENCE 3/4.2.2.1 Heat Flux Hot Channel Factor3/4.2.3.1 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor3/4.2.5 DNB Parameters 3/4.3.5 Shutdown Margin Monitor Alarm Setpoint3/4.9.1.1 REFUELING Boron Concentration 2.0 Operating LimitsThe cycle-specific parameter limits for the specifications listed in Section 1.0 arepresented in the following subsections.

These limits have been developed using theNRC-approved methodologies specified in Technical Specification 6.9.1.6.b.

2.1 Safety Limits (Specification 2.1.1)2.1.1 Reactor CoreThe combination of THERMAL POWER, Reactor Coolant Systemhighest loop average temperature, and pressurizer pressure shall notexceed the limits shown in Figure 1.MILLSTONE

-UNIT 3TRM 8.1-4LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT2.2 Limiting Safety System Settings (Specification 2.2.1)2.2.1 Overtemperature AT2.2.1.1 K1, 1.202.2.1.2 K2_0.025/0F2.2.1.3 K3 0.00113/

psi2.2.1.4 c 8 seconds2.2.1.5 "C2 3 seconds2.2.1.6 r4 > 20 seconds2.2.1.7 r5 4 seconds2.2.1.8 T' is loop specific indicated Tavg at RATED THERMALPOWER, _< 587.1-F2.2.1.9 P' is nominal pressurizer

pressure,

_> 2250 psia2.2.1.10 fl(AI) is a function of the indicated difference between topand bottom detectors of the power range neutron ionchambers; with nominal gains to be selected based onmeasured instrument response during plant startup testscalibrations such that:(1) For qt -qb between -18% and +10%, f, (AI) > 0, whereqt and qb are percent RATED THERMAL POWER inthe upper and lower halves of the core, respectively, and qt + qb is the total THERMAL POWER in percentRATED THERMAL POWER;(2) For each percent that the magnitude of qt -qbexceeds -18%, the AT Trip Setpoint shall beautomatically reduced by _> 3.75% of its value atRATED THERMAL POWER.(3) For each percent that the magnitude of qt -qbexceeds +10%, the AT Trip Setpoint shall beautomatically reduced by _> 2.14% of its value atRATED THERMAL POWER.2.2.2 Overpower AT2.2.2.1 K4<1.102.2.2.2 DeletedMILLSTONE

-UNIT 3TRM 8.1-5LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT2.2.2.3 K6 __0.0015/

0F when T > T" and <01 0/°F when T T"2.2.2.4 cl > 8 seconds2.2.2.5 t2 < 3 seconds2.2.2.6 Deleted2.2.2.7 T" is loop specific indicated Tavg at RATED THERMALPOWER, _ 587.1OF2.3 SHUTDOWN MARGIN -MODE I and 2 (Specification 3/4.1.1.1.1) 2.3.1 The SHUTDOWN MARGIN shall be greater than or equal to 1.3%Ak/k.2.4 SHUTDOWN MARGIN= MODE 3,4 and 5 Loops Filled(Specification 314.1.1.1.2) 2.4.1 The SHUTDOWN MARGIN shall be greater than or equal to thelimits shown in Figures 2, 3 and 4.12.5 SHUTDOWN MARGIN -MODE 5 Loops Not Filled (Specification 3/4.1.1.2)2.5.1 The SHUTDOWN MARGIN shall be greater than or equal to thelimits shown in Figure 5 or the limits shown in Figure 4 with thechemical and volume control system (CVCS) aligned to precludereactor coolant system boron concentration reduction.

12.6 Moderator Temperature Coefficient, (Specification 314.1.1.3) 2.6.1 The BOL/AROI0%.-

70% RTP MTC shall be less positive than + 0.5x 10-4 Ak/k/°F.

Above 70% RTP, the MTC limit is a linear ramp to 0Ak/kI0F at 100% RTP.2.6.2 The EOLIARO/RTP MTC shall be less negative than -5.65 x 10-4Ak/k/0i.2.6.3 The 300 ppm/ARO/RTP MTC should be less negative than or equalto -4.9 x 10-4 Ak/k/0F,where: BOL stands for Beginning Of Cycle LifeARO stands for All Rods Out'The SHUTDOWN MARGIN requirements in Figures 2, 3, 4 and 5 are based on cycle-specific boron dilu-tion analyses performed by Dominion.

MILLSTONE

-UNIT 3 TRM 8.1-6 LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTHZP stands for Hot Zero PowerEOL stands for End Of Cycle LifeRTP stands for RATED THERMAL POWER.2.7 Shutdown Rod Insertion Limit (Specification 314.1.3.5) 2.7.1 The shutdown rods shall be at least 220 steps withdrawn (inclusive).

2.8 Control Rod Insertion Limits (Specification 314.1.3.6) 2.8.1 The control rod banks shall be limited in physical insertion as shownin Figure 6, and2.8.2 Control bank A shall be at least 220 steps withdrawn.

2.9 AXIAL FLUX DIFFERENCE (Specification 3/4.2.1.1) 2.9.1 The AXIAL FLUX DIFFERENCE (AFD) limits are provided inFigure 7.2.9.2 The AFD target band during base load operation is +/- 5%.2.9.3 The minimum allowable (nuclear design) power level for base loadoperation (APLND) is 80% of RATED THERMAL POWER.2.10 Heat Flux Hot Channel Factor = FQ(Z) (Specification 3/4.2.2.1)

SR TPFQ(Z)< Q x K(Z) for P > 0.5/PFQ(Z) < -. x K(Z) for P 0.5-0.5-where: p = THERMAL POWERRATED THERMAL POWER2.10.1 FRTPQ = 2.60.2.10.2 K(Z) is provided in Figure 8.MILLSTONE

-UNIT 3TRM 8.1-7LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT2.11 Heat Flux Hot Channel Factor Surveillance

-FQ(Z) (Specification 3/4.2.2.1.2) iPX K(Z)F(Z) xW(Z) for P > 0.5F RTPK(Z)FQ(Z) Q 0.xfor P 0.50.5 xW(Z)where: p -THERMAL POWERRATED THERMAL POWER2.11.1 FRTPQ = 2.60.2.11.2 K(Z) is provided in Figure 8.2.11.3 W(Z) values for RAOC operation are provided in Table 1. Note thatthe W(Z) values at Axial Mesh 1 are at the top of the core. TheCycle 17 burnup dependent RAOC W(Z) values are valid over therange of burnup from 0 to 21,600 MWDIMTU.2.11.4 W(Z) values for Base Load (BL) operation are provided in Table 2.Note that the W(Z) values at Axial Mesh 1 are at the top of the core.The Cycle 17 burnup dependent BL W(Z) values are valid over therange of burnup from 0 to 21,600 MWD/MTU.2.11.5 W(Z) values for Part Power operation are provided in Table 3. Notethat the W(Z) values at Axial Mesh 1 are at the top of the core. TheCycle 17 burnup dependent Part Power W(Z) values are valid overthe range of burnup from 0 to 150 MWD/MTU.2.11.6 The factors in Table 4 shall be used for surveillance requirements 4.2.2.1.2 and 4.2.2.1.4.

A 2% factor shall be used outside of theburnup range shown in Table 4.2.12 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor -FN AH (Specification 3/4.2.3.1) 2.12.1 The RCS Total Flow Rate shall be greater than or equal to 379,200gpm.2.12.2 FNAH < FRTPAH X (1 + PFAH x [1 -P])MILLSTONE

-UNIT 3TRM 8.1-8LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTwhere: p =THERMAL POWERRATED THERMAL POWER2.12.2.1 FRTPAH = 1.586 for Robust Fuel Assemblies (RFA) and(RFA-2)2.12.2.2 PFAH = 0.3 for P < 1.0.2.13 DNB Parameters (Specification 314.2.5)2.13.1 Indicated Reactor Coolant System Tavg shall be maintained

<593.5°F.2.13.2 Indicated Pressurizer Pressure shall be maintained

_> 2204 psia 2.2.14 Shutdown Margin Monitor Alarm Setpoint (Specification 314.3.5)3 2.14.1 The Shutdown Margin Monitor (SMM) minimum count rate andAlarm Ratio Setting to meet Limiting Condition for Operation (LCO)3.3.5 shall be as shown below.Tech. Spec. LCO SMM Alarm Ratio Setting Min. Count Rate (counts/sec) 3.3.5.a 1.50 1.01.25 0.63.3.5.b.1 1.50 0.501.25 0.353.3.5.b.2 1.50 0.351.25 0.25The combination of the SMM Alarm Ratio setting and minimum count rate accounts forthe time lag between the indicated and actual count rates, as well as other uncertainties.

The specified SMM Alarm Ratio setting ensures that the assumption that an alarm isgenerated at flux doubling in the Boron Dilution Event analysis remains valid. The countrate is displayed on the SMM.2 Limit not applicable during either a THERMAL POWER ramp in excess of 5% ofRATED THERMAL POWER per minute or a THERMAL POWER step in excess of10% of RATED THERMAL POWER.3 Section 2.14 is based on cycle-specific boron dilution analyses performed byDominion.

MILLSTONE

-UNIT 3TRM 8.1-9LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT2.15 Refueling Boron Concentration (Specification 314.9.1.1) 2.15.1 The boron concentration of all filled portions of the Reactor CoolantSystem and the refueling cavity shall be maintained at a boronconcentration of greater than or equal to 2600 ppm.44 This boron concentration bounds the condition of keff < 0.95 (all rods in less the mostreactive two rods) and subcriticality (keff< 1.0 with all rods out).MILLSTONE

-UNIT 3TRM 8.1 -10LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTFigure I Reactor Core Safety Limit680660640dw06I-Cl)062060058056000.20.4 0.6 0.8 11.2FRACTION OF RATED THERMAL POWERMILLSTONE

-UNIT 3TRM 8.1-11LBDCR 13-MP3-005 Figure 2 Required SHUTDOWN MARGIN for MODE 34.03.5z03:U)3.02.52.01.51.00.50.00 500 1000 1500 20002500RCS CRITICAL BORON CONCENTRATION (ppm)TRM 8.1-12MILLSTONE

-UNIT 3LBDCR 13-MP3-005 Figure 3 Required SHUTDOWN MARGIN for MODE 46.05.55.04.5S4.0zi53.5S3.0zS2.50'2.0:=:.j _1.51.00.50.00500 1000 1500 2000RCS CRITICAL BORON CONCENTRATION (ppm)TRM 8.1-132500MILLSTONE

-UNIT 3LBDCR 13-MP3-005 Figure 4 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Filled5.54.54.0,z3.3 .02.5012.01000 115,00RCSCRITICAL BORON ,CONCENTRATION (ppm)TRM 8.1-142000 2500MILLSTONE

-UNIT 3LBDCR 13-MP3-005 Figure 5 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Not Filled7.06.56.05.5S5.04.5z(D 4.0_ 3.5R3.002.52.0(2200, 6.150)(15,5.523) (2500, 6.150)(0, 1.300)Af(355, 1.300)1.51.00.50.005001000150020002500RCS CRITICAL BORON CONCENTRATION (ppm)TRM 8.1-15MILLSTONE

-UNIT 3LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTFigure 6 Control Rod Bank Insertion Limits versus THERMAL POWER240220200180140( 120o 100c" 80060402000 10 20 30 40 50 60 70 80 90 100RATED THERMAL POWER (%)MILLSTONE

-UNIT 3TRM 8.1-16LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTFigure 7 AXIAL FLUX DIFFERENCE Limits as aFunction of RATED THERMAL POWER1201000E8060405!200-60 40 20 -10 010 20 30 40 50 60Flux Difference,

% Delta-IMILLSTONE

-UNIT 3TRM 8.1-17LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTFigure 8 K(Z) -Normalized FQ(Z) as a Function of Core Height0LLC)03(D01.21.11.00.90.80.70.60.50.40.30.20.10.0_2) Ele-a n1D 0.0 FtIn 6.0 Ft0.M5 12J. Ft-I0 1 2 3 4 5 -6 7 8 9 10 11 12Core Elevation, (feet)MILLSTONE

-UNIT 3TRM 8.1-18LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable IRAOC W(Z) Function, Millstone Unit 3 -Cycle 17-121+9 AFD at 100% RTPBurnup StepMesh No.1234567891011121314151617181920212223242526272829303132333435363738Height*12.077811.910111.742311.574611.406811.239111.071410.903610.735910.568110.400410.232610.06499.89719.72949.56169.39399.22619.05848.89068.72298.55518.38748.21968.05197.88417.71647.54877.38097.21317.04546.87776.70996.54226.37446.20676.03895.87121501.00001.00001.00001.00001.00001.00001.29461.29171.28391.26801.24731.22661.20931.19281.17461.15771.14461.13541.12701.12391.12601.13011.13311.13521.13691.13781.13781.13681.13521.13271.12881.12631.12601.12571.12491.12351.12071.1195(MWDIMTU) 20001.00001.00001.00001.00001.00001.00001.36911.36221.35021.33221.31071.28831.26511.23921.21221.19361.18061.16771.15631.15031.14911.14921.14831.14651.14811.15101.15181.15151.15031.14791.14471.14031.13501.13101.12821.12551.12141.1192100001.00001.00001.00001.00001.00001.00001.41031.40651.40711.39551.37471.35421.33381.31071.28741.26641.24991.23781.22761.21991.21591.21351.21061.20681.20621.20601.20381.20021.19531.18911.18171.17321.16351.15291.14161.12961.11691.1072180001.00001.00001.00001.00001.00001.00001.30921.30601.29961.29001.27801.26461.25011.23991.23451.23181.22901.22251.21331.20241.20331.20821.21371.21811.22131.22341.22421.22351.22151.21801.21341.20721.19991.19281.18591.17821.16931.1597* Distance from bottom of active core (feet)Note: Surveillance exclusion zone is 8% top, 8% bottom.MILLSTONE

-UNIT 3TRM 8.1-19LBDCR 15-MP3-001 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable I (Continued)

RAOC W(Z) Function, Millstone Unit 3 -Cycle 17-121+9 AFD at 100% RTPBurnup StepMesh No.3940414243444546474849505152535455565758596061626364656667686970717273Height*5.70345.53575.36795.20025.03244.86474.69694.52924.36144.19374.02593.85823.69053.52273.35503.18723.01952.85172.68402.51622.34852.18072.01301.84521.67751.50971.34201.17421.00650.83870.67100.50320.33550.16780.00001501.12081.12771.13651.14401.15101.15761.16371.16941.17461.17941.18381.18771.19141.19461.19771.20271.21451.23011.24501.26011.27491.28941.30561.32291.33971.35541.36981.38221.39171.00001.00001.00001.00001.00001.0000(MWDIMTU) 20001.12141.12791.13501.14121.14691.15211.15701.16331.17011.17621.18181.18711.19191.19671.20021.20441.21421.23201.25361.27551.29711.31861.33971.36021.37971.39781.4145.1.42911.44041.00001.00001.00001.00001.00001.0000100001.10361.10451.10661.10771.10801.10891.11111.11351.11561.11751.11921.12071.12321.12781.13211.13611.13991.14511.15321.16341.17421.18471.19501.20511,21461.22331.23121.23891.24451.00001.00001.00001.00001.0000.1.0000180001.15171.14991.14951.14931.14821.14651.14391.14091.13691.13251.13011.13011.13161.13291.13361.13431.13621.14421.15501.16591.17651.18721.19771.20791.21761.22671.23501.24211.24681.00001.00001.00001.00001.00001.0000I* Distance from bottom of active core (feet)Note: Surveillance exclusion zone is 8% top, 8% bottom.MILLSTONE

-UNIT 3TRM 8.1-20LBDCR 15-MP3-001 TECHMCAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable 2Base Load W(Z) FunctionMillstone Unit 3 -Cycle 17Mesh No.1234567891011121314151617181920212223242526272829303132333435363738Height*12.077811.910111.742311.574611.406811.239111.071410.903610.735910.568110.400410.232610.06499.89719.72949.56169.39399.22619.05848.89068.72298.55518.38748.21968.05197.88417.71647.54877.38097.21317.04546.87776.70996.54226.37446.20676.03895.8712Burnup Step1501.00001.00001.00001.00001.00001.00001.15671.15521.15191.14761.14251.13681.13251.12681.12011.11441.10901.10341.09811.09681.10111.10621.11091.11561.11981.12321.12571.12731.12811.12811.12701.12601.12591.12571.12491.12341.12101.1184(MWDIMTU) 20001.00001.00001.00001.00001.00001.00001.17391.17681.18021.18001.17411.16911.16321.15541.14661.13761.12871.12181.11451.11151.11361.11771.12161.12521.12811.13011.1313.1.13161.13111.12981.12741.12531.12441.12311.12111.11831.11471.1111I I100001.00001.00001.00001.00001.00001.00001.21021.21691.22461.22151.21071.2012.1.19531.18811.17821.16841.15701.14231.12861.11631.11281.11671.12071.12441..12731.12951.13091.13141.13111.12991.12811.12531.12181.11951.11771.11521.11201.1078180001.00001.00001.00001.00001.00001.00001.16451.16151.15861.15441.15151.15171.15241.15231.15061.14851.14521.13921.13121.12151.11241.10781.11031.11751.12701.13741.14591.15301.15901.16371.16711.16921.17001.16961.16811.16551.16211.1573* Distance from bottom of active core (feet)Note: Surveillance exclusion zone is 8% top, 8% bottom.MILLSTONE

-UNIT 3TRM 8.1-21LBDCR 15-MP3-001 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable 2 (Continued)

Base Load W(Z) FunctionMillstone Unit 3 -Cycle 17Burnup StepMesh No.394041424344454647484950.5152535455565758596061626364656667686970717273Height*5.70345.53575.36795.20025.03244.86474.69694.52924.36144.19374.0259.3.85823.69053.52273.35503.18723.01952.85172.68402.51622.34852.18072.01301.84521.67751.50971.34201.17421.00650.83870.67100.50320.33550.16780.00001501.11631.11401.11201.11091.10941.10731.10501.10231.09941.09621.09281.08931.08561.08251.08051.08021.08501.09511.10621.11761.12921.14091.15241.16371A17461.18481.19401.20191.20771.00001.00001.00001.00001.00001.0000(MWDIMTU) 20001.10811.10631.10491.10301.10071.09801.09511.09171.08901.08911.08961.09041.09141.09201.09251.09281.09301.10311.11781.13311.14811.16341.17851.19321.20741.22061.23281.24331.25131.00001.00001.00001.00001.00001.0000100001.10311.10121.10071.09951.09781.09591.09361.09111.08841.08561.08291.07981.07751.07871.07991.08111.08161.08841.09921.11041.12151.13281.14391.15481.16531.17501.18381.19131.19641.00001.00001.00001.00001.00001.0000180001.15161.14771.14521.14241.13871.13431.12931.12361.11741.11081.10381.09671.08941.08221.08061.07921.0806I1.08611.09531.10481.11411.12361.13311.14241.15151.15991.16771.17441.17871.00001.00001.00001.00001.00001.0000* Distance from bottom of active core (feet)Note: Surveillance exclusion zone is 8% top, 8% bottom.MILLSTONE

-UNIT 3TRM 8.1-22LBDCR 15-MP3-001 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable 3Part Power (74% RTP, 150 MWD/IMTU)

RAOC W(Z) FunctionMillstone Unit 3 -Cycle 17Mesh No Height (ft)* W(z)1 12.0778 1.00002 11.9101 1.00003 11.7423 1.00004 11.5746 1.00005 11.4068 1.00006 11.2391 1.00007 11.0714 1.14918 10.9036 1.14469 10.7359 1.136610 10.5681 1.122811 10.4004 1.106512 10.2326 1.090713 10.0649 1.078414 9.8971 1.067315 9.7294 1.055716 9.5616 1.045617 9.3939 1.041618 9.2261 1.038519 9.0584 1.035320 8.8906 1.037321 8.7229 1.044222 8.5551 1.052723 8.3874 1.060224 8.2196 1.067125 8.0519 1.073526 7.8841 1.078927 7.7164 1.083628 7.5487 1.087429 7.3809 1.090630 7.2132 1.092831 7.0454 1.093532 6.8777 1.095433 6.7099 1.099334 6.5422 1.103335 6.3744 1.106736 6.2067 1.109737 6.0389 1.111638 5.8712 1.115039 5.7034 1.1210* Distance from bottom of active core (feet)Note: Surveillance exclusion zone is 8% top, 8% bottom.MILLSTONE

-UNIT 3TRM 8.1-23LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable 3 (Continued)

Part Power (74% RTP, 150 MWD/iMTU)

RAOC W(Z) FunctionMillstone Unit 3 -Cycle 17Mesh No Height (ft)* W(z)40 5.5357 1.132741 5.3679 1.146142 5.2002 1.158443 5.0324 1.170244 4.8647 1.181845 4.6969 1.192746 4.5292 1.202947 4.3614 1.212648 4.1937 1.221849 4.0259 1.230750 3.8582 1.239451 3.6905 1.247552 3.5227 1.255153 3.3550 1.262654 3.1872 1.271955 3.0195 1.288356 2.8517 1.308757 2.6840 1.328358 2.5162 1.348459 2.3485 1.368560 2.1807 1.388261 2.0130 1.409462 1.8452 1.431663 1.6775 1.453664 1.5097 1.474465 1.3420 1.494066 1.1742 1.511867 1.0065 1.526268 0.8387 1.000069 0.6710 1.000070 0.5032 1.000071 0.3355 1.000072 0.1678 1.000073 0.0000 1.0000* Distance from bottom of active core (feet)Note: Surveillance exclusion zone is 8% top, 8% bottom.MILLSTONE

-UNIT 3TRM 8.1-24LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORTTable 4Burnup Penalty for IncoreMillstone Unit 3 -Cycle 17IBurnup (MWDIMTU)

Penalty1597 1.0211919 1.0252080 1.0273045 1.0373206 1.0363366 1.0364010 1.0334171 1.0304975 1.021*Note: A Penalty of 1.02 shall be used outside of theburnup range shown in Table 4.MILLSTONE

-UNIT 3TRMV 8.1-25LBDCR 14-MP3-010 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT3.0 Analytical MethodsThe analytical methods used to determine the core operating limits shall be thosepreviously reviewed and approved by the NRC, specifically those described in thefollowing documents.

3.1 WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology,"

July 1985 (Westinghouse Proprietary).

(Methodology forSpecifications 2.1.1.1-Departure from Nucleate Boiling Ratio, 2.1.1.2-Peak Fuel Centerline Temperature, 3.1.1.3-Moderator Temperature Coefficient, 3.1.3.5-Shutdown Bank Insertion Limit, 3.1.3.6-Control BankInsertion Limits, 3.2.1-AXIAL FLUX DIFFERENCE, 3.2.2-Heat Flux HotChannel Factor, 3.2.3-Nuclear Enthalpy Rise Hot Channel Factor,3.1.1.1.1, 3.1.1.1.2, 3.1.1.2-SHUTDOWN MARGIN, 3.9.1.1-Boron Concentration.)

3.2 WCAP-10216-P-A-R1A, "Relaxation of Constant Axial Offset Control FQSurveillance Technical Specification,"

Rev. 1, February 1994 (Westinghouse Proprietary).

(Methodology for Specifications 3.2.1-AXIAL FLUXDIFFERENCE

[Relaxed Axial Offset Control]

and 3.2.2-Heat Flux HotChannel Factor [W(Z) surveillance requirements for FQ Methodology].)

3.3 WCAP-12945-P-A, Volume 1 (Revision

2) and Volumes 2 through 5(Revision 1), "Code Qualification Document for Best Estimate LOCAAnalysis,"

March 1998 (Westinghouse Proprietary.

(Methodology forSpecifications 3.2.2-Heat Flux Hot Channel Factor.)3.4 WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method(ASTRUM),"

January 2005 (Westinghouse Proprietary).

(Methodology forSpecifications 3.2.2-Heat Flux Hot Channel Factor.)3.5 WCAP-11946, "Safety Evaluation, Supporting a More Negative EOLModerator Temperature Coefficient Technical Specification for the Millstone Nuclear Power Station Unit 3," September 1988 (Westinghouse Proprietary).

3.6 WCAP-1 0054-P-A, "Westinghouse Small Break ECCS Evaluation ModelUsing the NOTRUMP Code," August 1985 (Westinghouse Proprietary).

(Methodology for Specification 3.2.2-Heat Flux Hot Channel Factor.)3.7 WCAP-10079-P-A, "NOTRUMP

-A Nodal Transient Small Break andGeneral Network Code," August 1985 (Westinghouse Proprietary).

(Methodology for Specification 3.2.2-Heat Flux Hot Channel Factor.)3.8 WCAP-12610-P-A, "VANTAGE+

Fuel Assembly Report,"

April 1995(Westinghouse Proprietary).

(Methodology for Specification 3.2.2-Heat Flux Hot Channel Factor.)MILLSTONE

-UNIT 3TRM 8.1-26LBDCR 13-MP3-005 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT3.9 WCAP-8301, "LOCTA-IV Program:

Loss-of Coolant Transient Analysis,"

June 1974 (Westinghouse Proprietary).

3.10 WCAP-10054-P-A, Addendum 2, Revision 1, "Addendum to theWestinghouse Small Break ECCS Evaluation Model Using the NOTRUMPCode: Safety Injection into the Broken Loop and COSI Condensation Model," July 1997 (Westinghouse Proprietary).

3.11 WCAP-8745-P-A, "Design Bases for the Thermal Overpower AT andThermal Overtemperature AT Trip Functions,"

September 1986(Westinghouse Proprietary).

(Methodology for Specifications 2.1.1 and2.2.1.)3.12 WCAP-12610-P-A

& CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO-m,"

July 2006 (Westinghouse Proprietary).

(Methodology forSpecification 3.2.2-Heat Flux Hot Channel Factor.)MILLSTONE

-UNIT 3TRM 8.1-27LBDCR 13-MP3-005