ML16305A091

From kanterella
Jump to navigation Jump to search
Update to the Cycle 18 Core Operating Limits Report
ML16305A091
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/20/2016
From: Stanley B
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16305A091 (41)


Text

Dominion Nuclear Connecticut, Inc.

Rope Ferry Rd., Waterford, CT 06385 OCT 2 0 2016 Mailing Address: P.O. Box 128 Waterford, CT 06385

<lorn.com U.S. Nuclear Regulatory Commission Serial No.16-399 Attention: Document Control Desk NSS&L/MLC RO Washington, DC 20555 Docket No. 50-423 License No. NPF-49 DOMINION NUCLEAR CONNEcr;cuT. INC.

MILLSTONE POWER STATION UNIT 3 UPDATE TO THE CYCLE 18 CORE OPERATING LIMITS REPORT In accordance with the Millstone Power Station Unit 3 (MPS3) Technical Specifications (TSs ), Section 6.9.1.6.d, Dominion Nuclear Connecticut, Inc., hereby submits, as Enclosure 1, an update to the Cycle 18 Core Operating Limits Report (COLR).

The MPS3 Cycle 18 COLR was updated to be consistent with changes to the MPS3 TSs that were recently approved by the NRC under License Amendment 268 (ADAMS Accession No. ML16131A728). License Amendment 268 revised the MPS3 technical

  • specifications to:

(1) allow the use of Dominion nuclear safety and reload core design methods; (2) allow the use of applicable departure from nucleate boiling ratio design limits for VIPRE-D; (3) update the approved reference methodologies cited in TS 6.9.1.6.b; (4) remove the base load mode of operation which is not a feature of the Dominion Relaxed Power Distribution Control power distribution control methodology; and (5) address the issues identified in Westinghouse Nuclear Safety Advisory Letter (NSAL)-09-5, Rev. 1, Westinghouse Communication 06-IC-03, and NSAL-15-1 The MPS3 Cycle 18 COLR changes in support of License Amendment 268 include:

11 Formatting changes related to Item (3) were made to the COLR Analytical Methods section to maintain consistency with TS 6.9.1.6.b changes approved under License Amendment 268.

0 All references to base load operation were removed from the Cycle 18 COLR consistent with Item (4 ).

s The Cycle 18 COLR was updated to maintain consistency with the amended MPS3 TS Sections 3.2.1.1/4.2.1.1 (Axial Flux Difference) and 3.2.2.1/4.2.2.1 (Heat Flux Hot Channel Factor) related to Item (5). The associated Cycle 18 COLR limits were revised and new COLR items were added.

Serial No.16-399 Docket No. 50-423 Update to Cycle 18 Core Operating Limits Report Page 2 of 2 The approved methodologies from Items (1) and (3) are not included in the updated Cycle 18 COLR since they were not used to support the current M3C18 reload cycle design.

Item (2) does not require a COLR change.

The update to the Cycle 18 COLR has been incorporated into the MPS3 Technical Requirements Manual.

If you have any questions or require additional information, please contact Mr. Jeffry A.

Langan at (860) 444-5544.

Sincerely,

~SJ::;

B. L. Stanley Director, Nuclear Station Safety and Licensing - Millstone

Enclosures:

(1)

Commitments made in this letter: None.

cc: U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd, Suite 100 King of Prussia, PA 19406-2713 R. V. Guzman Senior Project Manager - Millstone Power Station U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2 11555 Rockville Pike Rockville, MD 20852-2738 NRG Senior Resident Inspector Millstone Power Station

Serial No.16-399 Docket No. 50-423 ENCLOSURE1 UPDATE TO THE CYCLE 18 CORE OPERATING LIMITS REPORT DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 3

TECHNICAL REQUIREMENTS MANUAL 1

APPENDIX 8.1 CORE OPERATING LIMITS REPORT MILLSTONE UNIT 3 CYCLE18 CORE OPERATING LIMITS REPORT MILLSTONE - UNIT 3 TRM 8.1-1 LBDCR 16-MP3-011 j

TECHNICAL REQUIREJ\1ENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table of Contents Section Title 1.0 CORE OPERATING LIMITS REPORT.. .............................................................................. 8.1-4 2.0 Operating Limits .................................................................................................................. 8.1-4 2.1 Safety Limits (Specification 2.1.1) ............................................................................. 8.1-4 2.2 Limiting Safety System Settings (Specification 2.2.1) ............................................... 8.1-5 2.3 SHUTDOWN MARGIN - MODES 1and2 (Specification 3/4.1.1.1.1) ....................... 8.1-6 2.4 SHUTDOWN MARGIN - MODES 3, 4 and 5 Loops Filled (Specification 314.1.1.1.2)8.1-6 2.5 SHUTDOWN MARGIN - MODE 5 Loops Not Filled (Specification 314.1.1.2) ............ 8.1-6 2.6 Moderator Temperature Coefficient (Specification 3/4.1.1.3) .................................... 8.1-6 2.7 Shutdown Rod Insertion Limit (Specification 3/4.1.3.5) ............................................. 8.1-7 2.8 Control Rod Insertion Limits (Specification 3/4.1.3.6) ................................................ 8.1-7 2.9 AXIAL FLUX DIFFERENCE (Specification 3/4.2.1.1) ................................................ 8.1-7 2.10 Heat Flux Hot Channel Factor - Fo(Z) (Specification 3/4.2.2.1) ................................ 8.1-7 2.11 Heat Flux Hot Channel Factor Surveillance - Fo(Z) (Specification 314.2.2.1.2) ......... 8.1-8 2.12 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FNL1H (Specification 314.2.3.1) ............................................................................................. 8.1-9 2.13 DNB Parameters (Specification 3/4.2.5) .................................................................... 8.1-9 2.14 Shutdown Margin Monitor Alarm Setpoint (Specification 3/4.3.5) ........................... 8.1-10 2.15 Refueling Boron Concentration (Specification 3/4.9.1.1) ......................................... 8.1-10 3.0 Analytical Methods ............................................................................................................ 8.1-37 MILLSTONE - UNIT 3 TRM 8.1-2 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT List of Figures Title Figure 1 Reactor Core Safety Limit ........................................................................................8.1-11 Figure 2 Required SHUTDOWN MARGIN for MODE 3 ................... , .................................... 8.1-12 Figure 3 Required SHUTDOWN MARGIN for MODE 4 ........................................................ 8.1-13 Figure 4 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Filled .................... 8.1-14 Figure 5 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Not Filled ............. 8.1-15 I

Figure 6 Control Rod Bank Insertion Limits versus THERMAL POWER ............................... 8.1-16 Figure 7 AXIAL FLUX DIFFERENCE Limits as a Function of RATED THERMAL POWER .. 8.1-17 Figure 8 K(Z) - Normalized Fa(Z) as a Function of Core Height ........................................... 8.1-18 List of Tables Table Title Table 1 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 -12/+9 AFD at 100% RTP ...... 8.1-19 Table 2 Deleted .................................................................................................................. 8.1-22 Table 3 Part Power (74% RTP, 150 MWD/MTU) RAOC W(Z) Function Millstone Unit 3 - Cycle 18 .................................................................................................... 8.1-23 Table 4 Burnup Penalty for lncore Millstone Unit 3 - Cycle 18* ......................................... 8.1-26 Table 5 Required Normal Operating Space Reductions for Fa(Z) Exceeding Its Non-Equilibrium Limits ..................................................................................................................... 8.1-27 Table 6 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 97% RTP for 1% Transient Fa Margin Gain+ ............................................................................. 8.1-28 Table 7 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 95% RTP for 2% Transient Fa Margin Gain+ ............................................................................. 8.1-31 Table 8 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 93% RTP for 3% Transient Fa Margin Gain+ ............................................................................. 8.1-34 MILLSTONE - UNIT 3 TRM 8.1-3 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Millstone Unit 3 Cycle 18 CORE OPERATING LIMITS REPORT 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Millstone Unit 3 Cycle 18 has been prepared in accordance with the requirements of Technical Specification 6.9.1.6.a.

The Technical Specifications affected by this report are listed below.

2.1.1 Safety Limits 2.2.1 Limiting Safety System Settings 3/4.1.1.1.1 SHUTDOWN MARGIN - MODES 1 and 2 3/4.1.1.1.2 SHUTD,OWN MARGIN - MODES 3, 4 and 5 Loops Filled 3/4.1.1.2 SHUTDOWN MARGIN - MODE 5 Loops Not Filled 3/4.1.1.3 Moderator Temperature Coefficient 3/4.1.3.5 Shutdown Rod Insertion Limit 3/4.1.3.6 Control Rod Insertion Limits 3/4.2.1.1 AXIAL FLUX DIFFERENCE 3/4.2.2.1 Heat Flux Hot Channel Factor 3/4.2.3.1 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor 3/4.2.5 DNB Parameters 3/4.3.5 Shutdown Margin Monitor Alarm Setpoint 3/4.9.1.1 REFUELING Boron Concentration 2.0 Operating Limits The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the

. NRG-approved methodologies specified in Technical Specification 6.9.1.6.b.

2.1 Safety Lim its (Specification 2.1.1) 2.1.1 Reactor*core The combination of THERMAL POWER, Reactor Coolant System highest loop average temperature, and pressurizer pressure shall not exceed the limits shown in Figure 1.

MILLSTONE - UNIT 3 TRM 8.1-4 LBDCR 16-MP3-011

TECHNICAL REQUIREJ\1ENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.2 Limiting Safety System Settings (Specification 2.2.1) 2.2.1 Overtemperature ~T 2.2.1.1 K1 ::;:; 1.20 2.2.1.2 K2 ~ 0.025 I °F 2.2.1.3 K3 ~ 0.00113 /psi 2.2.1.4 -c 1 ~ 8 seconds 2.2.1.5 -c2 ::;:; 3 seconds 2.2.1.6 -c4 ~ 20 seconds 2.2.1. 7 -c5 ::;:; 4 seconds 2.2.1.8 T' is loop specific indicated Tavg at RATED THERMAL POWER,::;:; 587.1°F 2.2.1.9 P' is nominal pressurizer pressure, ~ 2250 psia 2.2.1.10 f 1(~I) is a function of the indicated difference between top and bottom detectors of the power range neutron ion chambers; with nominal gains to be selected based on measured instrument response during plant startup tests calibrations such that:

(1) For qt-% between -18% and +10%, f 1 (~1) ~ 0, where qt and % are percent RATED THERMAL POWER in the upper and lower halves of the core, respectively, and qt.+ % is the total THERMAL POWER in percent RATED THERMAL POWER; (2) For each percent that the magnitude of qt - qb exceeds -18%, the ~T Trip Setpoint shall be automatically reduced by ~ 3. 75% of its value at RATED THERMAL POWER.

(3) For each percent that the magnitude of qt - qb exceeds +10%, the~T Trip Setpoint shall be automatically reduced by~ 2.14% of its value at RATED THERMAL POWER.

MILLSTONE - UNIT 3 TRM 8.1-5 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.2.2 Overpower L1T 2.2.2.1 K4 ::; 1.10 2.2.2.2 Deleted 2.2.2.3 K6 ~ 0.0015 I °F when T > T" and Ke::; 0 I °F when T::; T" 2.2.2.4 -r 1 ~ 8 seconds 2.2.2.5 -r2 ::; 3 seconds 2.2.2.6 Deleted 2.2.2.7 T" is loop specific indicated Tavg at RATED THERMAL POWER,::; 587.1°F 2.3 SHUTDOWN MARGIN - MODES 1 and 2 (Specification 3/4.1.1.1.1) 2.3.1 The SHUTDOWN MARGIN shall be greater than or equal to 1.3%

L1k/k.

2.4 SHUTDOWN MARGIN - MODES 3, 4 and 5 Loops Filled (Specification :Y4.1.1.1.2) 2.4.1 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figures 2, 3 and 4. 1 2.5 SHUTDOWN MARGIN - MODE 5 Loops Not Filled (Specification :Y4.1.1.2) 2.5.1 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figure 5 or the limits shown in Figure 4 with the chemical and volume control system (CVCS) aligned to preclude reactor coolant system boron concentration reduction. 1*

2.6 Moderator Temperature Coefficient (Specification 3/4.1.1.3) 2.6.1 The BOL/AR0/0% - 70% RTP MTC shall be less positive than + 0.5 x 1o-4 L1k/k/0 F. Above 70% RTP, the MTC limit is a linear ramp to 0 L1k/k/°F at 100% RTP.

2.6.2 The EOL/ARO/RTP MTC shall be less negative than - 5.65 x 1o-4 L1k/k/0 F.

1The SHUTDOWN MARGIN requirements in Figures 2, 3, 4 and 5 are based on cycle-specific boron dilu-tion analyses performed by Dominion.

MILLSTONE - UNIT 3 TRM 8.1-6 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.6.3 The 300 ppm/ARO/RTP MTC should be less negative than or equal to - 4.9 x 10-4 ~k/k/°F, where: SOL stands for Beginning Of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero Power EOL stands for End Of Cycle Life RTP stands for RATED THERMAL POWER.

2.7 Shutdown Rod Insertion Limit (Specification 3/4.1.3.5) 2.7.1 The shutdown rods shall be at least 220 steps withdrawn (inclusive).

2.8 Control Rod Insertion Limits (Specification 3/4.1.3.6) 2.8.1 The control rod banks shall be limited in physical insertion as shown in Figure 6, and 2.8.2 Control bank A shall be at least 220 steps withdrawn.

2.9 AXIAL FLUX DIFFERENCE (Specification 3/4.2.1.1) 2.9.1 The AXIAL FLUX DIFFERENCE (AFD) limits are provided in Figure 7.

2.9.2 Deleted 2.9.3 Deleted 2.10 Heat Flux Hot Channel Factor - F0 (Z) (Specification 3/4.2.2.1)

FRTP FoM(Z) ~ ~ x K(Z) for p > 0.5 FRTP FoM(Z) ~ o~ x K(Z) for p:::; 0.5 where: THERMAL POWER p = ----------

RATED THERMAL POWER 2.10.1 FRTP Q =2.60.

2.10.2 K(Z) is provided in Figure 8.

MILLSTONE - UNIT 3 TRM 8.1-7 LBDCR 16-MP3-011

_J

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.11 Heat Flux Hot Channel Factor Surveillance - F 0 (Z)

(Specification 314.2.2.1.2) where: p = THERMAL PO'wER

~~~~~~~~~-

RATED THERMAL POWER 2.11.1 FRTPa=2.60.-

2.11.2 K(Z) is provided in Figure 8.

2.11.3 W(Z) values for RAOC operation are provided in Table 1. The Cycle 18 burn up dependent RAOC W(Z) values are valid over the range of burnup from 0 to 21,600 MWD/MTU.

2.11.4 Deleted.

2.11.5 W(Z) values for Part Power operation are provided in Table 3. The Cycle 18 burn up dependent Part Power W(Z) values are valid over the range of burnup from 0 to 150 MWD/MTU.

2.11.6 The factors in Table 4 shall be used for surveillance requirement 4.2.2.1.2. A 2% factor shall be used outside of the burnup range shown in Table 4.

2.11. 7 The values provided in Table 5 shall be used to reduce the normal operating space for Fa(Z) exceeding its limits.

2.11.8 W(Z) values for RAOC operation for compensatory action at 97% -

RTP for 1% Transient Fa Margin Gain are provided in Table 6. The Cycle 18 burnup dependent W(Z) values are valid over a range of burnup from 0 to 21,600 MWD/MTU.

2.11.9 W(Z) values for RAOC operation for compensatory action at 95%

RTP for 2% Transient FQ Margin Gain are provided in Table 7. The Cycle 18 burnup dependent W(Z) values are valid over a range of burnup from 0 to 21,600 MWD/MTU.

MILLSTONE - UNIT 3 TRM 8.1-8 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.11.10 W(Z) values for RAOC operation for compensatory action at 93%

RTP for 3% Transient Fa Margin Gain are provided in Table 8. The Cycle 18 burnup dependent W(Z) values are valid over a range of burnup from 0 to 21,600 MWD/MTU.

2.12 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FN ~H (Specification 314.2.3.1) 2.12.1 The RCS Total Flow Rate shall be greater than or equal to 379,200 gpm.

2.12.2 FN~H ::::; FRTP~H X (1 + PF~H x [1 - P])

where: p THERMAL POWER

= ----------

RATED THERMAL POWER 2.12.2.1 FRTP~H =1.586 for Robust Fuel Assemblies (RFA) and (RFA-2) 2.12.2.2 PF~H =0.3 for P < 1.0.

2.13 DNB Parameters (Specification 3/4.2.5)

The following DNB-related parameters shall be maintained within the limits specified below:

2.13.1 Reactor Coolant System Tavg shall be maintained ::::; 593.5°F.

2.13.2 Pressurizer Pressure shall be maintained~ 2204 psia 2 .

2 Limit not applicable during either a THERMAL POWER ramp in excess of 5% of RATED THERMAL POWER per minute or a THERMAL POWER step in excess of 10% of RATED THERMAL POWER.

MILLSTONE - UNIT 3 TRM 8.1-9 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.14 Shutdown Margin Monitor Alarm Setpoint (Specification 3/4.3.5) 3 2.14.1 The Shutdown Margin Monitor (SMM) minimum count rate and Alarm Ratio Setting to meet Limiting Condition for Operation (LCO) 3.3.5 shall be as shown below.

Tech. Spec. LCO SMM Alarm Ratio Setting Min. Count Rate (counts/sec) 3.3.5.a 1.50 1.0 1.25 0.6 3.3.5.b.1 1.50 0.50 1.25 0.35 3.3.5.b.2 1.50 0.35 1.25 0.25 The combination of the SMM Alarm Ratio setting and minimum count rate accounts for the time lag between the indicated and actual count rates, as well as other uncertainties.

The specified SMM Alarm Ratio setting ensures that the assumption that an alarm is generated at flux doubling in the Boron Dilution Event analysis remains valid. The count rate is displayed on the SMM.

2.15 Refueling Boron Concentration (Specification 3/4.9.1.1) 2.15.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling cavity shall be maintained at a boron concentration of greater than or equal to 2600 ppm. 4 3 Section 2.14 is based on cycle-specific boron dilution analyses performed by Dominion.

4 This boron concentration bounds the condition of keff ~ 0.95 (all rods in less the most reactive two rods) and subcriticality (keff ~ 1.0 with all rods out).

MILLSTONE - UNIT 3 TRM 8.1-10 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Figure 1-Reactor Core Safety Limit UNACCEPTABLE OPERATION 660 ...... . ...... 2425 PSIA

. . .2250 PSIA ......

640 .. . ...... . .....

LL C) 2000 PSIA .. .. .

' \

w .......................... .. ... tll. '\

0

.._ ~

CJ 620 ' "

1840PSIA ..._ ..._ ..._ ._..._ -....._ ' \

~ .\

I- .

Cl) 0 ..................... '

0:::

600 ' \

\

\

ACCEPTABLE OPERATION 580 560-t-__....___,l--l__._.....-+-_.__.__._-+-_ _ ....___,l--l._____..-t-_,__.__._~

0 0.2 0.4 0.6 0.8 1 1.2 FRACTION OF RATED THERMAL POWER MILLSTONE - UNIT 3 TRMB.1-11 LBDCR 16-MP3-011

Figure 2-Required SHUTDOWN MARGIN for MODE 3 4.0 3.5 12oso, 3.ooo I 12soo, 3.ooo I

- 3.0 .,,..

/

~

-<]

--z

~0

( !)

2.5 0:::

<(

!:?.: 2.0

/

z

~

0 /

~

c 1.5

J
c 10. 1.300 I 1700. 1.300 I en 1.0 0.5 0.0 0 500 1000 1500 2000 2500 RCS CRITICAL BORON CONCENTRATION (ppm)

TRM 8.1-12 MILLSTONE - UNIT 3 LBDCR 16-MP3-011

Figure 3-Required SHUTDOWN MARGIN for MODE 4 6.0 5.5 5.0 11324. 4.500 I 12500. 4.500 I

- ~

-<l 4.5

/

--z

~ 4.0

/

(!) 3.5 ct:: /~

!: 3.0 z

2.5 /

0 c

I- 2.0

> 10. 1.300 I v

/

I:

fl')

1.5 /

/

1355, 1.300 I 1.0 0.5 0.0 0 500 1000 1500 2000 2500 RCS CRITICAL BORON CONCENTRATION (ppm)

TRM 8.1-13 MILLSTONE - UNIT 3 LBDCR 16-MP3-011

Figure 4-Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Filled 6.0 5.5 5.0 I*1441. 4.500 I 12200. 4.soo i 4.5

/ l2soo, 4.500 I

/

~

v

/

/

10, *1.300 I ~v

/

1.0 1300. t300 I 0.5 0.0 0 500 1000 1500 2000 2500 RCSCR1T1CAL BORON CONCENTRATION {ppm)

TRM 8.1-14 MILLSTONE - UNIT 3 LBDCR 16-MP3-011

Figure 5-Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Not Filled 7.0 (2200, 6.150) 6.5 6.0 (1252, 5.523) (2500, 6.150) 5.5

- ~ 5.0

/

~

~ 4.5 , 7

-(z!) 4.0

-/

fl!::

<(

E 3.5

/

z 3: 3.0 /

0 c

.... 2.5 /

c 2.0 /

,/

UJ (0, 1.300)  :

1.5 1.0 (355, 1.300) 0.5 0.0 0 500 1000 1500 2000 2500 RCS CRITICAL BORON CONCENTRATION (ppm)

TRM 8.1-15 MILLSTONE- UNIT 3 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Figure 6-Control Rod Bank Insertion Limits versus THERMAL POWER 240 I 23.7%, 2201 I 14.1 %

  • 220 I 220 vIControl Bank BI v

/ /

200

/

v /

v I

180 Vr0.0%, 1661

/

v I 100.0%. 164 I v

I 160

~ontrol Bank CI Q

~

"1 140 c.

~

l!2..

z:

120 I/ /

0 I=

"1

c. 100 0 v

/ /v

/

z:

<(

cc 80 Q v

/ VIControl Bank DI

/

0 c:::

/

60 v I 0.0%, 51 I

/

/

40 20 /

v

~2s.o%,OI

/

0 I 0 10 20 30 40 50 60 70 80 90 100 RATED THERMAL POWER(%)

MILLSTONE - UNIT 3 TRM 8.1-16 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LDvIITS REPORT Figure 7-AXIAL FLUX DIFFERENCE Limits as a Function of RATED THERMAL POWER 120 100 I -12,1 oo I

, I 8,100 I

~

~

i.:

G.I 80 -

UNACCE PT ABLE OPERATION r

\ UN AC CE PT ABLE OPERATION >-----

~

0 ll.

~

E 60 I

J ACCEPT ftBLE OPERATION

'\

G.I

.c I-

"U G.I I -3o, 50 I \ 2?,so I

~

a: 40 20 0 I 50 -40 -30 -20 -10 0 10 20 30 40 50 60 Flux Difference,% Delta-I MILLSTONE - UNIT 3 TRM 8.1-17 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Figure 8-K(Z) - Normalized Fa(Z) as a Function of Core Height 1.2 1.1 1.0 0.9 ---

N

,,....... 0.8

~

0 uro 0.7 LL D) c 0.6

. :s:'.

ro w

0....

"'D 0.5 w

N ro E

0.4 0

z

~ Ele1ation 0.3 1D 0.0 Ft 1D 6.0 F.t 0.925 12D Ft 0.2 0.1 0.0 0 2 3 4 5 6 7 8 g 10 11 12 Core Elevation, (feet)

MILLSTONE - UNIT 3 TRM 8.1-18 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 1 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18

-12/+9 AFD at 100% RTP Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 1 12.0778 1.0000 1.0000 1.0000 1.0000 1.0000 2 11.9100 1.0000 1.0000 1.0000 1.0000 1.0000 3 11.7423 1.0000 1.0000 1.0000 1.0000 1.0000 4 11.5745 1.0000 1.0000 1.0000 1.0000 1.0000 5 11.4068 1.0000 1.0000 1.0000 1.0000 1.0000 6 11.2390 1.0000 1.0000 1.0000 1.0000 1.0000 7 11.0713 1.3111 1.3639 1.3905 1.3433 1.2947 8 10.9035 1.2959 1.3538 1.3866 1.3378 1.2926 9 10.7358 1.2765 1.3357 1.3789 1.3280 1.2887 10 10.5680 1.2572 1.3218 1.3653 1.3162 1.2838 11 10.4003 1.2388 1.3084 1.3495 1.3031 1.2781 12 10.2325 1.2220 1.2930 1.3317 1.2907 1.2720 13 10.0648 1.2058 1.2792 1.3105 1.2847 1.2655 14 9.8971 1.1931 1.2701 1.2999 1.2778 1.2585 15 9.7293 1.1869 1.2625 1.2853 1.2674 1.2510 16 9.5616 1.1832 1.2548 1.2716 1.2579 1.2435 17 9.3938 1.1772 1.2453 1.2609 1.2471 1.2347 18 9.2261 1.1675 1.2361 1.2473 1.2336 1.2248 19 9.0583 1.1606 1.2189 1.2339 1.2245 1.2185 20 8.8906 1.1571 1.2015 1.2236 1.2158 1.2139 21 8.7228 1.1545 1.1913 1.2174 1.2030 1.2071 22 8.5551 1.1501 1.1793 1.2131 1.1918 1.2051 23 8.3873 1.1466 1.1684 1.2086 1.1930 1.2109 24 8.2196 1.1460 1.1630 1.2040 1.1952 1.2155 25 8.0518 1.1486 1.1613 1.2035 1.1978 1.2191

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-19 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 1 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18

-12/+9 AFD at 100% RTP (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 J 26 . 7.8841 1.1496 1.1608 1.2035 1.2000 1.2214 27 7.7163 1.1500 1.1597 1.2015 1.2007 1.2225 28 7.5486 1.1493 1.1574 1.1981 1.2002. 1.2221 29 7.3809 1.1478 1.1540 1.1935 1.1985 1.2203 30 7.2131 1.1454 1.1495 1.1875 1.1955 1.2172 31 7.0454 1.1418 1.1442 1.1803 1.1915 1.2128 '

32 6.8776 1.1383 1.1378 1.1719 1.1861 1.2070 33 6.7099 1.1358 1.1306 1.1624 1.1796 1.1999 34 6.5421 1.1330 1.1239 1.1522 1.1737 1.1932 35 6.3744 1.1296 1.1185 1.1407 1.1681 1.1867 36 6.2066 1.1255 1.1139 1.1287 1.1618 1.1794 .

37 6.0389 1.1202 1.1081 1.1193 1.f544 1.1709 38 5.8711 1.1163 1.1039 1.1126 1.1464 1.1618 39 5.7034 1.1156' 1.1031 1.1082' . 1.1401 1.1540 40 5.5356 1.1204 1.1064 1.1062 1.1394 1.1523 41 5.3679 1.1288 :I .1120 1.1063 1.1417 1.1521 42 5.2001. 1.1356. 1.1164 . 1.1075 1.1431 1.1522 43 5.0324 1.1420 1.1204 *****.* . .1.:1084 1.1437 1.1516 44 4.8647. 1.1481 1.1242* *. 1.1100 1.1436 1.1501 I

45 4.6969 1.1537 1.1'275. 1.1128 . 1.1430 1.1480

46. 4.5292 1.1588 . 1.1304 . 1.1153 1.1417 1.1451 47 4.3614 1.1635 . 1.1332 1'.1174 1.1399 1.1417' 48 4.1937 1.1679 1.1358 1.1192 1.1376 1.1377 49 4.0259 1.1718 1.1382 1.1210 1.1350 1.1334 50 3.8582 1.1754 1.1404:  : 1.1231 1.1320 1.1315
  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8%top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-20 LBDCR16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 1 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18

-12/+9 AFD at 100% RTP (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 51 3.6904 1.1786 1.1424 1.1281 1.1288 1.1321 52 3.5227 1.1813 1.1437 1.1328 1.1256 1.1334 53 3.3549 1.1844 1.1469 1.1374 1.1272 1.1340 54 3.1872 1.1883 1.1539 1.1416 1.1293 1.1345 55 3.0194 1.1919 1.1630 1.1449 1.1342 1.1361 56 2.8517 1.2007 1.1761 1.1498 1.1426 1.1452 57 2.6839 1.2185 1.1903 1.1585 1.1536 1.1581 58 2.5162 1.2384 1.2046 1.1689 1.1648 1.1713 59 2.3485 1.2579 1.2209 1.1796 1.1759 1.1839 60 2.1807 1.2774 1.2395 1.1902 1.1884 1.1966 61 2.0130 1.2963 1.2578 1.2005 1.2006 1.2091 62 1.8452 1.3146 1.2756 1.2104 1.2125 1.2212 63 1.6775 1.3321 1.2927 1.2212 1.2239 1.2327 64 1.5097 1.3483 1.3086 1.2327 1.2345 1.2434 65 1.3420 1.3631 1.3232 1.2430 1.2443 1.2533 66 1.1742 1.3759 1.3360 1.2517 1.2525 1.2617 67 1.0065 1.3857 1.3458 1.2577 1.2581 1.2675 68 0.8387 1.0000 1.0000 1.0000 1.0000. 1.0000 69 0.6710 1.0000 1.0000 1.0000 1.0000 1.0000 70 0.5032 1.0000 1.0000 1.0000 1.0000 1.0000 71 0.3355 1.0000 1.0000 1.0000 1.0000 1.0000 72 0.1678 1.0000 1.0000 1.0000 1.0000 1.0000 73 0.0000 1.0000 1.0000 1.0000 1.0000 1.0000

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-21 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 2 Deleted TABLE 2 INTENTIONALLY DELETED.

MILLSTONE - UNIT 3 TRM 8.1-22 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 3 Part Power (74% RTP, 150 MWD/MTU) RAOC W(Z) Function Millstone Unit 3 - Cycle 18 Mesh No Height* W(z) 1 12.0778 1.0000 2 11.9100 1.0000 3 11.7423 1.0000 4 11.5745 1.0000 5 11.4068 1.0000 6 11.2390 1.0000 7 11.0713 1.1829 8 10.9035 1.1633 9 10.7358 1.1432 10 10.5680 1.1259 11 10.4003 1.1101 12 10.2325 1.0972 13 10.0648 1.0857 14 9.8971 1.0772 15 9.7293 1.0745 16 9.5616 1.0741 17 9.3938 1.0715 18 9.2261 1.0652

-j 19 9.0583 1.0611 20 8.8906 1.0602 21 8.7228 1.0634 22 8.5551 1.0682 23 8.3873 1.0739 24 8.2196 1.0800 25 8.0518 1.0876

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-23 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 3 Part Power (74% RTP, 150 MWD/MTU) RAOC W(Z) Function Millstone Unit 3 - Cycle 18 (Continued)

Mesh No Height* W(z) 26 7.8841 1.0934 27 7.7163 1.0987 28 7.5486 1.1031 29 7.3809 1.1066 30 7.2131 1.1092 31 7.0454 1.1106 32 6.8776 1.1121 33 6.7099 1.1146 34 6.5421 1.1167 35 6.3744 1.1183 36 6.2066 1.1192 37 6.0389 1.1189 38 5.8711 1.1199 39 5.7034 1.1241 "'

40 5.5356 1.1337 41 5.3679 1.1471 42 5.2001 1.1588 43 5.0324 1.1699 44 4.8647 1.1808 45 4.6969- 1.1912 46 4.5292 1.2011 47 4.3614 1.2106 48 4.1937 1.2199 49 4.0259 1.2286 50 3.8582 1.2370

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-24 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 3 Part Power (74% RTP, 150 MWD/MTU) RAOC W(Z) Function Millstone Unit 3 - Cycle 18 (Continued)

Mesh No Height* W(z) 51 3.6904 1.2450 52 3.5227 1.2523 53 3.3549 1.2601 54 3.1872 1.2688 55 3.0194 1.2773 56 2.8517 1.2915 57 2.6839 1.3153 58 2.5162 1.3413 59 2.3485 1.3672 60 2.1807* 1.3930 61 2.0130 1.4182 62 1.8452 1.4430 63 1.6775 1.4670 64 1.5097 1.4897 65 1.3420 1.5113 66 1.1742 1.5312 67 1.0065 1.5482 68 0.8387 1.0000 69 0.6710 1.0000 70 0.5032 1.0000 71 0.3355 1.0000 72 0.1678 1.0000 73 0.0000 1.0000

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-25 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 4 Burnup Penalty for lncore Millstone Unit 3 - Cycle 18*

Burnup (MWD/MTU) Penalty 0 1.032 150 1.032 311 1.036 471 1.039 632 1.040 793 1.036 954 1.031 1114 1.027 1275 1.022 1436 1.020

  • Note: A Penalty of 1.02 shall be used outside of the burnup range shown in Table 4.

MILLSTONE - UNIT 3 TRM 8.1-26 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1  ;

CORE OPERATING LIMITS REPORT Table 5 Required Normal Operating Space Reductions for Fa(Z) Exceeding Its Non-Equilibrium Limits Required Non- Required Required Negative Required Positive Equilibrium Fa(Z) THERMAL BandAFD Band AFD Reduction Margin POWER Limit Reduction (%AFD) (%AFD)

Improvement(%) (%RTP)

~ 1% ~97% ~2% ~4%

> 1% and ~2% ~95% ~3% ~5%

> 2% and ~3% ~93% ~4% ~6%

>3% ~50% N/A N/A MILLSTONE - UNIT 3 TRM 8.1-27 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 6 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 97% RTP for 1% Transient Fa Margin Gain+

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 1 12.0778 1.0000 1.0000 1.0000 1.0000 1.0000 2 11.9100 1.0000 1.0000 1.0000 1.0000 1.0000 3 11.7423 . 1.0000 1.0000 1.0000 1.0000 1.0000 4 11.5745 1.0000 1.0000 1.0000 1.0000 1.0000 5 11.4068 1.0000 1.0000 1.0000 1.0000 1.0000 6 11.2390 1.0000 1.0000 1.0000 1.0000 1.0000 7 11.0713 1.2467 1.2596 1.2682 1.2372 1.2252 8 10.9035 1.2317 1.2525 1.2685 1.2353 1.2176 9 10.7358 1.2127 1.2390 1.2676 1.2312 1.2113 10 10.5680 1.1946 1.2250 1.2622 1.2264 1.2059 11 10.4003 1.1769 1.2142 1.2516 1.2214 1.1996 12 10.2325 1.1595 1.2067 1.2417 1.2163 1.1926 13 10.0648 1.1453 1.2013 1.2346 1.2111 1.1877 14 9.8971 1.1335 1.1964 1.2262 1.2055 1.1822 15 9.7293 1.1235 1.1910 1.2145 1.1997 1.1743 16 9.5616 1.1147 1.1866 1.2057 1.1943 1.1691 17 9.3938 1.1048 1.1790 1.1959 1.1868 1.1644 18 9.2261 1.0958 1.1654 1.1820 1.1756 1.1577 19 9.0583 1.1005 1.1509 1.1740 1.1634 1.1536 20 8.8906 1.1094 1.1405 1.1682 1.1512 1.1478 21 8.7228 1.1109 1.1360 1.1580 1.1393 1.1370 22 8.5551 1.1103 1.1316 1.1456 1.1323 1.1310 23 8.3873 1.1075 1.1265 1.1332 1.1372 1.1376 24 8.2196 1.1019 1.1205 1.1264 1.1403 1.1412 25 I 8.0518 1.1005 1.1169 1.1262 1.1455 1.1460

  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State Fa(Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-28 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 6 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 97% RTP for 1% Transient Fa Margin Gain+ (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 26 7.8841 1.1012 1.1141 1.1286 1.1514 1.1511 27 7.7163 1.1048 1.1106 1.1296 1.1553 1.1547 28 7.5486 1.1074 1.1100 1.1295 1.1576 1.1594 29 7.3809 1.1086 1.1098 1.1282 1.1587 1.1638 30 7.2131 1.1089 1.1080 1.1257 1.1583 1.1661 31 7.0454 1.1082 1.1049 1.1222 1.1566 1.1667 32 6.8776 1.1066 1.1011 1.1177 1.1536 1.1659 33 6.7099 1.1040 1.0962 1.1121 1.1494 1.1635 34 6.5421 1.1011 1.0915 1.1055 1.1438 1.1597 35 6.3744 1.0982 1.0881 1.0985 1.1375 1.1545 36 6.2066 1.0952 1.0846 1.0921 1.1309 1.1480 37 6.0389 1.0914 1.0802 1.0880 1.1237 1.1400 38 5.8711 1.0875 1.0754 1.0845 1.1167 1.1314 39 5.7034 1.0852 1.0720 1.0807 1.1112 1.1244 40 5.5356 1.0885 1.0730 1.0797 1.1095 1.1235 41 5.3679 1.0959 1.0767 1.0798 1.1093 1.1238 42 5.2001 1.1014 1.0804 1.0813 1.1082 1.1239 43 5.0324 1.1065 1.0838 1.0826 1.1063 1.1230 44 4.8647 1.1113 1.0867 1.0832 1.1038 1.1215 45 4.6969 1.1157 1.0892 1.0836 1.1010 1.1196 46 4.5292 1.1196 1.0919 1.0843 1.0986 1.1174 47 4.3614 1.1231 1.0947 1.0851 1.0964 1.1150 48 4.1937 1.1262 1.0973 1.0855 1.0939 1.1118 49 4.0259 1.1296 1.0995 1.0858 1.0910 1.1083 50 3.8582 1.1332 1.1016 1.0859 1.0877 1.1042

  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State F0 (Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-29 LBDCR 16-MP3-011

TECHNICAL REQIBREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 6 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 97% RTP for 1% Transient Fa Margin Gain+ (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 51 3.6904 1.1366 1.1033 1.0868 1.0868 1.0998 52 ~.5227 1.1393 1.1048 1.0907 1.0898 1.0962 53 3.3549 1.1426 1.1074 1.0944 1.0924 1.0944 54 3.1872 1.1471 1.1117 1.0978 1.0950 1.0941 55 3.0194 1.1512 1.1208 1.1012 1.0981 1.0951 56 2.8517 1.1592 1.1349 1.1061 1.1025 1.1026 57 2.6839 1.1737 1.1481 1.1135 1.1096 1.1121 58 2.5162 1.1892 1.1617 1.1220 1.1219 1.1224 59 2.3485 1.2051 1.1767 1.1312 1.1342 1.1329 60 2.1807 1.2221 1.1942 1.1413 1.1463 1.1438 61 2.0130 1.2388 1.2115 1.1534 1.1580 1.1550 62 1.8452 1.2548 1.2283 1.1655 1.1694 1.1657 63 1.6775 1.2703 1.2444 1.1768 1.1801 1.1760 64 1.5097 1.2847 1.2594 1.1872 1.1899 1.1856 65 1.3420 1.2979 1.2731 1.1966 1.1988 1.1942 66 1.1742 1.3093 1.2850 1.2045 1.2063 1.2016 67 1.0065 1.3180 1.2941 1.2099 1.2113 1.2065 68 0.8387.I 1.0000 1.0000 1.0000 1.0000 1.0000 69 0.6710 1.0000 1.0000 1.0000 1.0000 1.0000 70 0.5032 1.0000 1.0000 1.0000 1.0000 1.0000 71 0.3355 1.0000 1.0000 1.0000 1.0000 1.0000 72 0.1678 1.0000 1.0000 1.0000 1.0000 1.0000 73 0.0000 1.0000 1.0000 1.0000 1.0000 1.0000

  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State Fa(Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-30 LBDCR 16-MP3-011

TECHNICAL REQUIRE1\1ENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 7 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 95% RTP for 2% Transient Fa Margin Gain+

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 1 12.0778 1.0000 1.0000 1.0000 1.0000 1.0000 2 11.9100 1.0000 1.0000 1.0000 1.0000 1.0000 3 11.7423 1.0000 1.0000 1.0000 1.0000 1.0000 4 11.5745 1.0000 1.0000 1.0000 1.0000 1.0000 5 11.4068 1.0000 1.0000 1.0000 1.0000 1.0000 6 11.2390 1.0000 1.0000 1.0000 1.0000 1.0000 7 11.0713 1.1960 1.2566 1.2648 1.2133 1.2023 8 10.9035 1.1829 1.2488 1.2608 1.2067 1.2002 9 10.7358 1.1686 1.2349 1.2528 1.1985 1.1963 10 10.5680 1.1540 1.2246 1.2440 1.1918 1.1921 11 10.4003 1.1389 1.2116 1.2328 1.1871 1.1878 12 10.2325 1.1242 1.1976 1.2247 1.1820 1.1830 13 10.0648 1.1122 1.1834 1.2169 1.1771 1.1778 14 9.8971 1.1037 1.1738 1.2089 1.1699 1.1725 15 9.7293 1.1000 1.1678 1.2006 1.1596 1.1670 16 9.5616 1.0967 . 1.1614 1.1923 1.1523 1.1615 17 9.3938 1.0906 1.1533 1.1830 1.1460 1.1563 18 9.2261 1.0819 1.1459 1.1736 1.1376 1.1507 19 9.0583 1.0754 1.1325 1.1693 1.1310 1.1416

. 20 8.8906 1.0751 1.1218 1.1647 1.1232 1.1296 21 8.7228 1.0802 1.1206 1.1541 1.1121 1.1171 22 8.5551 1.0817 1.1168 1.1416 1.1042 1.1142 23 8.3873 1.0793 1.1109 1.1293 1.1037 1.1196 24 8.2196 1.0769 1.1052 1.1224 1.1046 1.1229 25 8.0518 1.0782 1.0984 1.1152 1.1057 1.1261

  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State F0 (Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-31 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 7 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 95% RTP for 2% Transient Fa Margin Gain+ (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 26 7.8841 1.0820 1.0928 1.1111 1.1085 1.1301 27 7.7163 1.0852 1.0898 1.1116 1.1127 1.1346 28 7.5486 1.0873 1.0863 1.1116 1.1157 1.1377 29 7.3809 1.0883 1.0839 1.1095 1.1183 1.1401 30 7.2131 1.0883 1.0830 1.1066 1.1213 1.1429 31 7.0454 1.0874 1.0811 1.1027 1.1228 1.1440 32 6.8776 1.0855 1.0778 1.0977 1.1226 1.1433 33 6.7099 1.0827 1.0741 1.0918 1.1211 1.1411 34 6.5421 1.0791 1.0701 1.0848 1.1183 1.1373 35 6.3744 1.0760 1.0666 1.0773 1.1141 1.1322 36 6.2066 1.0737 1.0637 1.0706 1.1088 1.1258 37 6.0389 1.0706 1.0600 1.0670 1.1020 1.1179 38 . 5.8711 1.0675 1.0561 1.0643 1.0952 1.1096 39 5.7034 1.0658 1.0534 1.0610 1.0905 1.1033 40 5.5356 1.0672 1.0533 1.0606 1.0897 1.1030 41 5.3679 1.0720 1.0564 1.0611 1.0894 1.1038 42 5.2001 1.0780 1.0602 1.0629 1.0884 1.1039 43 5.0324 1.0837 1.0635 1.0644 1.0868 1.1030 44 4.8647 1.0887 1.0664 1.0653 1.0842 1.1015 45 4.6969 1.0933

  • 1.0690 1.0659 . 1.0809 1.0991 46 4.5292 1.0975 1.0713 1.0661 1.0792 1.0960 47 4.3614 1.1013 1.0732 1.0660 1.0785 1.0922

- 48 4.1937 1.1048 1.0749 1.0657 1.0773 1.0879 49 4.0259 1.1079 1.0764 1.0653 1.0758 1.0831 50 3.8582 1.1105 1.0779 1.0646 1.0739 1.0779

  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State F0 (Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-32 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 7 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 95% RTP for 2% Transient Fa Margin Gain+ (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 51 3.6904 1.1128 1.0791 1.0685 1.0717 1.0725 52 3.5227 1.1158 1.0805 1.0722 1.0696 1.0666 53 3.3549 1.1209 1.0859 1.0757 1.0695 1.0665 54 3.1872 1.1277 1.0916 1.0789 1.0717 1.0671 55 3.0194 1.1331 1.1009 1.0818 1.0738 1.0715 56 2.8517 1.1414 1.1146 1.0848 1.0810 1.0791 57 2.6839 1.1566 1.1315 1.0901 1.0929 1.0881 58 2.5162 1.1744 1.1488 1.1023 1.1048 1.0977 59 2.3485 1.1924 1.1660 1.1148 1.1166 1.1080 60 2.1807 1.2101 1.1832 1.1271 1.1283 1.1188 61 2.0130 1.2274 1.2003 1.1392 1.1397 1.1294 62 1.8452 1.2441 1.2168 1.1508 1.1506 1.1396 63 1.6775 1.2599 1.2326 1.1619 1.1609 1.1493 64 1.5097 1.2745 1.2474 1.1720 1.1704 1.1583 65 1.3420 1.2879 1.2609 1.1812 1.1790 1.1665 66 1.1742 1.2993 1.2726 1.1889 1.1862 1.1734 67 1.0065 1.3076 1.2815 1.1941 1.1909 1.1779 68 0.8387 1.0000 1.0000 1.0000 1.0000 1.0000 69 0.6710 1.0000 1.0000 1.0000

  • 1.0000 1.0000 70 0.5032 1.0000 1.0000 1.0000 1.0000 1.0000 71 0.3355 1.0000 1.0000 1.0000 1.0000 1.0000 I 72 0.1678 1.0000 1.0000 1.0000 1.0000 1.0000 I 73 0.0000 1.0000 1.0000 1.0000 1.0000 1.0000 I
  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State F0 (Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-33 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 8 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18

  • Compensatory Action at 93% RTP for 3% Transient Fa Margin Gain+

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 1 12.0778 1.0000 1.0000 1.0000 1.0000 1.0000 2 11.9100 1.0000 1.0000 1.0000 1.0000 1.0000 3 11.7423 1.0000 1.0000 1.0000 1.0000 1.0000 4 11.5745 1.0000 1.0000 1.0000 1.0000 1.0000 5 11.4068 1.0000 1.0000 1.0000 1.0000 1.0000 6 11.2390 1.0000 1.0000 1.0000 1.0000 1.0000 7 11.0713 1.1857 1.2526 1.2639 1.2074 1:1748 8 10.9035 1.1692 1.2440 1.2587 1.2034 1.1722 9 10.7358 1.1510 1.2357 1.2500 1.1956 1.1680 10 10.5680 1.1321 1.2262 1.2419 1.1860 1.1634 11 10.4003 1.1128 1.2114 1.2264 1.1749 1.1583 12 10.2325 1.0952 1.1957 1.2102 1.1624 1.1530 13 10.0648 1.0787 1.1812 1.1934 1.1525 1.1487 14 9.8971 1.0676 1.1656 1.1760 1.1475 1.1430 15 9.7293 1.0651 1.1474 1.1606 1.1427 1.1344 16 9.5616 1.0641 1.1299 1.1520 1.1380 1.1280 17 9.3938 1.0609 1.1154 1.1439 1.1333 1.1220 18 9.2261 1.0551 1.1123 1.1339 1.1284 1.1145 19 9.0583 1.0498 1.1106 1.1288 1.1240 1.1087 20 8.8906 1.0489 1.1073 1.1244 1.1175 1.1016 21 8.7228 1.0529 1.1039 1.1153 1.1077 1.0914 22 8.5551 1.0544 1.1011 1.1045 1.1003 1.0890 23 8.3873 1.0534 1.0979 1.0939 1.0992 1.0899 24 8.2196 1.0515 1.0916 1.0856 1.1002 1.0916 I 25 8.0518 1.0499 1.0842 1.0823 1.1012 1.0947 I

  • Distance from bottom of active core (feet) I

+w(Z) functions were calculated assuming a Full Power Steady State F0 (Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-34 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 8 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 93% RTP for 3% Transient Fa Margin Gain+ (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 26 7.8841 1.0498 1.0764 1.0810 1.1031 1.0994 27 7.7163 1.0518 1.0691 1.0805 1.1057 1.1049 28 7.5486 1.0537 1.0673 1.0788 1.1071 1.1091 29 7.3809 1.0555 1.0662 1.0768 1.1081 1.1117 30 7.2131 1.0576 1.0645 1.0753 1.1094 1.1131 31 7.0454 1.0591 1.0620 1.0736 1.1093 1.1131 32 6.8776 1.0596 1.0584 1.0710 1.1076 1.1119 33 6.7099 1.0590 1.0541 1.0671 1.1045 1.1094 34 6.5421 1.0574 1.0495 1.0623 1.1000 1.1057 35 6.3744 1.0549 1.0452 1.0561 1.0944 1.1008 36 6.2066 1.0515 1.0413 1.0490 1.0875 1.0952 37 6.0389 1.0480 1.0374 1.0448 1.0789 1.0903 38 5.8711 1.0454 1.0346 1.0421 1.0712 1.0851 39 5.7034 1.0441 1.0337 1.0389 1.0677 1.0799 40 5.5356 1.0464 1.0367 1.0385 1.0687 1.0795 41 5.3679 1.0516 1.0421 1.0390 1.0712 1.0816 42 5.2001 1.0565 1.0462 1.0406 1.0719 1.0822 43 5.0324 1.0609 1.0499 1.0418 1.0718 1.0818 44 4~8647 1.0649 1.0532 1.0423 1.0711 1.0808 .

45 4.6969 1.0684 1.0560 1.0425 1.0696 1.0790 46 4.5292 1.0715 1.0585 1.0422 1.0675 1.0764 47 4.3614 1.0742 1.0606 1.0418 1.0648 1.0732 48 4.1937 1.0766 1.0624 1.0410 1.0616 1.0693 .

49 4.0259 1.0787 1.0638 1.0397 1.0579 1.0651 50 3.8582 1.0801 1.0651 1.0403 1.0539 1.0602

  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State F0 (Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-35 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 8 RAOC W(Z) Function, Millstone Unit 3 - Cycle 18 Compensatory Action at 93% RTP for 3% Transient Fa Margin Gain+ (Continued)

Burnup Step (MWD/MTU)

Mesh No. Height* 150 4000 10000 16000 18000 51 3.6904 1.0815 1.0661 1.0447 1.0497 1.0550 52 3.5227 1.0865 1.0669 1.0488 1.0449 1.0512 53 3.3549 1.0935 1.0682 1.0526 1.0425 1.0495 54 3.1872 1.1000 1.0708 1.0561 1.0437 1.0491 55 3.0194 1.1083 1.0724 1.0590 1.0481 1.0504 56 2.8517 1.1185 1.0802 1.0636 1.0563 1.0596 57 2.6839 1.1300 1.0f}49 1.0714 1.0669 1.0706 58 2.5162 1.1426 1.1116 1.0806 1.0776 1.0817 59 2.3485 1.1556 1.1277 1.0899 1.0880 1.0925 60 2.1807 1.1681 1.1440 1.0990 1.0985 1.1032 r

61 2.0130 1.1798 1.1601 1.1078 1.1086 1.1136 62 1.8452 1.1925 1.1757 1.1163 1.1185 1.1237 63 1.6775 1.2074 1.1906 1.1243 1.1278 1.1332 64 1.5097 1.2212 1.2045 1.1315 1.1364 1.1420 65 1.3420 1.2335 1.2172 1.1379 1.1442 1.1500 66 1.1742 1.2440 1.2280 1.1447 1.1506 1.1565 67 1.0065 1.2514 1.2360 1.1490 1.1543 1.1603 68 0.8387 1.0000 1.0000 1.0000 1.0000 1.0000 69 0.6710 1.0000 1.0000 1.0000 1.0000 1.0000 70 0.5032 1.0000 1.0000 1.0000 1.0000 1.0000 71 0.3355 1.0000 1.0000 1.0000 1.0000 1.0000 72 0.1678 1.0000 1.0000 1.0000 1.0000 1.0000 73 0.0000 1.0000 1.0000 1.0000 1.0000 1.0000

  • Distance from bottom of active core (feet)

+w(Z) functions were calculated assuming a Full Power Steady State F0 (Z) shape that will need to be adjusted for surveillance specific conditions.

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-36 LBDCR 16-MP3-011

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING Lil\1ITS REPORT 3.0 Analytical Methods The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents.

3.1 WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology,"

. July 1985 (Westinghouse Proprietary).

Methodology for Specifications:

  • 2.1.1 Reactor Core Safety Limits
  • 3.1.1.3 Moderator Temperature Coefficient
  • 3.1.3.5 Shutdown Rod Insertion Limit
  • 3.2.1.1 AXIAL FLUX DIFFERENCE
  • 3.2.2.1 Heat Flux Hot Channel Factor
  • 3.2.3.1 RCS Total Flow Rate, Nuclear Enthalpy Rise Hot Channel Factor
  • 3.2.5 DNB Parameters
  • 3.9.1.1 REFUELING Boron Concentration 3.2 WCAP-10216-P-A-R1A, "Relaxation of Constant Axial Offset Control Fa Surveillance Technical Specification," Rev. 1, February 1994 (Westinghouse Proprietary).

Methodology for Specifications:

  • 3.2.1.1 AXIAL FLUX DIFFERENCE
  • 3.2.2.1 Heat Flux Hot Channel Factor 3.3 WCAP-12945-P-A, Volume 1 (Revision 2) and Volumes 2 through 5 (Revision 1), "Code Qualification Document for Best Estimate LOCA Analysis," March 1998 (Westinghouse Proprietary).

Methodology for Specification:

  • 3.2.2.1 Heat Flux Hot Channel Factor 3.4 WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005 (Westinghouse Proprietary).

Methodology for Specification:

  • 3.2.2.1 Heat Flux Hot Channel Factor MILLSTONE - UNIT 3 TRM 8.1-37

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 3.5 WCAP-11946, "Safety Evaluation Supporting a More Negative EOL Moderator Temperature Coefficient Technical Specification for the Millstone Nuclear Power Station Unit 3," September 1988 (Westinghouse Proprietary).

Methodology for Specification:

Methodology for Specification

Methodology for Specification:

  • 3.2.2.1 Heat Flux Hot Channel Factor.

3.8 WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Report," April 1995 (Westinghouse Proprietary).

Methodology for Specification:

  • 3.2.2.1 Heat Flux Hot Channel Factor.

3.9 WCAP-8301, "LOCTA-IV Program: Loss-of Coolant Transient Analysis,"

June 1974 (Westinghouse Proprietary).

Methodology for Specification:

  • 3.2.2.1 Heat Flux Hot Channel Factor.

3.10 WCAP-10054-P-A, Addendum 2, Revision 1, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," July 1997 (Westinghouse Proprietary).

Methodology for Specification:

  • 3.2.2.1 Heat Flux Hot Channel Factor 3.11 WCAP-8745-P-A, "Design Bases for the Thermal Overpower ~T and Thermal Overtemperature ~T Trip Functions," September 1986 (Westinghouse Proprietary).

Methodology for Specification:

  • 2.2.1 Overtemperature ~T and Overpower~ T Setpoints 3.12 WCAP-12610-P-A & CENPD-404-P-A, Addendum 1-A, "Optimized ZIRLO' ,"July 2006 (Westinghouse Proprietary).

Methodology for Specification:

  • 3.2.2.1 Heat Flux Hot Channel Factor MILLSTONE - UNIT 3 TRM 8.1-38