-Ah Dominion Nuclear Connecticut, Inc. P~ominion Millstone Power Station Rope Ferry Road Waterford, CT 06385 NOV 1 8 2011 U.S. Nuclear Regulatory Commission Serial No.11-616 Attention: Document Control Desk NSS&L/MLC RO Washington, DC 20555 Docket No. 50-423 License No. NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 3 CORE OPERATING LIMITS REPORT, CYCLE 15 In accordance with the Millstone Power Station Unit 3 (MPS3) Technical Specifications (TSs), Section 6.9.1.6.d, Dominion Nuclear Connecticut, Inc., hereby submits, as Enclosure 1, the Cycle 15 Core Operating Limits Report (COLR).

The MPS3 COLR has been revised to incorporate the following:

  • Editorial changes to increment the cycle number from 14 to 15.
  • Revision of the MODE 5 (with RCS loops filled) shutdown margin requirements in Figure 4 to support Cycle 15 conditions.
  • Cycle 15-specific changes to the W(Z) values in Tables 1 through 3.
  • Revision of the burnup penalties for incore measurements in Table 4 to support Cycle 15 conditions.
  • Editorial change to Reference 3.6 to correct a typographical error.

" Editorial change to the title name of Table 4 on Pages 8.1-3 and 8.1-24.

The COLR has been incorporated into the MPS3 Technical Requirements Manual.

If you have any questions or require additional information, please contact William D.

Bartron at (860) 444-4301.

Sincerely, R. K. MacManus Director, Nuclear Station Safety and Licensing - Millstone

Enclosures:

(1)

Commitments made in this letter: None.

Serial No.11-616 Docket No. 50-423 Core Operating Limits Report, Cycle 15 Page 2 of 2 cc: U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406-1415 C. J. Sanders NRC Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 8B3 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station

Serial No.11-616 Docket No. 50-423 ENCLOSURE I CORE OPERATING LIMITS REPORT. CYCLE 15 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNIT 3

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT MILLSTONE UNIT 3 CYCLE 15 I CORE OPERATING LIMITS REPORT i

MILLSTONE - UNIT 3 TRM 8.1-1 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table of Contents Section Title Page 1.0 CORE OPERATING LIMITS REPORT ....................................................................... 8.1-4 2.0 O perating Lim its .......................................................................................................... 8.1-4 2.1 Safety Lim its (Specification 2.1.1) .......................................................................... 8.1-4 2.2 Limiting Safety System Settings (Specification 2.2.1) ............................................ 8.1-5 2.3 SHUTDOWN MARGIN - MODE l and 2 (Specification 3/4.1.1.1.1) ...................... 8.1-6 2.4 SHUTDOWN MARGIN - MODE 3,4 and 5 Loops Filled (Specification 3/4.1.1.1.2)8.1-6 2.5 SHUTDOWN MARGIN - MODE 5 Loops Not Filled (Specification 3/4.1.1.2) ........ 8.1-6 2.6 Moderator Temperature Coefficient (Specification 3/4.1.1.3) ................................. 8.1-6 2.7 Shutdown Rod Insertion Limit (Specification 3/4.1.3.5) ......................................... 8.1-7 2.8 Control Rod Insertion Limits (Specification 3/4.1.3.6) ............................................ 8.1-7 2.9 AXIAL FLUX DIFFERENCE (Specification 3/4.2.1.1) ............................................ 8.1-7 2.10 Heat Flux Hot Channel Factor - FQ(Z) (Specification 3/4.2.2.1) ............................ 8.1-7 2.11 Heat Flux Hot Channel Factor Surveillance - FQ(Z) (Specification 3/4.2.2.1.2) ..... 8.1-7 2.12 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FNAH (Specification 3/4 .2 .3.1) ......................................................................................... 8 .1-8 2.13 DNB Parameters (Specification 3/4.2.5) ................................................................. 8.1-9 2.14 Shutdown Margin Monitor Alarm Setpoint (Specification 3/4.3.5) .......................... 8.1-9 2.15 Refueling Boron Concentration (Specification 3/4.9.1.1) ....................................... 8.1-9 3 .0 A n a lytica l M e tho d s .................................................................................................... 8 .1-2 5 MILLSTONE - UNIT 3 TRM 8.1-2 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT List of Figures Figure Title Paqe Figure 1 Reactor Core Safety Lim it.................................................................................. 8.1-10 Figure 2 Required SHUTDOWN MARGIN for MODE 3 .................................................... 8.1-11 Figure 3 Required SHUTDOWN MARGIN for MODE 4 .................................................... 8.1-12 Figure 4 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Filled ............... 8.1-13 Figure 5 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Not Filled ......... 8.1-14 Figure 6 Control Rod Bank Insertion Limits versus THERMAL POWER .......................... 8.1-15 Figure 7 AXIAL FLUX DIFFERENCE Limits as a Function of RATED THERMAL POWER8.1-16 Figure 8 K(Z) - Normalized FQ(Z) as a Function of Core Height ....................................... 8.1-17 List of Tables Table Title Page Table 1 RAOC W(Z) Function, Millstone Unit 3 - Cycle 15 -12/+9 AFD at 100% RTP.8.1-18 Table 2 Base Load W(Z) Function Millstone Unit 3 - Cycle 15 ..................................... 8.1-20 Table 3 Part Power (74% RTP, 150 MWD/MTU) RAOC W(Z) Function Millstone Unit 3 -

C yc le 15 .......................................................................................................... 8 .1-2 2 Table 4 Burnup Penalty for Incore Millstone Unit 3 - Cycle 15 ..................................... 8.1-24 MILLSTONE - UNIT 3 TRM 8.1-3 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Millstone Unit 3 Cycle 15 I CORE OPERATING LIMITS REPORT 1.0 CORE OPERATING LIMITS REPORT This CORE OPERATING LIMITS REPORT (COLR) for Millstone Unit 3 Cycle 15 has I

been prepared in accordance with the requirements of Technical Specification 6.9.1.6.a.

The Technical Specifications affected by this report are listed below.

2.1.1 Safety Limits 2.2.1 Limiting Safety System Settings 3/4.1.1.1.1 SHUTDOWN MARGIN.- MODE 1 and 2 3/4.1.1.1.2 SHUTDOWN MARGIN - MODES 3,4 and 5 Loops Filled 3/4.1.1.2 SHUTDOWN MARGIN - MODE 5 Loops Not Filled 3/4.1.1.3 Moderator Temperature Coefficient 3/4.1.3.5 Shutdown Rod Insertion Limit 3/4.1.3.6 Control Rod Insertion Limits 3/4.2.1.1 AXIAL FLUX DIFFERENCE 3/4.2.2.1 Heat Flux Hot Channel Factor 3/4.2.3.1 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor 3/4.2.5 DNB Parameters 3/4.3.5 Shutdown Margin Monitor Alarm Setpoint 3/4.9.1.1 REFUELING Boron Concentration 2.0 Operating Limits The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.9.1.6.b.

2.1 Safety Limits (Specification 2.1.1) 2.1.1 Reactor Core The combination of THERMAL POWER, Reactor Coolant System highest loop average temperature, and pressurizer pressure shall not exceed the limits shown in Figure 1.

MILLSTONE - UNIT 3 TRM 8.1-4 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.2 Limiting Safety System Settings (Specification 2.2.1) 2.2.1 Overtemperature AT 2.2.1.1 K,1 1.20 2.2,1.2 K2 0.025 / -F 2.2.1.3 K3 0.00113 / psi 2.2.1.4 -r1 Ž8 seconds 2.2.1.5 1C2 *ý3 seconds 2.2.1.6 "C4 Ž>20 seconds 2.2.1.7 'U5 _<4 seconds 2.2.1.8 T' is loop specific indicated Tavg at RATED THERMAL POWER, !587.1 0 F 2.2.1.9 P' is nominal pressurizer pressure, > 2250 psia 2.2.1.10 fl(AI) is a function of the indicated difference between top and bottom detectors of the power range neutron ion chambers; with nominal gains to be selected based on measured instrument response during plant startup tests calibrations such that:

(1) For qt- qb between -18% and +10%, fl(AI) Ž 0, where qt and qb are percent RATED THERMAL POWER in the upper and lower halves of the core, respectively, and qt + qb is the total THERMAL POWER in percent RATED THERMAL POWER; (2) For each percent that the magnitude of qI - qb exceeds -18%, the AT Trip Setpoint shall be automatically reduced by > 3.75% of its value at RATED THERMAL POWER.

(3) For each percent that the magnitude of qt - qb exceeds +10%, the AT Trip Setpoint shall be automatically reduced by 5 2.14% of its value at RATED THERMAL POWER.

2.2.2 Overpower AT 2.2.2.1 K4 *1.10 2.2.2.2 Deleted MILLSTONE - UNIT 3 TRM 8.1-5 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.2.2.3 K6 > 0.0015 / OF when T > T" and K6 <01/ OF when T_<F" 2.2.2.4 c 1 > 8 seconds 2.2.2.5 1E 2 S3 seconds 2.2.2.6 Deleted 2.2.2.7 T" is loop specific indicated Tavg at RATED THERMAL POWER, 5,87.1OF 2.3 SHUTDOWN MARGIN - MODE 1 and 2 (Specification 314.1.1.1.1) 2.3.1 The SHUTDOWN MARGIN shall be greater than or equal to 1.3%

Ak/k.

2.4 SHUTDOWN MARGIN - MODE 3, 4 and 5 Loops Filled (Specification 3/4.1.1.1.2) 2.4.1 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figures 2, 3 and 4.

2.5 SHUTDOWN MARGIN - MODE 5 Loops Not Filled (Specification 31 4.1.1.2) 2.5.1 The SHUTDOWN MARGIN shall be greater than or equal to the limits shown in Figure 5 or the limits shown in Figure 4 with the chemical and volume control system (CVCS) aligned to preclude reactor coolant system boron concentration reduction.

2.6 Moderator Temperature Coefficient (Specification 3/4.1.1.3) 2.6.1 The BOL/ARO/0% - 70% RTP MTC shall be less positive than + 0.5 x 10-4 Ak/k/ 0 F. Above 70% RTP, the MTC limit is a linear ramp to 0 Ak/k/ 0 F at 100% RTP.

2.6.2 The EOL/ARO/RTP MTC shall be less negative than - 5.65 x 10-4 Ak/k/0 F.

2.6.3 The 300 ppm/ARO/RTP MTC should be less negative than or equal to - 4.9 x 10-4 Ak/k/ 0 F, where: BOL stands for Beginning Of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero Power EOL stands for End Of Cycle Life RTP stands for RATED THERMAL POWER.

MILLSTONE - UNIT 3 TRMV 8.1-6 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.7 Shutdown Rod Insertion Limit (Specification 3/4.1.3.5) 2.7.1 The shutdown rods shall be at least 220 steps withdrawn (inclusive).

2.8 Control Rod Insertion Limits (Specification 3/4.1.3.6) 2.8.1 The control rod banks shall be limited in physical insertion as shown in Figure 6, and 2.8.2 Control bank A shall be at least 220 steps withdrawn.

2.9 AXIAL FLUX DIFFERENCE (Specification 3/4.2.1.1) 2.9.1 The AXIAL FLUX DIFFERENCE (AFD) limits are provided in Figure 7.

2.9.2 The AFD target band during base load operation is +/- 5%.

2.9.3 The minimum allowable (nuclear design) power level for base load operation (APLND) is 80% of RATED THERMAL POWER.

2.10 Heat Flux Hot Channel Factor - FQ(Z) (Specification 3/4.2.2.1)

FRTP FQ(Z) ---P- x K(Z) for P > 0.5 FRyP FQ(Z) *- 0 5 0.5_0.

x K(Z) forPsU.5 where: p THERMAL POWER RATED THERMAL POWER 2.10.1 FRTPQ = 2.60.

2.10.2 K(Z) is provided in Figure 8.

2.11 Heat Flux Hot Channel Factor Surveillance - FQ(Z) (Specification 3/

4.2.2.1.2)

FRTP x K(Z)

FQ(Z)px W(Z) for P > 0.5 MILLSTONE - UNIT 3 TRM 8.1-7 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT

.FRTPx K(Z)

FQ(Z) < for P _<.5

-0.5 x W(Z) frs.

where: p = THERMAL POWER RATED THERMAL POWER 2.11.1 FRTPQ = 2.60.

2.11.2 K(Z) is provided in Figure 8.

2.11.3 W(Z) values for RAOC operation are provided in Table 1. Note that the W(Z) values at Axial Mesh 1 are at the top of the core. The Cycle 15 burnup dependent RAOC W(Z) values are valid over the range of burnup from 0 to 21,900 MWD/MTU.

2.11.4 W(Z) values for Base Load (BL) operation are provided in Table 2.

Note that the W(Z) values at Axial Mesh 1 are at the top of the core.

The Cycle 15 burnup dependent BL W(Z) values are valid over the range of burnup from 0 to 21,900 MWD/MTU.

2.11.5 W(Z) values for Part Power operation are provided in Table 3. Note that the W(Z) values at Axial Mesh 1 are at the top of the core. The Cycle 15 burnup dependent Part Power W(Z) values are valid over the range of burnup from 0 to 150 MWD/MTU:

2.11.6 The factors in Table 4 shall be used for surveillance requirements 4.2.2.1.2 and 4.2.2.1.4. A 2% factor shall be used outside of the burnup range shown in Table 4.

2.12 RCS Total Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor -

FNAH (Specification 3/4.2.3.1) 2.12.1 The RCS Total Flow Rate shall be greater than or equal to 379,200 gpm.

2.12.2 FNAH <FRTPIH X (1 + PFAH X [1 - P])

where: p = THERMAL POWER RATED THERMAL POWER 2.12.2.1 FRTPAH = 1.586 for Robust Fuel Assemblies (RFA) and (RFA-2) 2.12.2.2 PFAH = 0.3 for P < 1.0.

MILLSTONE - UNIT 3 TRM 8.1-8 LBIDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 2.13 DNB Parameters (Specification 314.2.5) 2.13.1 Indicated Reactor Coolant System Tavg shall be maintained _

593.50F.

2.13.2 Indicated Pressurizer Pressure shall be maintained > 2204 psia 1 2.14 Shutdown Margin Monitor Alarm Setpoint (Specification 3/4.3.5)2 2.14.1 The Shutdown Margin Monitor (SMM) minimum count rate and Alarm Ratio Setting to meet Limiting Condition for Operation (LCO) 3.3.5 shall be as shown below.

Tech. Spec. LCO SMM Alarm Ratio Setting Min. Count Rate (counts/sec) 3.3.5.a 1.50 1.0 1.25 0.6 3.3.5.b.1 1.50 0.50 1.25 0.35 3.3.5.b.2 1.50 0.35 1.25 0.25 The combination of the SMM Alarm Ratio setting and minimum count rate accounts for the time lag between the indicated and actual count rates, as well as other uncertainties.

The specified SMM Alarm Ratio setting ensures that the assumption that an alarm is generated at flux doubling in the Boron Dilution Event analysis remains valid. The count rate is displayed on the SMM.

2.15 Refueling Boron Concentration (Specification 3/4.9.1.1) 2.15.1 The boron concentration of all filled portions of the Reactor Coolant System and the refueling cavity shall be maintained at a boron 3

concentration of greater than or equal to 2600 ppm.

1 Limit not applicable during either a THERMAL POWER ramp in excess of 5% of RATED THERMAL POWER per minute or a THERMAL POWER step in excess of 10% of RATED THERMAL POWER.

2 Section 2.14 was prepared by Dominion based on boron dilution analyses performed by Westinghouse.

3 This boron concentration bounds the condition of keff _<0.95 (all rods in less the most reactive two rods) and subcriticality (keff_1l.0 with all rods out).

MILLSTONE - UNIT 3 TRM 8.1-9 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Figure 1 Reactor Core Safety Limit 680 660 640 LL d

0 cj 620 F-(0 0

600 580 560 0 0.2 0.4 0.6 0.8 1 1.2 FRACTION OF RATED THERMAL POWER MILLSTONE - UNIT 3 TRM 8.1-10 LBDCR 11-MP3-010

Figure 2 Required SHUTDOWN MARGIN for MODE 3 4.0 3.5 3.0 2.5 z

2.0 z

0 1.5 a

F-IO 1.0 0.5 0.0 0 500 1000 1500 2000 2500 RCS CRITICAL BORON CONCENTRATION (ppm)

TRM 8.1-11 MILLSTONE - UNIT 3 LBDCR 11-MP3-010

Figure 3 Required SHUTDOWN MARGIN for MODE 4 6.0 5.5 5.0 4.5 4.0 S3.5

~3.0 z

3 2.5 0

t 2.0 I

S1.5 1.0 0.5 0.0 0 500 1000 1500 2000 2500 RCS CRITICAL BORON CONCENTRATION (ppm)

TRM 8.1-12 MILLSTONE - UNIT 3 LBDCR 11-MP3-010

Figure 4 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Filled I

  • 5.5 5.0 4.5
  • .4.0

"" 3.5 z

3.0 82.5

2.0
  • 1.5 1.0 0.5 0.0 0 500 15.0

.0 2000 2500 RCSCRIDAi .BOROW04 CEN~CtTRATION (ppmr)

TRM 8.1-13 MILLSTONE - UNIT 3 LBDCR 11-MP3-010

Figure 5 Required SHUTDOWN MARGIN for MODE 5 with RCS Loops Not Filled 7.0 1 1*

(2200, 6.150) 6.5 I +/- f 6.0 (1252, 5.523) (2500, 6,150) 5.5 5.0 4.5 z

4.0 3.5 z

3.0 0

2.5 I-

-r, 2.0 (0, 1.300) /

1.5 1.0 (355, 1.300) 0.5 0.0 0 500 1000 1500 2000 2500 RCS CRITICAL BORON CONCENTRATION (ppm)

TRM 8.1-14 MILLSTONE - UNIT 3 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Figure 6 Control Rod Bank Insertion Limits versus THERMAL POWER 240 220 200 180

  • 160 140 CL.

z 120 0

o 100 z

" 80 0

40 60 40 20 0

0 10 20 30 40 50 60 70 80 90 100 RATED THERMAL POWER (%)

MILLSTONE - UNIT 3 TRIVI 8.1-15 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Figure 7 AXIAL FLUX DIFFERENCE Limits as a Function of RATED THERMAL POWER 120 100 80 L:

0 E 60 40 20 0

50 -40 -30 -20 -10 0 10 20 30 40 50 60 Flux Difference, % Delta-I MILLSTONE - UNIT 3 TRM 8.1-16 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Figure 8 K(Z) - Normalized FQ(Z) as a Function of Core Height 1.2 1.1 1.0 0.9 0.8 0

0.7 LL 0) 0.6 0-

-0 (D 0.5 N

0.4 0

Z Rp Elefalion 0.3 1i) 0.0 Ft 1D 6.0 Ft

_0.M5 120 Ft 0.2 0.1 0.0 0 1 2 3 4 5 6 7 8 9 10 11 12 Core Elevation, (feet)

MILLSTONE - UNIT 3 TRM 8.1-17 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table I RAOC W(Z) Function, Millstone Unit 3 - Cycle 15

-12/+9 AFD at 100% RTP Burnup Step (MWUIM I U)

Mesh No. HelghV 11bU 2000 9000 19000 1 12.0000 1.0000 1.0000 1.0000 1.0000 2 11.8333 1.0000 1.0000 1.0000 1.0000 3 11.6667 1.0000 1.0000 1.0000 1.0000 4 11.5000 1.0000 1.0000 1.0000 1.0000 5 11.3333 1.0000 1.0000 1.0000 1.0000 6 11.1667 1.0000 1.0000 1.0000 1.0000 7 11.0000 1.3369 1.3740 1.3501 1.3090 8 10.8333 1.3361 1.3665 1.3412 1.3003 9 10.6667 1.3353 1.3523 1.3274 1.2867 10 10.5000 1.3282 1'.3410 1.3108 1.2729 11 10.3333 1.3165 1.3251 1.2936 1.2593 12 10.1667 1.3015 1.3043 1.2733 1.2435 13 10.0000 1.2827 1.2783 1.2518 1.2250 14 9.8333 1.2593 1.2485 1.2339 1.2128 15 9.6667 1.2359 1.2242 1.2224 1.2083 16 9.5000 1.2187 1.2095 1.2161 1.2077 17 9.3333 1.2035 1.1968 1.2090 1.2064 18 9.1667 1.1847 1.1834 1.2016 1.2037 19 9.0000 1.1642 1.1709 1.1972 1.2005 20 8.8333 1.1511 1.1639 1.1956 1.1959 21 8.6667 1.1459 1.1619 1.1954 1.1927 22 8.5000 1.1434 1.1608 1.1951 1.1923 23 8.3333 1.1434 1.1583 1.1940 1.1946 24 8.1667 1.1444 1.1566 1.1929 1.2012 25 8.0000 1.1448 1.1586 1.1932 1.2078 26 7.8333 1.1467 1.1604 1.1925 1.2132 27 ,7.6667 1.1493 1.1603 1.1901 1.2168 28 7.5000 1.1504 1.1591 1.1865 1.2189 29 7.3333 1.1502 1.1568 1.1817 1.2196 30 7.1667 1.1490 1.1535 1.1757 1.2190 31 7.0000 1.1467 1.1491 1.1686 1.2168 32 6.8333 1.1436 1.1437 1.1604 1.2131 33 6.6667 1.1394 1.1374 1.1512 1.2080 34 6.5000 1.1343 1.1309 1.1413 1.2015 35 6.3333 1.1304 1.1262 1.1303 1.1939 36 6.1667 1.1283 1.1223 1.1191 1.1851 37 6.0000 1.1259 1.1170 1.1103 1.1752 38 5.8333 1.1227 1.1150 1.1056 1.1646

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-18 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 1 (Continued)

RAOC W(Z) Function, Millstone Unit 3 - Cycle 15

-121+9 AFD at 100% RTP Burnup Step (MWD/MTU)

Mesh No. Height* 150 2000 3UUM 19000 39 5.666T 1.1198 1.1155 1.104 40 5.5000 1.1262 1.1223 1.1049 1.1559 41 5.3333 1.1349 1.1299 1.1072 1.1564 42 5.1667 1.1418 1.1362 1.1111 1.1592 43 5.0000 1.1483 1.1422 1.1142 1.1617 44 4.8333 1.1546 1.1477 1.1182 1.1632 45 4.6667 1.1603 1.1531 1.1234 1.1640 46 4.5000 1.1656 1.1598 1.1282 1.1640 47 4.3333 1.1705 1.1666 1.1324 1.1634 48 4.1667 1.1749 1.1727 1.1366 1.1622 49 4.0000 1.1790 1.1785 1.1407 1.1604 50 3.8333 1.1828 1.1838 1.1445 1.1582 51 3.6667 1.1862 1.1888 1.1482 1.1556 52 3.5000 1.1892 1.1943 1.1523 1.1530 53 3.3333 1.1923 1.2004 1.1567 1.1530 54 3.1667 1.1972 1.2072 1.1615 1.1545 55 3.0000 1.2077 1.2156 1.1678 1.1580 56 2.8333 1.2230 1.2297 1.1742 1.1711 57 2.6667 1.2408 1.2498 1.1820 1.1855 58 2.5000 1.2591 1.2696 1.1960 1.1998 59 2.3333 1.2774 1.2888 1.2123 1.2138 60 2.1667 1.2954 1.3081 1.2275 1.2277 61 2.0000 1.3130 1.3269 1.2423 1.2412 62 1.8333 1.3300 1.3449 1.2569 1.2542 63 1.6667 1.3462 1.3621 1.2706 1.2666 64 1.5000 1.3612 1.3788 1.2833 1.2782 65 1.3333 1.3747 1.3947 1.2948 1.2885 66 1.1667 1.3863 1.4088 1.3044 1.2970 67 1.0000 1.3950 1.4197 1.3114 1.3029 68 0.8333 1.0000 1.0000 1.0000 1.0000 69 0.6667 1.0000 1.0000 1.0000 1.0000 70 0.5000 1.0000 1.0000 1.0000 1.0000 71 0.3333 1.0000 1.0000 1.0000 1.0000 72 0.1667 1.0000 1.0000 1.0000 1.0000 73 0.0000 1.0000 1.0000 1.0000 1.0000

  • Distance from bottom of active core (feet)

I Note: Surveillance exclusion zone is 8% top, 8% bottom.

MILLSTONE - UNIT 3 TRM 8.1-19 LBDCR 11-MP3-010

TECHNCAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERAT[NG LIMITS REPORT Table 2 Base Load W(Z) Function Millstone Unit 3 - Cycle 15 I

~Burniiip Step (MWD/MTU)

Mesh No. Height* Step 150 Burnup 2000 9000 19000

--- 1T 12.0000Y T0000 1.0000 1.0000 1.0000 2 11.8333 1.0000 1.0000 1.0000 1.0000 3 11.6667 1.0000 1.0000 1.0000 1.0000 4 11.5000 1.0000 1.0000 1.0000 1.0000 5 11.3333 1.0000 1.0000 1.0000 1.0000 6 11.1667 1.0000 1.0000 1.0000 1.0000 7 11.0000 1.1806 1.1713 1.1613 1.1364 8 10.8333 1.1873 1.1700 1.1600 1.1363 9 10.6667 1.1980 1.1673 1.1569 1.1352 10 10.5000 1.2036 1.1613 1.1515 1.1331 11 10.3333 1.2064 1.1585 1.1452 1.1308 12 10.1667 1.2081 1.1556 1.1386 1.1280 13 10.0000 1.2080 1.1498 1.1316 1.1246 14 9.8333 1.2037 1.1413 1.1241 1.1218 15 9.6667 1.1965 1.1344 1.1175 1.1203 16 9.5000 1.1894 1.1291 1.1127 1.1187 17 9.3333 1.1808 1.1209 1.1074 1.1170 18 9.1667 1.1688 1.1124 1.1034 1.1168 19 9.0000 1.1568 1.1080 1.1036 1.1164 20 8.8333 1.1493 1.1074 1.1055 1.1135 21 8.6667 1.1452 1.1090 1.1089 1.1125 22 8.5000 1.1412 1.1114 1.1112 1.1198 23 8.3333 1.1403 1.1150 1.1130 1.1285 24 8.1667 1.1404 1.1189 1.1150 1.1366 25 8.0000 1. 1405 1.1221 1.1172 1.1461 26 7.8333 1.1422 1.1261 1.1189 1.1551 27 7.6667 1. 1457 1.1305 1.1198 1.1626 28 7.5000 1.1474 1.1334 1.1199 1.1688 29 7.3333 1.1477 1.1351 1.1193 1.1736 30 7.1667 1.1471 1.1359 1.1180 1.1774 31 7.0000 1. 1454 1.1357 1. 1161 1.1799 32 6.8333 1. 1428 1.1345 1.1132 1.1811 33 6.6667 1.1391 1.1324 1. 1101 1.1810 34 6.5000 1.1342 1.1298 1.1086 1.1797 35 6.3333 1.1305 1.1265 1.1084 1.1771 36 6.1667 1.1283 1.1223 1.1086 1.1735 37 6.0000 1.1256 1.1172 1.1080 1.1690 38 5.8333 1.1226 1.1128 1.1064 1.1630

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom I MILLSTONE - UNIT 3 TRM 8.1-20 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 2 (Continued)

Base Load W(Z) Function Millstone Unit 3 - Cycle 15 tuurnup )tep jn"MVVUIM I U)

Meshl NO. Helghr 15U 2000 9uu0 1SUUU 39 5.6667 1.1198 1.1094 1.1046 1.1565 40 5.5000 1.1173 1.1064 1.1039 1.1518 41 5.3333 1.1145 1.1043 1.1034 1.1480 42 5.1667 1.1110 1.1028 1.1023 1.1439 43 5.0000 1.1069 1.1010 1.1008 1.1389 44 4.8333 1.1036 1.0988 1.0990 1.1331 45 4.6667 1.1013 1.0964 1.0968 1.1266 46 4.5000 1.0986 1.0937 1.0944 1.1196 47 4.3333 1.0955 1.0908 1.0919 1.1138 48 4.1667 1.0923 1.0878 1.0892 1.1096 49 4.0000 1.0890 1.0858 1.0866 1.1048 50 3.8333 1.0856 1.0864 1.0841 1.0997 51 3.6667 1.0821 1.0872 1.0816 1.0943 52 3.5000 1.0789 1.0881 1.0789 1.0890 53 3.3333 1.0758 1.0883 1.0781 1.0851 54 3.1667 1.0733 1.0883 1.0787 1.0821 55 3.0000 1.0765 1.0934 1.0834 1.0826 56 2.8333 1.0852 1.1009 1.0925 1.0877 57 2.6667 1.0969 1.1081 1.1052 1.0964 58 2.5000 1.1087 1.1178 1.1180 1.1050 59 2.3333 1.1205 1.1320 1.1307 1.1134 60 2.1667 1.1325 1.1463 1.1437 1.1220 61 2.0000 1.1444 1.1605 1.1564 1.1305 62 1.8333 1.1560 1.1744 1.1689 1.1388 63 1.6667 1.1672 1.1878 1.1808 1.1469 64 1.5000 1.1777 1.2003 1.1919 1.1545 65 1.3333 1.1872 1.2117 1.2019 1.1611 66 1.1667 1.1952 1.2215 1.2103 1.1664 67 1.0000 1.2011 1.2289 1.2163 1.1698 68 0.8333 1.0000 1.0000 1.0000 1.0000 69 0.6667 1.0000 1.0000 1.0000 1.0000 70 0.5000 1.0000 1.0000 1.0000 1.0000 71 0.3333 1.0000 1.0000 1.0000 1.0000 72 0.1667 1.0000 1.0000 1.0000 1.0000 73 0.0000 1.0000 1.0000 1.0000 1.0000

  • Distance from bottom fo active core (feet)

Note: Surveillance exclusion zone is 8% top, 8% bottom MILLSTONE - UNIT 3 TRM 8.1-21 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 3 Part Power (74% RTP, 150 MWDIMTU) RAOC W(Z) Function Millstone Unit 3 - Cycle 15 Mesh No Height (ft)* W(z) 1 12.0000 1.0000 2 11.8333 1.0000 3 11.6667 1.0000 4 11.5000 1.0000 5 11.3333 1.0000 6 11.1667 1.0000 7 11.0000 1.1952 8 10.8333 1.1907 9 10.6667 1.1913 10 10.5000 1.1837 11 10.3333 1.1734 12 10.1667 1.1618 13 10.0000 1.1487 14 9.8333 1.1335 15 9.6667 1.1190 16 9.5000 1.1093 17 9.3333 1.0993 18 9.1667 1.0862 19 9.0000 1.0717 20 8.8333 1.0641 21 8.6667 1.0633 22 8.5000 1.0649 23 8.3333 1.0687 24 8.1667 1.0742 25 8.0000 1.0791 26 7.8333 1.0858 27 7.6667 1.0926 28 7.5000 1.0977 29 7.3333 1.1014 30 7.1667 1.1045 31 7.0000 1.1066 32 6.8333 1.1080 33 6.6667 1.1083 34 6.5000 1.1078

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8%

bottom.

MILLSTONE - UNIT 3 TRM 8.1-22 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 3 (Continued)

Part Power (74% RTP, 150 MWDIMTU) RAOC W(Z) Function Millstone Unit 3 - Cycle 15 Mesh No Height (ft)* W(z) 35 6.3333 1.1085 36 6.1667 1.1110 37 6.0000 1.1133 38 5.8333 1.1148 39 5.6667 1.1164 40 5.5000 1.1269 41 5.3333 1.1394 42 5.1667 1.1501 43 5.0000 1.1612 44 4.8333 1.1722 45 4.6667 1.1830 46 4.5000 1.1930 47 4.3333 1.2026 48 4.1667 1.2117 49 4.0000 1.2200 50 3.8333 1.2277 51 3.6667 1.2349 52 3.5000 1.2426 53 3.3333 1.2510 54 3.1667 1.2612 55 3.0000 1.2777 56 2.8333 1.2992 57 2.6667 1.3237 58 2.5000 1.3480 59 2.3333 1.3712 60 2.1667 1.3934 61 2.0000 1.4159 62 1.8333 1.4403 63 1.6667 1.4649 64 1.5000 1.4881 65 1.3333 1.5074 66 1.1667 1.5232 67 1.0000 1.5365 68 0.8333 1.0000 69 0.6667 1.0000 70 0.5000 1.0000 71 0.3333 1.0000 72 0.1667 1.0000 73 0.0000 1.0000

  • Distance from bottom of active core (feet)

Note: Surveillance exclusion zone is 8% top, 8%

bottom.

MILLSTONE - UNIT 3 TRM 8.1-23 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT Table 4 Burnup Penalty for Incore Millstone Unit 3 - Cycle 15 I Burnup Penalty All Burnups 1.02 I MILLSTONE - UNIT 3 TRM 8.1-24 LBDCR 11-MP3-010

TECHNICAL REQUIREMENTS MANUAL APPENDIX 8.1 CORE OPERATING LIMITS REPORT 3.0 Analytical Methods The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents.

3.1 WCAP-9272-P-A, "WESTINGHOUSE RELOAD SAFETY EVALUATION METHODOLOGY," July 1985 (W Proprietary).

3.2 WCAP-10216-P-A-RgA, "RELAXATION OF CONSTANT AXIAL OFFSET CONTROL FQ SURVEILLANCE TECHNICAL SPECIFICATION," Rev. 1, February 1994 (W Proprietary).

3.3 WCAP-1 2945-P-A, Volume 1 (Revision 2) and Volumes 2 through 5 (Revision 1), "Code Qualification Document for Best Estimate LOCA Analysis," March 1998 (W Proprietary).

3.4 WCAP-16009-P-A, "Realistic Large-Break LOCA Evaluation Methodology Using the Automated Statistical Treatment of Uncertainty Method (ASTRUM)," January 2005 (W Proprietary).

3.5 WCAP-11946, "Safety Evaluation Supporting a More Negative EOL Moderator Temperature Coefficient Technical Specification for the Millstone Nuclear Power Station Unit 3," September 1988 (W Proprietary).

3.6 WCAP-10054-P-A, "WESTINGHOUSE SMALL BREAK ECCS EVALUATION MODEL USING THE NOTRUMP CODE," August 1985 (Wl Proprietary).

3.7 WCAP-10079-P-A, "NOTRUMP - A NODAL TRANSIENT SMALL BREAK AND GENERAL NETWORK CODE," August 1985 (W Proprietary).

3.8 WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Report," April 1995 (W Proprietary).

3.9 WCAP-8301, "LOCTA-IV Program: Loss-of-Coolant Transient Analysis,"

June 1974 (W Proprietary).

3.10 WCAP-10054-P-A, Addendum 2, Revision 1, "Addendum to the Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code: Safety Injection into the Broken Loop and COSI Condensation Model," July 1997 (W Proprietary).

3.11 WCAP-8745-P-A, "DESIGN BASES FOR THE THERMAL OVERPOWER AT AND THERMAL OVERTEMPERATURE AT TRIP FUNCTIONS,"

September 1986 (W Proprietary).

MILLSTONE - UNIT 3 TRM 8.1-25 LBDCR 11-MP3-010