ML023180484

From kanterella
Jump to navigation Jump to search
Core Operating Limits Report, Cycle 9
ML023180484
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/01/2002
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
B18788
Download: ML023180484 (17)


Text

Dominion Nuclear Connecticut, Inc.

Millstone Power Station S Dominion-Rope Ferry Road Waterford, CT 06385 NOV 1 2002 Docket No. 50-423 B18788 RE: TS 6.9.1.6 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit No. 3 Core Operating Limits Report, Cycle 9 Pursuant to Technical Specification 6.9.1.6, Dominion Nuclear Connecticut, Inc., hereby submits the Core Operating Limits Report (COLR) for Cycle 9. The COLR is enclosed as Attachment 1.

There are no regulatory commitments contained within this letter.

If you have any additional questions concerning this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

J. Aln0Price Site ce President - Millstone Attachment (1) cc: H. J. Miller, Region I Administrator V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 Millstone Senior Resident Inspector 0

Docket No. 50-423 B18788 Attachment 1 Millstone Power Station, Unit No. 3 Core Operatinq Limits Report, Cycle 9

M11,SONE UNIT 3 - CYCLE 9, REVISION I AUGUST 2002 MILLSTONE UNIT 3- CYCLE 9, REVISION I AUGUST2002 TRM APPENDIX 8.1 MILLSTONE UNIT 3 CYCLE 9 CORE OPERATING LIMITS REPORT Revision I MILLSTONE - UNIT 3 TRM 8.1 - 1 LBDCR 02-3-12 September 19, 2002

MLIusTONE UNIT 3 - CYCLE 9, REVjS1ON I AUGUST 2002 MILlSToNE UNIT 3- CYCLE 9, REVISION I AUGUST2002 Table of Contents Section Title Page 1.0 Core Operating Limits Report ............................................................... 8.1-4 2.0 Operating Limits ................................................................................ 8.1-4 2.1 Moderator Temperature Coefficient (Specification 3/4.1.1.3) .............. 8.1-4 2.2 Shutdown Rod Insertion Limit (Specification 3/4.1.3.5) ..................... 8.1-5 2.3 Control Rod Insertion Limits (Specification 3/4.1.3.6) ....................... 8.1-5 2.4 Axial Flux Difference (Four - Loop Operation)

(Specification 3/4.2.1.1) .............................................................. 8.1-5 2.5 Section Deleted ........................................................................ 8.1-5 2.6 Heat Flux Hot Channel Factor (Four - Loop Operation) - FQ(Z)

(Specification 3/4.2.2.1) .............................................................. 8.1-6 2.7 Heat Flux Hot Channel Factor Surveillance (Four - Loop Operation)

FQ(Z) (Specification 3/4.2.2.1.2) ................................................... 8.1-6 2.8 Section Deleted ........................................................................ 8.1-7 2.9 Section Deleted ........................................................................ 8.1-7 2.10 Nuclear Enthalpy Rise Hot Channel Factor (Four - Loop Operation)

Frg (Specification 3/4.2.3.1) ....................................................... 8.1-7 2.11 Section Deleted ........................................................................ 8.1-7 2.12 Shutdown Margin Monitor Alarm Setpoint (Specification 3/4.3.5) ........ 8.1-8 MILLSTONE - UNIT 3 TRM 8.1- 2 LBDCR 02-3-12 September 19,2002

MILLSTONE UNIT 3 - CYCLE 9, REVISION I AUGUST 2002 List of Figures Figure Title Page 1 Control Rod Bank Insertion Limits versus Thermal Power for Four Loop Operation ........................................................................... 8.1-9 2 Axial Flux Difference Limits as a Function of Rated Thermal Power for Four Loop Operation ......................................................................... 8.1-10 3 K(Z) - Normalized FQ(Z) as a Function of Core Height for Four Loop Operation ......................................................................... 8.1-11 List of Tables Table Title Page 1 Four Loop RAOC W(Z) Function Millstone Unit 3 - Cycle 9 ................................................................... 8.1-12 2 Four Loop Base Load W(Z) Function Millstone Unit 3 - Cycle 9 ................................................................... 8.1-14 MILLSTONE - UNIT 3 TRM 8.1 -3 LBDCR 02-3-12 September 19, 2002

MILLsroNE UNf"3 - CYCLE 9, REVISION 1 AUGUST 2002 Millstone Unit 3 Cycle 9 Core Operating Limits Report 1.0 Core Operating Limits Report This Core Operating Limits Report (COLR) for Millstone Unit 3 Cycle 9 has been prepared in accordance with the requirements of Technical Specification 6.9.1.6.a. The Technical Specifications affected by this report are listed below.

3/4.1.1.3 Moderator Temperature Coefficient 3/4.1.3.5 Shutdown Rod Insertion Limit 3/4.1.3.6 Control Rod Insertion Limits (Four Loop) 3/4.2.1.1 Axial Flux Difference - Four Loop 3/4.2.2.1 Heat Flux Hot Channel Factor - Four Loop 3/4.2.3.1 Nuclear Enthalpy Rise Hot Channel Factor - Four Loop 3/4.3.5 Shutdown Margin Monitor Alarm Setpoint 2.0 Operating Limits The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the following subsections. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.9.1.6.b. Limits for N-1 loop operation are not provided. Power operation in N-1 loop conditions is not allowed for Cycle 9.

2.1 Moderator Temperature Coefficient (Specification 3/4.1.1.3) 2.1.1 The Moderator Temperature Coefficient (MTC) limits are as follows:

The BOL/ARO/0% - 70% RTP MTC shall be less positive than + 0.5 x 104 Ak/kl/F.

Above 70% RTP, the MTC limit is a linear ramp to 0 Ak/k/ 0 F at 100% RTP.

The EOL/ARO/RTP MTC shall be less negative than - 5.65 x 10' Ak/k/ 0 F.

MILLSTONE - UNIT 3 TRM 8.1 - 4 LBDCR 02-3-12 September 19, 2002

MILLSTONE UNIT 3 - CYCLE 9, REVISION 1 AUGUST 2002 2.1.2 The MTC surveillance limit is as follows:

The 300 ppm/ARO/RTP MTC should be less negative than or equal to

- 4.9 x 104 Ak/k/ 0 F, where: BOL stands for Beginning Of Cycle Life ARO stands for All Rods Out HZP stands for Hot Zero Power EOL stands for End Of Cycle Life RTP stands for Rated Thermal Power.

2.2 Shutdown Rod Insertion Limit (Specification 3/4.1.3.5)

  • The shutdown rods shall be at least 220 steps withdrawn (inclusive).

2.3 Control Rod Insertion Limits (Specification 3/4.1.3.6)

The control rod banks shall be limited in physical insertion as shown in Figure 1 for four-loop operation, and Control bank A shall be at least 220 steps withdrawn.

2.4 Axial Flux Difference (Four - Loop Operation) (Specification 3/4.2.1.1) 2.4.1 The Axial Flux Difference (AFD) limits are provided in Figure 2.

2.4.2 The AFD target band during base load operation is +/- 5%.

2.4.3 The minimum allowable (nuclear design) power level for base load operation (APL*) is 80% of Rated Thermal Power.

2.5 Section Deleted MILLSTONE - UNIT 3 TRM 8.1 - 5 LBDCR 02-3-12 September 19, 2002

MILLSTONE UNIT 3 - CYCLE 9, REVISION I AUGUST 2002 2.6 Heat Flux Hot Channel Factor (Four-Loop Operation) - FQ(Z) (Specification 3/4.2.2.1)

F*RTP F,,(Z)<5 *K(Z) for P > 0.5 P

F0(Z)<5 .

  • K(Z) for P5<0.5

0.5 where

P = THERMAL POWER RATED THERMAL POWER 2.6.1 FRTPQ = 2.60.

2.6.2 K(Z) is provided in Figure 3.

2.7 Heat Flux Hot Channel Factor Surveillance (Four-Loop Operation) - FQ(Z)

(Specification 3/4.2.2.1.2)

FQZ*FR' *K(Z)

YJ)(ZJ(z) for P > 0.5 Pl* W(Z)

    • K(Z)

ORVW(Z)

FQ(Z)FoZ<0.5.* for P <0.5 where: P= THERMALPOWER RA TED THERMAL POWER 2.7.1 FRThQ = 2.60.

2.7.2 K(Z) is provided in Figure 3.

2.7.3* W(Z) values for 4-Loop RAOC operation are provided in Table 1. Note that the W(Z) values at Axial Mesh I are at the top of the core. The Cycle 9 burnup dependent RAOC W(Z) values are valid over the range of bumup from 0 to 21,200 MWDIMTU.

2.7.4* W(Z) values for 4-Loop Base Load (BL) operation are provided in Table 2. Note that the W(Z) values at Axial Mesh I are at the top of the core. The Cycle 9 bumup dependent BL W(Z) values are valid over the range of bumup from 0 to 21,200 MWD/MTU.

2.7.5* A 2% factor shall be used for surveillance requirements 4.2.2.1.2 and 4.2.2.1.4.

  • Sections 2.7.3 through 2.7.5 are prepared by Dominion.

MILLSTONE - UNIT 3 TRM 8.1 - 6 LBDCR 02-3002 September 19, 2002

MILLSTONE UNIT 3 - CYCLE 9, REVmISO1 AUGUST 2002 MILLSTONE UNIT 3- CYCLE 9, REVISION I AUGUST2002 2.8 Section Deleted 2.9 Section Deleted 2.10 Nuclear Enthalpy Rise Hot Channel Factor (Four-Loop Operation) - Ffl (Specification 3/4.2.3.1)

FNAn < FRTPIAu * (1 + PFz&n * [1 - P])

where: P = Thermal Power Rated Thermal Power 2.10.1 F = 1.54 for VANTAGE 5H fuel assembly mRT~A FIRTP~H = 1.58 for Robust Fuel Assembly (RFA).

2.10.2 PFAm = 0.3 for P < 1.0.

2.11 Section Deleted MILLSTONE - UNIT 3 TRM 8.1 - 7 LBDCR 02-3-12 September 19,2002

MILLSTONE UNIT 3 - CYCLE 9, REVISION I AUGUST 2002 2.12 Shutdown Margin Monitor Alarm Setpoint (Specification 3/4.3.5)'

The Shutdown Margin Monitor (SMM) minimum count rate and Alarm Ratio Setting to meet LIMITING CONDITION FOR OPERATION (LCO) 3.3.5 shall be as shown below.

Tech. Spec. LCO SMM Alarm Ratio Setting Min. Count Rate (counts/sec) 3.3.5.a 1.50 1.0 1.25 0.6 3.3.5.b.1 1.50 0.50 1.25 0.35 3.3.5.b.2 1.50 0.35 1.25 0.25 The combination of the SMM Alarm Ratio setting and minimum count rate accounts for the time lag between the indicated and actual count rates, as well as other uncertainties. The specified SMM Alarm Ratio setting ensures that the assumption that an alarm is generated at flux doubling in the Boron Dilution Event analysis remains valid. The count rate is displayed on the SMM.

+ Section 2.12 was prepared by Dominion based on boron dilution analyses performed by Westinghouse.

MILLSTONE - UNIT 3 TRM 8.1 - 8 LBDCR 02-3-12 September 19, 2002

AUGUST 2002 MILLSTONE UNIT 3 - CYCLE 9, REVISION I Figure 1 Control Rod Bank Insertion Limits versus Thermal Power for Four Loop Operation 220 200 180 E160 140 2 120 CF 2 100 08 0

60 60 40 20 0

0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 Fraction of Rated Thermal Power MILLSTONE - UNIT 3 TRM 8.1 - 9 LBDCR 02-3-12 September 19, 2002

MILLSTONE UNIT 3 - CYCLE 9, REVISION I AUGUST 2002 Figure 2 Axial Flux Difference Limits as a Function of Rated Thermal Power for Four Loop Operation 120 100 80 0

Lt.

"0 0

60 E

40 20 0

50 30 -20 -10 0 10 20 30 40 50 60 Flux Difference, % Delta-I MILLSTONE - UNIT 3 TRM 8.1 -10 LBDCR 02-3-12 September 19, 2002

AUGUST 2002 MILLSTONE UNIT 3 - CYCLE 9, REVISION I Figure 3 K(Z) - Normalized FQ(Z) as a Function of Core Height for Four Loop Operation 1.2 1.1 1.0 0.9 0.8 0.7 0

IL

0) 0.6 W

0.5 M4

-O (U

0. 0.4 K(Z) Erabo 0.3 10 00 Ft 10 60 Ft 0925 12-0 Ft 0.2 0.1 0.0 0 1 2 3 4 5 6 7 8 9 10 11 12 Core Elevation, (feet)

LBDCR 02-3-12 MILLSTONE - UNIT 3 TRM 8.1 - 11 September 19, 2002

AUGUST 2002 Mnis-rONE UNiT 3 - CYCLE 9, REVISION I Table 1 Four Loop RAOC W(Z) Function Millstone Unit 3 - Cycle 9

-12/+ 9 AFD at 100% RTP Burnup Burnup Burnup Bumup Burnup 10000 12000 18000 Mesh Axial* 150 3000 MWD/MTU MWD/MTU MWD/MTU Height MWD/MTU MWD/MTU No. 1.0000 1 12.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 2 11.8333 1.0000 1.0000 1.0000 1.0000 1.0000 3 11.6667 1.0000 1.0000 1.0000 1.0000 1.0000 4 11.5000 1.0000 1.0000 1.0000 1.0000 1.0000 5 11.3333 1.0000 1.0000 1.0000 1.0000 1.0000 6 11.1667 1.0000 1.0000 1.0000 1.0000 1.0000 7 11.0000 1.0000 1.0000 1.0000 1.0000 1.0000 8 10.8333 1.0000 1.0000 1.0000 1.0000 1.0000 9 10.6667 1.0000 1.3664 1.3616 1.3665 1.3301 10 10.5000 1.3703 1.3576 1.3455 1.3482 1.3212 11 10.3333 1.3507 1.3496 1.3267 1.3262 1.3091 12 10.1667 1.3319 1.3443 1.3064 1.3015 1.2952 13 10.0000 1.3209 1.3355 1.2922 1.2857 1.2800 14 9.8333 1.3133 1.3234 1.2823 1.2765 1.2629 15 9.6667 1.3067 1.3110 1.2698 1.2639 1.2449 16 9.5000 1.2999 1.2941 1.2548 1.2493 1.2339 17 9.3333 1.2882 1.2733 1.2381 1.2337 1.2279 18 9.1667 1.2722 1.2531 1.2195 1.2155 1.2203 19 9.0000 1.2561 1.2384 1.1977 1.1915 1.2148 20 8.8333 1.2432 1.2266 1.1802 1.1724 1.2144 21 8.6667 1.2328 1.2120 1.1765 1.1718 1.2182 22 8.5000 1.2217 1.1980 1.1742 1.1728 1.2212 23 8.3333 1.2092 1.1882 1.1708 1.1712 1.2234 24 8.1667 1.1974 1.1839 1.1715 1.1733 1.2281 25 8.0000 1.1892 1.1796 1.1722 1.1755 1.2319 26 7.8333 1.1816 1.1732 1.1706 1.1753 1.2332 27 7.6667 1.1744 1.1660 1.1681 1.1740 1.2330 28 7.5000 1.1692 1.1580 1.1644 1.1716 1.2312 29 7.3333 1.1642 1.1491 1.1597 1.1681 1.2278 30 7.1667 1.1578 1.1396 1.1542 1.1638 1.2228 31 7.0000 1.1501 1.1287 1.1479 1.1587 1.2165 32 6.8333 1.1437 1.1182 1.1406 1.1523 1.2088 33 6.6667 1.1394 1.1120 1.1324 1.1435 1.1997 34 6.5000 1.1356 1.1100 1.1239 1.1331 1.1900 35 6.3333 1.1324 1.1099 1.1167 1.1239 1.1799 36 6. 1667 1.1296 1.1085 1.1129 1.1193 1.1693 37 6.0000 1.1258 1.1074 1.1121 1.1186 1.1594 38 5.8333 1.1214 1.1072 1.1122 1.1188 1.1539 39 5.6667 1.1180

  • Distance from botlom of active core (feet)

"T'RM8.1 - 12 LBDCR 02-3-12 MILLSTONE - UNIT 3 September 19, 2002

MIU.SrONE UNIT 3 - C-YCLE 9, REViSION I AUGUST 2002 MILLSTONE UMT 3- CYCLE 9, REVISION I AUGUST 2002 Table l(continued)

Four Loop RAOC W(Z) Function Millstone Unit 3 - Cycle 9

-121+9 AFD at 100% RTP Bumup Bumup Bumup Bumup Bumup Mesh Axial* 150 3000 10000 12000 18000 No. Heigbt MWD/MTU MWD/MTU MWD/MTU MWD/MTU MWD/MTU 40 5.5000 1.1181 1.1070 1.1135 1.1205 1.1563 41 5.3333 1.1189 1.1076 1.1146 1.1218 1.1602 42 5.1667 1.1205 1.1102 1.1156 1.1223 1.1619 43 5.0000 1.1217 1.1121 1.1174 1.1241 1.1629 44 4.8333 1.1220 1.1135 1.1195 1.1264 1.1633 45 4.6667 1.1225 1.1147 1.1214 1.1285 1.1628 46 4.5000 1.1253 1.1155 1.1229 1.1303 1.1616 47 4.3333 1.1286 1.1160 1.1241 1.1317 1.1597 48 4.1667 1.1312 1.1164 1.1251 1.1328 1.1572 49 4.0000 1.1336 1.1165 1.1256 1.1334 1.1542 50 3.8333 1.1358 1.1175 1.1265 1.1342 1.1506 51 3.6667 1.1377 1.1214 1.1282 1.1354 1.1468 52 3.5000 1.1398 1.1250 1.1309 1.1378 1.1430 53 3.3333 1.1427 1.1278 1.1336 1.1405 1.1386 54 3.1667 1.1466 1.1313 1.1361 1.1427 1.1346 55 3.0000 1.1516 1.1382 1.1395 1.1452 1.1396 56 2.8333 1.1618 1.1463 1.1477 1.1534 1.1509 57 2.6667 1.1779 1.1555 1.1612 1.1682 1.1628 58 2.5000 1.1938 1.1703 1.1746 1.1812 1.1747 59 2.3333 1.2091 1.1875 1.1874 1.1929 1.1864 60 2.1667 1.2246 1.2037 1.2004 1.2050 1.1981 61 2.0000 1.2398 1.2197 1.2131 1.2169 1.2094 62 1.8333 1.2544 1.2353 1.2253 1.2281 1.2204 63 1.6667 1.2682 1.2501 1.2368 1.2387 1.2308 64 1.5000 1.0000 1.0000 1.0000 1.0000 1.0000 65 1.3333 1.0000 1.0000 1.0000 1.0000 1.0000 66 1.1667 1.0000 1.0000 1.0000 1.0000 1.0000 67 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 68 0.8333 1.0000 1.0000 1.0000 1.0000 1.0000 69 0.6667 1.0000 1.0000 1.0000 1.0000 1.0000 70 0.5000 1.0000 1.0000 1.0000 1.0000 1.0000 71 0.3333 1.0000 1.0000 1.0000 1.0000 1.0000 72 0.1667 1.0000 1.0000 1.0000 1.0000 1.0000 73 0.0000 1.0000 1.0000 1.0000 1.0000 1.0000

  • Distance from bottom of active core (feet).

MILLSTONE - UNIT 3 TRM 8.1 -13 LBDCR 02-3-12 September 19, 2002

AUGUST 2002 MILLSTONE UNIT 3 - CYCLE 9, REVISION 1 Table 2 Four Loop Base Load W(Z) Function Millstone Unit 3 - Cycle 9 Bumup Bumup Bumup Burnup Burnup Mesh Axial* 150 1200 3000 10000 18000 MWD/MTU MWD/MTU MWD/MTU MWD/MTU No. Height MWDJMTU 1 12.0000 1.0000 1.0000 1.0000 1.0000 1.0000 2 11.8333 1.0000 1.0000 1.0000 1.0000 1.0000 3 11.6667 1.0000 1.0000 1.0000 1.0000 1.0000 4 11.5000 1.0000 1.0000 1.0000 1.0000 1.0000 5 11.3333 1.0000 1.0000 1.0000 1.0000 1.0000 6 11.1667 1.0000 1.0000 1.0000 1.0000 1.0000 7 11.0000 1.0000 1.0000 1.0000 1.0000 1.0000 8 10.8333 1.0000 1.0000 1.0000 1.0000 1.0000 9 10.6667 1.0000 1.0000 1.0000 1.0000 1.0000 10 10.5000 1.2518 1.2669 1.2477 1.1532 1.1562 11 10.3333 1.2459 1.2598 1.2389 1.1523 1.1559 12 10.1667 1.2392 1.2526 1.2310 1.1524 1.1578 13 10.0000 1.2336 1.2468 1.2251 1.1536 1.1595 14 9.8333 1.2282 1.2413 1.2197 1.1519 1.1586 15 9.6667 1.2235 1.2367 1.2154 1.1482 1.1563 16 9.5000 1.2190 1.2326 1.2121 1.1447 1.1548 17 9.3333 1.2097 1.2236 1.2040 1.1365 1.1509 18 9.1667 1.1970 1.2112 1.1924 1.1265 1.1464 19 9.0000 1.1864 1.2009 1.1831 1.1212 1.1447 20 8.8333 1.1785 1.1931 1.1756 1.1173 1.1402 21 8.6667 1.1720 1.1859 1.1677 1.1141 1.1369 22 8.5000 1.1651 1.1778 1.1577 1.1142 1.1430 23 8.3333 1.1569 1.1684 1.1465 1.1157 1.1497 8.1667 1.1494 1.1600 1.1369 1.1192 1.1549 24 25 8.0000 1.1450 1.1552 1.1316 1.1218 1.1628 26 7.8333 1.1424 1.1529 1.1297 1.1236 1.1702 27 7.6667 1.1414 1.1518 1.1288 1.1248 1.1754 28 7.5000 1.1434 1.1524 1.1268 1.1262 1.1793 29 7.3333 1.1451 1.1525 1.1241 1.1267 1.1819 30 7.1667 1.1450 1.1511 1.1207 1.1262 1.1831 31 7.0000 1.1440 1.1488 1.1163 1.1252 1.1830 32 6.8333 1.1422 1.1466 1.1133 1.1234 1.1818 33 6.6667 1.1394 1.1443 1.1121 1.1207 1.1795 34 6.5000 1.1357 1.1416 1.1110 1.1170 1.1759 35 6.3333 1.1324 1.1392 1.1103 1.1138 1.1714 36 6.1667 1.1296 1.1372 1.1099 1.1120 1.1664 37 6.0000 1.1259 1.1343 1.1084 1.1120 1.1614 38 5.8333 1.1214 1.1311 1.1074 1.1122 1.1568 39 5.6667 1.1180 1.1288 1.1072 1.1123 1.1533

  • Distance from bottom of active core (feet)

TRM 8.1 - 14 LBDCR 02-3-12 MILLSTONE - UNIT 3 September 19, 2002

MILLSTONE UNIT 3 - CYCLE 9, REVISION I AUGUST 2002 Table 2 (continued)

Four Loop Base Load W(Z) Function Millstone Unit 3 - Cycle 9 Bumup Bumup Burnup Burnup Bumup Mesh Axial* 150 1200 3000 10000 18000 No. Height MWD/MTU MWDINMTU MWD/MTU MWDIMTU MWD/MTU 40 5.5000 1.1181 1.1285 1.1063 1.1118 1.1512 41 5.3333 1.1182 1.1280 1.1048 1.1107 1.1488 42 5.1667 1.1175 1.1269 1.1030 1.1092 1.1452 43 5.0000 1.1164 1.1254 1.1008 1.1073 1.1412 44 4.8333 1.1149 1.1235 1.0982 1.1050 1.1370 45 4.6667 1.1130 1.1211 1.0952 1.1023 1.1326 46 4.5000 1.1108 1.1185 1.0920 1.0995 1.1275 47 4.3333 1.1083 1.1157 1.0886 1.0969 1.1219 48 4.1667 1.1055 1.1125 1.0850 1.0947 1.1157 49 4.0000 1.1025 1.1092 1.0812 1.0923 1.1089 50 3.8333 1.0994 1.1035 1.0800 1.0894 1.1028 51 3.6667 1.0961 1.1048 1.0804 1.0868 1.0983 52 3.5000 1.0928 1.1028 1.0807 1.0869 1.0957 53 3.3333 1.0903 1.1012 1.0808 1.0875 1.0930 54 3.1667 1.0892 1.1006 1.0810 1.0887 1.0903 55 3.0000 1.0946 1.1077 1.0907 1.0920 1.0905 56 2.8333 1.1051 1.1200 1.1056 1.1002 1.0958 57 2.6667 1.1170 1.1328 1.1195 1.1130 1.1054 58 2.5000 1.1291 1.1458 1.1338 1.1259 1.1148 59 2.3333 1.1413 1.1591 1.1485 1.1385 1.1238 60 2.1667 1.1535 1.1725 1.1633 1.1513 1.1331 61 2.0000 1.1657 1.1857 1.1779 1.1639 1.1422 62 1.8333 1.1774 1.1985 1.1921 1.1761 1.1510 63 1.6667 1.1886 1.2107 1.2056 1.1877 1.1594 64 1.5000 1.0000 1.0000 1.0000 1.0000 1.0000 65 1.3333 1.0000 1.0000 1.0000 1.0000 1.0000 66 1.1667 1.0000 1.0000 1.0000 1.0000 1.0000 67 1.0000 1.0000 1.0000 1.0000 1.0000 1.0000 68 0.8333 1.0000 1.0000 1.0000 1.0000 1.0000 69 0.6667 1.0000 1.0000 1.0000 1.0000 1.0000 70 0.5000 1.0000 1.0000 1.0000 1.0000 1.0000 71 0.3333 1.0000 1.0000 1.0000 1.0000 1.0000 72 0.1667 1.0000 1.0000 1.0000 1.0000 1.0000 73 0.0000 1.0000 1.0000 1.0000 1.0000 1.0000

  • Distance from bottom of active core (feet)

MILLSTONE - UNIT 3 TRM 8.1 - 15 LBDCR 02-3-12 September 19,2002