Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
JREGULATORINFORMATION DISTRISUTION OATEN(RIDE)ACCESSION NBR82P3309149 OOCPATE!82/03/23(OTARI'ZED:
NOFACIL:50>>389
'St.LuciePlanti.Unitt 2EFlorida'PowerKLightCo~AUTH'AMPAUTHORAFFII,IATZON UHRIGER~E~'FloridaPower8'LightCo.RBCIP~NAMERECIPIENTAFFIL'IATION EISENHUTED.G.
DivisionofLicensing
"
SUBJECT:
For,wardsresponsetorequestforaddiinforemini'urtge sosvalves.DISTRISUTIOIJJCODEl A03ASiCOPIESiRECEIVEDIL'TR
.'IENCL,~(SIZEI"3LTITLE:Containment
~PurgirigNOTES!DOCKET05000389RECIPIENT IDCODE/NAgE LICBR03BC01INTERNALs IE06NRR.SHUMED 15NRR/DL/ORAB 10NRR/DSI/AEB N/ETSB.08REGF04~COPIESLTTRENCL771111111111RECIPI/NTIDCODE/NAME NRRREEVESiE14NRR/DE/EQB 09NRR/DSIAORSNRR/DSI/CSB 12NRR/DSI/RAB11RGN2..COPIESLATTRENCL11111011EXTERhlALe ACRS13NRC,PDR02NTI'10101111LPDRNSIC'0305111rTOTALNUMBEROFCOPIESREQUIRED~LITTR"33'NCL'32
'qX('rIrr'Irgt~W>>r;~I',yll3(.'<<fI~It<<<<,<<ftrhIllIIgrtf<<Ir<<~t<<II)lr4Il(.Igrr>>rr<<iqr'4>>~rh/1~3fi,(~'I'fair1<<>>fr>>r'lIg1$4QrIrr<<IOE P.O.BOX529100MIAMI,FL33152FLORIDAPOWER5LIGHTCOMPANYOfficeofNuclearReactorRegulation Attention:
Mr.DarrellG-.Eisenhut, DirectorDivisionofLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555
DearMr.Eisenhut:
Re:St.LucieUnit02DocketNo.50-389Mini-Purge SystemValvesReuestforAdditional Information March23,1982L-82-110MAPP9)g8p~L$irihmqRE~IutnrC:l3Q+Itgi7@i~l!P1)P'nttcAttachedistheFloridaPower8LightCompanyresponsetotheNRCstaffrequestforadditional information regarding theSt.LucieUnit82mini-purge systemvalves.Webelievethatallstaffquestions havebeenresponded tobythissubmittal.
Verytrulyyours,otE.UhrigVicePresident AdvancedSystems5Technology REU/RAK/ga Attachments cc:J.P.O'Reilly,Director, RegionII(w/oattachements)
HaroldF.Reis,Esquire(w/oattachments) ggpp>pp149
>ppppelpsepsis-',~-'.'pog ADOC~pogfp',,'~")'i.it-p~'EOPLE...
SERVINGPEOPLE LgItg~1' PURGESYSTEM1.QUESTION:
Provideinstallation detailsforthecontainment minipurgevalveI-FCV-25-26.
RESPONSE
Theinstallation detailsfoxtheminipurgevalveareprovidedonAttachment 1(EbascoDwg.No.2998-G-869, R.6).Thegeneralar-rangement (P&ID)forthesevalvesisprovidedinFSARFigure9.4-11.k2.QUESTION:
ProvideEQandSQRTQualification data'forminipurgevalvesI-FCV-25-26 andI-V-25-25.
IRESPONSE')
I,TheSQRTqualification information fortheabovevalveswassub-mittedtotheNRGonDecember2,1981(FPGLLetterL-81-507) inresponsetoQuestions, 271'.1thxu271.5oftheEquipment Qualifi-cationBranch-SeismicDynamicLoadsSection.b)TheEnvironmental Qualification forvalveI-FCV-25-26 wassub-mittedNovember1981inresponsetotheGenericEnvironmental Qualification Effort.3.QUESTION:
Providetheclosuretimesforallthepurgevalves.RESPONSE:
Eachpurgevalveisdesignedtocloseinlessthan5seconds.4.QUESTION:
Whatisthemaintenance programforthebutterfly valverubberseat?RESPONSE:
Amaintenance programwillbedeveloped forSt.LucieUnitf/2simi-lartoSt.LucieUnit//1.ThepxogramutilizedforSt.LucieUnit/!1involvestestingto10CFR50AppendixJrequirements.
Seatleak-agetestsareconducted every18monthsateachrefueling outage.Anyrepairorreplacement isdoneasrequiredsubsequent tothetest.Inservice inspection isperformed onthevalvesevery18monthsinaccordance withtherequirements ofASMESectionXI.5.QUESTION:
Areallsolenoids usedwiththevalveoperators environmentally qualified?
RESPONSE
TheminipurgevalvesutilizedASCOsolenoidvalvesPartNo.NP8321AIE whichmeettherequirements ofIEEE-3231974,and344-1975assub-stantiated bytestingvalvesofgenerically equaldesigninaccordance withASCOqualification specification AQS-21678 Rev.1,2/15/78.
6.QUESTION:
Whatisthe'stablished ISXPxogramforthevalves?RESPONSE:
TheInsexvice Xnspection Pxogramwill.followtherequirements ofASMEXI,1977Editionthruthesummerl978agenda.Thisprogramwillbesubmitted totheNRCforreviewandapprovalatalaterdate.7.QUESTION:
Dothepurgevalveshavehandwheels formanualoperation andhowdoyoupreventoverriding Automatic Isolation?
RESPONSE
Thecontainment minipurgevalvesareair-operated valveswithspringactuators providedforpromptclosure.Thosevalvesaredesignated containment isolation valvesandreceivetheappro-priateCIASforclosure.Handwheels areprovidedforvalveopeningandareusedonlyiftheairsupplyisnotavailable.
Xfthehandwheels areutilizedfoxopeningduringnorma1plantopexation, thevalvewillrequiretherestoration ofthisin-operablevalvetoOPERABLEstatuswithin4hoursorbringtheplanttoHotStandbywithinthenext6hours.Theseprovisions willpreventoverriding oftheAutomatic Containment Xsolation.
8.QUESTION:
Howisclosureofthecheckvalveonthemini.purgemakeuplineassured?RESPONSE:
Duringoperation ofthecontinuous Containment/Hydrogen PurgeSystemmakeupaixisprovidedtothecontainment viapenetra-tionP-56.Themotiveforcebehindthismakeupairisthe'light negativepressure(approximately 3"W.G.)createdinsidecontainment byt'eoperation ofthepurgesystem.Isolation ofthemakeuplineisassuredbyapoweroperatedbutterfly valveandaswingtypecheckvalve.Thischeckvalve(I-V-25-25) isdesignedtoopenat1.4"W.G.andisspringloadedtoinsureclosureascontainment pressureapproaches atmospheric.
Thus,thevalvediscwouldbeatrestagainstthevalveseatpxiortothegeneration ofelevatedpressures insidecontainment duetoapostulated accident.
Valveintegrity isfurtherassuredbyitsdesignpressureof150psigandadifferential pressuretestat75psig.Thisvalveismanufactured'by GPEControlstoASMEIII,Class2standards andisseismically qualified.
(J~'
Qmesz~~~~-~-'Ks-'EsCELPzs-oFLAN~~B....,
"..cPaN.>$6,84461.ld-o.
FQ.RcoQYi+o~vioQ
~~Eg4'll)5,Qg,'goy~gy/@~yqg@@g,@',~'m~.av~ZESTYKSR.CZC'-0"'~"parwcrgdu~~,:.
TOSSVSISLEfIOURE6241I~aepppccSSt~)ac.Qgtg4.aire~II'IQCIAIIa4lyaJC5&c:MlPat~caL"--,@pe>>ac'1ICjfagVa4>>I~acPaIIOIAAA+~taaaoaa>>~PncCVIIIaI~~~~rIQgg~PPa~ar,->>PIgVgg)I'eaca.tacI~11Iapa@Pg11,'ISSSU>>~paP~e.~~II~'eeoc@,rvQQ+>>f~WNIIIoPaI'lctIa>>Clp>>Palcpa<g~..~I'CK,Zaaawaaecea~Ia>>r~e~AI~~1.~.>q~ecalalaaeflaagecaIPut~\raVPPI(4CONT'NUOUcI Iac~I~CcpepaIcaccaepr'ccaaac>>a
<a1+P>>-+).-SCHKH5-OCONT+<4%V JNYCEOCgl PUSGI6YSIrgggpf<<TCAVOIIY%YICC AIICtCtWtIIT NO,O1LOIIFLORIDAPOWER6LIGNTCOIIPAN'Y ST.LUCIEPLANTUNIT2IllcOIIC:raal Ol20IICOIICIAIAIVclCONTINUOUS COHTAINIIENThIYOROGEN PURGESYSTENP6IOFIGURE9All O.CESrS<;caItgS1c5*~lA.LOCATIONOFLIHITSWITCHKSADJUSTABLE SCREWSTOPSSEATSIDEBELLINLE1'CREEN BYPRATT(ITEH11ONLY)CUSTOMER:
FLORIDAPOMCUSTOMERP.O'RATTORDERNO.~0OCPROVEC.:ST.
LUCIEUNIPRATTOPER~ATEOUANS)ZPOSiO287!I'-rTT18<<112GAGALVANIZED WIREI<<~QHFSHSCREEN.LIHIfSWITCH1N~P~TZ,CONDUITCONNECTIONSG
---H~-APPROX.LOCATIONOFNUClEARNAHEPLATE~s~BLHH-sea'LVIVVVVhVaV~FPI.ACEEOUALLVSPACEDSTRADDLECENTERLINE G=BOLT,CIRCLEr=""'"'*'""
""""INTERIOROFVAI.VE'XTERIOROFVALVEANDOPERATOR:
CARBOZINC11~ALiXOHENRYPRATTtQg,'W.EAIIPSIATfllllllEIhlNOQOCITClAT4hR77SIC>>NCCLCAHHlLHCNANCSLAEC
)SCCAACNCO01AEONOHlOCATION)
OEEHIHG7IHEGSEC~CLOSING7IIIE~SEC~ucSra,~2~EnlQlIice~
~uP-H4-y'~Qozs.:gAir<"-<>ke.rYwcuE.BY:DATECHKDBy:DATEOua1i.ication Sur.-..harv ofEouiny-.en-7~4PlantHare:STLUCIEUNITNO.2]faa-"Qti)$0)TFLORIDAPOWER6LIGHTCORe"NSSS:CE3aAfEEBASCOgfgermen~gaV4c5/2EynkBIZV~KLt/6c~"j~Tee:PMRxScope:f)NSSS~So~Z.gode1gunger:L02"IO-0Ig-lguanttty:~~
~D~<3Vendor:4Eftheccnpcnent isecabinetorpane1.nazeandeedee1No.oftCevicesinc1uded:
a6-Location:
Suilding:
/,EJevation:
5)e-C)OE'Systeetn'wMeAlanated:~d+lŽ~8d<1Ai4,+YD.~%464YSPcTstheequipment requiredfor~HotStandbyfgCoShutdctl3Sothheir12/M
~4'V1R'Vo-=,-.:A~a~sc~lforTE's.".ionfn-""e>'~"-"-:t~444~~&&%A&%&am%A%~&&&~A~&%&W&WWaaaW~Yes[ySoE=.i~=.e".t
~~a1ifice-'.;..e'.ho(.':
.~&&a&~~%~w%%Me~%&%Os&~E.3Tes:fQ4:elysfsfJt.cO't>ono.s~~a4penal1fsa544gunNficaionReour.~:Q(Ro..nc(eanoDa:e)p4~l-p(sopPFQ(-(pcorpsesshatpreparecR,or..~pgcol4(T~~4Vbra.OnlnJ~%&~&~a&~
~1~Loamcons'eC:~~u.fSeismicon1y5,g)YyCro~ne-ic onlyc,.f)Cosine.ion ofJulandfO)I44I~Its.Re"circeResporsespe..ra(o:eachhesraphs):PTTQPr(PAII4Dorp(nSCottespoflc'lllS CoRRS:DS=Wj~oSSESRe",uiree Acce4er.:n,inEachDire~ion:
[QSaAjgCc.",erEL,(B.CD'>Se~:aoS's=s/s-cp.as'p/s-G.C'$e~ac9.,SSaS/So@uF/S~Verefat'.peei.e..s'or ohermitra-ion coedsconsidreCTTfyes,cescr'.be DOedsconsCere('.
andhwthey(ertweeterino>>raElqua1ificat.on yrogra=:~a%%~%a~~~NUDGEgfcarehanonereporco'ru1ete
$ecIVthouVDforeecnrocr.12!Lj 1
0~~V$~~fcngy~glygfs~h1co"4ePIP%P%PPPP%PPPPPP0PPPPPPP4PPP~PPP0Pta%PPtwPPIP'Heho~ofArw'.gris:
ckf3$':a.fcQaTgshiqv'.valen.
Sta.icAnalysfsf3DynamicAnalysis:
5)Tive-his.ory f)Rs-ensepe.r"=~PP~2.SuturalFrecaencies SaKecbOfrec:ion (SiCe/Side.
Fron-lSa4.
~ec'1):Pe'PP'PPPPPPPPPPPPPP%[)zQf1Seem5/S~PPPP00PIPPPPPPPP~3HodelType:f,gMf)FinS:eKlewnp~ID(1csedFor=S-:mt,IItI45oHe.bodofCominform Ops->>'cResponses:
8.Oemfng:0'=IS=SesksAsolu-.eSu~<gS~SCpne"'PaasaP~OPPPOPPOSEPPPOPPAPPPgs,=eB=.I7 ffar:ltefh~<ayIIM"':t4I'oncerning t,oadorResoonscSeismicTo.alAPBePlf<cc'fenj(4Pfon'0naoon~SssSoressH<<fE.$144FT.,~<~~ii~l8,9S'sp>'eIIIII.',Location P~Lt8)Disc.I-tt~8.Z~.S~ssPPPPOPlP4sop~~Vexing:rQl~ab1eDefie..ioncoAssureFunc:ipnal C-c.xbflilyPP00P0PPPPPPPPPP00P>>~P>>'PP9.Rex.Crffcnl"DeflecPion PIPPPPPPP'PPP%%
lO.ogo.coIrd.+El5f4if4 LPADilJQ:
i.i8+(j.fEtiI)yll8=P.75P(++~~+U~TEP kl57V~I.~~~l-~++
~lHzPh'l,&.Yptsc.
1~50'1~'QO~~VLSTVhVOlTSL~Le~5TOVVh55hfeLK}tVLLttl05hKOe000 Sflhl}5lCVT51fSO.SFLOORSPECTRAHURIZQNTAL e.-H..4H-S.OBEE.4OKSl~"iREACTORBl.OGHASSPT19KL68.0ISLTaElCe4g(lubfeuT'.
~~e~~1'0~I~~g~1~201~101.00O.SOO.eo0.700600.50Oo}lO0.300.200010'~-~~~ZC)~~~~~(J'.ee}-~CC':~.s'.~~,~~~)~~e~,~-.}}~1~00~e'e~)~'~,)~~~~~~I$~eee~ec~2e00PICURE2~~l7i'll"'777'77~5.0010.0020.00FREQUENCIES fCPS30=2'I.SO.03\'1IIIlltl~e~~~e
).00FLQORSPECTRRVERTICAI, QBEE=QOKSl.REACTOR8LOSBASSPT9KL68.0~'.-'..Cl'GELC:OLlTklUMSLJT KfZ7lNICL1~ST.NC:t)la>>'19%II00Oo000QCITCNCIfIeOo~Wr0.900.80~~~~IIIia.70L~0.60ICC4JQ,oQ(p0.50q.!~"s'.~~I~~~,I~I~o0.300.20IeIGGRE30>>10~~],00-=----=---Roaa-s.ao)0-00'ao.ooFREQUCIMClCS (CPS).so.oagc.0,'e~~<<~See<<OSO<<et Oae<<eSea+>>I~'~OOSOie1~Ia<<aae<<O,<<SO<<a4ae
<<GeiS<<SS'a<<i.~~Ale<<SS<<eeSeaaee<<aala4ae ASSTOSOSS~~<<oM>>oIe>>~~~ot...e,~e<<
2400f1IIC"lREACTORBLOCBASSPT16KL68.0I'wMtLClllblPOtNAtlo'rStLJtar.tactici:4)Ã0.0$0+000OIQJQ%CJ't>sf lO.014901480~~~4~~'KTEBL.COQTAlQMSug
'ST@-]4'70-14601~50loQO1o301~201~'101.000.90~<'u~%.080~04100.60CCLUCII-r,~>,~~~~'E,~IQT~'IrII'q.~~~4I~~6~~~~~0~~~050.00004300.20Ool0II~lRz~~~~~~~~6~~~0I.'IIII'I'I~I~IFIGURE5i.00.,S005001000ZO-00FREQUENCIES t:CPS)5000~~r100rrl~044~r~r04>>I~~~trN~~~~
~~2+00)ISO).80l~70)o60)ISOI,0~qFLOORSPECTRAVERTICALOBEE=OOKSIREACTORBLDGHASSPT9K680-.~%caL'~~QM&v7 srq:.:PLClt5b~iAtt~Nitty1'90.000tlKit~to'tt DefRLt~II~.~~gtatt0~)o30)+20',a~IO"""3~00Vo90O.eo0.700.600.500.900.300.20~0.10~~~~~KQCCJ~tt.~~~-~I~~~'II~~W>>I~~II.,IIIFl.OORSPfCYRAHODIFIKD00'lAT10HIl4fRERtt'LNctES.
4T'fP.FIGURE6OR3%~~lF002.00S.00)0-00FREQUKNCIKS t:CPS)20.09IISO00
~~~~.'.'.'FL SPECTRAN-568E.Eetl'40<<<.3>>60'>>QO3>>203>>00*~:..-:::.2.802>>602>>QOI~~p~~.'.*.2>>20-:"..2>>002~80ie60~~':I.lyQO~~l>>201>>00'>>800':'I:','>>A>>BLDOKt.%2>>s~~~>>I~'~~e~)~Igrllv~~Ud(~O'~~...(KI~i'I~~,(~.~.~~~'vv'~.~mmieac-
~~Ig,gg7iLtgavioto4>~~p~0.600>>QOFIGURE11~O>>20'~~l>>002>>00500tO>>00FREQUENCIES (CP5320.00avvAAvv~Ve
~gr~~~~~I~'hr)'~~4glIC' I~s~~~~'I.t~t3.603.'403o203.002o80Ro60Ro40"2o20Ro00,~~1o80IQ1o60i1oQO1~201~000.800.60-;:.FLOOns~ECTRA~-vOBEE=QOKSIgo)g~~~~I~AoAoBLOSEt.QRo'SIFI'.I.~~~~~~I~~~-I,CC'Io~'(g'="rIr"~r~)0~rII~~~)~rI)~~gI~~OIfiTCADSTCCCRACIterreCOQQYst.teatr~Rm.st,ooo rraetatcs.cat m.QDo%0~I~~PIGURE1)Qo200~2X1o002o0050010.00FRFAUFNr:~F~
rr.~~~20.00l~T<'l.I.'0
~C2000FLSPECTRAVERTGBEE-"40NSI4UXacOGwpVKt.Q2.SWiN:DlWSof)t$I0<<ge'Wtfrtot!Cetae!i019CSMrO.'0 l1ttetN!0)I'f'lflOC01~90l~80l.70~~~~1~SO-10001030l02/l010.l~00l009000800..700.600.SO~1o'ro,(g~~~~'Ih~~~)~r'0IIirwQ't~=oC~~~~~~~~~~~II~~0040.0.3000200.10~~I~~FIGURE33Qsg%~~pr100020006.0010.00FRKQUENCIKS (CPS32000tSO.03 I~~~~SIOOQI80'Q.60Q~QO~~~~~~FLSPECTRAN-SDBKK-AoK~rAIAIBLOGKL02ISQAIISltIT%AWlirasCA7LZfI)StS1I.,C:Oau':C:S=.:i-Wt n.t%Gal'~lan!
lQ~003IBO34603IQOo.aog3,003o.soJ2+602IQO2I202IOOi,aalI601I40lI'20r,,~~J~~~~CCUJ~erII~i~*II~~~~0*fI~M4IrCt~~~,VIIUREN)I00~OI80Oa60OI40OI20I~I~~t~~l43RlIOO2.00-S.QO10.00FAl=Allrr.r vrCrroc.~20.00~~~ass~sr FLGQRSPECTRAE-HOBEE~QONSI'few0ooA~.00o80o~AoAoGLOOBLQRo51Wll&f~(~tagV~ggygptSi.~:.'<Co:ar'%~OR,O.O
%lDtfd"CJlitFJB.60~QOoROF00Io80'.o60'o40!o20'.~00o60~QO~'~P~~~~~..r~'J~,'".i)'::.~,a'~~C)lCCCCUJUJ~~CJa~~~~.aO-lo00)o80)o60Io'I~PICUREI)~QO)o20'Q3%io002.005oooe'OC'hilt" asrvraro.ra~i10o00Rooo50.00 odtwop4Asd4l~
3020~10.00~~FLSPKCTRRV'ERTOBEE=COKSI(COlgRUXBAZOOHP7Kt.<r28li4tlPLtOCRleUc!?CMICEr..u..:cr.si;RlT9~e000
't?&KltCZr"%l?10.t.90.80s70o50F40,o30o20~10F00i.90is80i.70i.60i.50i~40.l.30la20)~LO,~~~~~~~~~~n~~1~CCCC~r~,.43Oa.~~~.~~~~0~r~r1~~Cq~~I~'~~~~!i[~II~~I~.I~~)~'rxcuazt6'Or3K>.002+00FREQUENC?ES (CPS)20.0050.00 Ouaii!ication Suc;..arv o!touicuant Plant.'far"e:STLUCIEUNITNO.2Utility:FLORIDAPOWER&LICHTCO.~Toe:PMRX1'IZeNSSS.CEConcone.".
Ha."skPW3A/E:aaaecoBn'RPu(mS~C"P-'P'-Z>Zlg c4Scope:53htSSS~SOP//'ModelNunber:8'gXVendor:rz~HHQuantity:
4Iftheccnpcnent isacabinetorpanel,nar:.eandrachelNo-m~edevicesincluded:
6.Location:
Buiiding:VcFZV4'>Zdc"c'~~>>a Eievation:
Zev'd'aCoSystiinwhichloc'ted':
~~~Istheequip;.ent requiredfor~HotStandby53Co<~Shutdoi C3BothCjlfw=r J
~~III.IsEouip.-..ant PtiiiiahleforInsoeo:ion inthelit:pgYasfglioIV.Eouiorent Qua15ficat'-ra
..ethod:E1Test)~3AnaIysis'uaIiiioation Ileport:57~Zyn~+itHo.,TitieandDate)2>-iOO9'8
-/ODl//',Cospany thatPreparedP.por://w/ry'~a'7 PIIII,'"Vibration Input:It.oadsconsidered:
aMSeis-.conlyE1Coriination ofTes-andAna1ysisb.{.gHydrodynamic on1yc.jgCorbination offa)and(b)42.'tethodofCominingRRS:t:gAbsoluteSumt:gSRSSi.3-RequiredResponseSpecratattachthegraphs):4.OarpingCorresponding toRRS:OBE,55E~&w~&M'wu~E'3~o-ner,spec>~gc'cpsfpf4.vAsOthergp~/d/'a\(RequiredAcce1eraioninKa&Direction:
fgZPAiS/SI'F/8~S/S~~"f/8~Merefatigueeffectsorothervibration 1oadsconsideredT OBESS"6'C3Yes'~Ho:Ifyes,describebroadsconsidered andhewtheyveretree;edinovera?1qua1ification prograr-':
ONOTc,.WW&WW&WW&W\~W~&W~WaIIfwerethanonereportcorp1eteitemsIYthruVIIforeachrepor12/BO
~lN'1.I3SingleFrequency 2.t.3SingleAxisf.jmulti-rro""fancy:
t.jHulti-Axis YI.IfQua1ification byTest,thenCo.-..piete~:
t:g'andomC1sine~"L1NfNl(aturalFreouencies inEachOirec-ion (Si¹/Side, Front/Sack.
Ver-ical):
fiS/S~Fz-flv-NIIN8.Inouta-levelTes:OBES/SSKSSIF/B~CN:estResitsinclu10.Functional ooerabilt-vriied:EgYes53Ho53NotApplicble11diaeftdQ;,~!'ote:Ifqualification byaco~ination oftestandanalysisalsoco~Nlete"ItemYII12/80N
~~HVII~If0"aiifican bymaiysis,thencn;..nIete:
~'%WWWI.methodo.Ana1ysis:
{.3StaticAna1ysis~Kquiva1ent StaticAna1ysisE3DyhamicAna1ysis:
fjTire-History fgResponseSpectrum2Natura1rrecuencies inEachDirection (Side/Side, Front/Back, Ver-.ical):
280H~gs0&'AaeO&%%&WW3.Hode1Type:gg30E3~D~IDIIHfgF'initeK1emntf3Beam~ClosedrormSolu.5-."methodofCominingDynamia'c Responses:
E3Abso1uteSumE3'.PSSMOther:SESS 2~o~lz,+uE~rtc~agspecivy) 6-Garying:OBE'SEBasisforhedampinoused:W%%W~WW&w&w&w~B.Hax.Critica1Def1ecionl.ocat$onMaxirumA11cwaole Derlec.iontoAssureFont-iona1 Opera-bi1ity' A/E:EBASCOSERV1CESINC..UfILITY:FLORIDAPOKERbLIGHTQ~~szFAC}LITY:
COMPO}4ENT rdTipST.LUCIEHO.EVALUAT}ON SHEETNSSS:COMBUSTION ENG.-PVQCAPACITY:
890MV(E).V~0CESe-0447 EOUIPM}N'fIENVIRONMENT DESCRIPI}ONIPARAMETER SPECIF}ED tDOCUMENTATION IDUALIF}DEM.OUAL1F.ISPKClFlEODEM.OVALIF~fME}HOGI2--<<I--o-o3o--4---I-5IOUTSIITK}4SIH/M!oo6Ieo7ofTAGHO:FCV-2526(01APIOPKRABIL-I HRAGM.F.C.
)--I:ITYI.==--=-=INORM/TEST IVALVESIOBAIEOUIPMENT:
TYPEIIIIII---=ICOMB.ITEST6EXTRAPOL'N!HONEIACCKLT}MK:IIACCKLTEMP:el----CDMPONENT:
B'TFLYfTE}4PERAT t9}.SFNORMUREtI.----=I!}BF1200HR ITA821FfISL2FSARII1'ABLE3}f-I ICOMB.ITKST6!EXTRAIMtHONEfRKPLACEMENT:
MANUFACTURER:HENRY PRATTtIIIo\IT395--}IPOL'N!eeaeaaooeeoeeeeeeeeea!MA(NTA!N~IPRESSUREIATMOSNORMIIOPS1GIPAB21I!SL2oFSARICOMB.ITF.ST6!NONEII14AJORSUPPL1ERMODELAND:.SER}ALV*FUNCT.DES:
CONT1SOL:.'SERV}CECLOSE(C1AS)
TEST6.IEXTRAIISPRAYf~III-!IIfI-.-'I(ACC.OBA)IITABLE3ft1IIEXTRAIII}P394---IIPOL'NIeIRELATlVE}58.0%HORNI'IHA827F='IICOMB.IHUMIOfTYf--...IISL2oFSARI'ITEST6!I~I60.0)(}200H
!'TABLE3}tet I--..}EXTRAI==-.-=I;,.,IIH395IIPOL'NIICHK}41CAL III---I.....ICOMB.II/IIII/IISUBCOMPONENTS:
Ie'INOUNIOUETAGGEDNONEISUBCOMPONENTS ARK.,IENVELOPED BYTHISIKOU}PMENT IoeeetHONKIACCUR.SPEC:HDTAPPL1CABLK oeeee\ept~COOQDlNATKS X-609.0Y-}5!6.0Z-45.0T35.7P35~7H35.735.7R35.735.735.7~~e~~~~ee~~~e~~~e~e~~~~~eeeet}RAD}AT}ON PHYSDVGREF:2998G.395 PHYSDWGLOC:MOUN11NGEO.DOC.LOC:
'IAGINGISUBMERGENCE
!SARENVCAT:K10588CA1EG.:A!APPENDIX EIIt2HRI4803.0E4ACCUR.DKMotNOTIA30OI5.0ES5.6ESAPPLICABLE IDtYR!1.3E55.8ESI.40YR/R'@IS.OE3
5.0 KSSPEC1F1CAT1ONS
ItAGE-P.OP:422537I1NSTL1FEIl(PEQ323-IPLA}41;LOC.:AB21I!974OEF.)IIISUBMERGEOI IYES/NO!II}IINSTALLED (Y/N):LTRIINSTAL.RKF:BY-FLO PARASUPPL.OUALIFEXEMPIN:NOTAPPLICIMETERREVIEW~~e~~~~~~~~~~~~~~~~~~~~~~~e~~~IOPERA81L ITY~DUALIF:~ITEMPK'!ATURE
~STATUS~tPRESSURE
~fREL.HUl4}O}TY
~ICHK}4.SPRAYIIRAB27UItISL2-FSARIIITABLE31lef IIR395II}OCFRSOItIPARA50.5}IIIIIIIIIIIIIIIooPOL'NCOMB.TEST6KXTRA-POL'NtICOMB.IITEST6!EXTRAoPOL'N!ooeeetINONEIolHONKIISAFETYFUNCTION:
COMB.HOHEITES!6}IIEXTRA-ItIAUT}(.
REFERENCE:
'IPOL'NIII3.9}0ooeeo~eeoIOPERATING
REFERENCE:
}PREP/DATE
- C/5SIGNOFFS!CHECK/DATE:OQ EOUIV.INKO.FILEIOUALIF1CATIDN REFERENC'E fRKV>-0!PREP/DATE
- CKSSIGNOFFStCHECK/DATE:OQ Enu}V.INKO;FILESYSTEMITAGFCV~2526}DIAPHQAGM.F.C.
}IOIHEREOU}PMENT TH15CESAPPLIES1'0:IIFCVo25e!(PISTON,FC)
IIIREFEREHCES:
~~S%eDISCUSSION ONMAINTENANCE PROCEDURES RUBBERSEAT:TherubberseatismadeofRESILOSEAL N*whichisanethylenepropylene compounded specifically fornuclearserviceunderelevatedbackground radiation andtemperature levels.Although"indications showthatRESILOSEAL Nhasanexcellent servicelife,notenoughdatahasbeencollected toaccurately predictitsexpectedlifeundervaryingconditions ofuseandenvironment.
Itis.knownthathigherradiation levelsandtemperature shortenthelifeexpectancy oftheseat.Failuremodeischaracterized byashrinking alongwithahardening oftherubberandeventualcracking.
Forthisreasonwerecommend thefollowing semi-annual checks:l.Avisualinspection oftheseatbemadetocheckfordimensional shrinking andcracking.
2.ADurometer readingbetaken.(Ifareadingofover75isindicated, werecommend thattheseatbereplaced.):
Thesearestrictlyprecautionary measurestakenduetotheI'ccelerated aging'.causedbyradiation andheatandthefact..thatrelativelifeexpectancy canchangefrominstallation to,installation.
- Resiloseal isatrademark ofHenryPrattCo.,Inc.0-5.
Cf'E'4 Forinformation aboutPrattRubberSeatButterfly Valvnotcontaative,orinedinthismanual,contactourlocalSalesRepresewritedirectto:HENRYPRATTCOMPANY401SouthHighlandAvenueAurora,Illinois605071Jl~IIItlfII~1III'III,ii,If~gati~yIff,i'~I'ffIIj0-6 J'~+~
REPLACING RUBBERSEATINNUCLEARBUTTERFLY VALVEA.DISASSEMBLY 1.Turndiscinopenposition.
M2.Removeadjusting screwsinsegments.
II3.~Numberallreta'ining segmentsandmarkproperlocation"onvalvebody.4.Prysegmentsoutofbody.5.Removeoldrubberseat.6.Cleanseatgroovewithcleandryrag.B.INSTALLATION l.Applylightcoatofsiliconegreasetoseatgroove.*2.Insertnewlinerseatintoplacebypushingrubbersnug.3.Insertsegmentsbackintobodyandinstallscrews.4.Closevalvedisc.5.Tightenallsegmentadjusting screwstoassurereason-ableinterference betweenseatanddisc.6.Bubbleorleaktestvalveandtightenadjusting screwsasneededtostopallapparentleaks.MI*Werecommend DowCorningvalvesealorDow..Corning IIICompound.
Pleasenote.thattheuseofPetroleum greasenegatesallguarantee 0-7 g~-s~~mathSxvkekCo.'IManufacturere otDEPENDABLE CONTROLSince1SBS.?ARK,NBVJERSEY07NiNQPi2OOceegoo)N.Y;taQl34.3reS~~I(~(((~((tCERTlFICATE OFGOMPLIANCE
'eI'CFXndusteiesg Xc...".CustomerP.O.No.~"~I~~~~'ASCOShopOrderNo.063H~~(-:ASCOPaIINO.
~~~+Ua((IIIP~\,~Pwo,~pot~l25"VDCPngJobNo672L5CHECKEGKBY(~Peocertifythatthesubjectvalvegs)meettheperformance requirements oflEEE-323-1974,
$82-1972andlEEE-344-1975, assubstantiated bytestingvalvesofgenerically equaldesigndancewithASCOQualification Specificatio AQS-21678,Revision"B",2I15I78.els-IgSimolatio'n (ThermalAging-268Ffor12'daystosimulate4.4yearsat140Fambient.Thetesttemper-atureandperiodarebasedonthe10oCrole(Arrhenius Equation).
'adiation Ayng-50megaradsofgammaradiation ataratenotcxcccding 1mearadperhour.IWearAging-40,000operations atmaximumoperating prcssuredifferential andnominalvoltageVibration Endurance
-1mQlioncycles,'distributed equallyamongthethreeorthogonal axes,between50and100Hz,ataninputacceleration levelof0.75g.Thevalveswerccyckdonceevery15minutesduringthetest.'Xleywercattachedtothetablebyrigidtestfixturesusing.thestandardvalvemountingprovisions, withthesolcnoids verticalandu>tright..Flexible hoses~wercusedatallports;thercforc, thetestsetupdidnotaffecttheriydityormassofthcvalvesi.(bunotested.47~~~(Ia~I~~~~~~~~e!cEventSimulation
-Thevalveswereattached,to thetaHebyalgidtest.fixtures usingthe~,Mdvalvemountingprovisions, withthesolenoids verticalan8upright.Flexiblehoseswercata11ports;thercforc, thetestsct-updidnotaffecttherigidityormassofthevalvesbeingd.Theseismicshakerusedhadthefollowing minimumperformance qharacteristicst 1-2Hz~~~~I~~~~~~~~~~~~~~6"doubleampltu8c~\te~~O~0+02-33~.~~...~~~..~..35snrsec.velocityt'aiacceleration
- required, thenconstantacceleration.
(IC)perating BasisEarthquake (OBE)-'Acvalveswereexposedtotwosinusoida>
sweepsaug".(withinmachinelimits)ineachorthogonal axisfrom1-33-1Hz,at1octaveperainotc,zone
@veepwiththevalvescncrgbedandonewiththevalvesdc-cneryzed.
Thctwosinemvet.'psarcdesignedtoprovidethemechanical agingof5OBE's.Paaclof2 l'fII~~l~ISECTION2DESCRIPTION OPTESTSAMPLESThefolloving descrpioitionofthevalvesamplesvasprovidedbyAutomatic SwitchCo.Isomedixnumbersveremarkedonvalvehousingwithamarkerpen.t~g~~TABLE1VALVEDESCRIPTION LISTIsomedixNo.8ASCOCat.No.HVA-206-381.-6P NP8344A71E HVA-206-380-3RP NP8320A184E NP831665E NP8321A5E DCClassHleadedcoil,Nema4,7and9solenoidenclosure, normallyclosed,3-wayconstruction vithmetalseating.DC,ClassHleadedcoil,Nema4,7and9solenoidenclosure, 4-wayconstruction withresilient seating.AC<ClassHscrewterminalcoil,Nema6solenoidenclosure, normallyclosed,3-wayconstruction vithresilient seating.AC,'lassHleadedcoil,Nema6solenoidenclosure<
normallyclosed,3-wayconstruction withresilient
seating.1DC,ClassHleadedcoil,Nema4,7and9solenoidenclosure, normallyclosed,3-vayconstruction vithresilient seating.DC,ClassHleadedcoil,Nema4,7and9solenoidenclosure, normallyclosed,3-vayconstruction vithresilient seating.NP8323A39E
={Solenoid A)AC,ClassClassHscrewterminalnormallyclosed,3-wayseating.Hleadedcoil,{Solenoid B)DC,coil,Nema6solenoidenclosures, construction withresilient 0anC4O09Irt09OIV5Qsg4nQlUlQtr9ol08'0rt0IQl0I8lA'MUlQl~piQ0IVl8cf'rtP8QV5rt800N4bQlnH0 CQCATALOQNQNP832IA1E gl25VDCB.SafeShutdownEarthquake (SSE)-Thevalveswereexposedtosinglefrequency sinusoidal testsat1(3octavefrequency interv'al dwellpointswheretheg-levelwasrecordedatwhich'hecylinderportpressure(zerowhende-energized andfullinletpressurewhenenergized foranormaHyclosedvalve,oppositeforanormaHyopenvalve)differedfromthenominalby0,5and10%%uoofinletpressure]upto'10gmaximum).
Thevalvesareconsidered tofunctionproperly~:'ptoa10jochangeincylinderpoitpressure.
(Thislevelwasselectedasbeinoinsufficient to:'.causespuriousshiifting ofthecustomer's mainvalveorotherequipment).
Thedurationofeach'dwellwasthetimerequiredtooperatethevalvesthroughonecompleteopenfclose cycleor15..'seconds, whichever waslongerMotionwasapplie8atthesamefrequency andacceleration
':"'limitsineachofthethreeorthogonal axesseparately.
~~~~~~'".'Maximum Acceleration:
.-.i~~I~+Pro~~~g~..;3.0ga11conditions V~~~~~~4,~~~~~~~o~~~~LossofCoolantAccident(LOCA)-Thevalveswereexposedtoanaccidentdoseof150megaradsofgammaradiation ataratenotexceeding 1megaradperhour.Thevalveswereinstalled inapres-surevesselandsubjected toa30-dayexposureofsteamandchemicalsprayfollowing thesuges-tionsoflEEE-382-1972 (chemical sprayperTable1(b)andtestchambertemperature proQleperFigure1andTable2).Thevalveshadbeenpressurized tomaximumoperating pressureandcontin-ouslyenergized for4hourspriortothefirsttransient (toproducecoQsaturation).
The;iwerede-energized whenthetemperature oftheesttransient reached280oFtoshowsatisfactory shiftingfordemonstration ofsafetyfunction.
Thevalveswerel'eptpressurized andwerecycledduringthe30dayexposure, assuggested inlEEE-382-1972, todemonstrate theiraMitytooperateondemandduringtheXOCA.~~~~ThetestreportonAQS-21678 isonGleatAutomatic SwitchCompany'n FlorhamPark,NewJersey,andisavailable forcustomerperusaL~.rOO'~~hI,~II~'ated~~Authorized Signature
~te/c~~richK..PlautProjectEngineer~0Page2of2~~~0Chs'nnesvjM'pAghr%,
IAplI1CI}}