ML17301A042

From kanterella
Revision as of 11:37, 29 June 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Advises That License Conditions for 5% Power Completed. Power Ascension Will Be Commenced Upon Completion of Low Power Physics Testing
ML17301A042
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/06/1983
From: UHRIG R E
FLORIDA POWER & LIGHT CO.
To: EISENHUT D G
Office of Nuclear Reactor Regulation
References
REF-SSINS-6820 IEB-77-05, IEB-77-05A, IEB-77-5, IEB-77-5A, IEB-79-02, IEB-79-14, IEB-79-2, IEB-80-06, IEB-80-11, IEB-80-12, IEB-80-15, IEB-80-6, L-83-348, NUDOCS 8306130268
Download: ML17301A042 (10)


Text

Za-pP.X14000,JUNOBEACH,FL33408FLORIDAPOWER&LIGHTCOMPANYJune6,1983L-83-348OfficeofNuclearReactorRegulations Attention:

Mr.DarrellG.Eisenhut, DirectorDivisionofLicensing U.S.NuclearRegulatory Commission Washington, D.C.20555

DearMr.Eisenhut:

Re:ST.LUCIEUNITNO.2DOCKETNO.50"389COMPLETION OFLICENSECONDITIONS FOR5%POWERThepurposeofthisletteristoinformyouthatFloridaPower&LightCompany(FPL)hassatisfied the5%powerlicenseconditions, whicharedescribed inSection2andAttachment loftheSt.LucieUnitNo.2Operating License.Uponcompletion ofLowPowerPhysicsTesting,FPLwillbereadytocommencePowerAscension.

Pleasefindattachedadescription ofe'achlicensecondition andhowFPLhassatisfied thelicensecondition.

Verytlyyours,'obertE.UhrigVicePresident AdvancedSystemsandTechnology REU/RJS/JES/rms Attachment cc:J.P.O'Reilly, RegionIIHaroldF.Reis,Esquire.--------8eko60~830b13026 050003EHt'PORgoOCKpDRlriLIPEOPLE...

SERVINGPEOPLE l~I LICENSECONDITION FOR5%POWER ITEMSIECTION2OFST.LUCIEUNITNO.LICENSE2.C.4.Environmental uglification ofMechanical andElectrical Euiment(Section3.11.5SSER3)*Priortoexceeding 5%ofratedthermalpower,thelicensees shallcompleteandsubmitforNRCstaffreviewandapprovaltheanalysisrequitedby10CFR50.49(i).

Status:FPLvialetterL-83-329, datedMay26,1983,providedtheinformation requiredby10CFR50.49(i).

Thelettercompletes allrequirements forthislicensecondition.

2.C.8.Continuous Containment PureSstem(Section6.2.4SSER3)Priortoexceeding 5%ofratedthermalpower,thelicensees willmakethenecessary modifications toassuretheoperability oftheContinuous PurgeSystemintheeventofalossofcoolantaccident.

Status:1.FPLvialetterL-83-286, datedMay10,1983,,providedtheresultsofamodifiedcalculation whichshowedthatthemaximumfloodlevelwouldnotsubmergethesupplylinedischarge enteringcontainment.

Following reviewofthisletterbytheNRCstaffsomeadditional

'nformation wasrequested.

Thisadditional information wassubmitted viaFPLletterL-83-328, datedMay25,1983.Thiscompletes allactionbyFPLforthisportionofthelicensecondition.

2.Thedamperbetweenthedebrisscreenandthe.inboardcontainment isolation valvehasbeenremovedandthiswasverifiedbyaRegion'Iinspector.

Thiscompletes all'actionsbyFPLonthisportionofthelicensecondition.

2.C.13.FireProtection (Section9.5.1.11(a) and~(b)SSER3)Thelicensees shallimplement thefireprotection programonaschedulespecified inSection9.5.1.11(a) and(b)ofSupplement No.3totheSafetyEvaluation Report.Status:DuringmeetingsonJune2,1983,withtheRegionalOfficeandyourstaff,theimplementation oftheFireProtection Systemwasdiscussed.

Itwasunderstood thatthepresentdesignandconstruction statussatisfies thislicensecondition, andthatthefinalcloseoutoftheFireProtection System'ask willbeperformed bytheRegionalOffice.2.C.17(b)

ControlRoomDesinReview(I.D.lAendixEAlsoPartofAendixCSSER1SSER3)Priortoexceeding five(5)percentofratedthermalpower,thelicensees shallcompletecorrection ofthehumanengineering discrepancies asnotedinAppendixEofthislicense.

Status:DuringmeetingsonJune2,1983,withtheRegionalOfficeandyourstaff,thecorrection ofthehumanfactorsengineering discrepancies wasdiscussed.

Itwasunderstood thatthepresentdesignandconstruction statussatisfies thislicensecondition andthatthefinalcloseoutofthediscrepancies willbeperformed bytheRegionalOffice.2.C.17(c)

ReactorCoolantSstemVents(II.B.1SSER2)Priortoexceeding five(5)percentofthermalpower,FPLshallhavethereactorcoolantsystemventsinstalled andoperational.

Status:TheReactorCoolantSystemVentshavebeeninstalled andarefullyoperational.

Thiscompletes allactionbyFPLonthislicensecondition.

2.C.17(e)

In-Containment HihRaneRadiation Monitors(II.F.l(2c)

SSER3)Priortoexceeding five(5)percentofratedthermalpower,FPLshallhavethein-containment highrangeradiation monitorsinstalled andoperational.

IStatus:TheIn-Containment HighRangeRadiation Monitorsareinstalled andfullyoperational.

Thiscomplet'es allFPLactiononthislicensecondition.

ITEMSONPAGE2OFATTACHMENT 1OFST.LUCIEUNITNO.2LICENSEI.Thelicenseewillcomplete, tothesatisfaction ofNRCRegionII,therequirements ofthefollowing bulletins:

A.Pipesupportbaseplatedesignsusingconcreteexpansion anchorbolts(79-BU"02).

B.Seismicanalysisforas-builtsafety-related pipingsystems(79-BU-14).

C.D.E.F.G.Engineered SafetyFeature(ESF)resetcontrols(80-BU-06).

DecayHeatRemovalsystemoperability (80-BU-12).

Electrical connector assemblies (77-BU-05)(77"BU-05A).

Masonrywalldesign(80-BU-ll)(CDR 82-.24).Possiblelossofemergency notification system(ENS)withlossofoff"sitepower(80-BU-15).

Status:A.Afinalreportwassubmitted totheNRCviaFPLletterL-83-339, datedJune1,1983.Thiscompletes allFPLactiononthislicensecondition.

B.Afinalreportwassubmitted totheNRCviaFPLL-83-340, datedJune1,1983.Thiscompletes allFPLonthislicensecondition.

IletteractionC.Thisbulletinwasclosedouttothesatisfaction ofRegionII.D.Thisbulletinwasclosedouttothesatisfaction ofRegionII.E.Thisbulletinwasclosedouttothesatisfaction ofRegionII.F.G.Afinalreportwassubmitted totheNRCviaFPLL-83-319, datedMay24,1983.Thiscompletes allFPLonthislicensecondition.

Thisbulletinwasclosedouttothesatisfaction ofII.letteractionRegion II.Thelicenseewillresolve,tothesatisfaction ofNRCRegionII,thefollowing IENotices:A.Designmisapplication ofBergen-Paterson standardstrutrestraint clamp(IEN83-13).B.FailureofGeneralElectrictypeHFArelays(IEN"82"13).

Status:A.B.Allinformation wasprovidedtotheRegionIIinspectors.

Thiscompletes allFPLactiononthislicensecondition.

Thisnoticewasclosedouttothesatisfaction ofRegionII.

0a+~-a

'1I~III.Thelicenseewillresolvetothesatisfaction ofNRCRegionIIthefollowing openitems:A.Reviewshielding adequacyofCVCSletdownmonitorsamplelines(82"70"02).

B.Conductanaccountability drillforbothUnits1and2following implementation oftheUnit2SecurityPlan(82-05-10).

C.Programtoreviewanddocument10CFR50;59evaluations forunreviewed safetyquestions fortestsandexperiments (82-64-01).

D.Evaluateneedforshielding ofpenetrations inionexchangecubicleandspentresintankvalvegallery(82"70-05).

Status:A.Thisinspector ofRegionII.itemwasclosedouttothesatisfaction B.'hisinspector ofRegionII.itemwasclosedouttothesatisfaction C.Thisinspector ofRegionII.itemwasclosedouttothesatisfaction D.Thisinspector ofRegionII.itemwasclosedouttothesatisfaction

~e'4Is~~1IV.Thelicenseewillresolvetothesatisfaction ofNRCRegionIi,theissueofproperlabelingandaccessibility controlofmotoroperatedvalvethermaloverloadprotection bypassswitchesandcontrolroom(remote shutdownpanelcontroldiversion switches.

Status:Thisitemwasclosedouttothesatisfaction ofRegionII.