Public Version of Reissued Revision 1 to Emergency Plan Implementing Procedure PMP 2081 EPP.005, Personnel Evacuation.
ML17319B378
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/28/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B376 List:
References
PMP-2081-EPP., PMP-2081-EPP.00, NUDOCS 8206160286
Download: ML17319B378 (14)


Text

IiOWew8elcefeweEEECYNICCOMPANYDONALDCCOOKNUCLEARPLANTPROCEDURE COVERSHEETProcedure No.PMP2081EPP.005RevisionNo.TITLEPERSONNEL EYACUATION SCOPEOFREVISIONRev.1:ChangedSOEtoSS.DCRMAY281982SIGNATURES ORIGINALRev.IREV.2Rev.SPREPAREDBYQUALITYASSURANCE REVIEWINTERFACING DEPARTMENT HEADCONCURRENCE DEPARTMENT HEADAPPROVALPLANTNUCLEARSAFETYCOMMITIiEPLANTMANAGERAPPROVALDATEOFISSUEN.A.N.A.3-31-81i.A./(lP((iii/

FssNaMKlaI'zow50ms5 5~05~+PDR*DDCY,05000515PDRF l~~e*>>~ggry,PLN7pa<~',~~VINS--,)~BG>laalu-"i~BR.'4~II~g,4II

.~PMP2EPP.005LISTOFEFFECTIVE PAGESPaeNumberspage1of6Page2of6Page3of6EXHIBITAPage4of6EXHIBITBPage5of6EXHIBITCPage6of6CHECKLIST RevisionNumberandOateRevision1-5/25/82Revision1-5/25/82Revision0-4/~/8~Revision0-4/t/BtRevision0-4/1/81Revision1-5/25/82Page1of1Rev.1,5/25/82 0'3~N-lIIOF<<PVt"P*'Y~"~P'lNi+,PrWVJtP,'nef.l*g~>tt,,go1t,J

~~PMP208PP.005INDIANA5MICHIGANELECTRICCOMPANYDONALDC.COOKNUCLEARPLANTPERSONNEL EVACUATION

1.0 OBJECTIVES

Thisprocedure describes theactionsnecessary toassuresafeandexpeditious evacuation fromlocalworkareastopredesignated on-siteassemblyareasandtoalternate off-sitereassembly areas,ifnecessary.

2.0 RESPONSIBILITIES

TheShiftSupervisor (SS)On-SiteEmergency Coordinator (OSEC)isresponsible fordetermining theneedforinitialevacuation toon-siteassemblyareas,TheRadiological Assessment Director(RAD)incoordination withtheRadiation Protection Director(RPD)isresponsible forrecommending furtherevacuation requirements tooff-sitereassembly areasbasedonradiological assessment and/orprojections.

Allpersonnel atDCCNPareresponsible forknowingevacuation routesfromassignedworkingareas;knowingthelocations oftheirdesignated assemblyareasandreporting totheirdesignated assemblyareawhendirected..

TheEmergency SecurityTeamisresponsible toassistandsupportevacuation operations asrequested bySS/OSEC.30INSTRUCTIONS 0OPTIONALCHECKLIST, ENTRYPROVIDED83.1TheSS/OSECshall:3.1.1Determine needforevacuation ofsitepersonnel usingcriteriacontained inEXHIBITA,AFFECTEDAREAEVACUATION CRITERIA.3.1.2Initiateevacuation notification.

83.2TheRPDshall:3.2.1Initiatemonitoring activityofTSCandOSAassoonaspossibleafterevacuation notification todetermine habitability ofpre-designated on-siteassemblyareasshowninEXHIBITB,PLANTASSEMBLYAREASFORON-DUTYPERSONNEL ANDREPORTING OFF-DUTYPERSONNEL.

3.2.2Reportallpre-designated on-siteassemblyareasthatareunhabitable toSS/OSEC.Page1of6Revision1,5/25/82 P2081.EPP.005~~3.3TheRAD,shall:3.3.1Recommend potential reassembly areastoSS/OSECifnecessary.

NOTE:POTENTIAL OFF-SITEREASSEMBLY AREASARESHOWNINEXHIBITC,OFF-SITEREASSEMBLY AREAS.3.3.2Recommend evacuationroutesthatminimizepersonnel radiationexposurestoSS/OSEC.3.4TheESTLshallassistincontrolling evacuation routesasrequested bytheRAD/RPD.4'.5Emergency CenterManagersinvolvedinevacuation toreassembly areasshallreportpersonnel accountability statustotheOSAManagerorSS/OSECasappropriate.

Paqe2of6Revision1,5/25/82 AFFECTEDAREAEVACUATION CRITERIAPMP2081r05EXHIBITAOUTSIDEAFFECTEDAREAINSDEAFFECTEDAREAPrecautionary ReleaseofPersonnel DoseRate(mrem/h)(unanticipated)

AirborneAgtivity(uCi/coP) unevaluated d0.5(lasting10h)1.0E-10(b)nessen>aersonne2.59.0E-09ssenlaersonne1000(a)3.6E-07(c)Notes:(a)Asdeemednecessary, theOSECmayelecttoutilizehigherdoseratesforemergency responsepersonnel forlife-saving andfacilitysavingactionsbasedonpre-planned occupational radiation exposures underemergency conditions.

Assessment actionsshouldbeplannedwithinregulatory andadministrative exposurelimits.(SeeEPP2.7).(b)Equalto25Kofweeklylimit(unrestricted area).(c)Equalto40MPC/hunevaluated.

Respiratory protection shouldbeutilizedunlessunfeasible.

(d)Equalto520MPC/hunevaluated (quarterly Limit10CFR20.103(a)(l)).

Respiratory protection shouldbeutilizedunlessunfeasible.

Pageof6Revisio0,4-1-81 0)hqI~'Iw*,,J PHP2081EP"EXHIBIT0PLANTASSEHBLYAREAFORON-DUTYPERSONNEL ANDREPORTING OFF-DUTYPERSONNEL ControlRoomAecensTechnical Suortener0erationsStainreaSecurityControlener*PlantHanager**SSOperations Supt.ShiftTechn.AdvisorProd.Supv.Operations (affected unit)On-ShiftOperators EmerencNewsSourceEnerInformation CenterTechn.SupportHgr.Asst.Plt.Hgrs.Techn.Supt.Plt.Chem.Supv.Plt.RadProt.Supv.NRCRepr.2Westinghouse Repr.1Prod.Supv.Operations (unaffected unit)PlantC&IEngr.Perf.Supv.Engr.Envir.Supv.ProdSupv.Techn.Avail.STAdvisors*Haintenance Supt.AllotherswithinProtected Areaexcluding SASPeronnel(Security)

  • Emergency SecurityTeamLeaderSASpersonnel Emergency SecurityTeamEscortPersonnel Off-DutyPersonnel ShouldReporttoPrimary(orAlternate)

AssemblyArea,asDirected*Hgr.CookNuclearCtr.EICEmployees EICVisitorsAlternate

~evensvleSubstation PrimarateHouse*Directors (ofpersonnel resources)

Page4of6Revision0,4-1-81

~W4 2081EPP.005IBITCOFF-SITEREASSEMBLY AREASReassembl AreaOneProceedeastalongthemainentranceroadandreassemble acrossRedArrowHighwayalongmainaccessroad.Reassembly AreaTwoProceednorwaongaesciganandreassemble onthebeachattheplantpropertylineorRosemaryRoad.Reassembl AreaThreeProceedsouthalongLakeMichiganBeachandreassemble ontheBeachattheendofLivingston Road.Page5of6Revision0,4-1-81 ti'jf4a"'F'P' r~l~r~~*2081EPP.005CHECKLIST PMP2081EPP.005PERSONNEL EVACUATION3.1SS/OSECOetermine needforevacuation:

3.2Personnel movementtodesignated AssemblyAreas:3.5HovetoOff-SiteReassembly Areasifappropriate:

lnllaslnlCia5lnltlaslmetimetimePage6of6Revision1,5/25/82

  • A~~~~~'.w'I00>>Al9C.CO"..KPL,."tl,"