Public Version of Procedure Temporary Sheet 1 to Rev 2 to Emergency Plan Implementing Procedure PMP 2081 EPP.022, Activation & Operation of Emergency Operations Facility.
ML17320A349
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/20/1983
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A347 List:
References
PMP-2081-EPP.02, PMP-2081-EPP.2, NUDOCS 8302090062
Download: ML17320A349 (5)


Text

t~re0IIDIAIIIA.B iÃICN'GAIII EIECTBICCOMPAil/Y DONALDC.COOKNUCLEARPLANTinstruction orPI'ocedure Temporary SheetThistemporary sheetappliestoACTIVATION ANDOPERATION OFTHEEMERGENCY OPERATE)NS FACILITYInstruction orProceaure IlopMp2O81EppO22RevisionNo.2Thefollowing change()newrequirement (X)shallbeinstituted effective (Date)TEMPORARY SHEETNO.Subsitute Page4withAttachment.

Items~Chd.ChangedStep4.4.5toStep4.3.10Reason:Toassignproperresponsibi1ity AddednewStep4.4.5-Assigning responsibility ofprintdistribution atE.O.F.,Reason:()AAudit'82-18 discrepancy.'his changeshouldbemadeapermanent revisiontotheInstruction orProcedure:

gYESoNO0NOTKNOWN,.additional reviewrequiredExpiration patNeXtProOriginator:

Nhnagement Staff:SeniorReactorOpeIator:

PNSRC.,'i-"ureRevisionDIte//StandardDist.ListNo.:Distribution:

FormNo.4330RRvIsRD'r17a, J8302090062 830131-PGIurPDRADQCK"05000315' PDRWHITRORIGINALCANARY-ORIGINATOR COPYPINKWORKINGCOPY lWWQl~>e+I,II(C1 PMP2081EPP.0224.44.3.10Assumeresponsibility forthedoseassessment andradiation protection functionfromtheTSC.ITheCommunications Directorshallperformthefollowing functions:

4.4.14.4.2-4.4.3Establish achronological historylogofeventsandmakethislogava'ilable tocommunications, dose.assessment, radiation protection, andothe~EOFpersonnel.

Ensurethatdetailed'eventdata,PMP2081EPP.020,ExhibitB,ismadeavailable regularly tocommunications, doseassessment, andradiation protection personnel.

Normallythisdatawillbeprovidedeveryfifteenminutesbytelecopier fromtheTSC.Ensurethecommunicators, doseassessment, andradiation protection personnel'iare broughtup-to-date regarding eventdataandinformation requiredtoperformtheirfunctions.

4,4.4Establish commurdcation withtheBerrien=CountySheriff's Department, MichiganStatePolice,NuclearRegulatory Commission (Emergency Notification SystemandHealthPhysicsNetwork),

AmericanElectricPowerInitialAssessment Group,andPublicAffairs.Assumeresponsibility forthisfunctionfromtheTSC.4.4.5Assign"anindividual, therunnerifavailable, todistribute twosetsofflowdiagramsandone-linediagramstothePublicAffairsCommunication deskandtherecoveryandcontrolmanagersoffice.4.4.6Communicate requestsfromoff-sitegroupstotheTechnical Director.

4.5TheRadiological Assessment Directorisresponsible for:4.5.14.5.2Performing dosecalculations foron-siteandoff-siteareasandreporting theseresultstotheCommunications DirectorandRadiation ControlandWasteHandlingManager.Recommending Protective actionson-siteandoff-sitewhenappropriate.

Page4of5Rev.2(TP-1)

L1<<x~yl'PMPEPPINDEXINDIANA5MICHIGANPOWERCOMPANYDONALDC.COOKNUCLEARPLANTPLANTMANAGERPROCEDURE IndexIdentification NumberTitleRevisionNo.lAndDateCcmt}ants PMP2881EPP.014EPP.015EPP.016EPP.017EPP.018EPP.019EPP.020EPP.021EPP.022EPP.023EPP.024Off-SiteDoseAssessments SamplingandAnalysisofWaterborne ReleasesCollection andAnalysisofLiquidandGaseousSamplesInterpretation ofLiquidandGaseousSamplesTransportation, Accidents Involving Radioactive

'aterialAEPEmergency ResponseOrganization Activation andManagement Activation andOperation oftheTechnical SupportCenter(TSC)Activation andOperatio'n oftheOperations StagingArea(OSA)andPersonnel Accountability ActiVation andOperation oftheEmergency Operations

.Facility Activation andOperation oftheEmergency ControlCenter(ECC)(AnEmergency Operations Facility)

Activation andOperation oftheJointPublicInformation Center(JPIC)(AnEmergency Operations Facility)-

RevisionI110-12-82Revision04-1-81Revision04-1-81Revision04-1-81Revision16-24-82'evision 04-1-83Revision18-24-82Revision15-25-82Revision211-15-82CANCELLED 82Revision16-24-82TP-1,9-9-82 ExpNATP-l,l.-'12-83.

ExpNAAQfc3Re'I.Det='I-Qo-}IR-I'0~"Ifit%t'Ih,I"'kl