ML14168A283
ML14168A283 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 06/10/2014 |
From: | Armstrong L J Dominion, Dominion Nuclear Connecticut |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
14-261 | |
Download: ML14168A283 (14) | |
Text
iDominioniDominion Nuclear Connecticut, Inc.Rope Ferry Rd., Waterford, CT 06385Mailing Address: P.O. Box 128Warerford, CT 06385dorn.comJUN 10 2014'U. S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555Serial No.NSS&L/MLCDocket No.License No.14-261RO50-336DPR-65DOMINION NUCLEAR CONNECTICUT, INC.MILLSTONE POWER STATION UNIT 2CORE OPERATING LIMITS REPORT, CYCLE 23In accordance with the Millstone Power Station Unit 2 (MPS2) Technical Specifications(TSs), Section 6.9.1.8.d, Dominion Nuclear Connecticut, Inc., hereby submits, as anenclosure, the Cycle 23 Core Operating Limits Report (COLR).The MPS2 COLR has been revised to include the following:* Revision of page headers to reflect Cycle 23." Editorial changes to correct administrative and typographical errors." Revision of Figure 2.7-1 to extend the ACCEPTABLE OPERATING REGION overthe power range from 0% to 40%." Removal of the 1.0025 penalty factor for incore instrument misalignment.Starting with Cycle 21, this penalty was included in the COLR to account for asmall misalignment of 26 of the 44 installed In-Core Instruments (ICI) detectors(reference Agencywide Documents Access and Management System AccessionNos. ML11152A148, ML11342A122, ML12025A225 and ML12025A226). DuringRefueling Outage 22, all but two of the affected ICI strings were replaced with ICIstrings with a slightly shorter tail (the two remaining misaligned ICI strings arelocated on the core periphery). This allows the ICI detectors to be properlypositioned to restore the original axial power distribution monitoring function,permitting the deletion of the penalty factor for Cycle 23.The Cycle 23 COLR has been incorporated into the MPS2 Technical RequirementsManual.If you have any questions or require additional information, please contact Mr. William D.Bartron at (860) 444-4301.Sincerely,L. J. AfnmstrongDirector, Nuclear StationLicensing -Millstone4c&(
Serial No. 14-261Docket No. 50-336MPS2 Cycle 23 COLRPage 2 of 2
Enclosure:
Core Operating Limits Report, Cycle 23Commitments made in this letter:None.cc: U.S. Nuclear Regulatory CommissionRegion I2100 Renaissance Blvd. Suite 100King of Prussia, PA 19406-2713M. C. ThadaniProject Manager -Millstone Power StationU.S. Nuclear Regulatory CommissionOne White Flint North, Mail Stop 08-Bl11555 Rockville PikeRockville, MD 20852-2738NRC Senior Resident InspectorMillstone Power Station Serial No. 14-261Docket No. 50-336ENCLOSURECORE OPERATING LIMITS REPORT. CYCLE 23DOMINION NUCLEAR CONNECTICUT, INC.MILLSTONE POWER STATION UNIT 2 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 23I1. CORE OPERATING LIMITS REPORTThis CORE OPERATING LIMITS REPORT for Millstone 2 has been prepared inaccordance with the requirements of Technical Specification 6.9.1.8 a through 6.9.1.8 d.The Technical Specifications affected by this report are listed below:Section2.12.22.32.42.52.6Specification3/4.1.1.13/4.1.1.43/4.1.3.63/4.2.13/4.2.33/4.2.6SHUTDOWN MARGIN -(SDM)Deleted (Ref. License Amendment 280)Moderator Temperature Coefficient (MTC)Regulating CEA Insertion LimitsLinear Heat RateTOTAL UNRODDED INTEGRATED RADIALPEAKING FACTOR -- FrTDNB MarginI2.7Terms appearing in capitalized type are DEFINED TERMS as defined in Section 1.0 ofthe Technical Specifications.2. OPERATING LIMITSThe cycle-specific parameter limits for the specifications listed in Section 1.0 arepresented in the following subsections. These limits have been developed using theNRC approved methodologies specified in Section 3.2.1 SHUTDOWN MARGIN -(SDM) (Specification,3/4.1 .1.1)The SHUTDOWN MARGIN shall be _> 3.6% AK/K2.2 Deleted2.3 Moderator Temperature Coefficient (Specification 3/4.1.1.4)The moderator temperature coefficient shall be:a. Less positive than 0.7x1 04 AK/K/°F whenever THERMAL POWER is __70% ofRATED THERMAL POWER,b. Less positive than 0.4x104 AK/K/0F whenever THERMAL POWER is> 70%of RATED THERMAL POWER,c. Less negative than -3.2x10-4 AK/K/0F at RATED THERMAL POWER.IMILLSTONE -UNIT 2TRM 8.1-1LBDCR 14-MP2-004April 1,2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 232.4 Regulating CEA Insertion Limits (Technical Specification 3/4.1.3.6)The regulating CEA groups shall be limited to the withdrawal sequence and to theinsertion limits shown in Figure 2.4-1. CEA insertion between the Long TermSteady State Insertion Limits and the Transient Insertion Limits is restricted to:a. <4 hours per 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> interval,b. <5 Effective Full Power Days per 30 Effective Full Power Day interval, andc. < 14 Effective Full Power Days per 365 Effective Full Power Day interval.2.5 Linear Heat Rate (Technical Specification 3/4.2.1)The linear heat rate, including heat generated in the fuel, clad and moderator,shall not exceed:a. 15.1 kw/ft whenever the reactor coolant flow rate (determined per TechnicalSpecification 3/4.2.1) is _ 360,000 gpm.b. 15.0 kw/ft whenever the reactor coolant flow rate (determined per TechnicalSpecification 3/4.2.1) is < 360,000 gpm and _354,600 gpm.c. 14.9 kw/ft whenever the reactor coolant flow rate (determined per TechnicalSpecification 3/4.2.1) is < 354,600 gpm and _ 349,200 gpm.During operation with the linear heat rate being monitored by the Excore DetectorMonitoring System, the AXIAL SHAPE INDEX shall remain within the limits ofFigure 2.5-1.During operation with the linear heat rate being monitored by the Incore DetectorMonitor System, the alarm setpoints shall be adjusted to less than or equal to thelimit when the following factors are appropriately included in the setting of thealarms:1. A measurement-calculational uncertainty factor of 1.07,2. An engineering uncertainty factor of 1.03, and3. A THERMAL POWER measurement uncertainty factor of 1.02.MILLSTONE -UNIT 2 TRM 8.1-2 LBDCR 14-MP2-004April 1,2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 23I2.6 TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTOR -- FrT (TechnicalSpecification 3/4.2.3)The calculated value of FrT at RATED THERMAL POWER shall be:< 1.690 whenever the reactor coolant flow rate is 360,000 gpm.< 1.664 whenever the reactor coolant flow rate is < 360,000 gpm and 354,600gpm.< 1.639 whenever the reactor coolant flow rate is < 354,600 gpm and _ 349,200gpm.2.6.1 The Power Dependent Frr limits, whenever the reactor coolant flow rateis _> 360,000 gpm, are shown in Figure 2.6-1.2.6.2 The Power Dependent FrT limits, whenever the reactor coolant flow rateis < 360,000 gpm and >_ 354,600 gpm, are shown in Figure 2.6-2.2.6.3 The Power Dependent FrT limits, whenever the reactor coolant flow rateis < 354,600 gpm and _> 349,200 gpm, are shown in Figure 2.6-3.2.7 DNB Margin (Technical Specification 3/4.2.6)The DNB margin shall be preserved by maintaining the cold leg temperature,pressurizer pressure, reactor coolant flow rate, and AXIAL SHAPE INDEX withinthe following limits:IParameterLimitsFour Reactor Coolant Pumps Operationsure < 549°Fre > 2225 psia*a.b.C.Cold Leg TemperatiPressurizer PressurReactor Coolant FIcw Rate> 360,000 gpm with Linear Heat Rate and FrT limits asspecified in Sections 2.5 and 2.6.or> 354,600 gpm with Linear Heat Rate and FrT limitreductions as specified in Sections 2.5 and 2.6.or> 349,200 gpm with Linear Heat Rate and FrT limitreductions as specified in Sections 2.5 and 2.6.Figure 2.7-1d. AXIAL SHAPE INDEX* Limit not applicable during either the THERMAL POWER ramp increase in excess of 5% of RATEDTHERMAL POWER per minute or a THERMAL POWER step increase of greater than 10% of RATEDTHERMAL POWER.MILLSTONE -UNIT 2TRM 8.1-3LBDCR 14-MP2-004April 1, 2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 233. ANALYTICAL METHODSThe analytical methods used to determine the core operating limits shall be thosepreviously reviewed and approved by the NRC, specifically those described in thefollowing documents:3.1 EMF-96-029(P)(A) Volumes 1 and 2, "Reactor Analysis System for PWRsVolume 1 -Methodology Description, Volume 2 -Benchmarking Results,"Siemens Power Corporation, January 1997.3.2 ANF-84-73 Revision 5 Appendix B(P)(A), "Advanced Nuclear Fuels Methodologyfor Pressurized Water Reactors: Analysis of Chapter 15 Events," AdvancedNuclear Fuels, July 1990.3.3 XN-NF-82-21(P)(A) Revision 1, "Application of Exxon Nuclear Company PWRThermal Margin Methodology to Mixed Core Configurations," Exxon NuclearCompany, September 1983.3.4 XN-75-32(P)(A) Supplements 1 through 4, "Computational Procedure forEvaluating Fuel Rod Bowing," Exxon Nuclear Company, October 1983.3.5 EMF-2328(P)(A), "PWR Small Break LOCA Evaluation Model S-RELAP5 Based,"Framatome ANP, March 2001.3.6 EMF-2087(P)(A), "SEM/PWR-98: ECCS Evaluation Model for PWR LBLOCAApplications," Siemens Power Corporation, June 1999.3.7 XN-NF-78-44(NP)(A), "A Generic Analysis of the Control Rod Ejection Transientfor Pressurized Water Reactors," Exxon Nuclear Company, October 1983.3.8 XN-NF-621(P)(A) Revision 1, "Exxon Nuclear DNB Correlation for PWR FuelDesigns," Exxon Nuclear Company, September 1983.3.9 XN-NF-82-06(P)(A) Revision 1 and Supplements 2, 4, and 5, "Qualification ofExxon Nuclear Fuel for Extended Burnup," Exxon Nuclear Company, October1986.3.10 ANF-88-133(P)(A) and Supplement 1, "Qualification of Advanced Nuclear FuelsPWR Design Methodology for Rod Burnups of 62 GWd/MTU," Advanced NuclearFuels Corporation, December 1991.MILLSTONE -UNIT 2 TRM 8.1-4 LBDCR 14-MP2-004April 1,2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT. CYCLE 23I3.11 XN-NF-85-92(P)(A) "Exxon Nuclear Uranium Dioxide/Gadolinia IrradiationExamination and Thermal Conductivity Results," Exxon Nuclear Company,November 1986.3.12 ANF-89-151(P)(A), "ANF-RELAP Methodology for Pressurized Water Reactors:Analysis of Non-LOCA Chapter 15 Events," Advanced Nuclear Fuels Corporation,May 1992.3.13 EMF-1 961 (P)(A) Revision 0, "Statistical Setpoint/Transient Methodology forCombustion Engineering Type Reactors," Siemens Power Corporation, July 2000.3.14 EMF-2310(P)(A), Revision 1, "SRP Chapter 15 Non-LOCA Methodology forPressurized Water Reactors," Framatome ANP, May 2004.3.15 EMF-92-153(P)(A), Revision 1, "HTP: Departure from Nucleate BoilingCorrelation for High Thermal Performance Fuel," Siemens Power Corporation,January 2005.3.16 EMF-92-116(P)(A) Revision 0, "Generic Mechanical Design Criteria for PWR FuelDesigns," Siemens Power Corporation, February 1999.MILLSTONE -UNIT 2TRM 8.1-5LBDCR 14-MP2-004April 1,2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 23I(1.00, BeANK? 135 steps]!1000900.804 0.700.600.50o 040,, 0500.200.10000180(0.73. BANK 7 97 Ste-ps) -TiI-~~0 5- BAN K 6 90 '.l5~15S~ S tes0 TRANSIENT INSERTIONLIMI,4T --.---(~2)z1 -1 ~(0 20. BANK 5 @72 Steps)144BANKS1I 7 .1 1 1108 72 30 0 1M0I I Ia I1 1 I;I180144 10a 72 3638 0 180 144CEA Position (steps withdrawrI I0 1801 4 1I144 108 72 36 UI II s l I180* II II II144 108 72108 72 36 0Note: Regulating CEAs that are > 176 steps withdrawn are considered fully withdrawnand are acceptable per this figure.Figure 2.4-1CEA Insertion Limit vs. THERMAL POWER WithFour Reactor Coolant Pumps OperatingMILLSTONE -UNIT 2TRM 8.1-6LBDCR 14-MP2-004April 1,2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT. CYCLE 23I120 -UNACCEPTABLE OPERATION ---------REGION110 ......................!(-0.08, 100) !B D i_(0.08,100)3: .ACCEPTABLESG -- ------.L ------............ ,......... ,P T ----I.. .. -- --- -.. .. ... .-- -----,-- ----.. ... .R O ERAION.70 ---- --- ---........ ........... .......... .. -- I -'--------o (-0.3,8 *; 60 --------------.. ..; ... ... .... .Break Point ;.............;. ......... ....--- ---- --.... ... ... ... ... ..... ... ... ...... ... ....-..,.5)...5 .............. -- -- ..... ..... A" .............--o B (-0.11,100) ,6 40 -........... .......;........ C (0.00, 101)S0 D (+0.08, 100)so -------- ------------------ E (+0-25. 65) ....... .... .... .......I I I I,20 Note: Point'Uisproidedforsettingplantinstrurmentaiononly.Operation is not allowed above 100% of rated power. ,10 L .. .... ............I.. ..-- ---------------. ... .............,.,..-0.4 -0.3 -0.2 -0.1 0 0.1 0.2 0.3 0.4AXIAL SHAPE INDEX (ASI)Figure 2.5-1AXIAL SHAPE INDEX vs.PERCENT OF ALLOWABLE POWER LEVELMILLSTONE -UNIT 2TRM 8.1-7LBDCR 14-MP2-004April 1, 2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 2310 0,....,1....... ..(1.7ý068 90), , UNACCEPTABLE .,90= .. -......... ...... " ...... ". -- ....... r--, OPER.ATION .... ,......."........." .......REGICNq...................30.10....................................... ..........a.....I* I I l l
- I I I I I l lIA/U ....... I ...... .............. e ................... I ...... ,............. 0 ...... 0 ..... .-.... 4 ...... .-.0 ...... .L ..... ...... ..20 ... ... ... .I .. .. ' -- --.. .......... .. ------10 ....... ................ .... ............. ......... .......... ...............1.69 1.70 1.71 1.72 1.73 1.74 1.75 1.76 1.77 1.78 '1.79 1.80 1.81 1'.82 1.83 1.84TOTAL UNRODDED INT2ERATED RADIAL PEAKING FACTOR- F1TNote: The FrT limit should be reduced for reactor coolant flowrates : 349,200 gpm and < 360,000 gpm (see Section 2.6).Figure 2.6-1TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTORvs. Allowable RATED THERMAL POWERFor Reactor Coolant Flow Rates : 360,000 gpmMILLSTONE -UNIT 2 TRM 8.1-8 LBDCR 14-MP2-004April 1, 2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 23100- (1.664,100) -----. .0*
- 80 , LtNACCEPTABLE90 ....... .AC ...... .. .. ........ ... ... O".PE ON .. ... .I " .I ......REGION~60................7 ---..I .-I .---.CI a I
- I I I I I I Il I7 0 ........... .... ....... ..... -50 .... .... .. ...OPERATION.09,70S40................................. ............ ........................5 30 .... .... .......................... ....20 ......................... ...... ............. ...... ...... ...... ......... ...10o ........L...... " ............. ....... ................... ........ .10............*.r'......... .I.:. : :':, : :, , : : '..I lI I !011.664 1.674 1.684 1.694 1.704 1.7'14 1.7*24 1.7'34 1.744 1.754 1.764 1.7,74 1.7'84 1.7,94 1.8,04 12814TOTAL LINRCCCED INTEGRATED RADIAL PEAK(ING FACTOR- FrFigure 2.6-2TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTORvs. Allowable RATED THERMAL POWERFor Reactor Coolant Flow Rates < 360,000 gpm and t354,600 gpmMILLSTONE -UNIT 2 TRM 8.1-9 LBDCR 14-MP2-004April 1, 2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 2390 .......... ..........................................A.............REGIONs .a a L I ..... .3. ................. .............. ......a...................... r ......... ....0 .i ..e 0 .a ... I .i I I a I a I I I i I i* a
- a a a a a a a a Ii I a a I I i I i a lm I i i* I
- I10 ........... ... REIN........................... ............. ............ ........ .....313 a ... .. ..a .. .... .. .. ..... .. .. a a.. ... ..j .. .. I .. .20 ......1.639 1.649 1.659 1.669 1.679 11,6139 1.699 1.709 1.719 1.729 1.739 1.749 1.759 1.769 1.779 1.789TOTAL UNK)DCED INTEGRATED RADIAL PE] NG FACTOR- FTFigure 2.6-3TOTAL UNRODDED INTEGRATED RADIAL PEAKING FACTORvs. Allowable RATED THERMAL POWERFor Reactor Coolant Flow Rates < 354,600 gpm and i 349,200 gpmMILLSTONE -UNIT 2 TRM 8.1 -10 LBDCR 14-MP2-004April 1, 2014 TECHNICAL REQUIREMENTS MANUALAPPENDIX 8.1CORE OPERATING LIMITS REPORT, CYCLE 231.20 T ---ti i (-01 1.0 j j j i r7d i1.00 UNACCEPTABLE -.. .-UNACCEPTABLEEJ-- OPERATION .., -- ---. ....- --- .OPERATION .--.OREGION ~ --REGION0 .CC I _ REGI.90004 ---!.. __ ... !--0.20 .. -, -. 1...... ............o0.60 I I I I _ -lii1- .-REGON -IIO ....U .o ___ L __i _ j-0.6 -0.5 -0. -0.3 -0.2 -0.1 0 0.1 0. 2 0.3 04 0.5 0.6AXIALS-APE INDEX (AS[)Figure 2.7-1AXIAL SHAPE INDEX Operating Limits WithFour Reactor Coolant Pumps OperatingMILLSTONE -UNIT 2TRM 8.1-11LBDCR 14-MP2-004April 1, 2014