Letter Sequence RAI |
---|
TAC:ME7169, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
MONTHYEARNLS2011071, License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2011-09-16016 September 2011 License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a Project stage: Request ML1128600732011-10-13013 October 2011 Notice of Meeting with Nebraska Public Power District to Discuss Amendment Request to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, for Cooper Nuclear Station Project stage: Meeting ML1129715762011-10-24024 October 2011 Licensee Slides from 10/24/11 Meeting with Nebraska Public Power District to Discuss Cooper Nuclear Station Project stage: Meeting ML1130100232011-10-27027 October 2011 Acceptance Review Email, License Amendment Request to Revise Technical Specifications to Support Operation with 24-Month Fuel Cycle and to Incorporate TSTF-493, Revision 4, Consistent with Option a Project stage: Acceptance Review ML1132200762011-12-0505 December 2011 Summary of Meeting with Nebraska Public Power District to Discuss Amendment Request to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4 for Cooper Nuclear Station Project stage: Meeting ML1206203962012-03-0202 March 2012 Request for Additional Information, License Amendment Request, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a Project stage: RAI ML1206203922012-03-0202 March 2012 Email, Request for Additional Information, License Amendment Request, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a Project stage: RAI ML1208600542012-04-0303 April 2012 Request for Additional Information, License Amendment Request, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a Project stage: RAI NLS2012039, Supplement to License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2012-05-24024 May 2012 Supplement to License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a Project stage: Supplement ML12251A0582012-09-0606 September 2012 Request for Additional Information, License Amendment Request, Round 2, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt TSTF-493, Revision 4, Option a Project stage: RAI NLS2012100, Response to Request for Additional Information Regarding License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a2012-09-17017 September 2012 Response to Request for Additional Information Regarding License Amendment Request for Implementing a 24-Month Fuel Cycle and Adoption of TSTF-493, Revision 4, Option a Project stage: Response to RAI ML12251A0982012-09-28028 September 2012 Issuance of Amendment No. 242, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a Project stage: Approval ML12319A0552012-11-21021 November 2012 Correction to Amendment No. 242 Technical Specification (TS) and Safety Evaluation, Revise TSs to Implement a 24-Month Fuel Cycle and Adopt Technical Specification Task Force (TSTF)-493, Revision 4, Option a Project stage: Approval 2012-11-21
[Table View] |
|
---|
Category:Request for Additional Information (RAI)
MONTHYEARML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A0902024-01-0404 January 2024 RAI - 10120-R1 - Final Dfo Tank Inspections LAR ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information ML22208A0642022-07-26026 July 2022 Notification of Inspection and Request for Information for NRC Inspection Report 05000298/2022004 ML22179A3152022-06-28028 June 2022 Notification of Post-Approval Site Inspection for License Renewal (Phase 4) (NRC Inspection Report 05000298/2022011) and Request for Information ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21026A3112021-01-27027 January 2021 Notification of NRC Design Bases Assurance Inspection (Team) (NRC Inspection Report 05000298/2021010) and Initial Request for Information ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML18306A5582018-10-30030 October 2018 Notification of Cyber Security Inspection(Nrc Inspection Report 05000298/2019410) and Request for Information ML18060A0272018-02-28028 February 2018 Enclosurequest for Additional Information (Letter to J. Shaw Request for Additional Information Regarding Nebraska Public Power District'S Decommissioning Funding Plan Update for Cooper Nuclear Station ISFSI) ML18037B0002018-02-0606 February 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI Relief Requests RR-02 and RR-03 (EPIDs L-2017-LRR-065 and -066) ML18025C0042018-01-25025 January 2018 Notification of NRC Design Bases Assurance Inspection (Teams) (05000298/2018011) and Initial Request for Information ML18024A3752018-01-24024 January 2018 NRR E-mail Capture - Cooper Nuclear Station - Final RAI LAR to Adopt TSTF-542 (CAC MG0138; EPID L-2017-LLA-0290) IR 05000298/20170032017-11-13013 November 2017 NRC Integrated Inspection Report 05000298/2017003 and Independent Spent Fuel Storage Installation Inspection Report 07200066/2017001 ML17177A2432017-06-26026 June 2017 Notification of NRC Design Bases Assurance Inspection (Programs) (05000298/2017007) and Initial Request for Information ML17024A3292016-12-15015 December 2016 NRR E-mail Capture - Rec 2.1 Seismic: Cooper'S SFP Evaluation ML16335A0152016-11-29029 November 2016 NRR E-mail Capture - Cooper Nuclear Station - Formal Request for Additional Information Concerning License Amendment Request to Adopt TSTF-425 Revision 3 ML16112A2732016-04-21021 April 2016 Notification of NRC Triennial Fire Protection Baseline Inspection (05000298/2016008) and Request for Information ML15107A2542015-05-0404 May 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Hazard and Screening Report ML15051A4872015-02-20020 February 2015 Notification of NRC Component Design Bases Inspection 05000298/2015007 and Initial Request for Information ML13323A1052013-12-0404 December 2013 Interim Staff Evaluation and Request for Additional Information, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13304B4182013-11-0101 November 2013 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns ML13256A0822013-09-12012 September 2013 Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) ML13246A3482013-08-29029 August 2013 Draft Request for Additional Information Email, Overall Integrated Plan in Response to 3/12/12 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NLS2013082, Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding2013-08-22022 August 2013 Letter Requesting Information from the United States Army Corps of Engineers to Provide Response to March 12, 2012 Letter Regarding Enclosure 2, Recommendation 2.1, Flooding ML13155A0112013-06-0303 June 2013 Request for Additional Information Email, 2013 Decommissioning Funding Status Report ML13133A0802013-05-24024 May 2013 (Redacted) - Request for Additional Information, Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13144A5202013-05-24024 May 2013 Request for Additional Information Email, Decommissioning Funding Status Report ML13095A1602013-04-0404 April 2013 Email, Draft Request for Additional Information - Review of License Renewal Commitment NLS2009100-1 - Core Rim Plate Bolts ML13059A3452013-03-0808 March 2013 Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML13053A3422013-02-22022 February 2013 E-mail, Draft Request for Additional Information, License Amendment Request to Revise the Updated Safety Analysis Report to Reflect Changes to Fuel Handling Accident Dose Calculation ML12338A2642012-12-0303 December 2012 Email, Round 3, Request for Additional Information, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and SRs ML12312A2812012-11-14014 November 2012 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12283A4002012-10-0909 October 2012 Email, Draft Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12251A0582012-09-0606 September 2012 Request for Additional Information, License Amendment Request, Round 2, Revise Technical Specifications to Implement a 24-Month Fuel Cycle and Adopt TSTF-493, Revision 4, Option a ML12235A2522012-09-0505 September 2012 Request for Additional Information License Amendment Request to Revise Technical Specifications - Safety Limit Minimum Critical Power Ratio ML12205A2162012-08-10010 August 2012 Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification 3.4.9, RCS Pressure and Temperature (P/T) Limits, to Revise Limit Curves and Surveillance Requirements ML1217400512012-06-21021 June 2012 List of Questions for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants ML12159A2992012-06-11011 June 2012 Request for Additional Information, Relief Request RI-07 from ASME Code Requirements for Residual Heat Removal Shell Circumferential and Nozzle to Head Welds, Fourth 4th 10-Year Inservice Inspection Interval ML12157A5412012-06-11011 June 2012 Second Request for Additional Information Request for Relief for the Fourth 10-Year Pump and Value Inservice Testing Program ML12153A0642012-05-31031 May 2012 Notification of Inspection (NRC Inspection Report 05000298/2012005) and Request for Information ML1213905092012-05-18018 May 2012 Email, Draft Request for Additional Information, Second Round, Relief Request Nos. RV-07 and RV-01, Revision 1, Fourth 10-Year Inservice Testing Program Interval 2024-04-03
[Table view] Category:Letter
MONTHYEARML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding IR 05000298/20243012024-07-12012 July 2024 NRC Examination Report 05000298/2024301 ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information 2024-09-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 3, 2012 Mr. Brian J. O'Grady Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 COOPER NUCLEAR STATION -REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST FOR IMPLEMENTING A 24-MONTH FUEL CYCLE AND ADOPTION OF TSTF-493, REVISION 4, OPTION A (TAC NO. ME7169)
Dear Mr. O'Grady:
By letter dated September 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 11264A 165), Nebraska Public Power District submitted a license amendment request (LAR) to revise the Technical Specifications for Cooper Nuclear Station. The proposed LAR would implement 24-month fuel cycle and adopt U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF) change traveler TSTF-493, Revision 4, "Clarify Application of Setpoint Methodology for LSSS [Limiting Safety System Settings] Functions," to be consistent with Option A. The NRC staff has reviewed your submittal and determined that additional information is needed for the staff to complete its evaluation. The request for additional information was transmitted via e-mail to Mr. Edward McCutchen of your staff on March 2, 2012. During a telephone conference with Mr. McCutchen and others of your staff on March 22, 2012, Mr. McCutchen indicated that the response would be provided within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-1377 or via e-mail at Lynnea.wilkins@nrc.gov. Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. Request for Additional cc w/encl: Distribution via REQUEST FOR ADDITIONAL INFORMATION NEBRASKA PUBLIC POWER DISTRICT COOPER NUCLEAR STATION DOCKET NO. 50-298 By letter dated September 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 11264A 165, Nebraska Public Power District (the licensee) submitted a license amendment request (LAR) to revise the Technical Specifications (TSs) for Cooper Nuclear Station. The proposed LAR would implement 24-month fuel cycle and adopt U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF) change traveler TSTF-493, Revision 4, "Clarify Application of Setpoint Methodology for LSSS [Limiting Safety System Settings] Functions," to be consistent with Option A. Specifically, the change addresses certain TS Surveillance Requirement (SR) frequencies that are specified as "18 months" by revising them to "24 months" in accordance with the guidance provided in NRC Generic Letter (GL) 91-04, "Changes in Technical Specification Surveillance Intervals to Accommodate a 24-Month Fuel Cycle," dated April 2, 1991. The NRC staff has reviewed and evaluated the information provided by the licensee and has determined that the following information is needed in order to complete its review. TS SR 3.8.4.8 provides a surveillance requirement of 18 months instead of 12 months for completing the performance discharge tests. It is the NRC staffs position that SR 3.8.4.8 should be consistent with industry standard Institute of Electrical and Electronics Engineers, Inc. (IEEE) 450-1995, "Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications," Section 5.2.(c) which recommends, in part, that Annual performance tests of battery capacity should be made on any battery that shows signs of degradation or has reached 85% of the service life expected for the application. Degradation is indicated when the battery capacity drops more than 10% from its capacity on the previous performance test, or is below 90% of the manufacturer's rating. Please provide the technical basis that justifies why an 18-month SR is acceptable as opposed to "at least once per 12 months." Sections 3.1.3 and 3.1.4 of Attachment 1 to the LAR describe emergency core cooling system (ECCS) and Low-Low Set instrumentation whose current setpoint calculations do not bound the projected 30-month drift values and require revised allowable values. Calculations were not provided for these new allowable values. Enclosure
-Please submit one of the revised setpoint calculations for review. In addition, please submit the corresponding drift analysis with sufficient supporting documentation as to confirm adherence to the "Instrument Drift Analysis Design Guide" in Enclosure 1 of the LAR. Please provide additional detail on the surveillance test history for the ECCS. Attachment 5 page 16 of the LAR provides details for five ECCS TS failures. Please provide the total number of surveillance tests considered or the percentage of the surveillance tests that those 5 failures represent.
April 3, 2012 Mr. Brian J. O'Grady Vice President-Nuclear and CNO Nebraska Public Power District 72676 648A Avenue Brownville, NE 68321 COOPER NUCLEAR STATION -REQUEST FOR ADDITIONAL INFORMATION RE: LICENSE AMENDMENT REQUEST FOR IMPLEMENTING A 24-MONTH FUEL CYCLE AND ADOPTION OF TSTF-493, REVISION 4, OPTION A (TAC NO. ME7169)
Dear Mr. O'Grady:
By letter dated September 16, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 11264A 165), Nebraska Public Power District submitted a license amendment request (LAR) to revise the Technical Specifications for Cooper Nuclear Station. The proposed LAR would implement 24-month fuel cycle and adopt U.S. Nuclear Regulatory Commission (NRC)-approved Technical Specification Task Force (TSTF) change traveler TSTF-493, Revision 4, "Clarify Application of Setpoint Methodology for LSSS [Limiting Safety System Settings] Functions," to be consistent with Option A. The NRC staff has reviewed your submittal and determined that additional information is needed for the staff to complete its evaluation. The request for additional information was transmitted via e-mail to Mr. Edward McCutchen of your staff on March 2, 2012. During a telephone conference with Mr. McCutchen and others of your staff on March 22, 2012, Mr. McCutchen indicated that the response would be provided within 30 days of receipt of this letter. If you have any questions, please contact me at 301-415-1377 or via e-mail at Lynnea.wilkins@nrc.gov. Docket No. 50-298
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC RidsNrrDeEicb Resource LPLIV r/f RidsNrrDssSrxb Resource RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDeEeeb Resource RidsNrrDorlLpl4 Resource Sincerely, IRA! Lynnea E. Wilkins, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrLAJBurkhardt Resource JGali. NRRlDSS/SRXB RidsNrrPMCooper Resource SBasturescu. NRRI DE/EEEB RidsOgcRp Resource SWyman. NRR/DE/EICB RidsRgn4MailCenter Resource ADAMS Accession No' ML 120860054 .. *yia memo dated OFFICE NRRlDORULPL4/PM NRRlDORULPL4/LA NRRlDE/EEEB/BC N RRlDE/EICB/BC NAME LWilkins JBurkhardt JAndersen* JThorpe* DATE 3/30/12 3/29/12 2/9112 2/23/12 OFFICE NRRlDSS/SRXB/BC NRRlDORULPL4/BC NRRlDORULPL4/PM NAME AUlses* MMarkley (JSebrosky for) LWilkins DATE 2/28/12 4/2112 4/3/12 OFFICIAL RECORD COpy