ML17037C137
From kanterella
Revision as of 02:21, 4 April 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML17037C137 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 09/25/1971 |
From: | Burt P A Niagara Mohawk Power Corp |
To: | Morris P A US Atomic Energy Commission (AEC) |
References | |
Download: ML17037C137 (4) | |
Similar Documents at Nine Mile Point | |
---|---|
Category:Letter
MONTHYEARML24222A6772024-08-0909 August 2024
[Table view]Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, “Revise Risk Informed Completion Time (RICT) Program” Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable NMP1L3582, Annual Radioactive Environmental Operating Report2024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans NMP1L3554, Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases2023-10-0606 October 2023 Submittal of Revision 28 to the Final Safety Analysis Report (Updated), Fire Protection Design Criteria Document, 10CFR50.59 Evaluation Summary Report, 10CFR54.37(b) Aging Management Review, and Technical Specifications with Revised Bases C IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 ML23250A0822023-09-19019 September 2023 Regulatory Audit Summary Regarding LARs to Adopt TSTF-505, Rev. 2, and 10 CFR 50.69 ML23257A1732023-09-14014 September 2023 Requalification Program Inspection IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) 2024-08-09 Category:Licensee 30-Day Written Event Report MONTHYEARML16319A0982016-11-0808 November 2016
[Table view]Special Report: Inoperable Drywell Pressure Monitor/Suppression Chamber Water Level Instrumentation ML15174A1282015-06-19019 June 2015 Special Report: Containment High Range Radiation Monitor Instrumentation Channel #12 Inoperable NMP1L2980, 10 CFR 50.46 30-Day Report2014-12-12012 December 2014 10 CFR 50.46 30-Day Report ML12268A0492012-09-12012 September 2012 Discovery of Tritium in Groundwater In-Leakage - 30-Day Report in Accordance with the Industry Ground Water Protection Initiative ML11165A2212011-06-0606 June 2011 Day Report Pursuant to 10 CFR 50.46, Acceptance Criteria for Emergency Core Cooling Systems for Light-Water Nuclear Power Reactors ML1109701512011-04-0101 April 2011 Interim Report on Thermostatic Valve Failure on Palo Verde EDG ML0919505792009-07-0808 July 2009 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 11 Inoperable ML0913904002009-05-11011 May 2009 Submittal of Containment High Range Radiation Monitor Instrumentation Channel 11 Inoperable ML0802305112008-01-11011 January 2008 Special Report: Inoperable Suppression Chamber Water Level Instrument ML0701704682007-01-11011 January 2007 Report of Changes or Errors Discovered in the Current Acceptable Emergency Core Cooling System Evaluation Models ML0618703962006-06-19019 June 2006 Special Report; Channel #11 of the Containment Hydrogen Monitoring System Inoperable for Unplanned Maintenance ML0526401672005-09-12012 September 2005 Special Report, Channel #12 of the Containment Hydrogen Monitoring System Inoperable ML0525004162005-08-29029 August 2005 Special Report, Channel #12 of the Containment Hydrogen Monitoring System Inoperable ML0522402502005-08-0303 August 2005 Special Report, Channel #12 of the Containment Hydrogen Monitoring System Inoperable ML0506901722005-03-0101 March 2005 Special Report, Channel No. 11 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance ML0502501452005-01-17017 January 2005 Special Report, Channel #12 of the Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance ML0420403002004-07-12012 July 2004 Special Report, Channel #12 of the Containment Hydrogen Monitoring System Inoperable for Nine Mile Point Unit 1 ML0407607562004-03-0505 March 2004 Special Report, Channel #11 Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance ML0406409232004-02-20020 February 2004 Special Report, Channel #12 Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance ML0236101942002-12-13013 December 2002 Special Report, Channel #12 Accident Monitoring Instrumentation Inoperable Due to Loss of Power ML0233304002002-10-31031 October 2002 Special Report, Channel #11 Containment High Range Radiation Monitor Declared Inoperable to Repair Failed Chart Recorder ML0207905522002-03-0404 March 2002 Special Report Re Channel 12 Chamber Water Level Indicator Inoperable ML0208404412002-02-25025 February 2002 Special Report, Channel #11 Containment High Range Radiation Monitor Inoperable ML0206502942002-02-20020 February 2002 Special Report Re Channel #12 Containment Hydrogen Monitoring System Inoperable for Scheduled Preventive Maintenance ML0205801952002-02-0808 February 2002 Special Report, Channel #12 Suppression Chamber Water Level Indicator Inoperable ML0205002372002-01-21021 January 2002 Special Report Re Channel 11 Containment Hydrogen Monitoring System Inoperable for Scheduled Elective Maintenance ML18094A0311977-09-0707 September 1977 Telecopy Message from Niagara Mohawk Power Corp Re Event on 9/7/1977 Re August 1977 Liquid Waste Monthly Chemical Composite Analysis ML17037C1301972-08-0101 August 1972 Letter Reporting an Orderly Shutdown on July 27, 1972 Due to Increasing Recirculation System Valve Packing Leakage within the Drywell ML17037C1011972-04-19019 April 1972 Letter Reporting Findings on Incident That Occurred on 12/31/1971 in Which Unit 1 Tripped Off Line as Result of Surveillance Testing ML17037C1021972-04-18018 April 1972 Letter Reporting an Incident Tripped Off-Line as a Result of a Malfunction in a Continuous Power Supply on 02/28/72 ML17037C1371971-09-25025 September 1971 Letter Regarding a Maintenance Item Occurring During the Outage of Unit 1 in April-May 1971 ML17037C1421970-03-10010 March 1970 Letter Reporting an Incident, During Radiography and Ultrasonic Testing, That Disclosed a Series of Cracks Extending Around the Upper 180 Degrees of the Inside Diameter, Exist in the Stainless Steel Safe-End of the Core Spray.. ML17037C1431970-03-0606 March 1970 Letter Notifying the Commission of a Situation in Which Waste Discharge in Excess of Technical Specifications Has Taken Place on February 26, 1970 ML17037C1441969-12-0606 December 1969 Letter Reporting That the Nine Mile Point Reactor Was Scrammed from 25 Percent Power on November 20, 1969 and Advising That the Reactor Will Be Brought Critical and the Turbo-Generator Set Placed on the Line on December 8, 1969 ML17037C1451969-11-18018 November 1969 Letter Reporting an Incident on November 8, 1969 Where the Reactor Scrammed on Momentary Upscale Trips from Intermediate Range Monitoring Channels 2016-11-08 |