Letter Reporting an Incident on November 8, 1969 Where the Reactor Scrammed on Momentary Upscale Trips from Intermediate Range Monitoring Channels
ML17037C145
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 11/18/1969
From: Burt P
Niagara Mohawk Power Corp
To: Morris P
US Atomic Energy Commission (AEC)
References
Download: ML17037C145 (4)


Text

NIAGARA MOHAWK POWER CORPORATION NIAGARA ~ MOHAWK

'Figuldery file Gyi Nine Mile Point Nuclear Station P. 0. Box'2 Lycoming, New York 13093

., November 18, 1969 United States Atomic Energy Commission Division of Reactor Licensing Washington, D., C. 20545 .I Attention: Dr. Peter A. Morris, Director co Gentlemen:

While in the process of heating the Nine Mile Point Nuclear Station reactor to oper-ating pressure and temperature prior to supplying steam for turbine testing, on November 8, 1969, the reactor scrammed on momentary upscale trips from intermediate range monitoring channels. The flux spike had occurred due to an'ncrease in feed-water flow. Examination of the rod display disclosed that ten of the 129.,rods had missed being driven to their fully inserted position by one notch, and one had missed by <two notches. The reactor was made sub-critical. These control rods were then individually driven to full insertion by operator action.

Prior to= the complete insertion of all rods, the IRM returned below high trip setting; and the scram trip was reset, stopping the scram action. The operator contends that he did not operate the scram reset button. No occurrence of an unsafe condition existed as the reactor was shut down as was called for by the high IRM trip; and the trip condition had persisted, no manual or spurious reset could have prevented if full insertion of all control rods Investigation by the Station Operations Review Committee disclosed inadequate coordi-nation of the relay which interrupts power to the four sets of scram solenoid pilot valves. ,IIhis relay is normally energized through,a series arrangement of sensor trip relays and an auxiliary seal-in contact. The main contacts of, the GE type CR-105, relay which interrupts power to the'cram solenoid pilot valves open in from 10 to 12 milli-seconds. However, the auxiliary "seal-in" does not open in less than 20 milli-seconds after the coil deenergizes. Sensor trip relays operate much faster than 20 milli-seconds which can cause the CR-105 relay to drop out and pick up before the "seal-in" (actually prevents coil to pick up unless reset by pushbutton) contact opens producing an auto reset.

Relay circuits were revised to prevent the possibility of future auto resets. An existing relay type GE HFA whose coil is parallel with the CR-105 relay and had spare contacts available was utilized. This type relay has contacts which open in approx-imately 10 milli-seconds thus producing good coordination with the main contacts of the CR-105 relay. The contacts were added in series with the seal-in contacts of the CR-105 relay. This arrangement insures that the trip will not reset automatically on fast sensor trips because the sensor trip relays are no faster than the added contacts of the type HFA relay.

e 363S I

~

Q flip,,i

~

Wf,l

United States Atomic Energy Commission Page 2 November 18, 1969 Investigation also disclosed that it was possible to be manually resetting a "half-scram" on one channel and imposing a reset on the other channel (there was only one reset button for two channels). Should the second channel be in the process of initiating a full scram, the operator would by this action reset the scram trip.

If the reactor protection system trip was only momentary in nature and no longer present, the scram solenoids would reset arresting the rod travel in mid-travel causing a strong pressure surge in the index tubes of the drives. To avoid this possibility, reset buttons were installed in each of the two separate RPS channels instead of one button for two.

Presently design investigations are underway to install timers in the reset circuitry to prevent operator reset action before the control rods are fully inserted on scram action.

Very truly yours, P. Allister Burt Station Superintendent mjs cc: Mr. M. H. Pratt Mr. F. J. Schneider Mr. J. N. Ewart, Chairman, SR 6 A Board Mr. M. Hildreth, A.E.C. Compliance