Special Report, Channel #12 of the Containment Hydrogen Monitoring System Inoperable
ML052500416
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 08/29/2005
From: O'Connor T
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L 1979
Download: ML052500416 (2)


Text

Constellation Energy- P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Station August 29, 2005 NMP1L 1979 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001

SUBJECT:

Nine Mile Point Unit 1 Docket No. 50-220 Facility Operating License No. DPR-63 Special Report, Channel #12 of the Containment Hydrogen Monitoring System Inoperable Gentlemen:

In accordance with Action 4.a of Nine Mile Point Unit 1 Technical Specification Table 3.6.11-2, "Accident Monitoring Instrumentation Action Statements," Nine Mile Point Nuclear Station, LLC, is submitting the following Special Report concerning inoperability of Channel #12 of the Containment Hydrogen Monitoring (CHM) System.

Description ofEvent On August 15, 2005, at 1725 hours0.02 days <br />0.479 hours <br />0.00285 weeks <br />6.563625e-4 months <br />, operators removed Channel #12 of the CHM System from service in anticipation of a water purge cycle solenoid-operated valve (SOV) failure. There was no loss of sampling capability and no loss of Control Room indication prior to securing Channel

  1. 12 of the CHM System.

The redundant Channel #11 of the CHM System was verified to be operable prior to removal of Channel #12 from service.

Cause of Inoperabiitv Channel #12 of the CHM System was removed from service after identifying that a water purge circuit SOV was degraded due to rattling/vibration. The SOV did not experience a failure that would have prevented its normal operation.

Z Page 2 NMP1L 1979 Actions Taken The SOV was replaced and post maintenance testing was completed satisfactorily. Channel #12 ofthe CHM System was restored to operable status on August 20,2005, at 101 hours0.00117 days <br />0.0281 hours <br />1.669974e-4 weeks <br />3.84305e-5 months <br />.

V tu s, Ti yJ. O'Connor

- P1 General Manager TJO/RF/sac Attachment cc: Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector