Category:NOTICE OF VIOLATION OF A REGULATION
MONTHYEARIR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr IR 05000917/20100211995-11-17017 November 1995 Notice of Violation from Insp on 950917-1021.Violation Noted:Lctr 95-01384 Did Not Provide Adequate Instructions for Ensuring That Air Start Sys Piping Associated W/B EDG Was Properly Isolated & Depressurized IR 05000618/20070151995-08-10010 August 1995 Notice of Violation from Insp on 950618-0715.Violation Noted:Fire Door to Pipe Alley Was Blocked Open for Approximately 30 Minutes W/O Notification of Operations Personnel IR 05000514/20060171995-07-17017 July 1995 Notice of Violation from Insp on 950514-0617.Violation noted:OMM-005 Was Not Followed in That Auxiliary Operator & Independent Verifier Initialed Local Clearance & Test Request Re Valve 20 IR 05000423/20050131995-06-12012 June 1995 Notice of Violation from Insp on 950423-0513.Violation Noted:Contracted Refueling Technician Failed to Follow Procedure FHP-001 IR 05000319/20040221995-05-19019 May 1995 Notice of Violation from Insp on 950319-0422.Violation Noted:Operators Failed to Follow Procedure OST-254 by Not Verifying RHR Sys to Be Aligned for Standby Low Pressure Injection ML14181A6661995-04-0707 April 1995 Notice of Violation from Insp on 950306-10.Violation Noted: Determined That Abnormal Operating Procedure AOP-014 Inadequately Maintained Re Insufficient Guidance for Connection of Cw to Two Pumps ML14181A6131994-10-0505 October 1994 Notice of Violation from Insp on 940821-0924.Violation Noted:On 940915,assigned Escort Left Two Visitors Unattended in Turbine Building While Escort Used Adjacent Restroom ML14181A6081994-10-0404 October 1994 Notice of Violation from Insp on 940912-16.Violation Noted: Licensee Test Activity on Plant Alternate AC Power Source & SBO Equipment Not Performed Adequately & According to Procedures ML14181A5811994-08-15015 August 1994 Notice of Violation from Insp on 940625-0723.Violation Noted:Resident Inspectors Identified That Train B Inlet & Outlet Filter Dampers for Tagged Shut W/No Limit on Time Equipment Could Remain Out of Svc ML14181A5621994-06-15015 June 1994 Notice of Violation from Insp on 940424-0521.Violation Noted:Wr/Jo 94-AEBT1 Inadequate & Did Not Provide Adequate Instructions for Ensuring That Control Room Differential Pressure Instrument DPI-6520 Properly Initialized ML14178A4961994-04-15015 April 1994 Notice of Violation from Insp on 940226-0326.Violation Noted:Three Radiation Monitor Setpoints Improperly Established Following Termination of Continuous Containment Vessel Purge on 940314 ML14178A4471994-02-18018 February 1994 Notice of Violation from Insp on 931226-940122.Violation Noted:Inadequate Debris Intrusion Control Measures Were Employed on 931115 ML14178A5271993-12-16016 December 1993 Notice of Violation from Insp on 931115-19.Violation Noted: Priority a Drawings Had Not Been Updated within 28 Working Days & Classified Overdue ML14178A4001993-11-0808 November 1993 Notice of Violation from Insp on 930912-1016.Violation Noted:Operator Deviated from OP-603 While Transferring Svc Water Pump D from Normal to Emergency Power ML14178A3921993-10-29029 October 1993 Notice of Violation from Insp on 930913-17 & 27-1001. Violations Noted:Onsite Equipment Certification/Calibration Documentation for Equipment on SG a & B Expired ML14178A3641993-07-0202 July 1993 Notice of Violation from Insp on 930515-0611.Violation Noted:Nrc Not Notified within 4 H of Notification of Sc Dept of Health & Environmental Control That Weir Discharge Temp Limits Had Been Exceeded ML14178A2701992-08-21021 August 1992 Notice of Violation from Insp on 920717-0807.Violation Noted:Written Procedures Were Not Implemented in That When CST High Level Alarm Was Received,Source of CST Makeup Water Was Throttled Instead of Being Stopped Per Procedures ML14178A2551992-07-22022 July 1992 Notice of Violation from Insp on 920615-19.Violation Noted: on 920615,feedwater Block Valve FW-2V-6A Failed to Close Fully Due to High Differential Pressure of 480 Psid ML14178A2451992-07-20020 July 1992 Notice of Violation from Insp on Stated Dates.Violation Noted:Licensee Failed to Follow Stated Procedures ML14178A1811991-12-16016 December 1991 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $37,000.Noncompliance Noted:Inadequate Control of Design Interfaces & Design Organizations Resulted in Failure to Adequately Check Design for SI Sys ML20138F7901991-04-12012 April 1991 Notice of Violation from Insp on 910216-0330.Violation Noted:Documented Instructions Were Not Provided for Method to Establish Temporary Heating Equipment to Maintain Reactor Vessel Head Flang Temp.Procedures & Drawings Not Provided ML14178A0871991-03-0505 March 1991 Notice of Violation from Insp on 910111-0215.Violations Noted:Procedure OST-351 Inadequately Established That Procedure Did Not Fully Test Steam Line Isolation Circuitry Associated W/Containment Pressure Channel ML20058H9781990-11-20020 November 1990 Notice of Violation from Insp on 901029-1102.Violation Noted:Inservice Insp Isometric Sketch Did Not Accurately Depict Actual Pipe Configuration ML14176A8841990-07-27027 July 1990 Notice of Violation from Insp on 900617-21.Violation Noted: Commitments for Activation of Operational Support Ctr & Technical Support Ctr Not Acceptably Demonstrated ML14191A9791988-08-12012 August 1988 Notice of Violation from Insp on 870309-0415.Violations Noted:Failure to Take Prompt Corrective Action to Determine Cause of Significant Conditions Adverse to Quality,Assure Correction & Preclude Repetition of Listed Events ML20196A9431988-06-15015 June 1988 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000.Violation Noted:Combination of ECCS Subsystem Assumed to Be Operative in Evaluation Model in Updated SAR Did Not Reflect Failures of ECCS Equipment ML14191A9141988-04-14014 April 1988 Notice of Violation from Insp on 880111-15 & 0125-29. Violation Noted:On Four Occasions Licensee Reported Inoperability of All Diesel Generators While Operating at 100 Percent Power Under Incorrect Regulation ML14175B4421986-10-31031 October 1986 Notice of Violation from Insp on 860911-1010 ML14175B3931986-06-18018 June 1986 Notice of Violation from Insp on 860407-11 & 0516 ML14175B3211985-08-27027 August 1985 Notice of Violation from Insp on 850729-0802 ML20027E4651982-10-0101 October 1982 Notice of Violation from Insp on 820811-0910 ML20062J4381982-06-24024 June 1982 Notice of Violation from Investigation on 820111-0223 ML20054H0711982-04-22022 April 1982 Notice of Violation from Insp on 820311-0410 ML20052G2581982-03-30030 March 1982 Notice of Violation from Insp on 820222-26 ML20053B4911982-03-16016 March 1982 Notice of Violation from Insp on 820125-0204.Noncompliance Noted:Failure to Implement Plant Emergency Procedure 43 ML20052C1711982-03-16016 March 1982 Notice of Violation from Insp on 820111-0210 1998-06-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-99-039, on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected1999-09-30030 September 1999 PNO-II-99-039:on 990929,tornado Passed Through Protected Area.Tenting Matl from Turbine Deck Was Reported Blown on CR Roof.No Damage to Offsite Power Remained Available & No Fission Product Barriers Were Affected IR 05000261/19990041999-07-30030 July 1999 Insp Rept 50-261/99-04 on 990523-0703.One Violation of NRC Requirements Occured & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19990031999-06-16016 June 1999 Insp Rept 50-261/99-03 on 990411-0522.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000261/19990021999-05-11011 May 1999 Insp Rept 50-261/99-02 on 990228-0410.One NCV Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19990101999-05-0606 May 1999 Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 & & 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified:Failure to Review & Evaluate Background Info for Persons Granted Unescorted AA IAW 10CFR73.56(b)(3) IR 05000261/19990011999-03-29029 March 1999 Insp Rept 50-261/99-01 on 990117-0227.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980121999-02-12012 February 1999 Insp Rept 50-261/98-12 on 981206-990116.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980131999-01-0808 January 1999 Partially Withheld Insp Rept 50-261/98-13 on 981207-11 (Per 10CFR73.21).No Violations Identified.Major Areas Inspected: Physical Security Program for Power Reactors IR 05000261/19980111998-12-23023 December 1998 Insp Rept 50-261/98-11 on 981025-1205.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980091998-11-23023 November 1998 Insp Rept 50-261/98-09 on 980913-1024.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19980081998-10-0909 October 1998 Insp Rept 50-261/98-08 on 980802-0912.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19980061998-07-16016 July 1998 Insp Rept 50-261/98-06 on 980510-0620.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000261/19980101998-06-29029 June 1998 Insp Repts 50-261/98-10,50-324/98-12,50-325/98-12 & 50-400/98-12 on 980601-04.No Violation Noted.Major Areas Inspected:Plant Support.Areas Specifically Evaluated,Access Authorization & Fitness for Duty Programs IR 05000261/19980031998-06-0909 June 1998 Errata to Notice of Violation of Insp Rept 50-261/98-03, Conducted on 980105-09.Correction Reflects More Accurately That Licensee Actions Taken to Correct Violation Were Ineffective in Correcting Condition IR 05000261/19980021998-04-27027 April 1998 Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19980041998-03-24024 March 1998 Partially Withheld Insp Rept 50-261/98-04 on 980223-25 (Ref 10CFR73.21).No Violations Identified.Major Areas Inspected:Physical Security Program for Power Reactors ML14181A9961998-03-12012 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:As of 970407,licensee Failed to Revise UFSAR to Include Following Effects of Changes Made in Facility or Procedures as Described in UFSAR ML14181A9911998-03-0404 March 1998 Notice of Violations from Insp on 980105-09.Violations Noted:Licensee Failed to Verify Adequacy of Design to Substantiate Final Design Documents Met Design Inputs & Adequate for Design Change Affecting Pumps B & C IR 05000261/19970141998-02-10010 February 1998 Errata to Insp Rept 50-261/97-14,transmitted on 980202.Typo Was Discovered on Pages 9 & 12 of Rept ML14181A9811998-02-0606 February 1998 Notice of Violation from Insp on 980105-09.Violation Noted: as of 970407,licensee Failed to Correct Conditions Adverse to Quality Associated W/Instrument Sensing Line Slope Deficiencies Documented in Ltrs & 960221 ML14181A9781998-02-0202 February 1998 Insp Rept 50-261/97-14 on 971123-980103.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 07100012/20110221997-12-22022 December 1997 Notice of Violation from Insp on 971012-1122.Violation Noted:Licensee Failed to Accomplish Mod Related Activities as Evidenced.On 971007,licensee Did Not Evaluate Post Mod Test Acceptance Criteria for Measuring Total Air Flow ML20197E4841997-12-12012 December 1997 Notice of Violation from Insp on 970831-1011 & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Licensee Failed to Establish Measures to Assure That Conditions Adverse to Quality Promptly Identified ML14181A3961997-12-0909 December 1997 EN-97-111:on 971212,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on Severity Level III Problem Re Failure to Identify Promptly & Correct Mispositioned EDG Output Breaker Switch ML14181A9591997-11-0707 November 1997 Insp Rept 50-261/97-10 on 970831-1011.Violations Noted But Not Cited & Being Considered for Escalated Enforcement Action.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support ML14181A9481997-09-26026 September 1997 Notice of Violation from Insp on 970720-0830.Violation Noted:Reactor Trip Channels Had Not Been Calibrated IAW Formula Specified in TS 2.3.1.2.e IR 05000261/19970081997-08-18018 August 1997 Insp Rept 50-261/97-08 on 970608-0719.No Violations Noted. Major Areas Inspected:Aspects of Licensee Operations,Maint, Engineering & Plant Support IR 05000261/19972011997-08-14014 August 1997 Insp Rept 50-261/97-201 on 970407-0523.No Violations Noted. Major Areas Inspected:Si & AFW Sys & Support Sys ML14181A9331997-07-0707 July 1997 Insp Rept 50-261/97-07 on 970427-0607.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000261/19970041997-04-18018 April 1997 Insp Rept 50-261/97-04 on 970209-0322.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A9001997-04-18018 April 1997 Notice of Violation from Insp on 970209-0322.Violation Noted:On 970224,during Performance of Special Process Procedure SPP-002,freeze Plugging of Piping Not Requiring Brittle Fracture Steps 7.3.3,7.3.8 & 7.3.9 Not Followed IR 05000261/19970051997-04-18018 April 1997 Insp Rept 50-261/97-05 on 970317-21.No Violations Noted. Major Areas Inspected:Plant Support & Security Program Plans IR 05000261/19970011997-03-24024 March 1997 Pages 1 & 29 to Insp Rept 50-261/97-01 ML14181A8811997-02-28028 February 1997 Insp Repts 50-261/97-02,50-324/97-01 & 50-325/97-01 & 50-400-97-02 on 970113-0206.Violations Noted.Major Areas Inspected:Access Authorization & Fitness for Duty Programs ML14181A8541996-12-16016 December 1996 Notice of Violation from Insp on 960928-1116.Violation Noted:On 961016,operations Surveillance Test Procedure OST-160 Pressure Isolation Check Valve Back Leakage Test, Rev 23,inadequate,did Not Provide Adequate Instructions ML14181A8551996-12-16016 December 1996 Insp Rept 50-261/96-12 on 960928-1116.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML14181A8461996-10-25025 October 1996 Notice of Violation from Insp on 960818-0928.Violation Noted:Between 960917-19,shift Supervisors Assigned to Shifts Failed to Ensure That FMEA Controls Were Maintained in SFP Bldg While Fuel off-load Was Ongoing IR 05000261/19963011996-09-20020 September 1996 Exam Rept 50-261/96-301 on 960816-24.Exam results:14 SROs Passed & 1 Failed IR 05000261/19960081996-08-0101 August 1996 Insp Rept 50-261/96-08 on 960526-0706.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000261/19960071996-06-28028 June 1996 Insp Rept 50-261/96-07 on 960603-14.No Violations Noted. Major Areas Inspected:Integrated Performance Assessment to Development Perspective of Plant Strengths & Weaknesses; Operations,Maint,Engineering,Plant Support,Safety,Security IR 05000261/19960051996-06-24024 June 1996 Insp Rept 50-261/96-05 on 960414-0525.No Violations Noted. Major Areas Inspected:Plant Operations,Maint,Engineering & Plant Support IR 05000261/19960041996-05-10010 May 1996 Insp Rept 50-261/96-04 on 960303-0413.No Violations Noted. Major Areas Inspected:Plant Operations,Effectiveness of Licensee Controls in Identifying,Resolving & Preventing Problems & Close Out of Items & Fire Protection Program ML14181A8151996-04-25025 April 1996 Notice of Violation from Insp on 960311-0404.Violation Noted:From 951128 to 960309,licensee Allowed Access to Protected Area Using Hand Geometry Sys W/O Having Conducted Tests to Ensure Equipment Met 90% Detection Probability ML14181A8161996-04-23023 April 1996 Insp Rept 50-261/96-03 on 960311-0404.Violations Noted. Major Areas Inspected:Security Program for Power Reactors, Mgt Support,Security Program Plans & Procedures;Safeguards Info,Audits & Security Lighting IR 05000261/19960021996-03-27027 March 1996 Insp Rept 50-261/96-02 on 960121-0302.No Violations Noted. Major Areas Inspected:Plant Operations,Close Out of Open Issues,Maint & Surveillance,Physical Security Program, Internal & External Exposure Controls & Training ML14182A2821996-03-12012 March 1996 Notice of Violation from Exam on 960209-15.Violation Noted: Licensee Failed to Take Adequate Corrective Action to Correct Deficiency Previously Identified ML14181A8041996-02-16016 February 1996 Notice of Violation from Insp on 960101-20.Violation Noted: Operating Procedure OP-402 Was Not Properly Implemented in That AFW-110 & AFW-111 Were Not Maintained Fully Open IR 05000261/19950301996-01-26026 January 1996 Insp Rept 50-261/95-30 on 951126-1231.Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Surveillance,Engineering & Plant Support ML14181A7991996-01-26026 January 1996 Notice of Violation from Insp on 960126-31.Violation Noted: PIC-012 Did Not Provide Adequate Instructions for Ensuring That Accumulator Level Properly Calibr IR 05000261/19950291995-12-20020 December 1995 Insp Rept 50-261/95-29 on 951022-1125.No Violations Noted. Major Areas Inspected:Plant Operations,Maint Activities, Engineering Efforts & Plant Support Function 1999-09-30
[Table view] |