Notice of Violation from Investigation on 820111-0223
ML20062J438
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/24/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20062J373 List:
References
50-261-82-03, 50-261-82-3, NUDOCS 8208160367
Download: ML20062J438 (1)


Text

- .- _ . . .

APPENDIX A NOTICE OF VIOLATION i

Carolina Power and Light Company Docket NO. 50-261 H. B. Robinson License No. OPR-23 .

i Based on the NRC investigation conducted from January 11 to February 23, 1982, certain of your activities were apparently not conducted in full compliance with

NRC requirements as indicated below. These items have been categorized as i described in correspondence to you dated December 31, 1974.

Technical Specification 6.9.2.a requires the licensee to report to the NRC, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,. discovery of conditions not specifically considered in the safety analysis report or Technical Specifications that require remedial action or corrective measures to prevent development of an unsafe condition.

Contrary to the above, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of receipt of a letter dated April 4, i

1977, from Southwest Research Institute, the licensee did not report to the NRC conditions in the safety analysis report or Technical Specifications.

The conditions related to radiation embrittlement of the reactor vessel. It <

required consideration of remedial action, modification of heatup and cooldown limitations, to prevent development of an unsafe condition.

This is an infraction.  ;

P j Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within thirty days of the date.of this Notice, a written statement or

, explanation in reply, including: (1) admission or denial of ' the alleged f l violation: (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (a) corrective steps which ,

will be taken to avoid further violations; and (5) the date when full compliance ,

will be achieved. Consideration may be given to extending your response time for f good cause shown. -

l N N 2*4 198g E Date:

l l

  • l 0200160367 820729 PDR ADOCK 05000261 j g PDR L

__ _ _ . . _ _.