ML14182A280

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-261/96-300 During Period 960209-15 & Notice of Violation
ML14182A280
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/12/1996
From: Peebles T
NRC/IE, NRC/RGN-II
To: Hinnant C
Carolina Power & Light Co
Shared Package
ML14182A281 List:
References
NUDOCS 9603250202
Download: ML14182A280 (4)


See also: IR 05000261/1996300

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9603250202

DOC.DATE: 96/03/12

NOTARIZED: NO

DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261

AUTH.NAME

AUTHOR AFFILIATION

PEEBLES,T.A.

Region 2 (Post 820201)

RECIP.NAME

RECIPIENT AFFILIATION

HINNANT,C.S.

Carolina Power & Light Co.

SUBJECT: Forwards exam rept 50-261/96-300 & notice of violation.

DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR J ENCL J

SIZE:

TITLE: Operator Licensing Examination Reports

A

NOTES:

T

RECIPIENT

COPIES

RECIPIENT

COPIES

E

ID CODE/NAME

LTTR ENCL

ID CODE/NAME

LTTR ENCL

PD2-1 PD

1

1

MOZAFARI,B

1

1

G

INTERNA

ENTIE

1

1

NRR/DRCH/HHFB

1

1

0

NRR/DRCH/HOLB

1

1

RGN2

-FILE 01

1

1

R

EXTERNAL: NOAC

1

1

NRC PDR

1

1

y

2

D

0

C

U

M

E

N

T

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,

ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM

DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR

8 ENCL

8

March 12, 1996

Carolina Power & Light Company

ATTN:

Mr. C. S. Hinnant

Vice President

H. B. Robinson Steam Electric Plant

Unit 2

3581 West Entrance Road

Hartsville, SC 29550

SUBJECT: NOTICE OF VIOLATION

(NRC EXAMINATION REPORT NO. 50-261/96-300)

Gentlemen:

This refers to the Nuclear Regulatory Commission (NRC) administered

examinations led by Ronald F. Aiello during the period February 9-15, 1996.

The examinations were administered to employees of your organization who had

applied for licenses to operate the H. B. Robinson Steam Electric Plant. At

the conclusion of the examination, the examinations and preliminary findings

were 'discussed with those members of your staff identified in the NRC

Examination Report, Enclosure 2.

A Simulator Facility Report is included in this report as Enclosure 3. A copy

of the written examination questions and answer key, is included in this

report as Enclosure 4. Facility comments to the written examination is

included as Enclosure 5. The NRC's resolution to the facility comments is

included as Enclosure 6.

In October 1992, eight candidates from your facility participated in the

Generic Fundamentals Examination. Of the eight examined, eight passed for a

100 percent pass rate. In October,' 1993, three candidates participated. Of

the three examined, three passed for a 100 percent pass rate. In 1994, no

candidates participated. In April 1995, six candidates participated. Of the

six examined, six passed for a 100 percent pass rate.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). The violation is of concern because inadequate corrective

action with respect to EOPs and AOPs can affect the safe operation of the

plant and potentially endanger the health and safety of the public.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

actions you plan to take to prevent recurrence. After reviewing your response

to this Notice, including your proposed corrective actions and the results of

future inspections, the NRC will determine whether further NRC enforcement

action is necessary to ensure compliance with NRC regulatory requirements.

9603250202 960312

PDR ADOCK 05000261

PDR

CP&L

2

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

Sincerely,

(original signed by T. A. Peebles)

Thomas A. Peebles, Chief

Operator Licensing and Human

Performance Branch

Division of Reactor Safety

Docket No. 50-261

License No. DPR-23

Enclosures: 1. Notice of Violation

2. NRC Examination Report

3. Simulator Facility Report

4. Written Examinations and Answer

Keys (PUBLIC)

5. Facility Post Examination Comments

6. NRC Resolution to Facility Post Examination Comments

cc w/encls 1, 2, 3, 5, & 6:

Dale E. Young

Max Batavia, Chief

Plant Manager

Bureau of Radiological Health

H. B. Robinson Steam Electric Plant

Dept. of Health and Environmental

3581 West Entrance Road

Control

Hartsville, SC 29550

2600 Bull Street

Columbia, SC 29201

J. Cowan, Manager

Operations & Environmental

Dayne H. Brown, Director

Support

MS 0HS7

Division of Radiation Protection

Carolina Power & Light Company

N. C. Department of Environmental

P. 0. Box 1551

Comerce & Natural Resources

Raleigh, NC 27602

P. 0. Box 27687

Raleigh, NC

27611-7687

R. M. Krich, Manager

Regulatory Affairs

W. D. Johnson, Vice President

H. B. Robinson Steam Electric Plant

and Senior Counsel

3581 West Entrance Road

Carolina Power & Light Co.

Hartsville, SC 29550

P. 0. Box 1551

Raleigh, NC 27602

Dicc

w/encls cont'd:

(See page 3)

CP&L

3

cc w/encls 1, 2, 3, 5, & 6 cont'd:

Karen E. Long

Assistant Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC 27602

Robert P. Gruber

Executive Director

Public Staff - NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

Public Service Commission

State of South Carolina

P. 0. Box 11649

Columbia, SC 29211

Hartsville Memorial Library

147 W. College Avenue

Hartsville, SC 29550

M. E. Herrell

Manager - Training

H. B. Robinson Steam Electric Plant

Robinson Nuclear Project Department

3581 West Entrance Rd.

Hartsville, SC 29550

Distribution w/encls 1, 2, 3, 5. & 6:

B. Mozafari, NRR

G. A. Hal1strom, RH

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

2112 Old Camden Road

Hartsville, SC 29550

Distribution w/encls 1, 2. 3, 4, 5, & 6:

PUBLIC

SEND___ TO PUBLIC DOCUJMENT ROOM?

-

YES

0

_____

OFFICE

RII:DRS

RII:DRS

RII:DRP

RII:DRP

RII:DRS

SIGNATURE

NAME

RAiello/rfa/fr

PSteiner

JBartley

MSymlock

eZPbies

DATE

031/. /96

0

46

1 03/j~0/

9

DAE 3

-/

6

,a

/

96

1

03/

/

03/

/ 96

1

03 // -

96

03

/ /96

COPY?

YES

NO

E

NO

YES

N

ES

NO

YES

YES

NO

OFFICIAL RECORD COPY

DOCUMENT NAME:

G:\\LA\\ROB\\I300RPT.RFA