ML120650131
From kanterella
Revision as of 03:09, 3 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
ML120650131 | |
Person / Time | |
---|---|
Site: | Diablo Canyon ![]() |
Issue date: | 03/05/2012 |
From: | Joseph Sebrosky Plant Licensing Branch IV |
To: | Baldwin T, Soenen P R Pacific Gas & Electric Co |
Sebrosky J M, NRR/DORL/LPL4, 415-1132 | |
References | |
TAC ME7803, TAC ME7804 | |
Download: ML120650131 (1) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Acceptance Review Letter
MONTHYEARML25038A1062025-02-0707 February 2025
[Table view]Acceptance Review: Diablo Canyon Revision of Technical Specifications 1.1 and 5.5 to Use Online Monitoring Methodology ML25035A0042025-02-0303 February 2025 Acceptance Review: Diablo Canyon Revision to Technical Specifications to Adopt TSTF-541 ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML14122A3622014-05-0202 May 2014 Acceptance Review of LAR Regarding Revision to Technical Specification 3.8.1 ML13281A4952013-10-30030 October 2013 Acceptance of Application Following Supplement, Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML13214A0202013-08-0101 August 2013 Acceptance Review Email, Relief Request NDE-PNS-U2, Requirements for Examination Coverage of ASME Class 1 Pressurizer Nozzle-to-Head Welds, Third 10-Year Inservice Inspection Interval ML13123A0412013-05-0202 May 2013 Acceptance Review Email, Relief Request NDE-RCS-SE-1R18 - Alternative to Requirements to ASME Code, Section XI, Appendix Viii, Suppl. 2 and 10 as Modified by CC N-695 and CC N-696 to Allow Use of Alternative Depth-Sizing Criteria ML13022A0132013-01-22022 January 2013 Acceptance Review Email, Relief Request RVFLNG-INT3 - Alternative to ASME Code Pressure Test Requirements for Class 1 Reactor Vessel Flange Leakoff Lines, Third 10-Year Inservice Inspection Interval (TAC MF0408-MF0409) ML1206501312012-03-0505 March 2012 Acceptance Review Email, License Amendment Request, Revise Updated Final Safety Analysis Report Section 4.3.2.2 to Allow Use of Beacon Power Distribution Monitoring System ML1202406872012-01-24024 January 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.3.5, Loss of Power DG Start Instrumentation and Fsaru ML1201902312012-01-19019 January 2012 Acceptance Review Email, Request for Stand-alone Preemption Authority Pursuant to 42 U.S.C.. 2201a ML1201200052012-01-13013 January 2012 Acceptance Review Letter, License Amendment Request to Replace Digital Process Protection System for Reactor Protection System and Engineered Safety Features Actuation System Functions ML1120300652011-07-21021 July 2011 Acceptance Review Email, Request to Revise Technical Specifications Related to Auxiliary Feedwater System to Adopt TSTF-245, Rev. 1, TSTF-340, Rev. 3, TSTF-412, Rev. 3, and TSTF-439, Rev. 2 ML1111804492011-04-28028 April 2011 Acceptance Review Email, Request for Exemption from Specific 10 CFR Part 73 Requirements, Extension of Deadline for Implementation ML1110104912011-04-11011 April 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification 3.8.1, AC Sources Operating and TSTF 163, Revision 2, Minimum Vs. Steady State Voltage and Frequency ML1109002252011-03-31031 March 2011 Acceptance Review Email, Request for Exemption from Specific 10 CFR Part 73 Requirements, Extension of Deadline for Implementation ML1108706822011-03-28028 March 2011 Acceptance Review E-mail, License Amendment Request to Revise Technical Specification (TS) 3.7.1, Main Steam Safety Valves (Mssvs), to Remove a One-time Note from TS Table 3.7.1-1 ML1013700552010-05-24024 May 2010 License Amendment Request for Approval of the Cyber Security Plan (TACs ME2667 and ME2668) ML1013904452010-05-19019 May 2010 Acceptance Review Email, Relief Request NDE-RCS-SE-1R16, Relief from ASME Section XI Requirements to Allow Use of Alternate Sizing Qualification Criteria, Third 10-Year Inservice Inspection Interval ML1013704512010-05-17017 May 2010 Acceptance Review Email, Review of the Topical Report, Process Protection System Replacement Diversity and Defense-in-Depth Assessment, Rev. 0, Related to License Amendment Request for Digital Upgrade (TAC ME3722-ME3733) ML1003411112010-02-0303 February 2010 Acceptance Review Email, License Amendment Request to Revise Licensing Basis to Discuss Conformance of Delayed Access Offsite Power Circuit to GDC 17 ML1000604412010-01-0606 January 2010 Acceptance Review Email, Acceptance of Part 73 Exemption ML0914601842009-05-26026 May 2009 Acceptance Review Email, License Amendment Request to Modify Technical Specifications to Adopt TSTF-511, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 ML0907002112009-03-11011 March 2009 Acceptance Review Email, Re License Amendment Request to Revise Technical Specification 3.3.1, Reactor Trip System (RTS) Instrumentation, to Delete High-Negative Rate Trip Function ML0834002822008-12-0404 December 2008 Acceptance Review E-mail ML0820407482008-08-0101 August 2008 Acceptance Review of Proposed Amendments Revision to Technical Specifications 3.7.5, Auxiliary Feedwater System, & 3.7.6, Condensate Storage Tank & Fire Water Storage Tank (Tac Nos. MD8471 and MD8472) 2025-02-07 Category:E-Mail MONTHYEARML25038A1062025-02-0707 February 2025
[Table view]Acceptance Review: Diablo Canyon Revision of Technical Specifications 1.1 and 5.5 to Use Online Monitoring Methodology NUREG-1431, Revision of Technical Specification Completion Time to Be Consistent with NUREG-1431, Revision 52025-02-0707 February 2025 Revision of Technical Specification Completion Time to Be Consistent with NUREG-1431, Revision 5 ML25035A0032025-02-0303 February 2025 Acceptance Review_ Diablo Canyon Revision to Technical Specifications (Tss) to Adopt TSTF-505 for TS 3.3.1 and 3.3.2 ML25035A0042025-02-0303 February 2025 Acceptance Review: Diablo Canyon Revision to Technical Specifications to Adopt TSTF-541 ML25042A2382025-01-30030 January 2025 NRC to NMFS, Consideration of Black Abalone in the Diablo Canyon Intake Cove ML25028A0142025-01-27027 January 2025 LRA - Requests for Additional Information - Set 3 - Email from Brian Harris to Paula Gerfen ML25042A2362025-01-16016 January 2025 NRC to NMFS, Black Abalone in Diablo Lr ESA Consultation ML25014A3442025-01-14014 January 2025 (E-Mail) Diablo Canyon Nuclear Power Plant, Units 1 and 2 - Request for Additional Information Diablo Canyon Request to Revise Technical Specification 5.5.16 ML24365A0302024-12-30030 December 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 3.3.5 and 3.8.2 to Adopt TSTF-589 ML25042A2342024-12-17017 December 2024 NRC to NMFS, Responses to Requests for Additional Information for Diablo Canyon ESA Consultation ML25042A2452024-12-11011 December 2024 PG&E to Fws, Responses to Requests for Additional Information for ESA Consultation ML25042A2422024-12-10010 December 2024 NMFS to NRC, Requests for Additional Information for Diablo Canyon ESA Consultation with Attachment ML25042A2432024-12-10010 December 2024 NMFS to NRC, Requests for Additional Information for Diablo Canyon ESA Consultation ML24339B8832024-12-0404 December 2024 LRA - Requests for Additional Information - Set 2 - Email from Brian Harris to to Paula Gerfen ML25042A2412024-11-27027 November 2024 Fws to NRC, Requests for Additional Information for Diablo Canyon ESA Consultation ML24338A1472024-11-27027 November 2024 NRR E-mail Capture - Status Update to Petitioner - Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML25042A2402024-11-26026 November 2024 Fws to NRC, Acknowledgement of Diablo ESA Section 7 Consultation Review ML24346A0272024-11-20020 November 2024 Printed Documents Provided to NRC Staff During Nov 20, 2024 Public Meeting ML25017A2422024-11-12012 November 2024 Email to PG&E Diablo Canyon ISFSI License Renewal EA and Fonsi ML25017A2432024-11-12012 November 2024 Email to SHPO and Tribes Diablo Canyon ISFSI EA and FRN ML24285A1902024-10-0808 October 2024 Email - Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Environmental Assessment ML24281A1062024-10-0202 October 2024 NRR E-mail Capture - (External_Sender) Public Letter to Petition Review Board Regarding the Diablo Canyon Seismic Core Damage Frequency 10 CFR 2.206 Petition - OEDO-24-00083 ML24250A0542024-09-0606 September 2024 LRA - Requests for Additional Information - Set 1 - Email from Brian Harris to Adam Peck ML24250A0502024-09-0606 September 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML24291A1322024-09-0505 September 2024 E-mail to California Department of Public Health for Diablo Canyon ISFSI License Renewal Environmental Assessment ML24235A2032024-08-22022 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Final Determination e-mail - EPID L-2024-CRS-0000 ML24205A0622024-07-23023 July 2024 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request for Approval to Extend the Alternative for Use of Full Structural Weld Overlay ML24187A1382024-07-0202 July 2024 License Renewal Environmental Review: Summary of June 27 Clarification Call Regarding Pg&Es Response to RCI AQN-3 ML24184C0422024-07-0202 July 2024 NRR E-mail Capture - Request for Additional Information Diablo Canyon 50.69 risk-informed Categorization ML24149A0832024-05-28028 May 2024 Acceptance Review: Diablo Canyon Request for Alternative Security Measures and Exemption for the Early Warning System ML24145A0612024-05-22022 May 2024 Written Limited Appearance Statement of Doris Nassiry ML24136A1622024-05-15015 May 2024 OEDO-24-00083 (E-Mail) 10 CFR 2.206 - Diablo Canyon Power Plant, Unit Nos. 1 and 2 Seismic - Initial Assessment ML24135A1562024-05-13013 May 2024 July 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24134A1902024-05-10010 May 2024 Written Limited Appearance Statement of Shelley Hamilton ML24134A1872024-05-10010 May 2024 Written Limited Appearance Statement of Charlene M. Woodcock ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24095A3172024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Revise Technical Specification 5.6.6 for Pressure and Temperature Limits Report ML24088A2382024-03-28028 March 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 OEDO-24-00083 - Screen-in e-mail L-2024-CRS-0000 ML24058A1032024-03-0808 March 2024 OEDO-23-00350-NRR - Initial Assessment - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24071A1762024-03-0707 March 2024 Email - (External Sender) NRC Proceeding on Diablo Canyon 50-275 and 50-323 LR-2 ML24067A0892024-03-0505 March 2024 Email Response from Diane Curran to Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0902024-03-0505 March 2024 Email to Diane Curran from the Office of the Secretary, Assistant for Rulemaking and Adjudications, Russell Chazell ML24067A0882024-03-0404 March 2024 Email Hearing Request from San Luis Obispo Mothers for Peace, Friends of the Earth, and Environmental Working Group ML24060A0022024-02-28028 February 2024 (External Sender) Pre-Sub Mittal EWS Participants List E-mail ML24045A1972024-02-0606 February 2024 Tribal Consultation Request ML24033A3062024-02-0101 February 2024 Dcisc 2-1-2024 Email: Comments by Mr. Bruce Severance at This Mornings Public Meeting Re Scope of Review for DCPP License Extension ML23334A0912023-11-30030 November 2023 NRR E-mail Capture - Diablo Canyon 1 and 2 - Audit Questions for License Amendment Associated with TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML23335A1012023-11-0606 November 2023 OEDO-23-00350-NRR - Screen-in Email - 10 CFR 2.206 Petition from Mothers for Peace and Change.Org Regarding Diablo Canyon ML23306A0422023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Diablo Canyon Request to Adopt 10 CFR 50.69, risk-informed Categorization and Treatment of SSCs ML23230A0702023-08-18018 August 2023 NRR E-mail Capture - Acceptance Review - Diablo Canyon Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b 2025-02-07 |
Retrieved from "https://kanterella.com/w/index.php?title=ML120650131&oldid=457180"