Forwards Corrected Page 2 to Amend 64 to License DPR-21, Revising Implementation Date to Occur by End of Cycle 14 Refueling Outage (Jan 1994)
ML20057G353
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/20/1993
From: Andersen J
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20057G354 List:
References
TAC-M86674, NUDOCS 9310220092
Download: ML20057G353 (3)


Text

October 20, 1993 Docket No. 50-245 DISTRIBUTION:

CGrimes

+

Docket: Files.

ACRS (10) e NRC' &~ Local PDRs OPA Mr. John F. Opeka PDI-4 Plant OC/LFDCB Executive Vice President, Nuclear SVarga LDoerflein Connecticut Yankee Atomic Power Company JCalvo Northeast Nuclear Energy Company SNorris Post Office Box 270 JAndersen Hartford, Connecticut 06141-0270 OGC l

DHagan t

Dear Mr. Opeka:

GHill (2)

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 1 - CORRECTION TO AMENDMENT NO. 64 (TAC N0. M86674)

On September 29, 1993, the Commission issued Amendment No. 64 to Facility Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit 1, in response to your application dated May 25, 1993.

The amendment removed the operability and associated surveillance requirements for the main steam line radiation monitor (MSLRM) scram and Group I containment isolation functions. The amendment also moved the requirements for MSLRM calibration to Surveillance Requirement 4.6.K.2 and made some editorial changes to Limiting Condition for Operation Section 3.6.K.I.

We have discovered that the amendment was issued with an implementation date of "within 30 days." Since this change will be completed during the cycle 14 refueling outage (January 1994), the implementation date should have been by i

the end of the refueling outage.

Enclosed is a corrected page 2 of the Amendment to Facility Operating License.

Sincerely, Original signed by:

James W. Andersen, Acting Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosure:

Page 2 of Amendment to Facility Operating License cc w/ enclosure:

See next page o m et LA:PDI-4 PM:PDI-4

/

D:PDI-4 [ k OGC

/

SNNi[

JAndersen;If JStolz P

N km lC/19/93 10 /if/93 h/I/9d

/ /h

/ /

DATE OFFICIAL RECORD COPY DOCUMENT NAME: G:\\ANDERSEN\\86674.00R

[

E C ME CENIB N Y 4f"

m. o m 1 D 9310220092 931020 1

PDR ADOCK 05000245 P

PDR

+,yw%

.g it ' ^

i UNITED STATES Q

f NUCLEAR REGULATORY COMMISSION WASHINGTON. D C. 2%%-OK>1

.....f g

October 20, 1993 i

Docket No. 50-245 Mr. John F. Opeka Executive Vice President, Nuclear Connecticut Yankee Atomic Power Company l

Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141-0270

Dear Mr. Opeka:

SUBJECT:

MILLSTONE NUCLEAR POWER STATION, UNIT 1 - CORRECTION TO AMENDMENT NO. 64 (TAC NO. M86674)

On September 29, 1993, the Comission issued Amendment No. 64 to facility.

Operating License No. DPR-21 for Millstone Nuclear Power Station, Unit 1, in response to your application dated May 25, 1993.

The amendment removed the operability and associated surveillance requirements for the main steam line radiation monitor (MSLRM) scram and Group I containment isolation functions. The amendment also moved the requirements for MSLRM calibration to Surveillance Requirement 4.6.K.2 and made some editorial changes to Limiting Condition for Operation Section 3.6.K.I.

We have discovered that the amendment was issued with an implementation date of "within 30 days." Since this change will be completed during the cycle 14 refueling outage (January 1994), the implementat4n date should have been by the end of the refueling outage.

Enclosed is a corrected page 2 of the Amendment to Facility Operating License.

Sincerely,

)

{

/ JameMndersen, Acting Project Manager Project Directorate 1-4 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Enclosure:

Page 2 of Amendment to facility Operating License cc w/ enclosure:

See next page 1

Mr. John F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit I cc:

Gerald Garfield, Esquire R. M. Kacich, Director Day, Berry and Howard Nuclear Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President J. P. Stetz, Vice President Nuclear Operations Services Haddam Neck Plant Northeast Utilities Service Company Connecticut Yankee Atomic Power Company Post Office Box 270 362 Injun Hollow Road Hartford, Connecticut 06141-0270 East Hampton, Connecticut 06424-3099 Kevin T. A. McCarthy, Director Regional Administrator Monitoring and Radiation Division Region I Department of Environmental Protection U.S. Nuclear Regulatory Commission 79 Elm Street 475 Allendale Road Post Office Box 5066 King of Prussia, Pennsylvania 19406 Hartford, Connecticut 06102-5066 Allan Johanson, Assistant Director first Selectmen Office of Policy and Management Town of Waterford Policy Development and Planning Division Hall of Records 80 Washington Street 200 Boston Post Road Hartford, Connecticut 06106 Waterford, Connecticut 06385 i

S. E. Scace, Vice President P. D. Swetland, Resident Inspector Millstone Nuclear Power Station Millstone Nuclear Power Station Northeast Nuclear Energy Company c/o U.S. Nuclear Regulatory Commission Post Office Box 128 Post Office Box 513 Waterford, Connecticut 06385 Niantic, Connecticut 06357 H. F. Haynes, Nuclear Unit Director J. M. Solymossy, Director Millstone Unit No. 1 Nuclear Quality and Assessment Services Northeast Nuclear Energy Company Northeast Utilities Service Company Post Office Box 128 Post Office Box 270 Waterford, Connecticut 06385 Hartford, Connecticut 06141-0270 Nicholas S. Reynolds Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 i

i