ML20058E384

From kanterella
Revision as of 09:51, 17 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Rev 14 to Technical Requirements Manual, Page 2-27, Clarifying Discussion in Table 2.1.1 Notations for Local Test Connections,Vent & Drain Valves & Revising List of Effective Pages EPL-1 Through EPL-4
ML20058E384
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/30/1993
From:
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20058E383 List:
References
PROC-931130, NUDOCS 9312060291
Download: ML20058E384 (6)


Text

- _ _

+

I l

LvMANCHE PEAK STEAM ELECTRIC STATION UNITS I & 2 l

TECHNICAL REQUIREMENTS MANUAL (TRM) i INSTRU710N SHEET (Page 1 of 1)

The following instructional information and checklist is being furnished to help insert Revision 14 l

into the Comanche Peak Steam Electric Station TRM. A description of this revision is provided in l

TXX-93401, dated November 29,1993.

t Discard the old sheets and insert the new sheets, as listed below. Keep all instruction sheets in the i

front of the Effective Page 1.isting to serve as a record of changes.

s Remove Irnert l

Stetiorl l

f 2-27 2-27 i

i k

List of Effective Paces i

EPL-1 thru EPL-4 EPL-1 thru EPL-4 1

I i

)

i l

l 1

i l

I i

9312060291 931129 E

PDR ADocK 0500044S 4

P PDR g

i TECHNICAL REQUIREMENT 2.1 (continued)

TABLE 2.1.1 (continued)

TABLE NOTATIONS

  • Identification code for containment penetration and associated j

isolation valves in FSAR Tables 6.2.4-1, 6.2.4-2, and 6.2.4-3.

t

  1. May be opened on an intermittent basis under administrative control.

The table does not list local vent, drain and test connections as they 14 are a special class of containment isolation valves and are locked l

closed to meet containment isolation criteria when located within the penetration boundary. These valves are subject to the same leak rate 14 i

testing as the other containment isolation valves in the associated j

penetration, including all applicable leak testing exceptions.(see i

FSAR Table 6.2.4-2, including notes).

In addition, if these valves i

are capped (or isolated by blind flange) and under administrative i

controls they are not required to be leak rate tested.

Note 1:

All four MSIV bypass val.es are locked closed in Mode 1.

j During Mode 2, 3, and 4 one MSIV bypass valve may be opened provided the other three MSIV bypass valves are locked closed and their associated MSIVs are closed.

l Cote 2:

These valves require ste m to be tested and are thus not required to be tested until the plant is in MODE 3.

l Note 3:

These valves are included for table completeness; the l

requirements of Specification 3.6.3 do not apply.

Instead, i

the requirements of Specification 3.7.1.1, 3.7.1.5, 3.7.1.6 3

7 and 3.7.1.7 apply for main steam safety valves, main steam 3

isolation valves, feedwater isolation valves and steam 3

)

generator atmospheric relief valves, respectively.

3 4

Note 4:

These valves are leak tested in accordance with Technical

+

Specification Surveillance Requirement 4.E.1.2.

2

(

Note 5:

10 CFR 50 Appendix J, Type C testing of these valves is 6

l satisfied by the testing of the airlock under lechnical 6

Specification Surveillance Requirement 4.6.1.3b.

6

.i Note 6:

These valves are considered an integral part of the airlock 6

f associated with their respective airlock door.

Therefore, 6

1 they are subject to the controls of Specification 3.6.1.3.

6 l

Note 7:

These valves are secured in position by hydraulic system 6

l locks and/or interlocks and do not require separate locks.

6 i

d-COMANCHE PEAK - UNITS 1 AND 2 2-27 Revision 14 November 30, 1993 l

t

.i i

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

-j EFFECTIVE PAGE LISTING BELOW IS A LEGEND CDR THE EFFECTIVE PAGE LISTING:

{

Original Submitted July 21, 1989 j

Revision 1 September 15, 1989 i

Revit;on 2 January 15, 1990 l

Revision 3 July 20, 1990 Revision 4 April 24, 1991 1

Revision 5 September 6, 1991 Revision 6 November 22, 1991 Revision 7 March 18, 1992 Revision 8 June 30, 1992 Revision 9 December 18, 1992 i

Revision 10 January 22, 1993 Revision 11 February 3, 1993 i

Revision 12 July.15, 1993 Revision 13 September 14, 1993 l

Revision 14 November 30, 1993 e

i t

i i

l I

i i

i EPL-1 November 30, 1993 l

e i

^

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2

'[

TECHNICAL REQUIREMENTS MANUAL (TRM) l EFFECTIVE PAGE L1511NG TRM-Tab Original TRM-Title Page June 30, 1992 i

Table of Contents-Tab Original i

Revision 11 Administrative Cnntrols-Tab Original Administrative Controls-Title Page June 30, 1992 0-1 Revision 12 0-2 nuary 22, 1993 0-3

.: ember 18, 1992 l

0-t, June 30, 1992 l

0-5 January 22, 1993

^

0-6 January 22, 1993 0-7 January 22, 1993 l

0-8 January 22, 1993 0-9 January 22, 1993 0-) n January 22, 1993 0-11 January 22, 1993

[

0-12 June 30, 1992 0-13 June 30, 1992 0-14 July 15, 1993 i

0-15 July 15, 1993

(

0-16 January 22, 1993 0-17 January 22.-1993 0-18 Revision 12 0-19 Revision 8

[

0-20 July 15, 1993 i

0-21 July 15, 1993 0-22 Revision S 0-23 Revision 8 0-24 Revision 8 i

0-25 July 15, 1993 0-26 January 22, 1993 Techr<ical Requirements-Tab Original Section 1-Tab Original 1-1 June 30, 1992 1-2 Revision 12 i

1-3 July 15, 1993 1-4 July 15,'1993 1-5 June 30, 1992 1-6 Revision 12 1-7 July 15, 1993 l

1-B July 15, 1993 1-9 July 15, 1993 1-10 July 15, 1991 1-11 July 15, 1993 1-12 July 15, 1993 l

1-13 July 15, 1993

t EPL-2 November 30, 1993 i

[

~

~

COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 1-14 July 15, 1993 f

1-15 Revision 12 1-16 June 30, 1992 i

1-17 Revision 12 1-18 July 15, 1993 1-19 July 15, 1993 1-20 July 15, 1993 1-21 July 15, 1993 1-22 Revision 12 t

Sec. 2-Tab Original j

2-1 June 30, 1992 2-2 Revision'12 2-3 July 15, 1993 2-4 January 22, 1993 2-5 Revision 8 l

2-6 Revision 8-2-7 Revision 8 2

l 2-8 January 22, 1993 2-9 Revision 8

~

2-10 January 22, 1993 l

2-11 Revision 8 2-12 Revision 9 i

2-13 Revision 8

[

2-1 July 15,~1993 2-15 Revision 8 2-16 July 15, 1993 2-17 Revision 8 2-18 Revision a 2-19 January 22, 1993 t

2-20 January 22, 1993 2-21 Revision 8

(

2-22 Revision 8 f

2-23 Revision 8 2-24 Revision 8 2-25 Revision 12 2-26 January 22, 1993 2-27 Revision 14 2-28 July 15, 1993 Sec. 3-Tab Original 3-1 June 30, 1992 3-2 Revision 12 3-3 Revision 12 3-4 July 15, 1993 3-5 July 15, 1993 3-6 July 15, 1993 3-7 June 30, 1992 3-8

-July 15, 1993 EPL-3 November 30. 1993 j

. s-COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1 & 2 TECHNICAL REQUIREMENTS MANUAL (TRM)

EFFECTIVE PAGE LISTING 3-9 June 30, 1992 3-10 Revision 11 3-11 Revision 11 Sec. 4-Tab Original 4-1 June 30, 1992 4-2 Revision 12 4-3 July 15, 1993 4-4 July 15, 1993 4-5 Revision 9 4-6 Revision 9 4-7 Revision 8 4-8 Revision 13 4-9 Revision 13 4-10 Revision 13 4-11 September 14, 1993 4-12 September 14, 1993 4-13 Revision 13 4-14 Revision 13 4-15 Revision 8 4-16 Revision 12 4-17 Revision 10 4-18 Revision 12 4-19 Revision 12 4-20 Revision 8 4-21 Revision 12-4-22 July 15, 1993 4-23 Revision 12 4-24 Revision 12 4-25 Revision 12 s

4-26 Revision 12 4-27 Revision 8 l

4-28 Revision 10 4-29 Revision 12 4-30 Revision 10 4

1 4-31 July 15, 1993 EPL-Tab Original EPL-1 Revision 14 EPL-2 Revision 14 EPL-3 Revision 14 EPL-4 Revision 14 4

i EPL-4 November 30, 1993

~

-