Updated Inspection Plan for St. Lucie Plant Units 1 & 2 (Report 05000335/2021005 and 05000389/2021005)
ML21237A299
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 08/25/2021
From: David Dumbacher
NRC/RGN-II/DRP/RPB3
To: Coffey B
Florida Power & Light Co
References
IR 2021005
Download: ML21237A299 (5)


Text

August 25, 2021

SUBJECT:

UPDATE D INSPECTION PLAN FOR ST. L UCIE P LANT UNITS 1 & 2 (Report 05000335/2021005 and 05000389/2021005)

Dear Mr. Coffey:

The enclosed inspection plan lists t he i nspections scheduled through June 30, 2023 for St.

Lucie Plant U nits 1 & 2. The NRC pr ovides t he i nspection plan to allow for t he r esolution of any scheduling conflicts and personnel ava ilability i ssues. Routine inspections per formed by resident i nspectors a re not i ncluded in the inspection plan. The i nspections l isted during the l ast twelve months of t he i nspection plan are tentative and may be r evised. The NRC w ill contact you as soon as possib le to discuss cha nges t o t he inspection plan shoul d circumstances warrant any ch anges.

In response t o the COVID-19 public heal th em ergency ( PHE), the N RC i s adj usting inspection plans and schedules i n order t o sa feguard the health and safety o f both NRC and licens ee staff while still effectively i mplementing the ROP. Each planned inspection is b eing carefully reviewed in order to determine if any por tions o f the inspection can be per formed remotely, determine how bes t to p erform on-site portions to m inimize pe rsonnel heal th risks, and adjust inspection schedules i f needed. This i s done i n accordance w ith guidance c ontained in t he February 1, 2021 memo, Calendar Y ear 2021 Inspecti on Guidance D uring COVID-19 Telework Restrictions ( ML21027A274). For i nspections r equiring extensive coo rdination with offsite organizations, suc h as e valuated emergency pr eparedness e xercises, NRC gui dance and frequently aske d ques tions f or se curity and em ergency pr eparedness c an be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, t he N RC has deve loped guidance if f orce-on-force inspections cannot be completed as s cheduled due to an emergency, such as t he C OVID-19 PHE. These cha nges help ensure t he heal th and safety of bo th NRC and licensee staff while maintaining the N RCs important s afety and security mission during the COVID-19 PHE. The attached inspection plan i s accurate on the dat e of i ssuance bu t remains subject to change base d on approval o f potential exe mption r equests or ot her c hanges needed due to ch anging conditions i n the C OVID-19 P HE. NRC st aff will contact y our app ropriate regulatory af fairs st aff in order t o co ordinate i nspection planning and scheduling. The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 404-997-4628 with any questions you have regarding this letter.

Sincerely,

/RA/

David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects

Docket Nos. 50-335 and 50- 389 License Nos. DPR-67 and NPF-16

Enclosure:

St. Lucie Inspection/Activity Plan (09/01/2021 - 06/30/2023)

Distribution: via ListServe SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT UNITS 1 & 2 (Report 05000335/2021005 and 05000389/2021005) dated August 25, 2021

DISTRIBUTION:

M. Kowal, RII L. Gibson, RII OE Mail RIDSNRRDRO RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource PUBLIC

AD AMS ACCESSION NUMBER: ML21237A299 x SUNSI Reviewx Non -Sensitivex Publicly Available Sensitive n -Publiclyvlable

OFFICE R DRP I:

ME Hamm D. Dcher TE 08/24/2021 08/25/2021

OF FIAL RERD COPY IP 22b Site Inspection Activity Plan Saint Lucie

09/01/2021 - 06/30/2023

Unit Start End Activity CAC Title Staff Count

DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6

1, 2 10/18/2021 10/22/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1, 2 11/1/2021 11/5/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

SAINT LUCIE REQUAL INSPECTION 2

1, 2 11/1/2021 11/5/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5

1, 2 2/7/2022 2/11/2022 IP 71114.01 000716 Exercise Evaluation

1, 2 2/7/2022 2/11/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1, 2 2/7/2022 2/11/2022 IP 71151 001397 Performance Indicator Verification

DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3

1, 2 2/28/2022 3/4/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 3/14/2022 3/18/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements

SECURITY BASELINE INSPECTION 3

1, 2 4/18/2022 4/22/2022 IP 71130.02 000734 Access Control

1, 2 4/18/2022 4/22/2022 IP 71130.05 000737 Protective Strategy Evaluation

1, 2 4/18/2022 4/22/2022 IP 71130.09 001656 Security Plan Changes

1, 2 4/18/2022 4/22/2022 IP 71151 001338 Performance Indicator Verification

PROBLEM IDENTIFICATION AND RESOLUTION 4

1, 2 5/2/2022 5/6/2022 IP 71152B 000747 Problem Identification and Resolution

1, 2 5/16/2022 5/20/2022 IP 71152B 000747 Problem Identification and Resolution

TRIENNIAL HEAT SINK PERFORMANCE 1

1, 2 8/1/2022 8/5/2022 IP 71111.07SIX 000700 Heat Sink Performance

1, 2 8/1/2022 8/5/2022 IP 71111.07T 000700 Heat Sink Performance

UNIT 1 IN-SERVICE INSPECTION +SG 2

1 9/5/2022 9/9/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RAD SAFETY INSPECTION 2

1, 2 9/12/2022 9/16/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 9/12/2022 9/16/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1, 2 9/12/2022 9/16/2022 IP 71151 000746 Performance Indicator Verification

NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4

1, 2 11/28/2022 12/2/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

Prepared on 8/24/2021 3:13:14 PM 1 of 2 IP 22b Site Inspection Activity Plan

1, 2 12/12/2022 12/16/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

FORCE-ON-FORCE PLANNING AND EXERCISE - STL 4

1, 2 1/9/2023 1/13/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1, 2 1/30/2023 2/3/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2

1, 2 1/23/2023 1/27/2023 IP 71114.02 000717 Alert and Notification System Testing

1, 2 1/23/2023 1/27/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1, 2 1/23/2023 1/27/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1, 2 1/23/2023 1/27/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness

1, 2 1/23/2023 1/27/2023 IP 71151 001397 Performance Indicator Verification

CYBER SECURITY INSPECTION 2

1, 2 1/23/2023 1/27/2023 IP 71130.10P 000741 Cyber Security

UNIT 2 IN-SERVICE INSPECTION +SG 2

2 2/27/2023 3/3/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)

RP OCCUPATIONAL RADIATION SAFETY BASELINE 3

1, 2 4/17/2023 4/21/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 4/17/2023 4/21/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls

1, 2 4/17/2023 4/21/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 4/17/2023 4/21/2023 IP 71124.04 000728 Occupational Dose Assessment

1, 2 4/17/2023 4/21/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

1, 2 4/17/2023 4/21/2023 IP 71151 000746 Performance Indicator Verification

1, 2 5/15/2023 5/19/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1, 2 5/15/2023 5/19/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls

1, 2 5/15/2023 5/19/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1, 2 5/15/2023 5/19/2023 IP 71124.04 000728 Occupational Dose Assessment

1, 2 5/15/2023 5/19/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

1, 2 5/15/2023 5/19/2023 IP 71151 000746 Performance Indicator Verification

SECURITY BASELINE INSPECTION 3

1, 2 5/8/2023 5/12/2023 IP 71130.02 000734 Access Control

1, 2 5/8/2023 5/12/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1, 2 5/8/2023 5/12/2023 IP 71130.07 000739 Security Training

1, 2 5/8/2023 5/12/2023 IP 71130.09 001656 Security Plan Changes

1, 2 5/8/2023 5/12/2023 IP 71151 001338 Performance Indicator Verification

TARGET SET INSPECTION 2

1, 2 5/22/2023 5/26/2023 IP 71130.14 000743 Review of Power Reactor Target Sets

SAINT LUCIE INITIAL LICENSE EXAM 3

1, 2 6/26/2023 6/30/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

Prepared on 8/24/2021 3:13:14 PM 2 of 2