|
---|
Category:Inspection Plan
MONTHYEARIR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 IR 05000335/20220062023-03-0101 March 2023 Annual Assessment Letter for St. Lucie Units 1 & 2 (Report 05000335/2022006 and 05000389/2022006) ML23030A2412023-01-31031 January 2023 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000335/2023401; 05000389/2023401 ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML22238A0782022-08-26026 August 2022 Updated Inspection Plan for St Lucie Units 1 & 2 - Report 05000335/2022005 and 05000389/2022005 ML22075A1212022-03-16016 March 2022 Stl Problem Identification and Resolution (Pi&R) Information Request Final Report IR 05000335/20210062022-03-0202 March 2022 Annual Assessment Letter for St. Lucie, Units 1 & 2 (Report No. 05000335/2021006 and 05000389/2021006) IR 05000335/20210052021-08-25025 August 2021 Updated Inspection Plan for St. Lucie Plant Units 1 & 2 (Report 05000335/2021005 and 05000389/2021005) IR 05000335/20200062021-03-0303 March 2021 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 Report 05000335/2020006 and 05000389/2020006 ML20324A1122020-11-19019 November 2020 Emergency Preparedness Program Inspection Request for Information IR 05000335/20200052020-08-24024 August 2020 Updated Inspection Plan for St. Lucie Plant, Unit 1 and 2 (Report 05000335/2020005 and 05000389/2020005) ML20085H6692020-03-25025 March 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML19339H0272019-12-0505 December 2019 EP Exercise Inspection RFI IR 05000335/20190052019-08-27027 August 2019 Updated Inspection Plan for St. Lucie Plant, Unit 1 and Unit 2 - (Report 05000335/2019005 and 05000389/2019005) ML19218A2742019-08-0606 August 2019 Notification of Inspection and Request for Information ML19071A0902019-03-12012 March 2019 Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U. S. Nuclear Regulatory Commission Inspection Report Nos. 05000335/2019011 and 05000389/2019011 IR 05000335/20180062019-03-0404 March 2019 Annual Assessment Letter for St. Lucie Plant, Unit 1 and 2 - Report 05000335/2018006 and 05000389/2018006, Report 05000335/2018402 and 05000389/2018402, Report 05000335/2018501 and 05000389/2018501 ML18304A1872018-10-31031 October 2018 Notification of St. Lucie Plant Design Bases Assurance Inspection (Team) - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2019010 and 05000389/2019010 IR 05000335/20180052018-08-23023 August 2018 Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 (Report 05000335/2018005 and 05000389/2018005) IR 05000335/20170062018-02-28028 February 2018 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 - Report 05000335/2017006 and 05000389/2017006, Report 05000335/2017402 and 05000389/2017402, Report 05000335/2017501 and 05000389/2017501 IR 05000335/20170052017-08-22022 August 2017 Updated Inspection Plan for St. Lucie Plant, Units 1 and 2 (IR 05000335/2017005 and 05000389/2017005) IR 05000335/20160062017-03-0101 March 2017 Annual Assessment Letter for Saint Lucie Nuclear Plant, Units 1 and 2 (Report 05000335/2016006 and 05000389/2016006) IR 05000335/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Saint Lucie Nuclear Plant, Unit 1 and Unit 2 - NRC Inspection Report 05000335/2016005 and 05000389/2016005 ML16222B0142016-08-0808 August 2016 Notification of Inspection and Request for Information ML16064A0032016-03-0303 March 2016 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML16062A2562016-03-0202 March 2016 Annual Assessment Letter ML16054A0732016-02-18018 February 2016 Notification of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report Nos. 05000335/2016011 and 05000389/2016011) ML15281A0502015-10-0707 October 2015 IR 05000335/2016008 and 05000389/2016008 - 02/08/2016 - 02/12/2016 and 02/29/2016 - 03/04/2016 - Notification of St. Lucie Plant Component Design Bases Inspection IR 05000335/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for St. Lucie Plant Unit 1 and Unit 2 (Report 05000335/2015005 and 05000389/2015005) L-2015-218, Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request No. 10, Revision 02015-08-27027 August 2015 Inservice Inspection Plan Fourth Ten-Year Interval Unit 1 Relief Request No. 10, Revision 0 IR 05000335/20140012015-03-0404 March 2015 Annual Assessment Letter for St. Lucie Plant Unit 1 and Unit 2, (Report 05000335/2014001 and 05000389/2014001) L-2014-298, Inservice Inspection Plan - RAI Response - Third Ten-Year Interval Unit 2 Relief Request No. 162014-09-24024 September 2014 Inservice Inspection Plan - RAI Response - Third Ten-Year Interval Unit 2 Relief Request No. 16 ML14245A1842014-09-0202 September 2014 Mid-Cycle Ltr 2014 IR 05000335/20130012014-03-0404 March 2014 Annual Assessment Letter for St Lucie Plant Unit 1 and Unit 2 (Report 05000335/2013001 and 05000389/2013001) ML13305A3362013-11-0101 November 2013 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML13246A0542013-09-0303 September 2013 Mid-Cycle Assessment Letter ML13241A1032013-08-28028 August 2013 Notification of Inspection and Request for Information ML13219B1352013-08-0606 August 2013 Cyber Security Notification Letter ML13164A3182013-06-12012 June 2013 Requalification Program Inspection - St. Lucie Nuclear Plant IR 05000335/20120012013-03-0404 March 2013 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 (Report 05000335/2012001 and 05000389/2012001) ML12349A0382012-12-10010 December 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000335-13-007 & 05000389-13-007) ML12248A3232012-09-0404 September 2012 Mid Cycle Letter ML1206502402012-03-0505 March 2012 EOC Report 22 ML1124403312011-09-0101 September 2011 Report 22 - Saint Lucie ML1106301412011-03-0404 March 2011 Inspection/Activity Plan, Report 22 ML1024408762010-09-0101 September 2010 Report 22 - 2010 Mid Cycle ML1006208302010-03-0303 March 2010 Inspection/Activity Plan 03/01/2010 - 06/30/2011 ML0924404612009-09-0101 September 2009 Inspection/Activity Plan, Report 22, 09/01/2009 - 12/31/2010 ML0906304862009-03-0404 March 2009 EOC Report. 22, Inspection Plan ML0824605882008-09-0202 September 2008 Report 22 - Inspection/Activity Plan 08/01/08 - 12/31/09 2024-08-22
[Table view] Category:Letter
MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report 2024-09-09
[Table view] |
Text
August 25, 2021
SUBJECT:
UPDATE D INSPECTION PLAN FOR ST. L UCIE P LANT UNITS 1 & 2 (Report 05000335/2021005 and 05000389/2021005)
Dear Mr. Coffey:
The enclosed inspection plan lists t he i nspections scheduled through June 30, 2023 for St.
Lucie Plant U nits 1 & 2. The NRC pr ovides t he i nspection plan to allow for t he r esolution of any scheduling conflicts and personnel ava ilability i ssues. Routine inspections per formed by resident i nspectors a re not i ncluded in the inspection plan. The i nspections l isted during the l ast twelve months of t he i nspection plan are tentative and may be r evised. The NRC w ill contact you as soon as possib le to discuss cha nges t o t he inspection plan shoul d circumstances warrant any ch anges.
In response t o the COVID-19 public heal th em ergency ( PHE), the N RC i s adj usting inspection plans and schedules i n order t o sa feguard the health and safety o f both NRC and licens ee staff while still effectively i mplementing the ROP. Each planned inspection is b eing carefully reviewed in order to determine if any por tions o f the inspection can be per formed remotely, determine how bes t to p erform on-site portions to m inimize pe rsonnel heal th risks, and adjust inspection schedules i f needed. This i s done i n accordance w ith guidance c ontained in t he February 1, 2021 memo, Calendar Y ear 2021 Inspecti on Guidance D uring COVID-19 Telework Restrictions ( ML21027A274). For i nspections r equiring extensive coo rdination with offsite organizations, suc h as e valuated emergency pr eparedness e xercises, NRC gui dance and frequently aske d ques tions f or se curity and em ergency pr eparedness c an be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, t he N RC has deve loped guidance if f orce-on-force inspections cannot be completed as s cheduled due to an emergency, such as t he C OVID-19 PHE. These cha nges help ensure t he heal th and safety of bo th NRC and licensee staff while maintaining the N RCs important s afety and security mission during the COVID-19 PHE. The attached inspection plan i s accurate on the dat e of i ssuance bu t remains subject to change base d on approval o f potential exe mption r equests or ot her c hanges needed due to ch anging conditions i n the C OVID-19 P HE. NRC st aff will contact y our app ropriate regulatory af fairs st aff in order t o co ordinate i nspection planning and scheduling. The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff. The staff expects to communicate the schedule for these inspections to each utility separately.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4628 with any questions you have regarding this letter.
Sincerely,
/RA/
David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects
Docket Nos. 50-335 and 50- 389 License Nos. DPR-67 and NPF-16
Enclosure:
St. Lucie Inspection/Activity Plan (09/01/2021 - 06/30/2023)
Distribution: via ListServe SUBJECT: UPDATED INSPECTION PLAN FOR ST. LUCIE PLANT UNITS 1 & 2 (Report 05000335/2021005 and 05000389/2021005) dated August 25, 2021
DISTRIBUTION:
M. Kowal, RII L. Gibson, RII OE Mail RIDSNRRDRO RidsNrrPMStLucie Resource ROPassessment Resource ROPreports Resource PUBLIC
AD AMS ACCESSION NUMBER: ML21237A299 x SUNSI Reviewx Non -Sensitivex Publicly Available Sensitive n -Publiclyvlable
OFFICE R DRP I:
ME Hamm D. Dcher TE 08/24/2021 08/25/2021
OF FIAL RERD COPY IP 22b Site Inspection Activity Plan Saint Lucie
09/01/2021 - 06/30/2023
Unit Start End Activity CAC Title Staff Count
DESIGN BASES ASSURANCE INSPECTION (TEAMS) 6
1, 2 10/18/2021 10/22/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
1, 2 11/1/2021 11/5/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
SAINT LUCIE REQUAL INSPECTION 2
1, 2 11/1/2021 11/5/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
EMERGENCY PREPAREDNESS EXERCISE INSPECTION 5
1, 2 2/7/2022 2/11/2022 IP 71114.01 000716 Exercise Evaluation
1, 2 2/7/2022 2/11/2022 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1, 2 2/7/2022 2/11/2022 IP 71151 001397 Performance Indicator Verification
DESIGN BASES ASSURANCE INSPECTION (PROGRAMS) 3
1, 2 2/28/2022 3/4/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 3/14/2022 3/18/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
SECURITY BASELINE INSPECTION 3
1, 2 4/18/2022 4/22/2022 IP 71130.02 000734 Access Control
1, 2 4/18/2022 4/22/2022 IP 71130.05 000737 Protective Strategy Evaluation
1, 2 4/18/2022 4/22/2022 IP 71130.09 001656 Security Plan Changes
1, 2 4/18/2022 4/22/2022 IP 71151 001338 Performance Indicator Verification
PROBLEM IDENTIFICATION AND RESOLUTION 4
1, 2 5/2/2022 5/6/2022 IP 71152B 000747 Problem Identification and Resolution
1, 2 5/16/2022 5/20/2022 IP 71152B 000747 Problem Identification and Resolution
TRIENNIAL HEAT SINK PERFORMANCE 1
1, 2 8/1/2022 8/5/2022 IP 71111.07SIX 000700 Heat Sink Performance
1, 2 8/1/2022 8/5/2022 IP 71111.07T 000700 Heat Sink Performance
UNIT 1 IN-SERVICE INSPECTION +SG 2
1 9/5/2022 9/9/2022 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RAD SAFETY INSPECTION 2
1, 2 9/12/2022 9/16/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1, 2 9/12/2022 9/16/2022 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation 1, 2 9/12/2022 9/16/2022 IP 71151 000746 Performance Indicator Verification
NFPA 805 TRIENNIAL FIRE PROTECTION INSPECTION 4
1, 2 11/28/2022 12/2/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
Prepared on 8/24/2021 3:13:14 PM 1 of 2 IP 22b Site Inspection Activity Plan
1, 2 12/12/2022 12/16/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
FORCE-ON-FORCE PLANNING AND EXERCISE - STL 4
1, 2 1/9/2023 1/13/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
1, 2 1/30/2023 2/3/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
EMERGENCY PREPAREDNESS PROGRAM INSPECTION 2
1, 2 1/23/2023 1/27/2023 IP 71114.02 000717 Alert and Notification System Testing
1, 2 1/23/2023 1/27/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
1, 2 1/23/2023 1/27/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
1, 2 1/23/2023 1/27/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness
1, 2 1/23/2023 1/27/2023 IP 71151 001397 Performance Indicator Verification
CYBER SECURITY INSPECTION 2
1, 2 1/23/2023 1/27/2023 IP 71130.10P 000741 Cyber Security
UNIT 2 IN-SERVICE INSPECTION +SG 2
2 2/27/2023 3/3/2023 IP 71111.08P 000702 Inservice Inspection Activities (PWR)
RP OCCUPATIONAL RADIATION SAFETY BASELINE 3
1, 2 4/17/2023 4/21/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1, 2 4/17/2023 4/21/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls
1, 2 4/17/2023 4/21/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 4/17/2023 4/21/2023 IP 71124.04 000728 Occupational Dose Assessment
1, 2 4/17/2023 4/21/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
1, 2 4/17/2023 4/21/2023 IP 71151 000746 Performance Indicator Verification
1, 2 5/15/2023 5/19/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
1, 2 5/15/2023 5/19/2023 IP 71124.02 000726 Occupational ALARA Planning and Controls
1, 2 5/15/2023 5/19/2023 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
1, 2 5/15/2023 5/19/2023 IP 71124.04 000728 Occupational Dose Assessment
1, 2 5/15/2023 5/19/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
1, 2 5/15/2023 5/19/2023 IP 71151 000746 Performance Indicator Verification
SECURITY BASELINE INSPECTION 3
1, 2 5/8/2023 5/12/2023 IP 71130.02 000734 Access Control
1, 2 5/8/2023 5/12/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
1, 2 5/8/2023 5/12/2023 IP 71130.07 000739 Security Training
1, 2 5/8/2023 5/12/2023 IP 71130.09 001656 Security Plan Changes
1, 2 5/8/2023 5/12/2023 IP 71151 001338 Performance Indicator Verification
TARGET SET INSPECTION 2
1, 2 5/22/2023 5/26/2023 IP 71130.14 000743 Review of Power Reactor Target Sets
SAINT LUCIE INITIAL LICENSE EXAM 3
1, 2 6/26/2023 6/30/2023 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
Prepared on 8/24/2021 3:13:14 PM 2 of 2