IR 05000335/2021402

From kanterella
Jump to navigation Jump to search
Material Control and Accounting Program Inspection Report 05000335/2021402 and 05000389/2021402 - Public
ML22088A023
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/04/2022
From: David Dumbacher
NRC/RGN-II/DRP/RPB3
To: Coffey B
Florida Power & Light Co
References
IR 2021401
Download: ML22088A023 (3)


Text

April 4, 2022

SUBJECT:

ST. LUCIE UNITS 1 & 2 - MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000335/2021402 AND 05000389/2021402

Dear Mr. Coffey:

On April 20, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at St. Lucie Units 1 & 2 and discussed the results of this inspection with Mr. Dan DeBoer and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Signed by Dumbacher, David on 04/04/22 David E. Dumbacher, Chief Reactor Projects Branch 3 Division of Reactor Projects Docket Nos. 05000335 and 05000389 License Nos. DPR-67 and NPF-16 cc w/o encl: Distribution via LISTSERV ML22088A023 (Cover letter)

Entire Report: Non-Sensitive Publicly Available SUNSI Review X Sensitive X Non-Publicly Available Cover Letter Only: X Non-Sensitive X Publicly Available X SUNSI Review Sensitive Non-Publicly Available OFFICE RII:DRP RII:DRP RII:DRP NAME T. Morrissey S. Roberts D. Dumbacher DATE 3/11/2022 3/14/2022 4/4/2022