ML21281A198

From kanterella
Revision as of 19:33, 19 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
HI-STORM FW, CoC 1032, Amd. 8 Acceptance Letter
ML21281A198
Person / Time
Site: 07201032
Issue date: 10/13/2021
From: Kristina Banovac
Storage and Transportation Licensing Branch
To: Elisio D
Holtec
K BANOVAC NRC/NMSS/DFM/STLB 3014157116
References
Download: ML21281A198 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ms. Denise Elisio Licensing Engineer Holtec International Holtec Technology Campus One Holtec Boulevard Camden, NJ 08104

SUBJECT:

APPLICATION FOR AMDENDMENT NO. 8 TO THE CERTIFICATE OF COMPLIANCE NO. 1032 FOR THE HI-STORM FW SYSTEM - ACCEPTED FOR REVIEW (CAC/EPID NOS. 001028/L-2021-LLA-0139)

Dear Ms. Elisio:

By letter dated July 30, 2021 [Agencywide Documents Access and Management System (ADAMS) Accession No. ML21211A608], Holtec International (Holtec) submitted a request to the U.S. Nuclear Regulatory Commission (NRC) to amend the Certificate of Compliance (CoC)

No. 1032 for the HI-STORM FW System. The NRC staff performed an acceptance review of the application to determine if the application contains sufficient technical information in scope and depth to allow the staff to begin a detailed technical review.

This letter acknowledges acceptance of your application. We have established a review schedule based on current workload and priority. The schedule would allow the staff to complete and issue a request for additional information (RAI) in January 2022. If Holtec provides a sufficient response to the RAI in March 2022, and a second RAI is not needed, a draft CoC would be submitted to Rulemaking in September 2022. The staff estimates that completing the safety review of this CoC amendment application will require approximately 100 staff review hours. If an additional RAI is needed, the staff will keep you informed of any schedule or estimate changes. In general, no additional changes to the application should be submitted except for changes resulting from your response to a RAI. October 13, 2021 D. Elisio 2 Please reference Docket No. 72-1032 and CAC/EPID Nos. 001028/L-2021-LLA-0139 in future correspondence related to this request. If you have any questions regarding this matter, please contact me at 301-415-7116 or Kristina.Banovac@nrc.gov.

Sincerely, Kristina L. Banovac, Project Manager Storage and Transportation Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards Docket No. 72-1032 CAC/EPID Nos. 001028/L-2021-LLA-0139 Signed by Banovac, Kristina on 10/13/21

ML21281A198 OFFICE NMSS/DFM/STL NMSS/DFM/STL NMSS/DFM/STL NAME KBanovac WWheatley JMcKirgan DATE 10/13/ 2021 10/13/ 2021 10/13/ 2021

Ltr ML21281A198 OFFICE NMSS/DFM/STLB NMSS/DFM/STLB NMSS/DFM/STLB NMSS/DFM/STLB NAME KBanovac KBWWheatley WW JMcKirgan JM KBanovac KB DATE Oct 12, 2021 Oct 13, 2021 Oct 13, 2021 Oct 13, 2021