Category:Inspection Report Correspondence
MONTHYEARML23129A6062023-05-0404 May 2023 Special Inspection Team Charters to Evaluate the Circumstances Surrounding the Ground Settling at the Davis-Besse Nuclear Power Station IR 05000346/20224012022-05-17017 May 2022 Security Baseline Inspection Report 05000346/2022401 ML22081A1472022-03-11011 March 2022 R22 (March 2022) - Steam Generator Tube Inspection Discussion Points 11 March 2022 L-21-285, Response to NRC Inspection Report 05000346/2021090, EA-21-1552021-12-15015 December 2021 Response to NRC Inspection Report 05000346/2021090, EA-21-155 IR 05000346/20214012021-10-0707 October 2021 Cyber Security Inspection Report 05000346/2021401 and Premliminary Greater than Green Finding and Apparent Violation ML21155A0392021-06-0808 June 2021 Review of the 2016, 2018, and 2020 Steam Generator Tube Inspection Reports (Epids L-2020-LRO-0055, L-2020-LRO-0082, and L-2020-LRO-0083) ML18190A4902018-07-0909 July 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team), Inspection Report 05000346/2018011 (DRP-DXB) ML18093A4612018-03-16016 March 2018 Response to NRC Inspection Report 05000346/2018010, EA-18-008 ML17087A3192017-03-28028 March 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20164052016-09-13013 September 2016 NRC Security Baseline Inspection Report 05000346/2016405 - Cover Letter Only IR 05000346/20164082016-08-10010 August 2016 NRC Supplemental Inspection Report 05000346/2016408 and Assessment Follow-up Letter (Cover Letter Only) IR 05000346/20164072016-08-0303 August 2016 NRC Security Baseline Inspection Report 05000346/2016407, (Cover Letter Only) ML16210A0432016-07-27027 July 2016 Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000346/2016009 (Akd) IR 05000346/20155012016-02-0303 February 2016 NRC Emergency Preparedness Annual Inspection Report No. 05000346/2015501 IR 05000346/20135022014-02-12012 February 2014 Ltr 02/12/14 Davis Besse EP Annual Closeout (RDJ) ML14045A1902014-02-12012 February 2014 EP Annual Closeout (Rdj) ML1005409512010-02-17017 February 2010 Ohio Department of Public Safety/Request for Permission to Observe the NRC Inspections at Davis-Besse Nuclear Power Plant Scheduled for the Week of March 1-5, 2010/Letter IR 05000346/20074022007-05-30030 May 2007 IR 05000346-07-402, on 02/12/2007 - 02/16/2007, and 05/04/2007, Davis-Besse Nuclear Power Plant; Ti 2515/154, Material Control and Accounting Program - Cover Letter ML0635602892006-12-21021 December 2006 Ltr. Davis-Besse 12/21/06 Notification of Triennial Fire Protection Baseline Inspection 07-006 ML0630701552006-11-0202 November 2006 Ltr. 11/02/06 Davis Besse Request for Information 06-005 IR 05000346/20060102006-10-24024 October 2006 IR 05000346/2006010 - Cover Letter ML0619900902006-07-13013 July 2006 IA-05-055, Goyal, 7/13/2006 Letter Withdrawing 01/18/2006 Request for Hearing (NRC Special Inspection Report No. 0500346-02-008 DRS) (NRC Investigation Report No. 3-2002-006) ML0533903582005-11-30030 November 2005 Information Request for an NRC Biennial Permanent Modifications and 10CFR 50.59 (MOD/50.59) Baseline Inspection IR 05000346/20030022003-03-0707 March 2003 IR 05000346-03-002, on 12/29/2002 - 02/08/2003, for Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Routine Inspection IR 05000346/20020022002-04-15015 April 2002 IR 05000346/2002-002, on 02/16-03/31/2002, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station. Integrated Inspection Report. No Violations Identified IR 05000346/20010152002-01-18018 January 2002 IR 05000346/2001-015, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Integrated Inspection on 11/14-12/31/2001. No Violations Noted IR 05000346/20010142002-01-16016 January 2002 IR 05000346/2001-014, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Inspection on 12/17-20/2002 Re Permanent Plant Modification and Changes, Tests, and Experiments. One Noncited Violation Noted 2023-05-04
[Table view] |
Text
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION - CYBER SECURITY INSPECTION REPORT 05000346/2023402
Dear Terry Brown:
On November 13, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Davis-Besse Nuclear Power Station and discussed the results of this inspection with Christopher Jackson, and other members of your staff. The results of this inspection are documented in the enclosed report.
No NRC-identified or self-revealing findings were identified during this inspection.
A licensee-identified violation which was determined to be of very low security significance is documented in this report. We are treating this violation as a non-cited violation (NCV)
consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Davis-Besse Nuclear Power Station.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.December 19, 2023 The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Jorge J. Corujo-Sandin, Acting Branch Chief Engineering Branch 2 Division of Operating Reactor Safety Docket No. 05000346 License No. NPF-3 Enclosure:
As stated cc: C. Salz, State Liaison Officer Ohio Emergency Management Agency cc w/o encl: Distribution via LISTSERV Signed by Corujo-Sandin, Jorge on 12/19/23
ML23353A143 (Cover letter)
Entire Report: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter Only: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RIII RIII NAME JGilliam:sw JCorujo-Sandin DATE 12/19/2023 12/19/2023