MONTHYEARML23129A6062023-05-0404 May 2023 Special Inspection Team Charters to Evaluate the Circumstances Surrounding the Ground Settling at the Davis-Besse Nuclear Power Station IR 05000346/20224012022-05-17017 May 2022 Security Baseline Inspection Report 05000346/2022401 ML22081A1472022-03-11011 March 2022 R22 (March 2022) - Steam Generator Tube Inspection Discussion Points 11 March 2022 L-21-285, Response to NRC Inspection Report 05000346/2021090, EA-21-1552021-12-15015 December 2021 Response to NRC Inspection Report 05000346/2021090, EA-21-155 IR 05000346/20214012021-10-0707 October 2021 Cyber Security Inspection Report 05000346/2021401 and Premliminary Greater than Green Finding and Apparent Violation ML21155A0392021-06-0808 June 2021 Review of the 2016, 2018, and 2020 Steam Generator Tube Inspection Reports (Epids L-2020-LRO-0055, L-2020-LRO-0082, and L-2020-LRO-0083) ML18190A4902018-07-0909 July 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team), Inspection Report 05000346/2018011 (DRP-DXB) ML18093A4612018-03-16016 March 2018 Response to NRC Inspection Report 05000346/2018010, EA-18-008 ML17087A3192017-03-28028 March 2017 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Davis-Besse Nuclear Power Station IR 05000346/20164052016-09-13013 September 2016 NRC Security Baseline Inspection Report 05000346/2016405 - Cover Letter Only IR 05000346/20164082016-08-10010 August 2016 NRC Supplemental Inspection Report 05000346/2016408 and Assessment Follow-up Letter (Cover Letter Only) IR 05000346/20164072016-08-0303 August 2016 NRC Security Baseline Inspection Report 05000346/2016407, (Cover Letter Only) ML16210A0432016-07-27027 July 2016 Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000346/2016009 (Akd) IR 05000346/20155012016-02-0303 February 2016 NRC Emergency Preparedness Annual Inspection Report No. 05000346/2015501 IR 05000346/20135022014-02-12012 February 2014 Ltr 02/12/14 Davis Besse EP Annual Closeout (RDJ) ML14045A1902014-02-12012 February 2014 EP Annual Closeout (Rdj) ML1005409512010-02-17017 February 2010 Ohio Department of Public Safety/Request for Permission to Observe the NRC Inspections at Davis-Besse Nuclear Power Plant Scheduled for the Week of March 1-5, 2010/Letter IR 05000346/20074022007-05-30030 May 2007 IR 05000346-07-402, on 02/12/2007 - 02/16/2007, and 05/04/2007, Davis-Besse Nuclear Power Plant; Ti 2515/154, Material Control and Accounting Program - Cover Letter ML0635602892006-12-21021 December 2006 Ltr. Davis-Besse 12/21/06 Notification of Triennial Fire Protection Baseline Inspection 07-006 ML0630701552006-11-0202 November 2006 Ltr. 11/02/06 Davis Besse Request for Information 06-005 IR 05000346/20060102006-10-24024 October 2006 IR 05000346/2006010 - Cover Letter ML0619900902006-07-13013 July 2006 IA-05-055, Goyal, 7/13/2006 Letter Withdrawing 01/18/2006 Request for Hearing (NRC Special Inspection Report No. 0500346-02-008 DRS) (NRC Investigation Report No. 3-2002-006) ML0533903582005-11-30030 November 2005 Information Request for an NRC Biennial Permanent Modifications and 10CFR 50.59 (MOD/50.59) Baseline Inspection IR 05000346/20030022003-03-0707 March 2003 IR 05000346-03-002, on 12/29/2002 - 02/08/2003, for Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Routine Inspection IR 05000346/20020022002-04-15015 April 2002 IR 05000346/2002-002, on 02/16-03/31/2002, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station. Integrated Inspection Report. No Violations Identified IR 05000346/20010152002-01-18018 January 2002 IR 05000346/2001-015, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Integrated Inspection on 11/14-12/31/2001. No Violations Noted IR 05000346/20010142002-01-16016 January 2002 IR 05000346/2001-014, Firstenergy Nuclear Operating Company, Davis-Besse Nuclear Power Station, Inspection on 12/17-20/2002 Re Permanent Plant Modification and Changes, Tests, and Experiments. One Noncited Violation Noted 2023-05-04
[Table view] Category:Letter
MONTHYEARML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) L-24-186, Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule2024-08-15015 August 2024 Response to RAI for Exemption Request from 10 CFR 50.71(e)(4) Final Safety Analysis Update Schedule IR 05000346/20240022024-08-0101 August 2024 Integrated Inspection Report 05000346/2024002 IR 05000346/20244012024-07-30030 July 2024 Security Baseline Inspection Report 05000346/2024401 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification L-24-032, Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report2024-07-15015 July 2024 Cycle 23 and Refueling Outage 23 Inservice Inspection Summary Report L-24-063, License Amendment Request to Remove the Table of Contents from the Technical Specifications2024-07-0808 July 2024 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-24-024, Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2024-06-19019 June 2024 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-214, Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements2024-06-0505 June 2024 Submittal of Relief Request for Impractical American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI Examination Requirements L-24-019, Unit No.1 - Report of Facility Changes, Tests, and Experiments2024-05-22022 May 2024 Unit No.1 - Report of Facility Changes, Tests, and Experiments ML24142A3532024-05-21021 May 2024 Station—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection L-24-072, Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 20232024-05-15015 May 2024 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report - 2023 L-24-111, Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-05-15015 May 2024 Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations L-24-031, Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage2024-05-14014 May 2024 Unit No.1 - Steam Generator Tube Circumferential Crack Report - Spring 2024 Refueling Outage IR 05000346/20240012024-05-0303 May 2024 Integrated Inspection Report 05000346/2024001 L-24-069, Occupational Radiation Exposure Report for Year 20232024-04-30030 April 2024 Occupational Radiation Exposure Report for Year 2023 L-24-018, Submittal of Core Operating Limits Report, Cycle 24, Revision 02024-04-16016 April 2024 Submittal of Core Operating Limits Report, Cycle 24, Revision 0 ML24089A2582024-04-0101 April 2024 Request for Information for the NRC Quuadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000346/2024010 L-24-013, Annual Notification of Property Insurance Coverage2024-03-26026 March 2024 Annual Notification of Property Insurance Coverage ML24036A3472024-03-0707 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0076 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24057A0752024-03-0101 March 2024 The Associated Independent Spent Fuel Storage Installations ML24057A3362024-02-28028 February 2024 Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) IR 05000346/20230062024-02-28028 February 2024 Re-Issue Annual Assessment Letter for Davis-Besse Nuclear Power Station (Report 05000346/2023006) L-23-264, Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule2024-02-23023 February 2024 Request for Exemption from 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule CP-202300502, Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions2024-02-23023 February 2024 Notice of Planned Closing of Transaction and Provision of Documents to Satisfy Order Conditions L-24-050, Retrospective Premium Guarantee2024-02-22022 February 2024 Retrospective Premium Guarantee IR 05000346/20243012024-02-0202 February 2024 NRC Initial License Examination Report 05000346/2024301 IR 05000346/20230042024-01-31031 January 2024 Integrated Inspection Report 05000346/2023004 ML23313A1352024-01-17017 January 2024 Authorization and Safety Evaluation for Alternative Request RP 5 for the Fifth 10 Year Interval Inservice Testing Program ML23353A1192023-12-19019 December 2023 Operator Licensing Examination Approval Davis Besse Nuclear Power Station, January 2024 L-23-260, Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station2023-12-0707 December 2023 Corrections to the 2022 Combined Annual Radiological Environmental Operating Report and Radioactive Effluent Release Report for the Davis-Besse Nuclear Power Station L-23-243, Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Independent Spent Fuel Storage Installation - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23338A3172023-12-0606 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000346/2024001 IR 05000346/20234032023-11-0202 November 2023 Security Baseline Inspection Report 05000346/2023403 ML23293A0612023-11-0101 November 2023 Letter to the Honorable Marcy Kaptur, from Chair Hanson Responds to Letter Regarding Follow Up on Concerns Raised by Union Representatives During the June Visit to the Davis-Besse Nuclear Power Plant ML24045A0322023-10-26026 October 2023 L-23-221 Proposed Exam Submittal Cover Letter L-23-215, Changes to Emergency Plan2023-10-19019 October 2023 Changes to Emergency Plan ML23237B4222023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Letter Regarding Order Approving Transfer of Licenses and Draft Conforming License Amendments 2024-09-06
[Table view] |
Text
November 2, 2006 Mr. Mark B. Bezilla Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2 Oak Harbor, OH 43449-9760
SUBJECT:
DAVIS-BESSE NUCLEAR POWER STATION - NOTIFICATION OF AN NRC BIENNIAL HEAT SINK PERFORMANCE INSPECTION AND INFORMATION REQUEST
Dear Mr. Bezilla:
On December 11, 2006, the NRC will begin the on-site portion of the Biennial Heat Sink Performance Inspection at your Davis-Besse Nuclear Station. This inspection will be performed in accordance with NRC baseline inspection procedure (IP) 71111.07. The heat exchangers selected for detailed review during this baseline inspection are the Control Room Emergency Ventilation (CREV) system train 1 condenser and the Auxiliary Feedwater system train 2 oil cooler.
We have enclosed a request for documents needed for the inspection. This information can be sent to the following e-mail address gfo@nrc.gov, no later than November 27, 2006, so that we may start the review of these documents. A hard-copy with the required information is also an acceptable option.
The lead inspector for this inspection is Mr. Gerard ODwyer. If there are questions about the material requested, or the inspection, please call Mr. Gerard ODwyer at (630) 829-9624.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document
M. Bezilla Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-346 License Nos. NPF-3
Enclosure:
BIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST cc w/encl: The Honorable Dennis Kucinich G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer Richard Anderson, Vice President Director, Plant Operations Manager - Site Regulatory Compliance D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners
M. Bezilla Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-346 License Nos. NPF-3
Enclosure:
BIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST cc w/encl: The Honorable Dennis Kucinich G. Leidich, President and Chief Nuclear Officer - FENOC J. Hagan, Senior Vice President of Operations and Chief Operating Officer Richard Anderson, Vice President Director, Plant Operations Manager - Site Regulatory Compliance D. Pace, Senior Vice President of of Fleet Engineering J. Rinckel, Vice President, Fleet Oversight D. Jenkins, Attorney, FirstEnergy Manager - Fleet Licensing Ohio State Liaison Officer R. Owen, Administrator, Ohio Department of Health Public Utilities Commission of Ohio President, Lucas County Board of Commissioners President, Ottawa County Board of Commissioners DOCUMENT NAME: ML063070155.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII NAME GODwyer: ls AMStone DATE 10/26/06 11/02/06 OFFICIAL RECORD COPY
M. Bezilla ADAMS DISTRIBUTION:
DXC1 TEB SPS1 SJC4 RidsNrrDirsIrib GEG KGO JER7 CAA1 DRPIII DRSIII PLB1 TXN
Initial Document Request BIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST Inspection Report: 05000346/2006005(DRS)
Inspection Dates: December 11-15, 2006 Inspection Procedures: IP 71111.07, Biennial Heat Sink Performance Inspection Lead Inspector: G. ODwyer (630) 829-9624, gfo@nrc.gov I. Information Requested Expeditiously The following information is requested to be provided as soon as possible, but no later than November 27, 2006, to support the biennial Heat Sink Performance Inspection, IP 71111.07. Unless otherwise specified, all the below requests are for the selected heat exchangers:
- 1. Copies of the procedures used to monitor, inspect, clean or test heat exchanger performance;
- 2. A list of corrective action program documents, with a short description associated with heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, that are documented in your corrective action system (for the previous two years or since the last biennial heat sink inspection), this item is for all the Generic Letter 89-13 Hxs and the ultimate heat sink; 3 Copy of system description and/or design basis document for the heat exchangers under review (as applicable);
4 Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation of the heat exchangers; 5 Copy of any self-assessment done within last two years on any of the licensees heat exchanger programs (e.g., Generic Letter 89-13 program heat exchangers) or on the sample heat exchangers; and 6 A schedule of all inspections, cleanings, maintenance, or testing of any plant heat exchanger to be done during the on-site portion of the inspection.
1 Enclosure
Initial Document Request II. Information Requested to be Available on First Day of Inspection The following requests are only for the two HXs selected as samples unless otherwise stated. We request that the following information be available to the inspector once he arrives on-site December 11, 2006:
- 1. Copies of the two most recently completed tests confirming thermal performance for those heat exchangers which are performance tested. Include documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for these tests. (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests;
- 2. Copy of the evaluations of data for the two most recent completed tests confirming the thermal performance of each heat exchanger;
- 3. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers;
- 4. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria);
- 5. The clean and inspection maintenance schedule for each heat exchanger for the next five years;
- 6. Copy of the document describing the inspection results for the last two clean and inspection activities completed on each heat exchanger;
- 7. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger;
- 8. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger;
- 9. Copy of the design specification and heat exchanger data sheets for each heat exchanger;
- 10. Copy of the vendor/component drawings for each heat exchanger;
- 11. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping;
- 12. Copy of heat exchanger performance trending data tracked for each heat exchanger; 2 Enclosure
Initial Document Request
- 13. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers;
- 14. Copies of the documents that verify the following for the ultimate heat sink:
- sufficient reservoir capacity 15 Copies of the documents that verify the following for the ultimate heat sink:
- for underwater UHS weirs or excavations, that visual or other inspections have been performed to check for:
- a. any possible settlement or movement indicating loss of structural integrity and/or capacity; and
- b. sediment intrusion that may reduce capacity.
If the information requested above will not be available, please contact Gerard ODwyer as soon as possible at (630) 829-9624 or email: gfo@nrc.gov.
3 Enclosure