Text
energy harbor Terry J. Brown Site Vice President, Davis-Besse Nuclear December 15, 2021 L-21-285 Ms. Laura L. Kozak, acting Branch Chief United States Nuclear Regulatory Commission Region Ill
'2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352
Subject:
Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Davis-Besse Nuclear Power Station 5501 N. State Route 2 Oak Harbor, Ohio 43449 419-321-7676 Response to NRC Inspection Report 05000346/2021090, EA-21-155 The purpose of this letter is to confirm the position the Energy Harbor Nuclear Corporation (Energy Harbor) is taking in response to Nuclear Regulatory Commission (NRC) Inspection Report 05000346/2021090 dated December 9, 2021. I verbally notified you on December 15, 2021, that Energy Harbor is not requesting a regulatory conference on this matter regarding the Emergency Diesel Generator Speed Switch and will not be submitting a written response. Energy Harbor understands that by declining to submit a written response or to arrange a regulatory conference, the preliminary assessment of significance will become final, and that we relinquish our right to appeal the NRC's final significance determination of the issue.
There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Robert W. Oesterle, Manager, Site Regulatory Compliance and Emergency Response, at (419) 321-7462.
Sincerely,
~