PY-CEI-NRR-2422, Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826

From kanterella
Revision as of 17:43, 20 July 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Addl Info Re ASME Section IX Relief Request (IR-023) for Inservice Examination Program at Pnpp,Submitted on 980826
ML20210S046
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/10/1999
From: Jeffery Wood
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PY-CEI-NRR-2422, NUDOCS 9908170284
Download: ML20210S046 (2)


Text

,, * ,

7 ef .

FENOC M'"*

  • W W "

P,-. .

Pe ,Ohc 4408 ,

. l JoM K. Wood 4 4 280-S224 Vk;e Prowdent, Nudear Tax:4 4 2804029 l

August 10,1999 PY-CEl/NRR-2422L l

United States Nuclear Regulatory Commission Document Control Desk '

Washington, DC 20555 Perry Nuclear Power Plant Docket No. 50-440 l Submittal of Additional Information for Relief Request (IR-023)

Ladies and Gentlemen:

By letter dated August 26,1998 (PY-CEl/NRR-2310L), ASME Section XI relief requests for the Inservice Examination Program at the Perry Nuclear Power Plant were submitted i per 10 CFR 50.55a (g)(5)(iii). Attachment 1 provides additionalinformation on one of the I

relief requests (IR-023) presently under Nuclear Regulatory Commission review.

There are no regulatory commitments contained in this submittal. If you have questions .

or require additionalinformation, please contact Mr. Henry L. Hegrat, i Manager - Regulatory Affairs, at (440) 280-5606.

Very truly yours, .

i for John K. Wood Attachment cc: NRC Project Manager

! NRC Resident inspector I NRC Region til Otle/j i

9908170284 990810 PDR ADOCK 05000440 P PDR

PY-CEl/NRR-2422L Attachment 1 Page 1 of 1 Additional Information for Relief Request (IR 023)

During recent discussions with the NRC staff, questions arose about one of the Relief Requests (IR-023) submitted by the Perry Nuclear Power Plant (PNPP) staff as part of the second ten-year interval. Below are the questions and the responses given.

Question 1: Are repairs and replacements of snubbers conducted in accordance with ASME Section XI?

Answer: Yes, they are conducted in accordance with the PNPP Nuclear Repair and Replacement (NR&R) Manual following the repair and replacement rules of Section XI. IR-023 does not discuss repairs and replacements because relief is not being requested from the Section XI repair and replacement requirements.

Question 2: Are VT-3 exama performed on the snubbers?

Answer: There are two different types of visual snubber inspections performed at PNPP, each with its own qualification requirements.

4 When inspections of component support assemblies that contain snubbers are conducted to fulfill the requirements of the ASME Section XI Inservice Examination Program (ISEP) and are scheduled for examination in accordance with Code Case N-491, VT-3 personnel are required to perform these inspections, j The relief request deals with the visual inspections performed in accordance with Operational Requirements Manual (ORM) 6.4.1. IR-023 is requesting relief from the visual inspection requirements within Part 4 of the .

OMa-1988 Addenda to the OM-1987 Edition of the Code. These Code requirements do not discuss personnel qualifications for the inspections.

Therefore, the relief request also does not discuss whether the inspections are performed as VT-3 examinations or by VT-3 certified personnel. In practice, the PNPP snubber program requires that the visual inspections be performed by either VT-3 certified personnel or personnel qualifed specifically as snubber visual inspectors under the program.

This should resolve all the questions that have been discussed conceming Relief Request IR-023, i