MONTHYEARIR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 IR 05000352/20220062023-03-0101 March 2023 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2022006 and 05000353/2022006) IR 05000352/20220052022-08-31031 August 2022 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2022005 and 05000353/2022005) IR 05000352/20210062022-03-0202 March 2022 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2021006 and 05000353/2021006) IR 05000352/20210052021-09-0101 September 2021 Updated Inspection Plan for the Limerick Generating Station, Units 1 and 2 (Report 05000352/2021005 and 05000353/2021005) IR 05000352/20200062021-03-0303 March 2021 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2020006 and 05000353/2020006) ML20293A1712020-10-19019 October 2020 Information Request to Support Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000352/2021010 and 05000353/2021010 IR 05000352/20200052020-08-31031 August 2020 Updated Inspection Plan (Inspection Report 05000352/2020005 and 05000353/2020005) ML20183A3192020-07-0101 July 2020 Information Request to Support Triennial Baseline Design-Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000352/2020014 and 05000353/2020014 IR 05000352/20190062020-03-0303 March 2020 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2019006 and 05000353/2019006) ML19254A6312019-09-0909 September 2019 Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000352/2020401 and 05000353/2020401 IR 05000352/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Reports 05000352/2019005 and 05000353/2019005) IR 05000352/20180062019-03-0404 March 2019 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Reports 05000352/2018006 and 05000353/2018006) IR 05000352/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000352/2018005 and 05000353/2018005) IR 05000352/20170062018-02-28028 February 2018 Annual Assessment Letter for Limerick Generating Station-Units 1 and 2 (Report 05000352-2017006 and 05000353-2017006-Report 05000352-2017402 and 05000353-2017402-Report 05000352-2017501 and 05000353-2017501) IR 05000352/20170052017-08-28028 August 2017 Updated Inspection Plan for Limerick Generating Station Units 1 and 2 (Report 05000352/2017005 and 05000353/2017005) IR 05000352/20160062017-03-0101 March 2017 Annual Assessment Letter for Limerick Generating Station Units 1 and 2 - Report Nos. 05000352/2016006 and 05000353/2016006 IR 05000352/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Limerick Generating Station Units 1 and 2 (Report 05000352/2016005 and 05000353/2016005) IR 05000352/20150062016-03-0202 March 2016 ROP 16 Annual Assessment Letter for Limerick Generating Station, Units 1 & 2 (Inspection Report 05000352/2015006 & 05000353/2015006) IR 05000352/20150052015-09-0101 September 2015 ROP-16 Mid-Cycle Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2015005 and 05000353/2015005) IR 05000352/20140012015-03-0404 March 2015 ROP 15 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2014001 and 05000353/2014001) IR 05000352/20140062014-09-0202 September 2014 ROP-15 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2014006 and 05000353/2014006 IR 05000352/20130012014-03-0404 March 2014 ROP-14 2013 Limerick Generating Station Annual Assessment Letter for Report 05000352/2013001 and 05000353/2013001, and Inspection Plan IR 05000352/20130062013-09-0303 September 2013 ROP-14 Mid-Cycle Performance Review and Inspection Plan Report 05000352/2013006 and 05000353/2013006 IR 05000352/20120012013-03-0404 March 2013 Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2012001 and 05000353/2012001) ML13031A4462013-01-31031 January 2013 Notification of Conduct of Triennial Fire Protection Baseline Inspection ML12248A0252012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan 2012 - Limerick Generating Station IR 05000352/20110012012-03-0505 March 2012 Annual Assessment Letter for Limerick Generating Station (Report 05000352-11-001 and 05000353-11-001) ML1124113542011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Limerick Generating Station IR 05000352/20100012011-03-0404 March 2011 Annual Assessment Letter for Limerick Generating Station, EOC-11 (05000352/2010001 and 05000353/2010001) ML1024405552010-09-0101 September 2010 Mid-Cycle Assessment Letter 2010 - Limerick Generating Station Units 1 and 2 ML1006210902010-03-0303 March 2010 EOC Letter and Report 22 ML0924402372009-09-0101 September 2009 Mid-Cycle Assessment Letter - Limerick Generating Station (September 1, 2009) IR 05000352/20090012009-03-0404 March 2009 Annual Assessment Letter - Limerick Generating Station (05000352-09-001 and 05000353-09-001) ML0824704412008-09-0202 September 2008 2008 Mid-Cycle Assessment Letter and Inspection Plan - Limerick ML0806004312008-03-0303 March 2008 Annual Assessment Letter ML0724305792007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan, for 07/01/2007 - 12/31/2008 IR 05000352/20070012007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Limerick Station (05000352-07-001 and 05000353-07-001) IR 05000352/20060012006-03-0202 March 2006 Annual Assessment Letter - Limerick Generating Station (Report 05000352/2006001 and 05000353/2006001) ML0524207032005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Limerick ML0506106412005-03-0202 March 2005 Annual Assessment Letter 2005001 - Limerick ML0406301852004-03-0202 March 2004 2003-04 Annual Assessment Letter - Limerick IR 05000352/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Limerick Generating Station (Report 50-352/03-01, 50-353/03-01) IR 05000352/20020012002-03-0101 March 2002 2002 Annual Assessment Letter - Limerick Generating Station (Report 50-352/02-01, 50-353/02-01) 2024-01-31
[Table view] Category:Letter
MONTHYEARIR 05000352/20243012024-02-0202 February 2024 Initial Operator Licensing Examination Report 05000352/2024301 and 05000353/2024301 IR 05000352/20230042024-01-31031 January 2024 Integrated Inspection Report 05000352/2023004 and 05000353/2023004 IR 05000352/20240112024-01-31031 January 2024 Information Request to Support Post-Approval Site Inspection for License Renewal; Inspection Report 05000352/2024011 ML24026A2962024-01-26026 January 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS)- Syrs, . ML24004A0342024-01-17017 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0026 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000352/20230102024-01-11011 January 2024 Age-Related Degradation Report 05000352/2023010 and 05000353/2023010 IR 05000352/20234012023-12-21021 December 2023 Cybersecurity Inspection Report 05000352/2023401 and 05000353/2023401 ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23333A2182023-11-29029 November 2023 Operator Licensing Examination Approval ML23325A2062023-11-21021 November 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23313A0432023-11-13013 November 2023 Summary of Regulatory Audit in Support of Amendment Request for Control Room Air Conditioning Technical Specifications ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000352/20230032023-10-27027 October 2023 Integrated Inspection Report 05000352/2023003 and 05000353/2023003 and Independent Spent Fuel Storage Installation Inspection 07200065/2023001 ML23297A1722023-10-24024 October 2023 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000352/2024010 and 05000353/2024010 IR 05000352/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000352/2023501 and 05000353/2023501 RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23276A5162023-10-0303 October 2023 Federal Emergency Management Agency Level 1 Finding from 2023 Evaluated Emergency Preparedness Exercise ML23275A1082023-09-29029 September 2023 FEMA Level 1 Findings Limerick NPP- Boyertown/Colebrookdale ML23241A9452023-09-27027 September 2023 Generation Station, Units 1 and 2 Regulatory Audit Plan Supporting Review of the Equipment Qualification Portion of Limerick Digital Instrumentation and Controls License Amendment Request ML23269A0522023-09-26026 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000352/2023010 and 05000353/2023010 ML23255A0952023-09-12012 September 2023 Resubmittal of License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) to Address ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A1002023-09-0606 September 2023 Requalification Program Inspection IR 05000352/20230052023-08-31031 August 2023 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2023005 and 05000353/2023005) ML23248A2082023-08-31031 August 2023 UFSAR Cover Page ML23242A2172023-08-30030 August 2023 Response to Request for Additional Information for Application to Adopt TSTF-477, Revision 3, Add Action for Two Inoperable Control Room AC Subsystems and Associated Technical Specification Changes NMP2L2851, Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations2023-08-25025 August 2023 Relief Request Associated with Successive Inspections for Generic Letter 88-01 / BWRVIP-75-A Augmented Examinations ML23228A0942023-08-16016 August 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . IR 05000352/20230022023-08-14014 August 2023 Integrated Inspection Report 05000352/2023002 and 05000353/2023002 ML23220A0182023-08-0808 August 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000352/2023401 and 05000353/2023401 RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212B2362023-07-31031 July 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System - WEC Documents ML23212B1052023-07-31031 July 2023 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation - Revise ML23202A2192023-07-21021 July 2023 Response to Request for Additional Information for Supplemental License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the . ML23193B0122023-07-20020 July 2023 Audit Plan in Support of Review of License Amendment Request and Exemption Request for Digital Instrumentation and Controls Installation Support (Epids L-2023-LLA-0025 and L-2023-LLE-0005) ML23187A0962023-07-19019 July 2023 Generation Station, Unit Nos. 1 and 2 - Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML23208A1522023-07-0606 July 2023 PEMA Letter Dated 7-6-23 Re Limerick Exercise 9-26-23 ML23177A2242023-06-26026 June 2023 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection . ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 2024-02-02
[Table view] |
Text
March 3, 2020
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2019006 AND 05000353/2019006)
Dear Mr. Hanson:
The NRC has completed its end-of-cycle performance assessment of Limerick Generating Station (LGS) Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2019 through December 31, 2019. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at LGS Units 1 and 2 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2021. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. Furthermore, all the inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In addition to baseline inspections, the NRC will also conduct Inspection Procedure (IP) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection, in February 2020; Temporary Instruction (TI) 2515/193, Hardened Containment Vent, in June 2020; IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants, in August 2021; and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, in September 2021. Lastly, during calendar year 2020, the NRC will schedule an additional inspection per a revised version of TI 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01), for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176). Licensees will be individually notified when the NRC schedules these inspections.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at (610) 337-5337 with any questions you have regarding this letter.
Sincerely, X /RA/
Signed by: Jonathan E. Greives Jonathan E. Greives, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Enclosure:
Inspection/Activity Plan cc w/ encl: Distribution via LISTSERV
ML20059K640 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCasey JGreives DATE 3/2/20 3/3/20
IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count Access Authorization and Fitness for Duty-LM 2 1, 2 01/06/2020 01/08/2020 IP 71130.01 000733 Access Authorization 1, 2 01/06/2020 01/08/2020 IP 71130.08 000740 Fitness For Duty Program CYBER FULL IMP 4 1, 2 01/13/2020 01/17/2020 IP 71130.10P 000741 Cyber Security 1, 2 01/27/2020 01/31/2020 IP 71130.10P 000741 Cyber Security Radiation Safety - Radwaste 1 1, 2 01/27/2020 01/31/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 10 CFR 50.69 Implementation Inspection 4 1, 2 02/10/2020 02/14/2020 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 1, 2 02/24/2020 02/28/2020 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Radiation Safety - Rad Haz 1 1, 2 03/30/2020 04/03/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/30/2020 04/03/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/30/2020 04/03/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation ISI - UNIT 1 1 1 04/06/2020 04/10/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Radiation Safety - ALARA 1 1, 2 05/04/2020 05/08/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls TI-193 Hardened Containment Vent 2 1, 2 06/01/2020 06/05/2020 TI 2515/193 000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions PI&R Biennial Team Inspection - LM 4 1, 2 06/08/2020 06/12/2020 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.
3/2/2020 10:19:59 AM Enclosure
IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count PI&R Biennial Team Inspection - LM 4 1, 2 06/22/2020 06/26/2020 IP 71152B 000747 Problem Identification and Resolution 50.59 INSPECTION 3 1, 2 07/20/2020 07/24/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments EP PROGRAM INSPECTION - LIMERICK 1 1, 2 09/07/2020 09/11/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 09/07/2020 09/11/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 09/07/2020 09/11/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/07/2020 09/11/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 09/07/2020 09/11/2020 IP 71151 001397 Performance Indicator Verification Design Basis Assurance Inspection - Programs - Power Operated Valves - Limerick Units 1 and 2 3 1, 2 09/14/2020 09/18/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 09/21/2020 09/25/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 09/28/2020 10/02/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Radiation Safety - Airborne 1 1, 2 09/14/2020 09/18/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Access Control, Protective Strategy, TSR-LM 4 1, 2 09/22/2020 10/09/2020 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 10/05/2020 10/09/2020 IP 71130.02 000734 Access Control 1, 2 10/05/2020 10/09/2020 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 10/05/2020 10/09/2020 IP 71130.09 001656 Security Plan Changes 1, 2 10/05/2020 10/09/2020 IP 71151 001338 Performance Indicator Verification TRIENNIAL HEAT SINK 1 1, 2 11/16/2020 11/20/2020 IP 71111.07T 000700 Heat Sink Performance Radiation Safety - Dose & PIV 1 1, 2 12/14/2020 12/18/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 12/14/2020 12/18/2020 IP 71151 000746 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION - TEAM 6 1, 2 01/24/2021 01/30/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.
3/2/2020 10:19:59 AM
IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count DESIGN BASIS ASSURANCE INSPECTION - TEAM 6 1, 2 02/07/2021 02/13/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
Radiation Safety - Instruments 1 1, 2 02/15/2021 02/19/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation INSERVICE INSPECTION - UNIT 2 1 2 05/02/2021 05/08/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Radiation Safety - Rad Hazards 1 1, 2 05/03/2021 05/07/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls FY21 Limerick Initial Examination 3 1, 2 06/13/2021 06/20/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
1, 2 07/11/2021 07/24/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
FORCE-ON-FORCE PLANNING & EXERCISE WEEKS - LIM 6 1, 2 08/09/2021 08/13/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 08/30/2021 09/03/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing ISFSI Dry Run & Operational Inspection - LM 3 1, 2 08/16/2021 08/20/2021 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1, 2 08/30/2021 09/03/2021 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1, 2 09/06/2021 09/10/2021 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiation Safety - REMP 1 1, 2 10/04/2021 10/08/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program Limerick Requal Inspection with P/F Results 2 1, 2 10/18/2021 10/22/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 10/18/2021 10/22/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP Exercise Inspection - Limerick 5 1, 2 11/15/2021 11/19/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 11/15/2021 11/19/2021 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.
3/2/2020 10:19:59 AM
IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count EP Exercise Inspection - Limerick 5 1, 2 11/15/2021 11/19/2021 IP 71151 001397 Performance Indicator Verification Radiation Safety - RETS & PIV 1 1, 2 11/15/2021 11/19/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/15/2021 11/19/2021 IP 71151 000746 Performance Indicator Verification Access Control, Equipment Testing and Maintenance, Training, SPR 3 1, 2 11/29/2021 12/03/2021 IP 71130.02 000734 Access Control 1, 2 11/29/2021 12/03/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 11/29/2021 12/03/2021 IP 71130.07 000739 Security Training 1, 2 11/29/2021 12/03/2021 IP 71130.09 001656 Security Plan Changes 1, 2 11/29/2021 12/03/2021 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.
3/2/2020 10:19:59 AM