Annual Assessment Letter for Limerick Generating Station, Units 1 and 2 (Report 05000352/2019006 and 05000353/2019006)
ML20059K640
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 03/03/2020
From: Jon Greives
Reactor Projects Region 1 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Greives J
References
IR 2019006
Download: ML20059K640 (7)


Text

March 3, 2020

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR LIMERICK GENERATING STATION, UNITS 1 AND 2 (REPORT 05000352/2019006 AND 05000353/2019006)

Dear Mr. Hanson:

The NRC has completed its end-of-cycle performance assessment of Limerick Generating Station (LGS) Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2019 through December 31, 2019. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at LGS Units 1 and 2 during the most recent quarter was within the Licensee Response Column (Column 1) of the NRCs Reactor Oversight Process (ROP) Action Matrix in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2021. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. You should be aware that the agency is pursuing potential changes to the ROP, including changes to engineering inspections (SECY-18-0113, Recommendations for Modifying the Reactor Oversight Process Engineering Inspections) and other changes to the baseline inspection program described in SECY-19-0067, Recommendations for Enhancing the Reactor Oversight Process. Should these changes to the ROP be implemented, the engineering and other region-based inspections are subject to change in scope, as well as schedule. Furthermore, all the inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. In addition to baseline inspections, the NRC will also conduct Inspection Procedure (IP) 37060, 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection, in February 2020; Temporary Instruction (TI) 2515/193, Hardened Containment Vent, in June 2020; IP 60854.1, Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants, in August 2021; and IP 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, in September 2021. Lastly, during calendar year 2020, the NRC will schedule an additional inspection per a revised version of TI 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerability in Electrical Power Systems (NRC Bulletin 2012-01), for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176). Licensees will be individually notified when the NRC schedules these inspections.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at (610) 337-5337 with any questions you have regarding this letter.

Sincerely, X /RA/

Signed by: Jonathan E. Greives Jonathan E. Greives, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Enclosure:

Inspection/Activity Plan cc w/ encl: Distribution via LISTSERV

ML20059K640 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME LCasey JGreives DATE 3/2/20 3/3/20

IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count Access Authorization and Fitness for Duty-LM 2 1, 2 01/06/2020 01/08/2020 IP 71130.01 000733 Access Authorization 1, 2 01/06/2020 01/08/2020 IP 71130.08 000740 Fitness For Duty Program CYBER FULL IMP 4 1, 2 01/13/2020 01/17/2020 IP 71130.10P 000741 Cyber Security 1, 2 01/27/2020 01/31/2020 IP 71130.10P 000741 Cyber Security Radiation Safety - Radwaste 1 1, 2 01/27/2020 01/31/2020 IP 71124.08 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 10 CFR 50.69 Implementation Inspection 4 1, 2 02/10/2020 02/14/2020 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection 1, 2 02/24/2020 02/28/2020 IP 37060 000521 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection Radiation Safety - Rad Haz 1 1, 2 03/30/2020 04/03/2020 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 1, 2 03/30/2020 04/03/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls 1, 2 03/30/2020 04/03/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation ISI - UNIT 1 1 1 04/06/2020 04/10/2020 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Radiation Safety - ALARA 1 1, 2 05/04/2020 05/08/2020 IP 71124.02 000726 Occupational ALARA Planning and Controls TI-193 Hardened Containment Vent 2 1, 2 06/01/2020 06/05/2020 TI 2515/193 000511 Inspection of the Implementation of EA-13-109: Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation under Severe Accident Conditions PI&R Biennial Team Inspection - LM 4 1, 2 06/08/2020 06/12/2020 IP 71152B 000747 Problem Identification and Resolution This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

3/2/2020 10:19:59 AM Enclosure

IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count PI&R Biennial Team Inspection - LM 4 1, 2 06/22/2020 06/26/2020 IP 71152B 000747 Problem Identification and Resolution 50.59 INSPECTION 3 1, 2 07/20/2020 07/24/2020 IP 71111.17T 000709 Evaluations of Changes, Tests, and Experiments EP PROGRAM INSPECTION - LIMERICK 1 1, 2 09/07/2020 09/11/2020 IP 71114.02 000717 Alert and Notification System Testing 1, 2 09/07/2020 09/11/2020 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1, 2 09/07/2020 09/11/2020 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 09/07/2020 09/11/2020 IP 71114.05 000720 Maintenance of Emergency Preparedness 1, 2 09/07/2020 09/11/2020 IP 71151 001397 Performance Indicator Verification Design Basis Assurance Inspection - Programs - Power Operated Valves - Limerick Units 1 and 2 3 1, 2 09/14/2020 09/18/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 09/21/2020 09/25/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1, 2 09/28/2020 10/02/2020 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements Radiation Safety - Airborne 1 1, 2 09/14/2020 09/18/2020 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation Access Control, Protective Strategy, TSR-LM 4 1, 2 09/22/2020 10/09/2020 IP 71130.14 000743 Review of Power Reactor Target Sets 1, 2 10/05/2020 10/09/2020 IP 71130.02 000734 Access Control 1, 2 10/05/2020 10/09/2020 IP 71130.05 000737 Protective Strategy Evaluation 1, 2 10/05/2020 10/09/2020 IP 71130.09 001656 Security Plan Changes 1, 2 10/05/2020 10/09/2020 IP 71151 001338 Performance Indicator Verification TRIENNIAL HEAT SINK 1 1, 2 11/16/2020 11/20/2020 IP 71111.07T 000700 Heat Sink Performance Radiation Safety - Dose & PIV 1 1, 2 12/14/2020 12/18/2020 IP 71124.04 000728 Occupational Dose Assessment 1, 2 12/14/2020 12/18/2020 IP 71151 000746 Performance Indicator Verification DESIGN BASIS ASSURANCE INSPECTION - TEAM 6 1, 2 01/24/2021 01/30/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

3/2/2020 10:19:59 AM

IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count DESIGN BASIS ASSURANCE INSPECTION - TEAM 6 1, 2 02/07/2021 02/13/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

Radiation Safety - Instruments 1 1, 2 02/15/2021 02/19/2021 IP 71124.05 000729 Radiation Monitoring Instrumentation INSERVICE INSPECTION - UNIT 2 1 2 05/02/2021 05/08/2021 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

Radiation Safety - Rad Hazards 1 1, 2 05/03/2021 05/07/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls FY21 Limerick Initial Examination 3 1, 2 06/13/2021 06/20/2021 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1, 2 07/11/2021 07/24/2021 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

FORCE-ON-FORCE PLANNING & EXERCISE WEEKS - LIM 6 1, 2 08/09/2021 08/13/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1, 2 08/30/2021 09/03/2021 IP 71130.03 000735 Contingency Response - Force-On-Force Testing ISFSI Dry Run & Operational Inspection - LM 3 1, 2 08/16/2021 08/20/2021 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1, 2 08/30/2021 09/03/2021 IP 60854.1 000589 Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating Plants 1, 2 09/06/2021 09/10/2021 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants Radiation Safety - REMP 1 1, 2 10/04/2021 10/08/2021 IP 71124.07 000731 Radiological Environmental Monitoring Program Limerick Requal Inspection with P/F Results 2 1, 2 10/18/2021 10/22/2021 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1, 2 10/18/2021 10/22/2021 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance EP Exercise Inspection - Limerick 5 1, 2 11/15/2021 11/19/2021 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1, 2 11/15/2021 11/19/2021 IP 71114.07 000722 Exercise Evaluation - Hostile Action (HA) Event This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

3/2/2020 10:19:59 AM

IP 22 Inspection Activity Plan Report Limerick 01/01/2020 - 12/31/2021 Unit Start End Activity CAC Title Staff Count EP Exercise Inspection - Limerick 5 1, 2 11/15/2021 11/19/2021 IP 71151 001397 Performance Indicator Verification Radiation Safety - RETS & PIV 1 1, 2 11/15/2021 11/19/2021 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 11/15/2021 11/19/2021 IP 71151 000746 Performance Indicator Verification Access Control, Equipment Testing and Maintenance, Training, SPR 3 1, 2 11/29/2021 12/03/2021 IP 71130.02 000734 Access Control 1, 2 11/29/2021 12/03/2021 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1, 2 11/29/2021 12/03/2021 IP 71130.07 000739 Security Training 1, 2 11/29/2021 12/03/2021 IP 71130.09 001656 Security Plan Changes 1, 2 11/29/2021 12/03/2021 IP 71151 001338 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.

3/2/2020 10:19:59 AM