IR 05000261/1982026

From kanterella
Revision as of 08:50, 1 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-261/82-26 on 820726-30.No Noncompliance Noted.Major Areas Inspected:Security Plan & Implementing Procedures,Security organization-mgt,personnel & Response.Details Withheld (Ref 10CFR73.21)
ML20062H600
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/10/1982
From: Mcguire D, Stansberry W, Tobin W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20062H591 List:
References
50-261-82-26, NUDOCS 8208160110
Download: ML20062H600 (2)


Text

.

.

SAFEGUARDS UNITED STAT S INf,0RMATION

  1. gung o "g NUCLEAR REGULATORY COMMISSION 8 n REGION 11 3,

.g 101 MARIETTA ST., N.W., SUITE 3100

  • ATLANTA, GEORGIA 30303 4,***** ,o AUG 111982
Report No. 50-261/82-26 Docket No. 50-261

!

License No. DPR-23 Licensee: Carolina Power and Light Company ATTN: Mr. J. A. Jones -

Vice Chairman i 411 Fayetteville Street Raleigh, NC 27602  ;

Facility Name: H. B. Robinson Steam Electric Plant 2 Inspection at: Hartsville, South Carolina Inspection conducted: July 26-30,1982 Date of Last Physical Security Inspection Visit: May 10-14, 1982

Type of Inspection: Unannounced Physical Security Inspectors: _( $ (6 2c?

W. Tobin,, ghystq)1 Security Inspector Date Signed Y.Y. D / \D k ? ?-

W. W. Stalisbe ry, PhysiQ1 Security Inspector Date S14hed Approved by: o ~ /b!82_ ;

D. R. McGuire Chief, Physical Protection Section D'at'e signed Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Irspected: Included review of Security Plan & Implementing Procedures; Security Organization-Management, Personnel and Response; Security Program Audit; Reports and Records; Testing and Maintenance; Locks, Keys and Combination; Physical Barriers-Protected and Vital Areas; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel, Package and Vehicles; Detection Aids-Protected and Vital Areas; Alarm Stations; and Communication The inspection involved 66 inspector hours on site by two NRC inspectors. Ten ,

inspection hours were accomplished during offshift period ENCLOSURE CONTAINS SAFECARD3 INFO.t!ATIO UFON SE?ARATION THIS

%FEGUARDS INFORMATION nazIan=nlaouz PDR ADOCK 05000261 O PDR

. _ - . - - -

_

. .

SAFEGUARDS INFORMATioN

.

Results: The licensee was found to be in compliance with NRC requirements within the 20 areas examined during the inspt:ction except for the following item:

Inspector Followup Item 50- 261/82-26 01 Security Organization-Management: The licensee's written agreement with the guard force contractor needs to specify 10 CFR 73.55(b)(1) criteria ( see paragraph 6).

ENCLOSUF2 COTIAINS S AygGUARDS INF0FRATIOL ypen SEPARATION THIS PAGE IS DECONTROM- <