NRC-94-4208, Provides Advance Reactor Corp Technical Core Group Rept on Piping Initiatives,App G,Piping Design/Analyst Users Guide

From kanterella
Revision as of 03:25, 31 May 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Advance Reactor Corp Technical Core Group Rept on Piping Initiatives,App G,Piping Design/Analyst Users Guide
ML20071K322
Person / Time
Site: 05200003
Issue date: 07/20/1994
From: Liparulo N
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Borchardt R
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NTD-NRC-94-4208, NUDOCS 9407290336
Download: ML20071K322 (115)


Text

y q (n\

\

w.-)

Westinghouse . Energy Systems fy,3,5Ign pennsyivania 15230 03s5 u

Electric Corporation -

t NTD-NRC-94-4208 DCP/NRC0135 Docket No.: STN-52-003 ,

\

July 20,1994 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 ATTENTION: R. W. BORCliARDT t

.i

Subject:

ADVANCED REACTOR CORPORATION TECHNICAL CORE GROUP f REPORT ON PIPING INITIATIVES, APPENDIX G [

l

Dear Mr. Borchardt:

This letter provides three copics of the Advanced Reactor Corporation Technical Core Group Report on Piping Initiatives, Appendix G, Piping Design / Analyst Users Guide. This appendix was referenced by Westinghouse during the May,1994 piping audit and is provided here as information to support l review of the AP600 application for design certification.

Please contact Brian A. McIntyre on (412) 374-4334 if you have any questions concerning this transmittal.

n ,

N. J. 'parulo, Manager l Nuclear Safety Regulatory and Ucensing Activities

/nja Attachment i

Enclosure cc: K. Shembarger U.S. Nuclear Regulatory Commission [

B. A. McIntyre (w/o Enclosure) Westinghouse I L

S. Gray Advanced Reactor Corporation k

C r . .. [

L svu, u< .

"^ ~

Q 9407290336 940720 l PDR ADOCK 05200003 l A PDR

7 4

r

. 4 i

APPENDIX G PIPING DESIGNER / ANALYST USEP GUIDE t

Prgared by Sargent & Imndy Engineers r

r ,

l5ANSENT $LUNDY PIPING DESIGNER / ANALYST Project No. 909643

~t a m -

USER'S GUIDE

  • Page 1 APPENDIX G TABLE OF CONTENTS PAGE PURPOSE 1

OVERVIEW 2 SECTION G.1 1.0 PROCESS REQUIREMENT l-1 1.1 Preliminary Design Cycle 1-1 1.1.1 Input 1-1 1.1.2 Process Steps 1-2 1.1.3 Output 1-4 1.2 Certified Analysis 1-4

! .7.1 Input 1-4 1.'. 2 Pre-Requisites 1-5 1.2.3 Certified Analysis / Design Process Steps 1-7 1.2.4 Output 1-8 1.3 Precautions 1-9 1.3.1 Space Control 1-9 1.3.2 Computer Aided Engineering 1-9  ;

SECTION G.2 2.0 DESIGN CONTROL 2-1 2.1 Process Control 2-1 2.1.1 Preliminary Analysis Procedure 2-1 2.1.2 Certified Analysis Procedure 2-1 2.2 Scope Control  !

2-1 l 2.2.1 Subsystem Boundaries 2-1 2.2.2 l Subsystem Component Database 21 l 2.2.3 Supports 22 l 2.2.4 Penetrations 2-2 2.2.5 Branch Subsystems 22 l

1

l5ARSENT 8 LUNDY PIPING DESIGNER / ANALYST Project No. 90%C3, -

USER'S GUIDE Page 2 APPENDIX G

  • 1 TABLE OF CO? GENTS, Coat.

PAGE 2.3 Schedule Control 2-2 2.3.1 Design Process Duration 2-3 2.3.2 Schedule Deve:opment 2-3 2.3.3 Progress Monitoring 2-5 2.4 Input Control 24 2.4.1 Vendor Data 24 2.4.2 System Engineering Freeze 24 2.4.3 Construction Progress 2-7 2.5 Documental Control 2-7 Sec: ion G.3 3.0 PIPING LAYOUT GUIDELINES 3-1 3.1 Layout Aspects 3-1 3.1.1 Clearances 3-1 3.1.2 input Required 3-15 SECTION G.4 4.0 PIPING ANALYSIS GUIDELINES 4-1 4.1 Overview of Design Parameters 4-2 4.1.1 Physical System Characteristics 4-2 4.1.2 Identification of Design Basis Loading 4-2 4.1.3 Structural Evaluation 4-2 4.1.4 Code Evaluation and Load Combination Calculations 4-2 4.1.5 Review and Documentation (Quality Assurance) 4-3 4.1.6 Applicable Design Documents 4-3

. 4.2 Preparation of Piping Model 4-4 4.2.1 Introduction 4-4 4.2.2 Building Blocks of the Model 4-4 4.2.3 Information for Modeling a Piping System 4-5 4.2.4 Component Representation 44

~

Tr

.' . l$ANSSNT E LNNSY PIPING DESIGNER / ANALYST Project No.' 9096 03 8""me" -

USER'S GUIDE Page 3 APPENDDC G TABLE OF CONTENTS, Cont.

PAGE 4.3 General Structural Modeling 4-8 4.3.1 Node Spacing and Element Lengths 4-8 4.3.2 Location of Nodes Between Restraints 4-9 4.3.3 Additional Structr.ral Modeling Detail for Class 1 Piping 4-9 4.3.4 Piping System Analysis Boundaries 4-9 4.4 Weight Analysis 4-10 4.4.1 Dead Weight Analysis of Piping 4-10 4.4.2 Loading Definition Data 4-11 4.4.3 Proper Piping and Suspension System Arrangement 4-12 4.5 Thermal Expansion Analysis 4 14 4.5.1 Dermal Modes 4-15 4.5.2 Anchor movements -

4-16 4.5.3 Resolution of Design Problems 4-16 4.6 Dynamic Analysis of Piping Systems 4-17 4.7 Uniform Response Spectra Analysis 4-18 4.7.1 Description of Basic Procedure Used 4-18 4.7.2 Procedure Used 4-IS 4.7.3 Specification of the Forcing Functions and Its Use in the Calculations 4-19 4.7.4 Selection of Number of Modes to be Used in Analysis 4-22 4.7.5 Natural Frequency and Mode Shape Data 4-23

'4.7.6 The Role of Natural Periods, Mode Shapes, and Participation Factors in the Response Calculations 4-24 4.7.7 Resolution of Design Prcblems for Response Spectrum Analysis 4-25 4.8 Dynamic Load Forced Displacement Analysis 4-26 4.8.1 Building Displacements 4-26 4.8.2 Dynamic Header Displacements 4-27 4.8.3 Building Displacement Loads 4-29 4.8.4 Design Problems and Resolutions 4-30 4.9 Code Equation Applicability and Other Requirements 4-31 4.9.1 ASME Code Evaluation of Piping System 4-31

a l5ANSENT 8 LUNDy PIPING DESIGNER / ANALYST Project Nm. 909M)3 8 ""N -

USER'S GUIDE Page 4 APPENDIX G TABLE OF CONTENTS, Cont.

PAGE 4.10 Suppon Placement and Recommended Practice 4-36 4.10.1 Optimize Pipe Supporu 4 36 4.10.2 Maximum Use of Wall and Stab Penetration and Suppons 4-36 4.10.3 Minimize Structural Anchor and Welded Attachments 4-36 4.10.4 Maintaining Design Margin in Initial Analysis 4-37 4.10.5 Maximum Routing Symmetry and Duplication 4-37 4.10.6 Use Existing Embedments 4-37 4.10.7 Do Not Locate Suppons Close to Equipment 4-37 4.10.8 Use of Appropriate Slab Response Spectra and Header Enveloped Spectra 4-37 4.10.9 Stress Margins at Decoupled Branch Locations 4-38 4.10.10 Local Stresses in Thin Wall Pipe at Support Locations 4-38 4.10.11 Thermal Analysis for Cold Piping (< IS0*F) 4-38 4.10.12 Effect of Friction on Piping Model 4-38 4.10.13 Pipe Support Stability'for Non Seismic Piping 4-39 4.10.14 Pressure for Elbow Flexibility Calculations 4-39 4.10.15 Design Tolerance for Pipe and Suppon Locations 4-39 4.10.16 Support Hardwc.re Weight 4-39 4.10.17 Design Consideration for Branch Correction and Tees 4-39 4.10.18 Area Replacement Calculation at Tees 4-39 4.10.19 Code Case N 319 for Class 1 Piping 4 -50 4.10.20 Use of Rod Hangers 4-40 4.10.21 Minimizing the Use of Snubber 4-SECTION G.5 5.0 PIPE SUPPORT DESIGN GUIDELINES 5-1 SECTION G.6 6.0 DEFINITIONS 6-1 6.1 Subsystem 6-1 6.2 Pipe Spool 6-1 6.3 Layout 6-1 6.4 Stress 6-1 t

l l

._ _ _ . . _ . . _ . _ __ . . _ . . --._ m . . . _ _

t l54BSENT $ LON5Y PIPING DESIGNER / ANALYST Project No. 909643  !

" "- USER'S GUIDE Page5 APPENDIX G ,

i t

TABLE OF CONTENTS, Cont. ,

U 6.5 Support 6-1 [

i 6.6 System Engi.neering 6-1 i e

i e

i i

f

-r i

l e

h i

I l

t

r lSARSENT fBL5NSY PIPING DESIGNER / ANALYST Project Ns. 90%C3

= =- USER'S GUIDE Page 1 APPENDIX G PURPOSE The purpose of this Piping Analyst / Designer User's Guide is to provide general description of the technical aspects of design and analysis, as well as the process and design control basic elements necessary to ensure high quality and optimum engineering output. The preparation of this document reflects Sargent & Lundy's recent experience in the engineering of the Korean Yonggwang 1000-MWe Nuclear Units 3 & 4 (19881993). The Nuclear Steam Supply System (NSSS) was supplied by Combustion Engineering downsized System 50 and the turbine-generator by General Electric.

This document may be used as a model for the development of project unique administrative procedures and Piping Analyst / Designer Manual. This document also provides detailed discussions of the process requirements to assist managers in defining a given project's quality goals and determine the tools, procedures and resources necessary to achieve them.

j l3ARSEMT $ LUNDY PIPING DESIGNER / ANALYST Project No. 909643 ,

4Da** * -

USER'S GUIDE ' Page 2' APPENDDC G OVERVTEW INTRODUCTTON The engineering of a new nuclear power plant must result in an optimum and reliable plant design and be completed to a fast construction schedule. The piping and pipe support scope is a large design activity affecting most aspects of the overall plant design and has a significant effect on the entire project success. The piping /suppon design philosophy should be based on the following goals:

Develop an optimum and reliable design Minimize installation time and construction cost

  • Minimize plant maintenance cost In order to achieve these goals, the piping and pipe suppott design process must be implemented to meet the l following quality ot.jectives: '

l l

  • Minimize or eliminate pipe and suppon installation interferences l

Minimize the total number of supports l

  • Simplify pipe support configurations i
  • Maximize standard support design Maximize pipe routing symmetry l Maintain adequate design margin against future design changes i
  • Minimize or eliminate the use of snubbers (active devices) -

1 Minimize the use of welded attachments to the piping pressure boundary Establish support embedment plate and penetration locations and sizes before concrete placement

  • Allow adequate installation tolerance Ensure proper compliance and adequate interaction with other design considerations such as ALARA, Fire Hazards, Radiation and Shielding, Equipment Removal, Personnel Access walkways, plant maintainability, inspection and surveillance, pipe whip, jet impingement and Seismic Category II/I.

Anticipate operational and maintenance additional needs, such as lead blankets, scaffolding and rigging.

j

. .lsagsgNT81.5NDY PIPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE i Page 3 APPENDIX G .

i PROCESS ,

The piping and pipe support engineering scope snould.be completed in two design cycles:

i

1. Preliminary Design Cvele I

Material procurement for piping and supports should use input from preliminary piping layout and

{

stress analysis cycle (weight, thermal and seismic). He preliminary design cycle should utilize to

(

the maximum extent possible a space control mechanism, such as a physical plastic model or a  !

computerized plant layout graphic model. The inclusion of the seismic analysis at this early stage f

results in enhanced ability to reduce support hardware during this preliminary analysis cycle and the following certified analysis cycle. In addition, equipment bid evaluation should use input from the f

preliminary cycle results to obtain adequate equipment nozzle allowable loads from the vendors. f (Equip specifications should contain " target" values for the vendors to meet with the equipment design).

l

2. Certified Desien Cvele f

l t

Pipe and support fabrication and construction shall be based on a certified design specification and approved pipe and support design which are documented by a certified piping analysis using verified  !

vendor data. The design shall not be released for fabrication until verified to be completely free of [

interferences through the use of a plastic, or computer, model and the engineering documentation .

reflects the interference free design.

^

Ngig: ne as-built analysis cycle is a verification rather than an engineering development scope of ,

t work and therefore, is not covered in this document. The high quality of the Certified Design -

Cycle output which includes design margin alceg with reasonable installation tolerance however, minimizes the cost of the as-built modifications and/or documentation.

9 g, - - - , . , - - , . _ . - _--,m. - > - - - , - , , . ,

lSARSENT $ LONDY PIPING DESIGNER / ANALYST Project No. 9096 03 USER'S GUIDE Page 4 APPENDIX G f

IMPLEMENTATION De project team responsible for implementing the above process should be provided with the following:

~

An organizational structure based on a fully integrated design concept 1.syout AL leodel Support design qr Analyst System .

Equipment design quellfication l

Construction Specifications Piping Design Team Integration Concept

  • Space control mechanism (either plastic model, computerized layout graphics, or both)

=

Integrated Computer aided engineering hardware / software package

i

(~

  • lSARSENT $ L5NSY PIPING DESIGNER / ANALYST Project Ns. 9096 03 i USER'S GUIDE Page 5 APPENDIX G I

1 DESIGN CONTROLS l

Adequate Controls shall be in place for the following aspects of the work: i i

  • Process
  • Scope
  • Schedule <
  • Input l l

l

  • Documents

.l TECHNICAL GUIDELINES i

1 he design team shall be trained on proper techniques and design approaches to produce technically adequate output. The following topics shall be addressed in detail in this User's Guide.

  • Piping layout Piping stress analysis t
  • Support configuration i

CRITICAL PATHS / CONFLICT'ING CONCERNS A. Plastic Model Versus Electronic Model De decision to utilize either a plastic model or an electronic model has to be based on the architect  ;

engineering (AE) firm's capability and the benetits that are achievable from either systems. De  ;

discussion below, however, supports the use of both systems in the engineering of the first wave of new US nuclear power plants in the 1990's.

He following plant model features / usages are required in the design of nuclear power plants in the 1990s:

1. Space control and interference checking
2. Design tool for individual engineers to conceptualize component layout and configurations
3. Team reviews and multi discipline design / interface walkdowns 4

Special design requirement reviews, such as ALARA, system operability, separation, equipment removal, pipe whip, jet impingement and Seismic Category II/I requirements.

5. Management overviews l

lSARSENT @.LUHY PIPING DESIGNER / ANALYST Project N1909603

' t = 8 *5 -

USER'S GUIDE Page 6 '

APPENDIX G

6. Construction management aid and sequencing
7. Automated drawings and design data generation
8. Automated design interface and electronic data transmittals While some of the above 8 features, such as items 1 and 2, appear to be equally achievable by both systems (plastic or computer model), the remaining items are not. A project that uses a plastic model to supplement a computerized electronic graphic model realizes the entire spectrum of benefits if it can resolve the apparent overlap or redundancy in capabilities especially in the first two items.

Almost every power engineering tirm in the US has both computerized and plastic modelling capabilities.

However, it is relatively easier for an engineering tirm to achieve proticiency and total coverage in these first two items by using a plastic model rather than a computerized one. On the other hand, the real benefit of using the computer model is concentrated in items 7 and 8. These two capabilities alone (7 and 8) justify the use of the electronic model.

For the features listed in items 3 through 6 one could easily conclude the advantage of using the plastic model over the electronic model. Managers, vendors. contractors and design teams of four or more engineers reviewing the model at the same time, do not need special training to review and reach conclusions on the plastic model, nor do they need an operator to walk them through the model as in the case of a computer graphic model. The importance of conducting such team reviews of the plant model to the quality of the plant engineering outcome cannot be sufficiently emphasized.

Therefore, to realize the total array of benefits listed above, the decision to use both the plastic and the electronic models may be justified by many engineering firms for use on a new nuclear power plant. In the text of this document reference to the type of model used being plastic or electronic is avoided.

Reference is made to "Model" only, wherever the use of a space control mechanism is discussed.

B. Procurement Schedule Vendors develop their component documentation (drawings and data sheets), transmit them to the owner  ;

for review, and proceed to manufacture the component as soon as the owner accepts or approves the submitted documentation. Shipment and delivery of the component proceeds benceforth with on-site storage and the related owner's payments to follow. The vendor documents and data sheets are needed early to support engineering, w hile manufacturing and shipment are needed much later in time to support I I

lSARSENT fB LSESY PIPING DESIONER/ ANALYST Project No. 909643 USER'S GUIDE Page 7 APPENDIX G construction. If the development of procurement schedule is construction driven, engineering progress would lack timely vendor input and, consequently, suffer costly delays. If the procurement schedule is advanced to have the vendor documentation support engineering development, owner's payment and on-site storage costs will be incurred early thus increasing the financial burden of the plant owner. As far as engineering development is concerned, vendor input is usually late on two accounts; schedule is based on construction needs in the first place, plus actual schedule delays of the procurement process.

Therefore, a compromise schedule should be developed that is basically construction driven, but at the same time accommodating to engineering development needs as well as allowing adequate margin for the usual bidding and procurement process delays.

C. Eauipment Allowable Norrie Loads Vendors prefer to limit piping loads on their equipment nonles, to preserve ample design margin and reduce both manufacturing and documentation cost. Unreasonably low nonle allowable loads increase the cost of analysis and may necessitate that the first support on the pipe be too close to the nonle. This results on two adverse conditions:

1. It increases the total number of supports required for supporting the pipe, which in turn increases the cost of both engineering and construction, and
2. When the suppon is placed too close to the nonie, the gaps within the support hardware, such as in the pipe clamps, rear end brackets or box supports, result in the equipment nonle carrying loads even though the analysis model predicts otherwise.

"Iherefore, from the onset of the project engineering work the piping analyst / engineer should aggressively interface with the procurement process along two lines: 1) by establishing target nonle load allowables to be incorporated into the procurement specification, and 2) by carefully reviewing the vendor supplied allowable nonle loads against the preliminary analysis .nads and challenge the vendor where unreasonably low nonle allowable loads would result in the addition of unnecessary supports or increased analysis effort.

D. Small Bore Desien - Field Versus Office Nuclear Power plants commissioned in the 1980's utilized significant field engineering support staff.

Major components and large bore piping were installed in the plant before the detailed design for small

y a

\

lSABOENT $ LONDY PfPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE Page 8  ;

.sPPENDDC G -

, i bore piping and instrument lines began. Field engineering groups were needed to use the plant as a full l scale model and develop the small bore piping and instrument line designs.  !

i The new wave of US nuclear power plants to be engineered in the 1990's, will march to a significantly  ;

faster schedule and, therefore, must have the small bore piping and instrument line design scope of work done in the office using the design model. Dere should be an overlap, not a gap like in the 1980s, between the engineering schedules of the large bore and the small bore piping, and likewise with instrument lines.

t E. Instrument Lines Desien Responsibility i To maintain design consistency, optimum plant arrangement and high level of proticiency, the responsibility of the instrument lines should be assigned to the same team responsible for the large and

[

small bore piping scope.

i F. Pine Wall Dickness

  • Increasing the pipe wall thickness, over the minimum requirements determined by system engineering for operating conditions including erosion and corrosion, reduces the pipe stresses and in turn the number of supports required to support the pipe. On the other hand, increasing the pipe wall thickness impacts the overall cost of the pipe. Therefore, the approach to this concept should be carefully reviewed and  ;

established early in the design stage of the project.

G. Comoonent Suonort Procurement Careful preparation and setup of the component support procurement specification provide greater flexibility to the support designers to select appropriate components to meet optimum engineering, construction and operational requirements. The following points are a few examples:

1. De vendor should be made aware of the fact that engineering would strive to minimize or eliminate the use of expensive active devices such as snubbers and constant supports. De procurement contract should be set up to allow engineering absolute flexibility to optimize the design and minimize, if not eliminate, the use of such components without any contractual pena'tles or constraints. Also, lead time for such components if and when ordered should be optimized to the

r

' i

\

l- ..

)

1 JSARSENT!BbSNSY PIPING DESIGNER / ANALYST . Project No. 9096 43

~ 8"ee" -

USER'S GUIDE Page 9 APPENDIX G maximum extent possible, or provisions should be established for smooth construction progress and enhanced installation time including the use of temporary components.

2. Reduce or eliminate from the procurement specification components with high degree of sensitivity to operational vibration concerns, such as welded beam attachment and U-bolts.  ;

Welded beam attachment allow the sliding of the eye-rods or variable spring attachments from its center to the sides thus increasing load offsets or introducing undesirable moments that should be accounted for in the design calculation. To avoid this phenomena, these components may be completely replaced by welding lugs. l The nuts of the U-bolts cause several technical problems, such as ability to maintain the design gaps, torque speci5 cation / control, interference with the pipe itself, limited load capacity, and loss of  :

I stability induced by friction with the pipe side walls or steady state vibrations. Welded straps provide effective replacement of U-bolts for use as one- or two-directional restraints for pipes up

  • to 8" in diameter.
3. Special clamps with dual pipe attachment @ 90' angle for use with struts provide several advantages for pairs of struts used as pipe guides. These clamps have higher stability and can tit easier in short  !

pipe segments than in the case of two clamps for two strats @ 90* angle. ,

4 I

l t

I

t lSARSENV$LBMSY PIPING DESIGNER / ANALYST Project No. 90964)3  !

      • am -

USER'S GUIDE Page 1-1 l APPENDIX G l

1 SECTION G.1 l l

1.0 PROCESS REOUIREMENTS I i

The piping and pipe .=upport engineering scope of work shall be completed in two design cycles; the '

Preliminary and the Cenified Design / Analysis cycles. The preliminary design is used for material '

procurement and the certified analysis is used for fabrication and construction releases.

The scope of the piping design, analysis and pipe support design comprises piping layout, support location, functions and configuration determination as well as the piping weight, thermal and seismic analysis. These three design activities (piping design, analysis, and support design) will require severr.1 iterations over a short period of time. One encineer proficient in all three design activities is the ideal candidate to lead this work. However, two or three engineers / designers, or groups, may do this work to the desired quality provided the interface arrangement among the entire design / analysis work is i

optimum and efficient, i.e., an integrated team under a single leadership responsibility.

1.1 Prelimimrv Desien Cycle The outcome of the preliminary analysis / design cycle is used: 1) in the pipe and support material procurement,2) to provide nozzle load input to the equipment procurement scope, and 3) to provide ,

realistic suppon loads to the structural building design.

1.1.1 Input f

The input required for this cycle, is preliminary by definition and uses the best available information from the following:

a. General Arrangement Drawings i
b. Design Criteria & Piping Design Specification [
c. Process / Flow Diagrams and System Design Specification  !
d. Equipment Procurement Specification and Catalog / Reference Data  ;

l5ARSENTSleUNDY" PIPING DESIGNER / ANALYST Projets No. 0096-03 USER'S GUIDE Page 1-2 APPENDIX G 1.1.2 Process Steps - See Figure 1 (Page 1-10)

The preliminary design cycle for major piping systems, such as main steam and feedwater, actually -

starts in concert with the development of the plant general arrangement and the configuration of the -

major equipment of the NSSS and Turbine Generator. --

Step 1: Conceptual Routing ,

Preliminary system process and instrumentation diagrams (P&lDs) are used to start the conceptuaJ pipe layout using standard catalog data for equipment / components such as, pumps and valves and previous reference projects data for heat exchangers, tanks etc.

Routing of major systems, such as main steam and feedwater is given priority to ensure appropriate space allocation, optimum layout contiguration (minimum number of tees, laterals and elbows), and to provide identification of the building areas or structural components that will accommodate and support the loading of these major piping system.

Optimal support configurations are an essential consideration in the conceptual routing ,.

activity. Piping should be routed such as simple standard supports may be used without l

l the need to add auxiliary steel.

Step 2: Initial Analysis. Support Location and Contiguration Determination Piping weight, thermal and seismic stress analysis of the preliminary routing provide early indication of the acceptability of the routing, supporting arrangement, nozzle loads and pipe stresses. The pipe wall thickness for certain locations under certain operating l conditions, may require some increases based on the stress levels indicated by the analysis.

l Areas of high stress concentration such as at tees, laterals and reducers are reviewed and l the findings resolved in this cycle. Depending on the timing, equipment nozzle loads developed by the analysis, plus margin, are either used as input to tne process of preparing l of the procurement specification or to evaluate bid proposals from prospective vendors.

l l Step 3: Piping Code Check 1

The pipe stresses should be maintained below the code allowables by an adequate margin throughout the engineering of the project (e.g.,20 - 30%). This may be achieved for piping areas found with less margin by relocating supports, rerouting the pipe or both, and l as a last resort by increasing pipe wall thickness.

I

  • i

.l33333N7Eb5Ngy PIPING DESIGNER / ANALYST Project Ns. 9096-03 USER'S GUIDE Page 1-3 APPENDIX G Step 4: Piping and Support Contiguration on the Model The conceptual piping and supports should be installed (or loaded) on the Model to identify and resolve interference and clearance problems and to reserve space. In this process, piping layout and support locations and configurations receive special review for simplification, optimization and reduction of auxiliary support steel. The goal during this activity is to optimize the pipe and support configuration such tht the use of standard support hardware is maximized and auxiliary steel is minimized. The review shall be conducted by the integrated piping analyst / designer and the support designer team.

Step 5: Preliminary Support and Nozzle Loads The changes in pipe routing and support arrangement resulting from the model review should be verified by analysis.

Step 6: Preliminary Support Design The preliminary analysis support loads are used with adequate margins to develop preliminary support designs. The level of detail of the support design required in this step should be adequate to at least defme embedded plate requirements, provide support reaction loads to the building structure and to verify that the support hardware sizes required for the design loads fit in the space available. The design load margin (e.g. 30%)

in this stage is dependant on the confideace and completeness of the input. During the certified analysis, the load margin may be slightly reduced (e.g. 20%) to allow for the final as-built analysis.

Step 7: Freeze Piping Layout The piping layouts and supporting arrangement shall be frozen. Any subsequent change requests should be filed in pending action files till the next analysis cycle. The frozen pipe i should be identified as such on the appropriate system, such as the Model, piping computer master drawing file or the system P&lDs.

G lSARSENT $ LONEY PIPING DESIGNER / ANALYST Pmject No. 9096 03 i

        • - USER'S GUIDE '

Page 1-4 APPENDIX G i

1.1.3 Output The result of the preliminary analysis / design of the pipe and supports are used to: ,

a. Provide comments to equipment procurement specifications based on preliminary analysis nozzie j loads (bidding and awarding of procurement contracts should be in progress at this stage) to  ;

obtain reasonable and adequate nozzle allowable loads from the vendors.

i

b. Identify concrete penetration locations and sizes.

t

c. Request concrete embedment plates and structural steel.

l

d. Provide preliminary support loads to building design.

l I

e. Prepare preliminary piping and support desige drawings and/or sketches and provide input to pipe and support procurement and material takeoff. ,

l I

f. Provide comments to system engineering on pipe schedule, sizes, and fittings (tees, laterals, etc.) l i

where necessary to reduce stress levels at locations of high stress concentration on the piping system.  ;

g. Provide interface input to NSSS, turbine generator and any subsystem or equipment packages l supplied by others.

\

h. Defime the subsystem (analysis problem) boundaries on system P& ids or any other appropriate l media.

l 1.2 Certified Analysis Cycle i The purpose of the certified analysis cycle is to release safety and non-safety related pipe and suppon design for fabrication and construction. As such, all input or interface documentation have to be finalized, verified, certified and/or approved for use.

l 1.2.1 Input i

'The following is the required input for the certified analysis cycle.  ;

1

-~_ , - . _ - _ _ .- .- - - . .. . - . . ,\

c j

l33333NTEb5NST PIPING DESIGNER / ANALYST Pmject No. 909tW)3 i amm -

USER'S GUIDE Page I-5  !

APPENDIX G i

\

a. Cenified or verified vendor data, jt
b. Finalzed system engineering input.

f

c. Preliminary pipe and suppons configuration installed on the Model (plastic or electronic). l t

[

d. Cenified design specification.

fi i

e. Structural steel, embedment plate and penetration sleeve designs.

i t

1.2.2 Pre-Requisites )

a. Area Reviews

[

The time span between the preliminary and the cenified analysis cycles should be utilized to make atta reviews to resolve and/or make allowances for the design issues or design features as i discussed below. Some of those reviews will be conducted by the piping designer / analyst team and some are by other groups, such as safety analysis, nuclear safeguard and licensing groups. i al. Optimize Design:

De reviewer shall conduct systematic area reviews on the Model for all supports using latest support drawings or sketches, ne actions resulting of this review may be categorized as follows:

Suppom required to be revised, relocated or reoriented to enhance their design, or to i combine more than one suppon on one single auxiliary structural steel (gant twoons) without impact to pipe routing. {

i i

Suppom that may be deleted. This may require the relocation of neighboring suppom.

Pipe rerouting to simplify complicated, uneconomical or unconstructable supports.  !

Relocation of other components such as electrical cable trays and HVAC ducts to improve the supponability of the piping.

a2. Design issues:

ne teams responsible for radiation protection and shielding, ALARA, vibrations induced from {

flow or equipment operation, safety analysis, jet impingement and pipe whip design issues.

t h

e l3333ENT $ LONBY PIPING DESIGNER / ANALYST Proja:ct No. 9096 03,

' " *- USER'S GUIDE Page 1-6 APPENDIX G maintainability, constructability, etc., shall complete their area reviews at this time to identify and  :

resolve component arrangements that cause conflict with these issues.

f

b. Incorocrate Vendor Data: ,

As the certified vendor data are received and incorporated on the piping design, piping and i

suppons are adjusted and the Model updated. In parallel, system flow diagrams incorporate the vendor input and new lines (mainly equipment vents and drains) shall be routed and added to the scope. Supports for these new lines may be located and conceptualized using either approximate j load determination methods or stress analysis. Equipment pull space and maintenance clearance  ;

requirements as specified by the vendor should be verified and any problems resolved.  ;

Equipment drain and foundation requirement as well as the nozzle location may result in piping [

layout changes. Consideration to avoid hydraulic turbulences, especially at major pumps should also be identified and incorporated.

-l

c. System Freeze: .

l De subsystem boundaries identifying the analysis problem (discussed in Section 1.1.3h) shall be  !

used to inform system engineering of the schedule of beginning the certified analysis cycle for l I

a given subsystem (analysis problem) and to request system engineering freeze for that subsystem.

System engineering shall freeze the subsystem or respond by indicating any open items within the j specific analysis problem boundary, the schedule for resolving the open items, and if significant l changes are anticipated, shall request a hold on the analysis.

I 1

d. Gallery Layout:

Access gallery conceptual layout based on the piping layout should commence in this stage

[

between the preliminary and certified analysis cycles. Galleries consume considerable plant  !

space. As their layout design progresses, interferences with pipe and pipe suppons should be resolved. Many of the interfering suppons may be reattached to the gallery supponing steel l depending on the magnitude of their loads. His will result in simplified gallery and suppon design, which enhances personnel access (ALARA) and improves the engineering outlook of the plant arrangement.

l

... l33333NT$b5Ngy P! PING DESIGNER / ANALYST Project No. 90E03 8="**- USER'S GUIDE Page 1-7 ;

APPENDIX G i

1.2.3 Certified Analysis /Dmign Process Steps - See Figure 2 (Page 1-1I)

Step 1: Support Design Loads:

Significant modifications of the piping and support arrangement after the preliminary  ;

analysis as a result of the pre-requisite activities discussed in Section 1.2.2.a and b above, !

should be analyzed to develop support design loads. The pipe stresses shall be reviewed for -

r compliance with code allowables.

Step 2: Support Feasibility: i Modified suppon contiguration will be reviewed against the support loads and new support sketches will be prepared for new locations.

i Step 3: Model Update:  ;

The subsystem piping and support arrangement will be updated on the Model.

Step 4: Subsystem Freeze:

h A team walkdown shall be conducted on the Model for a final configuration review, optimization and acceptance. The final design shall be simple, ecenomic and constructable. l The design shall be free of snubbers, welded attachments and with minimum m.mber of constant supports. Supports shall be located such that the use of auxiliary steel and expansion anchor plates are minimal. De suppon hardware selection shall be geared '

towards minimizing field construction welds (e.g., by using two 90*- angle struts needing about 20 linear inches of field welds in lieu of a box support that requires over 100 linear inches of field welds).

Step 5: Final Loads:

De frozen piping and pipe support arrangement shall be incorporated into the analysis model. He stress analysis results shall be reviewed and approved. Loads on equipment nozzles, penetrations and supports as well as code allowaNes shall be reviewed. He approved loads are used as input to develop approved support, penetration and equipment foundation designs. The nozzle loads shall be used to document compliance with equipment  !

vendor allowables. All interface requirements with other entities requiring input from the  !

i

t i

1 lSARSENT$L5NBY PIPING DESIGNER / ANALYST Project No. 9096 03 eme" -

USER'S GUIDE Page 1-8 APPENDIX G piping analysis shall receive their input at this step. This is necessary to allow adequate  ;

i time for remrning to the cenified analysis group contirmation that the input is incorporated with no exceptions.

Step 6: Approved Piping and Support Design:

Using the approved support loads the support final design is completed, verified to be free of interference on the Model, and then approved.

The piping design shall also be approved after incorporation of all certified vendor i input, analysis initiated changes, and Model verification of interference free design.  !

t Step 7: Certified (ASME) or Approved (ANSI) Design Report: i The certification or approval of the subsystem design report shall be completed only after j acceptable documentation of the satisfaction of all associated and interfacing design requirements such as per.etration sleeve design and foundation design are on file.

Step 8: Release to Fabrication and Construction: i Based on the certified or approved design report, the piping and its associated supports are released for fabrication and construction. t i

1.2.4 Output The output of the Certified Analysis Cycle is as follows:

a. Pipe design released for fabrication and construction.
b. Support design released for fal rication and constmetion.  !
c. Penetration design and associated support reaction loads transmitted to building design.
d. Embedment plate design incorporated on building design drawings. l
e. Final support loads input to building structure. l
f. Equipment nozzle load compliance documentation.
g. Equipment nozzle final load input for equipment foundation documentation.

[

I

h. Finalized interface with NSSS, turbine generator and other interfaces, (loads, stiffnesses, motion i time history, etc.)

l

lSANSENT $LdNDY PIPING DESIGNER / ANALYST Project N3. 909603 D****-

USER'S GUIDE Page 1-9 APPENDIX G

i. Cenified or approved design repon.

1.3 Precautions 1.3.1 Space Control

a. Panicipation and Timing:

he effectiveness, and the benefit to the project, of using the Model for design and space control is commensurate with the number of groups interacting with the system and the time each individual group starts the interaction.

b. Space Reservation / Allocation:

This aspect should be well coordinated from the beginning of the project work, with area responsibilities assigned and conflicts resolved from an overall plant arrangement perspective.

c. Design Reviews:

ne Model should have capabilities to highlight to the users features or aspects that will affect the design decisions reached by viewing the Model. This includes equipment pull space. equip-ment removal paths, personnel access walkways, radiation zones, fire zones, areas containing safe shutdown equipment (for 11/1 considerations), pipe whip and jet impingement. etc.

)

d. Problem Identification /Resciutions- l The space control mechanism should have a feedback mechanism to identify to the responsible group any physical design problems requiring resolution. His includes interference and clearance criteria violation.

1.3.2 Computer Aidexi Engineenng Engineering groups should develop their design using computer hardware / software packages that are set up to electronically interface with each other. Coordination and interface among the engineering I

groups shall be controlled such that the design sequence and interface is streamlined and the design status (preliminary, frozen, approved or in revision) of components are highlighted to the interfacing groaps in order to assure the quality of engineering interface and exchange of design data.

P I

t

, i lSABSENT8L5NSY PIPING DESIGNER / ANALYST Project No. 9096 03  !'

8me" -

USER'S GUIDE Page 1-10 APPENDIX G I

i f

r D

1 I

i k D

,to e w

l r vs e Y

gw v w a a

\I,- -

E

=

,2

  • I G o ,.

r a

G }I" 4 l

L'zG i '

r L:a i =g

d. S
  • C E @

v O -

a 4

a. i w w V 5 # lN . f ",; y I a s- zw =

v = E$ e ;7 Jk 3 l2 0 ,

w 5 i iw ,

Iww , - -

i w -

a  ; y .

!541 E I li E WI 3 g

w e; 9 >i -

io

's in j= l '  :@ e & m d .g *ig'

9- k 'd- '!

. fI

  • i 2

-l e S

m- iso ed # ,

=

b,.

u o '

W

  1. la . .l

!5 I g

I >w * ~

w Z s ., -

Eh i z~ .z w

2 s a.

- l s

,- l'-# E"sN e
  • s w w w3 e u I  ;  :- w N

,. 7-O

! I g g w A =

l*$ J_ w

- - ld- $ l t* 7; a ,e m

.-e m c - n w .

i 1*8 a a. A o l

'y.

C -

e e

- e -

$ 5 m 4 o  :-

i .n . ." 4

! i g + a s w .

.d g & P j h W w w )

u -

lY i f. Q J B A w

Y t- e . w x "

4 w o W @ g T 1 9  : :~

l5-

. - Y. -

e.

j*

3- - - g -

l 5 8 .

a.

C 2

D  ;

4 & A -

Q 3 =

A

s A c.

8 s

  • _J  ;

w O. W j o ,$ L N & '

w .o a # .# c,, e d ..

A -

/

- N a w o

= w'\ C 2

3

4 g M o '

Y E w E8a w w w w L W -=  : wg g W f

& E= $ w-2 = v

c. * =

2 m 5:w w4 e -

- -a E

5* ,

$ e k I Y 5 I l 3 v  : i i I f

i 1

a i

I

, lSARSENT $ L5NST PIPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE Page 1-11 APPENDDC G P

l I

w INPUT i

StifCM ENG N((RI NG #' ' ' ' ' *

  • ettimiNamy PIPE /5UPPom15 % 'stg5 M SUP80RTS GLPPORT/WODEL.
ESIGN SPE C IF I C a t I GN f6 o f f = 51 ETE* O 4 oftn54 STES ?

L!#vCTURAL CLSIGN / s

=( t

  • 56 l

i

' ' i *s A L L; ADS ' 5 e5757Em i  !

rart;g arvige l i pg g  : LATOUT/57RE55/ e e ,

l 'UPPORTS I ,

'5TES * =

.E f

  • Si )

l STEP a s wE E M 51 IAPPDOvf SUPPORT OCSICNi

% OUPPORT/MODEL )%

bfEP 64 * *( f a 51 CERTIFIED /APPWQyggl l $wPPQM7( F A$R CAfloN 4 Of5ICN #EDSNT l l CONSTRUCTICN #ELEASE O-- STRESS "% SUPPORTS 1

l 1

! IA***0VED PiptaG CtSir,ni s 15IE' i * *EEa5 15tEP ea a ettas i

L Av0UT/uc0gg  %

STEP 68 e et ta 51 PE NE TRa t ion \ _

,pgPi%c c 5Poots, raepicationi l OE5tCN , -

1 4 (!% TDUCTION #fLfAST j LAYOUT dij$'L!!!,

N  : [stcp .. . . stas 00CUME N T & T I ON/

FIGURE 2: CERTIFIED ANALYSIS CES!CN PROCESS FLOW CHART

, e - - - m u g- ~ p w

lSARSENT$L5N3Y PIPING DESIGNER / ANALYST Project No. 909643

-- USER'S GUIDE Page 2-1 APPENDIX G ,

SECTION G.2 2.0 DESIGN CONTROL This section provides the attributes for developing a Design Control System to manage the various aspects associated with the piping design and analysis work. Several of the controls that are designed in this section will require databases. A master database indexed by the common subsystem number shall be linked all the sub databases to service this scope.

2.1 Process Control Appropriate engineering procedures shall be in place to support this work.  ;

2.1.1 Preliminry Analysis Procedure f See Section 1.1.2 and Figure I of this document for a detailed description of this procedure.

i 2.1.2 Certified Analysis Procedure i

See Section 1.2.3 and Figure 2 of this document for a detailed description of this procedure. e i

2.2 Scooe Control 2.2.1 Subsystem Boundaries At the conclusion of the preliminary analysis cycle. The subsystem boundaries of each analysis  !

problem are shown as an overlay over the system P& ids. This controls the boundaries of the analysis ,

problems and coordinates the interface with system engineering.

(

2.2.2 Subsystem Component Database ,

A subsystem component database listing each equipment, component and valve within each subsystem l is generated using the subsystem boundaries mentioned above. This database should identify the vendor I and the schedule and the actual dates of receiving certified / approved vendor data necessary to complete i l

the Certified Analysis cycle for this subsystem.

l l

l$ARSENT @ LONSY PIPING DESIGNER / ANALYST Project No. 9096-03 USER'S GUIDE Page 2-2 APPENDIX G i

2.2.3 Supports A database listing all supports in each subsystem, class, type, drawing number, and pipe loads and -

movements at the support shall be developed and maintained throughout this process. Anchors between subsystems should identify the other subsystem number to ensure control over the total load imposed t.

on the anchor from both sides.

1 l 2.2.4 Penetrations l Interface with piping penetrations shall be controlled to ensure that piping loads on the penetrati.on or movements within the penetration sleeve are addressed and that the design of the penetration seals, if l

any, is consistent with the analysis basis, nis requires a database listing of penetration sleeve and pipe sizes, schedules, temperature, insulation. loads, movements, gaps between pipe and sleeve, seal type, building locations. room and partition numbers, and subsystem numbers.

2.2.5 B anch Subsystems He relationship between the header and branch piping is sensitive to changes in either subsystems.

Therefore, it is important to control this relationship in a database throughout the process. The scheduling of subsystems has to take this relationship into consideration and schedule the branch subsystems such that the header / branch interface conditions are well developed by the header analysis before the start of the branch analysis. In some cases the branch location along the header pipe may be moved closer to anchors or guides on the header pipe to reduce the header movements imposed on the branch subsystem.

2.3 Schedule Control The main purpose of any control system is to provide management with a means of assessing progress of the activity being undertaken and to identify problem areas early enough so that they can still be corrected before the schedule is delayed beyond recovery. Th svelopment of a control system that is able to fulfill the above stated goal requires the generation of four separate components that have to interface with each other. These four components are 1) a work process,2) a detailed schedule,3) a method for updating the schedule, and 4) a method for monitoring the progress of the work effort.

l33333578L5NSY PIPING DESIGNER / ANALYST Project No. 90%03

= =- USER'S GUIDE Page 2-3 APPENDIX G

  • i i

ne schedule for the Preliminary Analysis cycle is straight forward and fo!!ows the engineering development in each building from the lowest elevation and upwards. De development of the Cr.nified Analysis schedule is a much more complex issue and significantly impacts the construction schedule and therefore, is discussed below in octail.

1 I

2.3.1 Design Process Duranon '

A 7- step procedure guides the flow of the Preliminary and an 8-step procedure the Certified Piping Analysis / Design work, respectively. An explanation of these step processes, is given in Section 1. For

{

easy reference, see the flow charu of this design processes given in Figures I and 2 of Section'7. De span of time of these processes is a key ingredient to the generation of a detailed subsystem schedule.

For pipe spools the total nominal span time of the design process from Step I through Step 8 shall be determined. For pipe supports the total span time shall also be calculated. For subsystems that have  ;

no pipe supports the total span time for pipe spools drops by the number of weeks in the support design ,

steps. De start date for any particular subsystem is the completion of the preiequisite activities and the system engineering freeze notification (Section 2.4.2).

2.3.2 Schedule Development De approach used to develop the Certified Analysis schedule consists of three main activities. Dese '

are !) the development of an early schedule based on the availability of vendor input, 2) the development of a late schedule based on the needs of erection, and then by combining the early and late schedules, 3) the development of a schedule that could reasonably be supported by the available  !

manpower. These activities are discussed below. t t

a. Early Schedule:

In developing the early schedule, it is first necessary to define what equipment and valves are contained in each subsystem. His is done by the development of a special database which I contains this information and which could interface with the project's Vendor input Schedule ,

(Section 2.2.2). The Vendor input Schedule (VIS) is another database which contains all equipment for which vendor input is required to support either structural design work or piping analysis. In this database is contained the actual or forecast dates for the receipt of vendor data.

Relating the subsystem equipment database with the VIS provide early start dates for each i

4

l sam 8ENT!B LUNDY PIPING DESIGNER / ANALYST Project No. 9096-03.

USER'S GUIDE Page 2-4 APPENDIX G subsystem. Using these stan dates and the span times for the steps in the Certified Analysis Process an early schedule is developed.

b. Late Schedule:

The late engineering schedule is developed by working backward from the early erection start date given in the Construction Schedule, which is a detailed schedule that gives erection start dates by both system and elevation. Using the lead times for both spools and supports shown in Figures 3 and 4 (page 2-9 and 2-10) and the span times for the steps in the Certified Analysis process creates a late schedule for the Certified Analysis.

c. Reconciling Early and Late Schedules:

The lead times shown in Figures 3 and 4 constrain the design process at three different points.

The pipe spool lead time constrains the design process at Step 8 by requiring it to be complete by a certain number of months prior to the start of spool erection. The pipe support lead time -

constrains the design process at both Steps 6 and 8. Step 6 needs to be completed by a certain numbers of months prior to the start of suppon erection with support crea o starting after the start of spool erection. Step 8 needs to be completed prior to the start of support erection. At Step 6 supports are released for material purchase or takeout and credit is taken by supports for the completion of the certified support design work. At Step 8 supports are released for fabrication. Delaying support material takeout till Step 6 of the Certitled Analysis (as opposed to the Preliminary Analysis) ensures that there would not be any greater than 5% changes in support design between those issued at Step 6 and those issued at Step 8. However, this delay, greatly constrains the process, and the project team has to negotiate with the plant owner a more flexible arrangement to deal with surplus materials of supports and provide less constraints on the schedule.

The difference between the start dates for the early schedule and the late schedule gives the engineering float. Where this float is negative a special effort is required to resolve it. It is first necessary to review the constraints to starting the analysis earlier. After this is done, it is checked to see if the erection start date could be delayed. In some cases it is also possible to shorten the durations in some of the process steps. After these activities are carried out a final schedule for the subsystem is developed.

. . lSARSENT $ LONgY PIPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE Page 2-5

_ APPENDIX G

d. Levelizing Manpower:

De last step in producing a fina! subsystem schedule is to levelize the manpower requirements for this work. His is accomplished by moving the early schedule, for those subsystems with a positive float, out in time by a cenain percent of the float and calculating the manpower requirement. Various manpower curves are developed for various percent values of float used and then compared to determine the best schedule. To calculate the manpower the manhours for

[

each step in the process are required. These values shall be provided by the groups involved. t Manpower curves are generated separately for Stress, Layout and Support steps. Manpower shall be calculated for the early schedule, the late schedule, and for increments of 25%,50%, and 75%

of the float between the early and late schedules. De results of this effort are reviewed and the ideal schedule for the best manpower picture is selected for the Certified Analysis effort.

2.3.3 Progress Monitoring ne monitoring of the progress of the Certified Analysis effort may take three separate forms. These are 1) weekly exception reports, 2) monthly status reports, and 3) monthly delayed subsystem report.

a. Weekly Exception Repon:

The weekly exception reports list those subsystems that are late in each step of the process and are used as the basis for weekly expediting meetings which result in weekly meeting notes with action items assigned and monitored till resolutions are reached.

b. Monthly Status Report:  !

He monthly status report shows the percent progress of the Cenified Analysis effort, provides )

production curves for the quantities that have passed through important steps, a list of completed subsystems, etc.

c. Delayed Subsystem Report ne delayed subsystem report keeps track of how various subsystems are being delayed and why and what the impact of these delays are relative to the shift of the work load. De delayed 1

subsystem list is used for review against the construction progress and results in reassigning priorities to support construction as required.

{

1 d

l

lSARSENT $ LONDY PIPING DESIGNER / ANALYST Project No. 9096-03, 5""" -

USER'S GUIDE Page 24 APPENDIX G i

24 Inout Control i The piping and pipe support design work is a highly input-dependant scope. The releases of the pipe and support design for fabrication and construction have significant effect on the performance of the project's construction schedule. Therefore, an aggressive control mechanism over the input is critical . ,

to the overall success of this scope.

l 2.4.1 Vendor Data i

(

As discussed in Section 2.3, the Cenified/ Analysis schedule for a given subsystem is developed based on the scheduled receipt of certified / approved vendor input for equipment and components within that subsystem.

t The certified / analysis process may span over 20 weeks of calendar time for a given subsystem. To r facilitate progress of this scope of work, certain rules have to be established about the relative '

1 importance of the component data in relationship with the process. Step 1 for a given subsystem cannot ,

start if vendor data on a major equipment such as a pump, a heat exchanger or a tank, is not available.

Vendor data on motor operated valves may be incorporated into the process if received prior to Step 4, the Subsystem Freeze. Vendor data on manual valves, orifices and such components may be  !

incorporated into the process if received prior to Step 7, Cenified Design Report.

A mechanism should be in place to use the subsystem database (Section 2.2.2) to track the schedule  !

performance of the various vendors and communicate the defaults to the management, the responsible '

vendor and most importantly, to the owner. Late vendor input problems take long time to correct and l

an aggressive problem identification and feedback mechanism is an absolute must.

i

]

2.4.2 System Engmeenng Freece I Prior to the start of the certified analysis of a given subsystem, system engineering shall provide assurance of engineering finalization of all issues impacting the piping within the subsystem boundary.

Any open items should be identified and monitored till closure, or if significant, the Cenified Analysis should not stan until a resolution is reached. To control this interface with system engineering, the  ;

system P& ids with subsystem boundary overlay and a list of the subsystem components from the database are used. The subsystem list of components from the database could be used by system

1 4 1 lSARSENT $ L558Y PIPING DESIGNER / ANALYST Project No. 909M)3

""me" - i USER'S GUIDE Page 2-7 j APPENDDC G '

l l

engineering to respond to the analysis groups con 6rming the freeze and concurring with the stan of the analysis , or listing the open issues that are considered grounds for holding the analysis.

Changes of System Engineering design basis while the Cenified Analysis of the impacted subsyste is in progress can prove to be very costly to the project's progress. Therefore, controlling the systf freeze interface (Section 1.2.2.c) is very important. Late vendor input impacts the completion of both system engineering and the subsystem analysis. The control of the system freeze process should i recognize this inter-relationship and be able to control it relative to the progress of the analysis.  ;

2.4.3 Construction Progress There is an overlap between the final stages of the cenified analysis scope of work and the early sta l

of construction progress. A mechanism should be in place for adjusting the subsystem progress priorities to respond to construction needs.

t 2.5 Documentation Control The flow of design input, both within the process and with interfacing engineering groups shall be I controlled. The nature of the control mechanism depends on the computer capabilities available to the team and to the team and the organizational structure of the project. Controlling data transmittal within

[

the process itself can be greatly reduced if one integrated team under one leadership is assigned the respc.sibility for the entire scope; i.e. piping layout, piping analysis and support design. The same I i

concept applies if the same organization that is responsible for large piping, is also assigned the i responsibility of the small piping as well as the instrument lines. i Documentation and/or controls for the following items needs to be in place.

a.

Design Information Transmittals between interfacing groups b.

Penetration Design Basis (including seal design and analysis input)

c. Calculations and Design Repons
d. Equipment Nozzles
e. Equipment Foundation

i lSARSENT $ LONST PIPING DESIGNER / ANALYST Projea No. 909641 ,

" "- USER'S GUIDE Page 2-8  !

APPENDIX G r

I

f. Vendor Data i
g. System Engineering Data (line list, valve list and thermal modes)

I P

I h

i i

t i

f i

r F

n L

a -

lganggNT8b553Y PIPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE Page 2-9 APPENDIX G ,

[

DIPC

$ POOL afu e

  1. TM e REL(a$( 10 manl #atfuRC Ov4R fteaCalwc - OsNE N f8&CKING l$ fllMihaICD la af REL(al($

TO CONTRACTOR ClRfCTLY

' "*5

. s . our,.s l 1P Soo* DeC5 i a *%

l 5 Y troot rase Cattow i

  • =$

.l y $rt( teseni=C -!

. -~s A

, ,fStant or i i (Ct:0=

\ (=:.700L l

  • erat eier smoot trae ti-r a

I i

\v i

r! CURE 3: P!PE SPOOL LEAD TIME t

m e a e me 6 I

t b

lSARSENT 8 LONST PIPING DESIGNER / ANALYST Pmject N2. 909643, .

"a""** -

USER'S GUIDE Page 2-10 '

APPENDIX G t

I 1

a f*

LUPPORT I DESIGN {

l SUPPORf BULR MATERIAL lt SA5ED ON STEP 6 0F THE PRELIMINARY ANALYSIS SUPPORf M ATERI AL P ACKACINC IMatt f.0.1 15 '

MAft BASED ON STEP GA of t*4 CERilFIED ANALv515 I f.o.

g wNS - RTM5 RELEASED TO MANUF ACfuPE total MATERI AL PURCMASE LEAD f f ME  : MONIMS 70f AL FABR f CAflON LE AD flME o

  • MONIMS OWNER TRACRINC 15 ELEviNATED IF AE RELE ASES i

, TO CONTRACTOR DIRECTLf I

MN5 e MONTHS f NATEstag p,getwagg e MN5

)

Y CplPolNC E MN5 e -

i l- l l 1 FABRICAfl0N RT kPP.M

. n , -5 .

sten sa j 1

CwNER i yTRACRING f 51TE TPACRING j i Mw i M% A  !

l 57 ART OF j SUPPORT 1 wATERfAL LEAD fiME 8 SUPPOR f F ABRIC AT !CN LE AD f f MT l r

i l

. i 1 CURE 4: P!PE $UPPORT LE AD TIME l

l I

I l

l

I'. l5ARSENT $ LUNDY PIPING DESIGNER / ANALYST Pmject N . 909643 o*** -

USER'S GUIDE Page 3-1 APPENDIX G 1

SECTION G.3 1

3.0 PIPING LAYOUT GUIDELINES l

l 3.1 Layout Aspects A piping designer must consider all of the following items during the layout of piping systems. Many of the requirements are spelled out in more detail in industry standards and guidelines.

3.1.1 Clearances Clearances for ciping include, inservice inspection requirements, weld locations, space from the building structure, electrical equipment, cable trays and ducts. There are also pipe to pipe spacing .

requirements for 151, seismic interaction and construction requirements.

a. Inservice insocction Piping clearances are necessary to provide: I Access for inspection personnel and/or examination personnel and equipment necessary to conduct examinations l

Sufficient space for removal and storage of structural members, shielding, and insulation.

1 Installation and support of handling machinery (e.g., hoists) where required to facilitate removal, disassembly, and storage of equipment, components, and other material. l l

  • i Performance of examinations other than those specified if structural defects or  !

indications are revealed that require such alternate examinations.

Performance of necessary operations associated with repairs or installation of replacements.

As a general rule, the designer shall base the design on the direct examination method. Remote inspection should be considered only when adequate space or accessibility for the direct method cannot be provided, when it would be prohibitively expensive, or when the required inspection is to be performed in a high radiation area.

No hanger straps, luF welds, radiograph ports, branch connections, etc., shall be located within 2t + 2 in of shop and field' welds, where t = pipe wall thickness.

Review shall be made to provide adequate accessibility.

-,a. .

l l5458ENT $ LONEY PIPING DESIGNER / ANALYST Project No. 9096 03 i

        • - USER'S GUIDE Page 3-2

, APPENDIX G Circumferential piping welds shall not be located inside wall and floor penetration sleeves. Weld locations shall allow adequate access for ISI.  ;

Piping shall be designed to avoid branch connection saddles and pads being installed over welds subject to ISI.

Where piping is run in a pipe chase, or groups of piping are run in banks, the pipe j to be examined by ISI, shall be located in the outside layers to ensure access l without removing other piping.

j Where direct manual operations are required, clearance should be provided for the head and shoulders of a man within a working arms's length (20 inches) of the i surface to be examined. '

al. General Piping systems must comply with OSHA requirements with regard to headroom, '

walkspace, etc.

Piping that runs parallel and adjacent to cable trays must allow sufficient clearance for access to cable in trays and sufficient clearance so that there is no interference ,

with the cable tray supports.

Motor Control Center (MCC) location drawings must be reviewed to verify their location relative to the piping.

i Piping and hangers should clear bus ducts by a distance as determined by the project.

For piping required for safe shutdown, it is recommended that a 6 in. clearance be maintained between the insulation (or piping if uninsulated) and adjacent  !

components and structures where practical. 'Ihis recommendation will reduce future seismic interaction calculations. ,

I

b. Relief Valve Vents There are specific standards that depict the methods of layout and design of vents and vents stacks. Generally, the piping designer must locate vent valves so that the discharge piping is kept as short as possible,
c. Thermal 1

Any piping system over 150 degrees F should be reviewed using simplified standards for preliminary flexibility check. This will minimize having to reroute piping systems after the final '

lSANSENT $ LUNDY PIPING DESIGNER / ANALYST Project No. 9096-03 USER'S GUIDE Page 3 3 APPENDIX G analysis is run on the computer. Expansion joints can also be used in limited cases, to avoid overstressing piping and equipment, cl. He following are some points which the piping designer should consider when routing a system to ensure adequate thermal flexibility of the piping.

ne most undesirable routing is a straight pipe run between the two anchor points.

Therefore, locate as much pipe as possible away from an imaginary line drawn between two anchors.

Minimize the number (not the length) of flexible pipe legs occurring between the anchors for each expansion direction.

Narrow elbow to-elbow U-bends are not recommended, since the bending stresses are highly localized at the bend.

Symmetrical routings are preferred, because they will rnore evenly distribute the stresses.

Out-of-plane pipe bends are preferred in order to take advantage of the greater flexibility of a pipe under torsion (as comparr, to a pipe subjected to bending).

An increase in the length of pipe used to improve flexibility is acceptable, however, it should be remembered that ! .rge increases will only result in a higher material cost and greater pressure drop, while not significantly improving the thermal stresses.

c2. Expansion joints may be used in water piping at pump suctions, where the design pressure of the line is less than 50 p,si. Otherwise, waterline expansion will also be accommodated by expansion loops. The expansion loop does not have to be a true loop configuration; it can be a combination of a number of bends between one anchor point and another.

d. Insulation Pipe routing must consider the added diameter that insulation adds for proper clearances. There should also be provisions to temporarily store insulation removed during inspection or maintenance, in the vicinity of the piping system.

dl. The insulation thickness is particularly important to the piping designer. It is a surface covering that affects the weight and the overall diameter of the pipe being routed. As an example, a 4-inch insulation thickness will increase the working diameter by 8 inches: this. coupled with pipe movement as a result of thermal expansion, greatly affects the clearance requirements

lSANSENT8 LONDY PIPING DESIGNER / ANALYST Pmject No. 9096 03.

" "- USER'S GUIDE Page 3-4 APPENDIX G

+

surrounding the pipe. Herefore, special care should be taken when routing hot pipelines through floors or walls, and adjacent to steel members, as well as to other plant piping and components to allow for these design conditions.  !

d2. The insulation covering all components and piping welds in adjacent base material shall be

^

designed for easy removal and replacement in areas where external in-service inspection will be required. i

e. Instruments There are three primary types of instruments that affect pipe layout, el. Flow Measuring bevices i

All flow elements shall be installed in straight pipe with proper length upstream and downstream of the device. Straight lengths taken from the appropriate curves are recommended minimums.

Within limiu, lesser lengths may be acceptable at the discretion of the user provided ai0.5% -

additional deviation added to the uncertainty (limits of accuracy) of the flow measurement. .

Straight lengths have been standardized only for venturies, nozzles, and orifices. For [

proprietary devices the user should follow the manufacturer's recommendations. Whenever possible, it is preferable to locate the primary element in a horizontal line. It is recommended j that no instrument protrusions (chemical injection nozzles, isokinetic samplers, etc.) nor pockets (thermowsells for test or for temperature elements) be located for a minimum straight distance on the upstream and downstream side of the element as determined by the project. Control l

valves must be located downstream of the flow element.

e2. Thermowells Often, thermowells may have a minimum insertion length greater than the pipe ID. Provisions must be made to accommodate the inserted length. Consideration must also be given to access for the insertion and removal of the thermal element itself with regard to surrounding ,

. components, e3. Orifices j Flow instruments encompass flow meters, rotameters, sight glasses, and orifice meters, among i others. Orifice flanges may cause piping designers problems, especially in the larger sizes.

. , lganggNT$L5NBY PIPING DESIGNER / ANALYST Project No. 909643

' **es" -

USER'S GUIDE Page 3-5 APPENDIX G Many orifice flanges, or meter runs as they are commonly called, are critical to a plant's operation. For size 16 inches and larger, one solution is to replace orifice flanges with a venturi tube, which needs only a few feet of straight-run pipe upstream. Another solution is straightening vanes installed in the line upstream of the orifice plate. Orifice flanges may be installed in a venical pipe run for liquid flowing up ar down and for vapor flowing down.

Horizontal meter runs are preferred and should be provided where feasible. It is preferable to locate orifice flange taps as follows:

Service Location Steam Horizontal Water Horizontal Compressed Air & Fuel Gas Venical (Preferred) or Horizontal ne piping designer must leave about 15 inches clear from orifice taps for valves and piping.

De minimum orifice flange rating should be 300 pounds because a wide flange thickness is needed to allow tars to be drilled. Flanges are erected, bolted, and hydrotested prior to insenion of the orifice plate. When the plate is inserted, a gasket is placed on both sides and the flanges are then rebolted. This results in a gap, caused by the plate and two gaskets. When thick flanges are used for the taps, then the gap will require longer bolts, a fact often overlooked.

f. Suonort Locations One of the most important consideration of pipe layout is to anticipate the requirements for supports. The location of heavy pipe loads with respect to the supponing building structure, (such that the support configurations are simple to enable the use of standard hardware to the maximum extent possible) should be identified very early in the design.

fl. The system design may require supports at mandatory locations, such as near the equipment or expansion joints or heavy pipe line supponed equipment (e.g., strainers).

The suppo ting philosophy and routing configuration should be agreed upon before detailed design begins.

lSARGENT $ LONDY PIPING DESIGNER / ANALYST Project No. 90%03.

wasa -

USER'S GUIDE Page 3-6 APPENDIX G l

4 The piping system being designed may have unique operating modes that j sometimes affects the analysis and supporting requirements, such as removable i spools.

  • Also, the piping system being designed may require supports with heavy structural attachments, or embedments that could alter the pipe route in order to properly . j satisfy such attachments. j During the layout of the plant piping, the piping should be arranged to minimize-the number of piping supports required, and eliminate the use of snubbers. l To minimize the number and size of supports required, piping shall be routed close te walls, ceilings, and floors or other large structural components, not including partitions or block walls, to allow the installation of restraints. Piping shall be ,

grouped together as much as possible to allow the use of common supports. l I

g. Valves The most desirable arrangement for valves is in a horizontal run of pipe with the operator in a vertical position and easily accessible to plant personnel. If this is not possible, care must be 4

taken to avoid difficult analysis problems. For motor operated valves the location of the operator must be carefully reviewed.

h. Tao Lines Tap lines are small branch piping generally less than 2 inches in diameter. They typically branch off of header piping having a much larger diameter. An example of a common tap line is a 3/4 inch size high point vent. Most tap lines have at least one valve near their header tap connections to provide isolation, and two valves are often required for double isolation.

Different categories of tap lines include high point vents, low point drains, pressure tap -

connections, flow venturi pressure tap lines, process sampling lines, gland steam seal leakoff licas, and miscellaneous instrumentation lints. Many tap lines are short dead-ended runs of pipe, such as high point vents. Tap lines may also have downstream piping, such as pressure instrumentation pipe lines.

I hl. Tap line locations are determined by their function, for example, a high point vent is located i at the high point of the system. However, as much as practical, the tap line orientation and location should allow easy access to the valve. These lines should be located in a manner that will facilitate personnel access to the lines for operability and that will avoid interferences with I

_ __________I

l5AESENT $ LUNDY PIPING DESIGNER / ANALYST Project No. 9096-03 USER'S GUIDE Page 3-7 APPENDDC G nearby structures and insulation on the header piping. For example, expected thermal expansion of the header piping needs to be considered in locating the tap lines to avoid potential interferences. If a tieback design is to be used, the tan line should be in a location that will allow room for support. A tieback design refers to supporting the tap line by a structural member that is anchored to or " tied back" to the header piping. His is the preferred configuration to protect against failure of the tap to a header weld by either expansion or vibration induced stresses. If the tap line is to be connected to downstream piping, then consideration should be given to the routing and location of the downstream piping when locating the tap line. If possible, tap lines should not be located near areas of potential cavitation, such as control valves or flow orifices, or near areas of flow turbulence, such as elbows and branch connections.

h2. Valves specified for tap line applications should be as small and light as practical. A small valve will allow the routing to be kept short, which increases its stiffness, h3. He length of a tap line is kept as short as possible to provide for a rigid design. The length of the routing is based on providing sufficient flexibility for thermal expansion, ease of access for operation, the distance required to avoid interference, and the minimum distance required between welds.

h4. Downstream piping refers to piping downstream of the tap line valve (s) that runs to a location remote from the branch location. Examples include a d.aia line that is routed to a common drain header and pressure tn lines that run to a rem ate instrumentational panel. The effects of downsteams piping must be conddered in the tap line design, h5. Sufficient flexibili:y must be designed into the downstream piping (or tubing) to al!ow for the expected thermal expansion movements of the header along with the dynamic movements resulting from postulated seismic or accident events if necessary, this can be accomplished through the use of expansion loops. In some cases the temperature of dead end tap lines can be reduced to alleviate flexibility problems. This should be verified with the system engineer.

h6. Cantilever designs are desirable in that they take a minimum of space, require no support, and facilitate installation. Cantilever designs are possible with tap lines requiring only one valve,

l5 ABSENT $ LOMBY PIPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE Page 3-8 APPENDDC G especially when light valves are used, ne routing is kept shon, which results in a high vibrational frequency, and allows the header piping and tap line to vibrate together as a rigid ,

body. Cantilever designs have no downstream piping or are connected to downstream piping by flexible metal hose.

r-h7. Tieback designs, which involve supporting the tap line from the header piping, are used for longer routings, routings with downstream piping, and routings using two valves or one large valve. The objective of the tieback design is to keep the routing short, and the tieback into the header avoids relative motion between the header and tap line which allows the header and tap '

line to vibrate together as a rigid body. A primary objective of the tieback support is to restrain the valves on the tap line. Valves act as large lurrped masses on the tap line piping. Lumped masses lower the vibrational frequency and increase their vibrational response. Restraining these .

valves through a tieback support significantly reduce the vibration response. Routing a tap line --

parallel to the process piping facilitates its support from the header. The pipe span between the .

nozzle and support is kept short and the parallel routing a!!ows the line to be readily supponed .

from the header. In circumstances where the tap line cannot be routed parallel to the header,-

for example to allow for easier personnel access to open and close the valves, the tap line can still be supported from the header piping. Tap lines not routed parallel to the header will require somewhat more elaborate tieback support configurations. Standard support configurations shall be developed for project use.

h8. Tap lines having large motor operated valves, such as in the case of valve bypass lines, may ,

require the tap line valve to be supported independent of the header. In these cases, the tap line a t would be ha d piped to the motor operated valve, which would be supported from the building structure or auxiliary steel. He hard pipe routings must contain sufficient flexibility to accommodate header movements.

1. Pioe Sleeves The location of pipe penetrations through walls in high radiation areas must be carefully reviewed before finalizing the design.
  • Wherever it is practicable to do so, the penetration should be located near where two or three shield walls join (for example, near the upper corners of a room where the penetration is far away from radiation sources), and near beams and

lSARSENT 8LUNSY PIPING DESIGNER / ANALYST Project No. 90%C3 omm -

USER'S GUIDE Page 3-9 APPENDDC G columns which may serve as extra shielding to at least one side of the penetration l (e.g., when a beam or a column is between the source and penetrations).

The penetration should be located as high above the Door as is practicable and not less than 8 feet if possible.  !

l The penetration should not be aligned with a radiation source, nor (where practicable) should it be aligned with areas of frequent occupancy.

Generally, a penetration should penetrate through the thinnest of shield walls when l

a choice exists.

{

Normally each process pipe should have its own sleeve.

For adjacent pipes, sufncient space must be allowed for sleeves a minimum of 2" l, l larger than the process pipe. Space must also be allowed for head 6ttings welded to the sleeve and used as anchors.

Project requirements must be established to determine if piping inside sleeves will be insulated or if other types of seals will be required.

j. Substructure Pining It usually is desirable to embed large coldwater piping systems (Cire, water, service water etc.)

in the substructure foundations. This avoids taking large amounts of space in the plant or having to support very large loads from the building structure.

The substructure piping philosophy must be reviewed and agreed upon with the project team Preliminary foundation sizes shall be determined by the Structural Designer The depth of the finished Door must be determined The mechanical piping drawings must be reviewed for possible interference with plumbing, electrical conduits, and column pockets.

Corrosion conditions cf the piping should be investigated by system engineering against the piping material.

k. Eauicment Drains When equipment is located in the plant. equipment drains must be anticipated and provisions made for these drains in concrete Doors.

Equipment baseplate drains must be incorporated into the substructure.

i l5ARSENT 8 LSNST PIPING DESIGNER / ANALYST Project No. 90%C3  ;

USER'S GUIDE Page 3-10 APPENDIX G If equipment drain locations have not been finalized, agreements must be made to  !

allow for future routing within the finish thickness.

Spare piping stubs may be located in the substructure in anticipation of additional users.

  • Piping with operating temperature of 150'F or over must be reviewed by the !t Structural Designer.

Generally,2 inch or smaller piping should not be routed in the substructure unless stipulated by the project scope of work as provided by the client.

I. Pumo Suction i Pump suction piping has certain requirements that should be followed to ensure proper and most i efficient pump operation. Some of these requirements are as follows: 1

11. De following approach will be used in the layout of suction piping for pumps with double suction first stage impellers. For other designs of horizontal pumps, there is some leeway in m the requirements of this approach. He suction piping shall be laid out so that each eye of the 1

double suction impeller sees the same piping approach configuration. De elbow in the  !

approach piping should be in a vertical position, perpendicular to the pump's centerline. There  !

should be at least four diameters of straight pipe between the elbow and the reducer. If the elbow at the pump suction must be in a horizontal position, there must be at least 8 diameters 1 of straight pipe between the elbow and the reducer. Reducers in the pump suction piping close to the pump connection should be of the straight sided type (not contoured). If the reducer is in a horizontal position, eccentric reducers should be used with the top of the reducer horizontal to avoid an air pocket in the suction line. The reducer should use a minimum side angle when it is located at the suction connection of the pump. The suction piping should be at least the same diameter of the pump connection, or preferably one size larger.

12. For general service centrifugal pumps with a suction lift, the pump manufacturer's recommended minimum submergence of the suction line should be observed. De suction piping should slope continuously upwards towards the pump and an eccentric reducer with the top surface horizontal shall be used to prevent air pockets in the pump's suction. Suction isolation valves should be either butterfly or gate type, with the stem in a horizontal position to vent air that could be trapped in the valve bonnet. The suction valve should be located at least 3 pipe diameters

l5ARSENT fB LUNDY PIPING DESIGNER / ANALYST Project N2. 9096-03 E== -

USER'S GUIDE Page 3-11 APPENDIX G I

l upstream of the pump connection. When expansion joints are used in the pump suction, anchors j or restraints should be installed to prevent forces that result from pressure (or vacuum) in the pipe from being transmitted to the pump.

m. Desien Holds When piping design and layout begins on a project the designer must prepare a design that will cause minimum changes as input becomes veri 6ed.

ml. He ideal situation would be to have 100% of the input available before the piping design process begins, ne piping design process cannot wait for all of the input to be assembled before design work begins, it would only delay the schedule. Herefore, the key is to use the available input and assess the possible effect that incomplete or missing data may have on the overall design. The design decisions are then made based on an allowance for these contingencies. In this way, the effort required to bring all of the station design to completion is kept to minimum. Tne design input will be Snalized as the missing components and information are applied to the original design, m2. All af eas of the system piping drawings where design input is not vermed, is not intended for release for fabrication, or is not ba:ted on certified vendor equipment drawings, shall be circled and marked " Hold." A " Hold" list shall be generated and each ho!d shall be numbered with a description of the reason for the " Hold".

n. Radiation /Shieldine All radioactive or potentially radioactive pipelines require special routing considerations to decrease the amount of exposure to plant operating personnel.

nl. Piping shall be routed to optimize radiation protection, and enhance ALARA and lead shielding  !

considerations.

)

1 n2. Radioactive process piping shall be routed in shielded pipe tunnels, trenches or chases, or in  !

neas where the radiation Geld due to the pipe is consistent with the radiation zone for that area.

l l

i I

lSARSENT8L5NBY PIPING DESIGNER / ANALYST Project No. 9096 43, I

= = * * -

USER'S GUIDE Page 3-12 APPENDIX G n3. To aid in preventing crud buildup in radioactive and potentially radioactive process piping, sharp bends, dead ends and other obvious crud traps shall be avoided, in general, socket welds and welds employing backing rings should be avoided to the extent practicable in these systens.

These welds contribute to radioactive crud accumulation which results in increased radiation fields near the weld. i 1

n4. Shielding of radwaste drain piping (including floor and sink drain piping) shall be provided as necessary. Radwaste drain piping not specifically shielded shall be routed so that it is not exposed to normally occupied areas and general access routes. Vertical runs of radwaste drain piping not specifically shielded shall be run against wa!!s and sufficiently isolated so as to facilitate compensatory shielding, if required, n5. Penetrations in shield walls for pipes, shall be located and designed to minimize radiation levels .

to personnel. Location and orientation of penetrations shall be selected to avoid streaming to areas most likely to be occupied by operating and maintenance personnel. Compensatory ,

shielding shall be used where necessary to reduce radiation streaming due to penetrations and localized shield deficiencies (expected hot spots). ,

n6. Routing of radioactive lines in low radiation zones shall be avoided to the extent practicable.

Lines that require shielding shall be routed in shielded pipe tunnels or in radiation areas to the extent practicable. Where necessary, radioactive and nonradioactive lines may be routed in common pipe tunnels. This however, is not preferred.

n7. Penetrations through shielded pipe tunnels should not be made by lines which do not themselves run through the pipe tunnels.

n8. Lines that carry radwaste demineralizer resins, filter backwash, filter /demineralizer sledges, or other paniculate should have 5 diameter radius bends and should be continuously sloped. The use of loop seals on these lines shall be avoided to the extent practicable, n9. Radioactive piping shall not be routed near the designated location of an area radiation monitor thereby causing abnormally high radiation readings which are non-representative of the ares in which the monitor is located. The monitor shall be relocated when the above criteria can not

l

)

l 1

i lSARSENTS LONEY PIPING DESIGNER / ANALYST Projecs No. 909643

'8"**-

USER'S GUIDE Page 3-13

. APPENDIX G i

be satisfied. Slightly radioactive lines shall be routed in a manner which minimizes radiation exposure to plant operating and maintenance personnel. Slightly radioactive lines in low 3

radiation zones shall, to the extent practicable, be routed at a minimum elevation aoove the finished floor of 10'-0", but it is desirable that these lines be routed as high abave the floor as is practicable. To the extent prac..icable, slightly radioactive lines shall not be routed near normally travelled passageways, or near galleries and other elevated work areas.

n10. Shielded valve aisles shall be provided to permit greater accessibility to valves requiring frequent maintenance. The valves should be shielded to the exten practicable from the equipment it services.

o. Pine Connections ne majority of pipe connections in a power plant are welded or flanged. It is important for the pipe designer to review the connections on all vendor furnished equipment to ensure it is compatible with the piping design requir'ements. If not a note must be added to the piping drawing to provide a matching connection.

01.

Flanged joints are generally required where pipe line, piping components, or equipment must be disassembled for maintenance work. Connections to cast iron valves and fittings and to steel flanged-end valves where such constniction is considered more desirable, must be flanged.

p. High-Enerry/Senaration High energy piping should be located so that it could not impact any safety related components in the plant.

pl. Piping systems whi h are part of the engineered safety features shall be separated from each other and from cable associated with the other safety divisions.

p2.

He pipe routing for systems essential to safe shutdown shall provide physical separation between redundant systems. To protect safe shutdown components from the adverse effects of postulated high energy line breaks, high energy lines shall be eliminated from safety-related

PIPING DESIGNERJANALYST Project No. 9096 02-l5 ABSENT $LUMBY

" **

  • Page 3-14 USER'S GUIDE APPENDIX G areas wherever possible. To protect electrical components essential to safe shutdown from the adverse effects of postulated moderate energy line cracks, moderate energy lines shall be eliminated from areas containing safety-related electrical components.

p3. To minimize engineering and construction costs, redundant systems shall be routed symmetrically. By providing a symmetrical design the analysis and constmetion of piping systems is greatly simplified.

q. Maintenance it is imponant for the piping design layout to avoid spaces reserved for equipment removal and maintenance, ql. Equipment removal spaces or aisles as well as large truck or rail aisles must be reviewed for j

specifics and their relationship to the system or systems being designed. Equipment removal drawings are often more current and show in greater detail, the removal schemes for major plant equipment. These drawings should be reviewed for the compatibility with the piping layout.

r. Main Steam & Feedwater Main steam and feedwater should be designed, routed and analyzed during the development of the general arrangements.

1 I

rl, ne routing inside the containment of the MS and FW lines shall be such as to minimize subcompartment pressurization and environmental effects. Also the potential for damage to safety related equipment due to pipe whip and jet impingement shall be minimized.  !

I

s. Other Pine Considerations Dere are other items that a piping layout designer should be familiar with.

si. Long radius (Ir) elbows (ells) are normally used in the design of piping systems, if suitable for l the design, bends may be substituted when acceptable to the project. Short radius elbows should be used only if their use has been reviewed and if their use complies with the applicable requirements of ANSI Standards. ANSI B16.28 limits the pressure rating of shon radius elbows I

l

l8 ABSENT $ L5ZSY PIPING DESIGNER / ANALYST Project No. 9096-03  ;

amma* -

USER'S GUIDE Page 3-15 APPENDIX G to 80% of a pipe of comparable size. wall thickness and material. If short radius fittings are used, they must be certified to the full pressure rating of the system to which they are connected. If bends are used, the radius for the size and sa!! thickness must be determined, s2. Pipe lines that require slope for drainage must be routed with continuous sloping in mind.

Usually, the minimum acceptable slope is 1/8 inch per foot.

s3. Provisions shall be made to effectively eliminate condensation in steamlines, and adequate' ,

venting of air shall be ensured for all waterlines.

s4. All steam lines should be designed with a minimum number of low points, as the low points must be drained. Low points should preferably be located on the inlet side of isolation valves, as water will tend to follow the steam flow, regardless of the slope of the pipe. Steam pipin'g at the location of the low point shall have at least 3 feet of clearance between the bottom of the pipe and the structure to allow for the low point drain pot, controls, and valving. All steam piping shall have adequate provisions for expansion. Expansion joints will only be used in i extraction steam lines for feedwater heaters, unless otherwise justified.

3.1.2 Input Required '

The following is a list of items required by a piping designer to complete the design of all piping 3 systems in a nuclear power plant.

t General Arrangement Drawings i

Piping and Instrument Diagrams (P&lDs) ,

Derign base drawings (DBDs)

  • Piping Design Tables (PDTs)

Vendor Equipment drawings '

  • Piping Line list
  • Valve list '

1

  • 1 Instrument index

=

Other design drawings (electrical, structural etc.)

1

l5ANSENT fB L5NBY PIPING DESIGNER / ANALYST Project No. 9096-03 rmese -

USER'S GUIDE Page 4-1 i APPENDIX G SECT' ION G.4 4.0 PIPING ANALYSIS GUIDFT INES

, The ASME code provides rules and requirements for maintaining pipe stresses below specified limits.

To satisfy code rules, one must perform a stress analysis for all loadings to which the piping system is subjected. Before the advent of computers, the piping analyst designed piping systems by using handbooks and/or simplified design rules to achieve a conservative design. With advances in computer technology, designers are relying more and more on computers to achieve optimized piping system designs. Many commercially available computer programs have been developed for piping stress analysis. All these programs are linear, three-dimensional space frame, finite element  ;

programs.

Not all piping in a nuclear plant is designed by analysis. Small-bore piping,2 inch diameter and l under, is usually designed using small-bore piping design by rule procedures. These procedures are used to route the piping using simplified rules, and to obtain loads for support design. Compliance with the rules ensures that pipe stresses meet code allowables. These simplified nales can be applied manually, or applied by a computer program.

i The piping engineer's overall responsibilities are i

to establish a piping, suspension, and restraint system arrangement that satisfies all j design requirements for the system, and that is consistent with good piping design practice; to ensure that the suspension and restraint system arrangement is physically designed j to function in a fashion that is consistent with the calculations used to qualify the  !

piping system design; and to properly document all design calculations that were required to demonstrate that I the design arrangement meets all pertinent requirements.  !

l The basic design steps followed in performing a complete system evaluation are shown below:

l identification of design parameters,  ;

  • piping structural evaluation.
  • code evaluation, and documentation and review.

lSARSENT $ LONDY

't = "

PIPING DESIGNER / ANALYST Project No. W3 USER'S GUIDE Page 4-2 APPENDDC G 4.1 Overview of Desien Parameters 4.1.1 Physical System Characteristics. Before any evaluation can begin, an adequate representation of ,

components to be evaluated must be prepared, including routing of the piping system, the various components that make up the piping systems, their weights, preliminary supporting system, etc.

4.1.2 Identification of Design Basis leading. De loadings that must be acknowledged in the design of a given piping system are given in the design specification for the piping system and may depend on the service that it provides and its location in the pir.at. Dese loadings fall into two categories:

! normal service loads (dead weight and thermal expansion) and occasionally acting dynamic loads.

Typical examples of the dynamic loads are building vibration loads (earthquakt, etc), and fluid transient loads that result from the operat.on of fast acting system controls (water hammer loads).

i 4.1.3 Strucmral Evaluation Once the loading required for design is identified, a structural analysis is performed to determine the ,

effect of loading on the system. For routine piping system design, four types of structural analyses l are usually performed. Three are static analyses and one is a dynamic analysis. The four types are j listed below:

t static analysis for dead weight loading, e

static analysis for thermal expansion loading, '

l

  • static analysis for relative support displacement, and ,

e response spectrum analysis for building vibration loads. l For water hammer loads, time history using direct integration methods is required. However, these analyses are only performed on few systems, where water hammer loading is significant.

i 4.1.4 Code Evaluation and IAad Combination Calculations l

After a structural analysis for each individual load has been completed, the results are used for two purposes, those being:

  • performance of all design calculations required by the piping code that governs the i design of the piping, and l
  • computation of suspension and restraint system hardware design loads and pipe-  !

imposed loads on equipment nozzles.

1

l5AESENT $ LUNDY PIPING DESIGNER / ANALYST Project No. 909643

      • - USER'S GUIDE Page 4-3 APPENDIX G Shculd these computations indicate that the design does not comply with code requirements, or that equipment is overloaded, corrective action is necessary. Repetition of the individual structural analyses and the design calculations is then required to confirm that corrective action was adequate.

4.1.5 Review and Dom'm reinn (Quality Assurance)

Once the adequacy of the design has been confirmed and a complete design report package is assembled the work must be reviewed by an independent party to ensure that it is technically adequate. One of the piping engineer's responsibilities will be to act as a reviewer of design calculations that were performed by another person. After the review has been completed, documentation of all computations and/or calculations that were performed is required.

4.1.6 Applicable Design Documents Before proceeding with a more detailed discussion of the design steps and their implementation, a piping engineer should be aware of the numerous documents that directly or indirectly affect the course of his work. Regardless of whether his analysis pertains to a nuclear or fossil power plant the design will be controlled by information contained in some or all of these documents. A summary of the types of documents the piping engineer should be aware ofis contained in Exhibit 4.1 1. De list is not necessarily all inclusive but it indicates the magnitude of information available.

A major portion of the work for piping is designed per the requirements of ASME Section ill of the B&PV Code (hereafter referred to as the Code). Most of the piping engineer's exposure will be related to Code-related documents. In a very general sense the Piping Engineer will be working with three types of Code documents: the Design Specification, Design Documents, and the Design Report.

Without going into details the following def'mitions apply:

Design Specification. A document that contains sufficient detail to provide a complete design basis for components covered by the Code.

Design Documents. A set of reports, calculations, drawings, and sketches that show that the applicable sections of the Code have been met. (This includes the Design 1 Report.)

j Design Report. A design document that includes the stress analysis complying to i the Code requirements and those requirements set out in the Design Specification. 1 I

l

l5ANSENT $ LOMBY PIPING DESIGNER / ANALYST Project No. 909643

""a- USER'S GUIDE Page 44 APPENDIX G 4.2 Preoaration of Pioine Model 4.2.1 Introduction A piping system model is a mathematical representation of the piping system being analyzed that is used as input to the computer programs. The piping analysis programs are large structural analysis I programs that are designed specifically for the analysis of piping systems. Dese programs are linear, three dimensional space frame, tinite element programs. The programs perform four basic functions:  ?

The programs read in the analytical data for the model that the piping engineer prepares.

The programs perform the structural analyses that are specified by the engineer.

The programs collect the results of all the structural analyses that they perform and use them to check the piping design against the requirements imposed on them by the piping codes that govern them.

The programs summarize all the design information that they generate in a report that can be transmitted to the parties responsible for the designs of associated ,,

equipment and structures.

The models that are prepared contain two basic sets of information. The first set of information consists of the structural model, which is a detailed description of the piping being analyzed. The second set of information consist of type of analyses to be performed and how to combine these i analyses to perform code evaluation.

4.2.2 Building Blocks of the Model Structural models for piping are constructed from two basic building blocks called N_cdss and Elements. The two building blocks are described below,

a. N_cdra. A node is a reference point in space that is used to define a physical location on the piping system.
b. Elements. An element is a length of pipe that spans between two nodes. Straight elements are used to represent straight pipe and curved elements are used to represent elbows and pipe bends. ,

l33333NT$L5NSY PIPING DESIGNER / ANALYST Projea No. 909643

          • as -

USER'S GUIDE Page 4-5 i APPENDIX G I

4.2.3 Informanon for Modeling a Piping System

a. Node Information. Nodes are reference points that are used to define physicallocations on the piping system. Nodes are used as reference points to specify the following information in a piping model:

location of a hanger or restraint, I

location of a fitting, ,

(

  • location of an elbow, a

location of valve ends.

location of equipment.

location of a weld that joins two different types or sizes of piping.

center of gravity of valves.

  • location of anchors, and l

location of an intermediate data point in the model.

There are two basic pieces of information about each node that are required to be provided by the preparer of the model. These are its location, and then what it represents.

b. Element Information. Elements are used to represent the pipe segments that run between two nodes. To describe the pipe, the following information is required:

outside diameter of the pipe, wall thickness of the pipe, weight of pipe, its contents and itr, insulation.

what material the pipe is made of, which two nodes the element runs between, and for curved elements, information about how the element is curved and oriented.

Some computer codes combine the node and element cards into one set of cards.

i i

lSARSENT $ LONSY PIPING DESIGNER / ANALYST Project No. 9096 03, cmane -

USER'S GUIDE Page 4-6 APPENDIX G i

4.2.4 Component Representanon Piping systems contain a broad range of fittings, such as elbows, branch connections, or valves. In addition to fittings, piping systems may also contain miscellaneous types of welded attachments that are used to connect restraint hardware to the pipe. The piping codes that govern the design and i erection of power piping (ASME Boiler & Pressure Vessel Code and ANSI B31.1) require that stress analysis be done on those components. This detailed analysis is done by the computer program, la '

order to do this analysis, the computer program has to know what types of fittings are in the piping system and where they are.

There are two basic types of components, the first type being small components that are represented by a single node, and the second type being large pieces of in-line equipment, such as valves and large bends, that are typically represented by several elements. Both types will be discussed, ,

i

a. Sincie Node Reoresentation of Comoonents. In modeling piping systems, most of the components will be represented by a single node. Information about the details of these fittings may be input into the computer program on the node card. Typically the following type of components are represented by a single node representation: -
  • straight seamless pipe,
  • ginh butt welds. '
  • girt fillet welds to socket fitting, .

t a longitudinal butt weld in straight pipe, .,

  • tapered transitions
  • branch and tee connections,
  • reducers  ;
b. Modeline of Components Using Elements l

Several types of components commonly installed in piping systems are modeled using one, or several, elements. Listed below are the components falling into this category.

  • all types of valves.
  • elbows or bends,

l$ANSENT8L8MBY PIPING DESIGNER / ANALYST Project No. 909643

==*** -

USER'S GUIDE Page 4-7 APPENDIX G ne modeling of each of these types of components is be discussed below.

c.

Modeline of Valves. For the purposes of piping analysis, valves fall into two main categories.

cl. Valves with Center of Gravity Atsoroximately on the Centerline of the Pine. Valves that fall into this category include most hand-operated valves, control valves, and some air-operated ,

valves. To determine if a valve falls into this category, the distance from the CG to the pipe .

centerline should be less than or equal to one-half of the pipe outside diameter. Valves that fall into this category should be modeled in the following manner.

The valve is represented by a single element.

A node should be located at each end of the valve, where the valve is  ;

connected to the pipe. These node types will depend on how the connections '

are made.

The material of this single element should be the material of the valve body, given on the valve drawing.

He geometry of this element will have these properties:

Unit weight is equal to the total weight of the valve plus normal operating contents plus insulation,if any, divided by the length of the valve.

The wall thickness of the valve element can be either the maximum ,

wall thickness of the valve body (shown on the drawing) or five times i the wall thickness of the attached pipe. Either of these values will '

give a reasonably accurate model; however, the latter approach is l recommended for consistency in normal modeling situations.

The outside diameter of the valve can be either the maximum outside diameter of the valve body, or the outside diameter of the pipe.

c2. Valves with Center of Gravity off the Centerline of the Pine. Some valves that fit into this category are motor-operated valves, solenold-operated valves, and some air-operated valves.

Any valve whose CG is greater than one-half of the pipe diameter from the pipe centerline should be coded in the following way:

ne valve is represented by three elements as shown in Exhibits 4.2-1.

De nodes are located as shown in Exhibit 4.21, When specifying the coordinates of the CG node, the piping engineer makes sure how the valve is

l8ARSENT fB LUNBY PIPING DESIGNER / ANALYST Project No. 909643 USHR*S GUIDE Page 4-8 APPENDDC G oriented. The CG might not be directly above the pipe; it may be at an angle.

It is important that the valve CG is located correctly with respect to the pipe.

The valve orientation will be shown on the single line drawing.

The material used in al: three elements should be the material of the valve body.

De geometry of all three elements should be as follows:

All three elements are weightless.

Wall thickness and outside diameters of all three elements as discussed before.

Lump valve weight at C. G. node

d. Modeline of Elbows or Bends. The elbows or bends are modelled using curved elements. He radius of the elbow or bend should be input correctly as the propenies of the bend or elbow depend on the radius. The elbow end connections should be mode!!ed properly as the elbow flexibility factors depend on the end conditions. ~

4.3 GENERAL STRUCTURAL MODELING 4.3.1 Node Spacing and Element Lengths After locating nodes at all we!J;.. ikings, special components, subsystem boundaries, etc., the piping engineer must locate nodes on the remaining portions of plain, straight piping. These nodes should be located in a way such that the following three criteria are satisfied:

The length of any element divided by the ouuide diameter of the piping being modeled by that element L/D should be between 0.5 and 15.

These values are extreme values. The piping engineer should, in general, try to keep the L/D ratio somewhere in the middle of that range.

To simulate proper dynamic behavior of continuous piping system, the minimum distance between node points (mass points) can be determined based on frequency formula for simple-simple supponed beam for the frequency ofinterest. For various pipe sizes the tables of minimum distance can be developed.

Adjacent elements should be approximately the same length. In cases where adjacent elements are different diameters, the L/D ratios should be approximately equal.

lSARSENT8 LONSY PIPIhC -

"I / C (ST Project No. 909643 emsesa' -

  1. Page 4-9 A SPP , e C '

One situation that should always be avoided is having a very long element next to a ver!

element. If one is forced to have a very short element (UD approximately 0.5) due to weld location or some type of fining one is modeling, make the adjacent element slightly longer and the element after that slightly longer yet, and so on, until the IJD ratio is in the more acceptable range. H 5 piping engineer should avoid having a large jump in the UD ratios of adjacent elements.  ;

e 4.3.2 la: anon of Nodes Beween Restraints At least one node should always be located between any nodes that are restrained in any dir 4.3.3 Additional Structural Modeling Detad for Class 1 Piping l

Re Class I pipe design rules require a fatigue evaluation of the piping system. To support th fatigue analysis, internal bending moments are required at all locations being analyzed. De program will not store the internal bending moments required unless there is a node located at those points in the mcdel.

b To ensure that one will be able to calculate all information required for the fatigue analysis, t engineer must take the following precautions:

Stg 1. Inspect the system carefully and identify all locations at which fatigue -

analysis is required (for instance, at all weld locations on the pipe). '

Sig 2. Ensure that there is a node in the model at all locations that he identified i in Step 1.

4.3.4 Piping System Analysis Boundaries and Support Modelling Usually piping systems are modelled betweer, anchors. De anchors define piping system ana; boundaries. The feilowing criteria define acceptable methods for breaking up large continuous systems into analytically mantgeable system for qualifications.

Anchors.

Analysis boundaries can be located at in line anchors or equipment anchors. In-line anchors provide complete isolation between adjacent piping i

segments on either sides. De piping results from one side will not effect the results of other sides. However, for in-line anchors, qualification must be based on loads l j

from both sides of the system. For weight and thermalloads, algebraic sum should be used. For dynamic loads, t.'.e loads from both sides can be combined based on SRSS method.

Anchors used to isolate seismic and nonseismic piping always present a problem that often loads are not available from the nonseismic portion of piping. One approach is to design the anchor for plastic moment capacity of the nonseismic pipe. This may result in extremely conservative design. EPRI Report

l5ANEEMY fB LUNDY PIPING DESIGNER / ANALYST Project No. 909M)3 Emm ,

USER'S GUIDE Page 4-10 l APPENDIX G l 1

RP-2967-2, Vol. 5 provides additional guidelines for evaluating these type of anchors.

Branch Line Decoucline. Small branches are generally decoupled from large headers. It is recommended that if the ratio of run to branch pipe moment ofinenia is 25 to i, or more, the branch pipe may be decoupled from the run pipe. He use of lower ratios may be used if adequate technical justification is provided. The mass effect of the decoupled branch line should be included, if significant, in the run pipe analysis, ne appropriate stress indices and intensification factors should be calculated and applied to run and branch analysis. Also the effect of stresses from the branch and run pipe need to be added (see Section 4.10.9).

  • Overlan Boundary Pininc. When piping system boundaries are located at translational supports rather than at an anchor, additional overlap boundary pipe beyond the qualification limit is required to account for the effect of adjacent pipe.

The overlap boundary should extend beyond two active supports in each of the three orthogonal directions. Enveloped results of the overlap boundary must be used for qualification. Other guidelines provided in EPRI RP-2967-2, Vol. 5 can also be used.

Modelline Succorts. The supports in the piping analysis are usually mode!!ed as rigid boundary conditions. The pipe designer must assure himself that the support I

design will approximate rigid behavior, nis is usually attained by imposing a deflection limit on the support. The recommended limit on suppon deflection is 1/8." Larger values may be used if demonstrated for a plant specific application.

EPRI report RP 2967-2, Vol. 6 provide additional guidelines for justifying larger values.

Suppons, when installed on pipe, may have gaps associated with them. Current industry practice (WRC 353) is to limit the total gap in the range of 1/8" for loaded directions.

For regions near sensitive equipment, this gap is funher limited to 1/16". Gaps of this i

size limit redistribution of load and do not require any consideration in the piping analysis.

l 4.4 Weicht Analysis i 4.4.1 Dead Weight Analysis of Pip'mg

a. A dead weight analysis is performed on all piping systems that are designed by co,mputer l analysis methods. Proper design of piping systems for dead weight loading consists of three j steps.

A suspension system arrangement must be established by careful visual inspection of the physical structure of the piping system. This process is the l most critical step in the design process. His step must be completed carefully l

to result in a properly supponed system. It consists of an inspection of the I

pipmg system to identify and correct undesirable internal loading mechanisms.

l l

l

1 l5&ESENT $ LUNDY PIPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE Page 4-11 APPENDIX G

=

Suspension system loads must be calculated.

De stress obtained from the computer program must be checked for code compliance,

b. A piping system that is properly suppotted will have the following characteristics.

The bending stresses in the piping created by the dead weight loading will be below the allowable levels that are specified by the piping code that governs the design of the piping. Usually the support spacing is such that weight stresses are less 3000 psi.

The weight loading will be evenly distributed on all elements of the suspension system.

All vertical piping will be supported in a stable fashion.

All vertical deflections of the piping will be downward and reasonably small

( < 0.2 ").

All horizontal deflections of the piping will be less than 0.25 inch.

He reactions on equipment to which the piping is connected will be minimized. The vertical nozzle reaction forces on all pieces of equipment will be downward.

4.4.2 Leading Definition Data. To perform a dead weight analysis, a considerable amount of information is required to define the loading. The information consists of two sets of data. These are:

a description of the weight of all the components that exist in the piping system, and a listing of the hanger setting data that were used to preload the variable hangers in the system. His data is required only if the piping system that is analyzed, and its I

l suspension system, have been purchased and installed.

These two sets of information wn! be discussed below.

a.

Weicht Data. De data equired to perform a dead weight analysis are essentially detailed descriptions of the weight af everything that makes up the piping system. Rey consist of the items listed below, al. weight of every piece of pipe that makes up the system, a2. weight of every valve in the system and the location of its center of gravity,  ;

a3. '

weight of every strainer in the system and the location of its center of gravity,

P lSARGENT $ LBMBY PIPING DESIGNER / ANALYST Projea No. 9096-03,

= = * * -

USER'S GUIDE Page 4-12 APPENDIX G 1 l

a4. weight of every piece of inline equipment in the system and its center of gravity, ,

a5. weight of the normal operating fluid inside the piping, valves, strainers, and inline equipment, a6. weight of the insulation installed on every piece of pipe, every valve, strainers, and inline -

equipme..t.

a7. weight of significant pipe restraint hardware that is supported by the piping, and '

a8. weight of all socket welding tittings and all flanges regardless of what type they are.

The accuracy of weight data is very important when analyzing systems that are supported with variable hangers. Conservative overestimation of the weight of the piping, its contents, insulation. and valves actually does more harm than good in these cases. He reason for this is that variable hangers are preloaded devices. The preload specified for the hangers is called their setting. These settings are determined by the results of analysis. When the analysis is ,

done with overestimated weights, hanger settings that are higher than those actually required to support the pipe will result. He hangers are then designed and purchased with excessive settings. Thi: will result in a suspension system that pulls the pipe upwards rather than -

supponing it in a uniform manner.

b. Hanger Setting Data. Two types of dead weight analysis are usually performed, one being the initial design analysis, which determines the settings in the system, the other being an analysis l of a system that bas already been designed and fabricated. For this hanger settings are specified as input.

(

9 4.4.3 Proper Piping and Suspension System Arrange If a piping system is improperly supported, the l suppon reactions will be unevenly distributed or will indicate that the hangers are holding the pipe down. His is an indication that the hangers in the system are not properly placed or that there is a L

[3ARSEMT $ LENBY PIPING DESIGNER / ANALYST Project No. 9096 03 USER'S GUIDE Page 4-13 APPENDIX G heavy weight in the system that is not adequately supponed. Both conditions cause unnecessary l bending of the pipe and indicate an unstable condition.

He venical reaction forces on equipment nonles due to dead weight loading should load the equipment nonle downward. Equipment nonle loads from weight analysis should be reviewed to determine what proponion of the allowable load they represent. If they represent a significant proportion of the manufacturer's allowable loads for a nonle, action should be taken to reduce them before any subsequent analyses are performed.

l

\

The following items summarize undesirable weight loading mechanisms that result from improper )

i piping and/or suspension arrangements.

1 I a. I Uneven Sunnort Snacine. De supports on the piping should be spaced at intervals that are as '

(

uniform as possible. If this feature does not exist, pivoting of the piping occurs about the supports as indicated in Exhibit 4.4-1. De result is uneven distribution of the weight of the piping on its suspension system. These conditions should be cor ected by relocation of supports or addition of supports.

l 1

Immediate Sunnort of Larce Valves and Fittines. Large valves and flanges should have supports located immediately adjacent to them. If they do not, pivoting about the nearest restraints will occter. If the potential for pivoting exists, a suppon should be added immediately adjacent to the valve on the line.

1 b.

Unstable Risers. Piping systems can be unstable near risers (vertical legs of pipe). For this reason, there should al vays be a support near the top of every vertical leg of pipe in the system. If this is not feasible the riser should be supponed or guided near the top to prevent it from falling over if laterally loaded near the top, as illustrated in Exhibit 4.4-2.

l Note that piping analysis computer programs will not indicate if unstable configurations exist.

Instability problems must be located and corrected by visual inspection of the system by the designer.

l l

lSARSENT &lLEEDY PIPING DESIGNERJANALYST ProjectNr. 0096-01

" "- USER'S GUIDE Page 4-14 APPENDIX G

, c. Drooninc Fiat Bends. Supports should be located near the elbows of horizontal flat bends.

Not doing so may result in large lateral and vertical deflections of the piping. When thi condition exists, supports should be added at or neu any unsupponed elbows. Failing to do so may result in excessive vertical deflections, which will present future drainage problems.

See Exhibit 4.4-3.

d. Weicht Shiftine. During thermal expansion of the piping, weight shifts can occur between i

rigid hangers. This happens in low temperature and high temperature systems and must be  ;

i prevented in the design. To prevent this, do not use rigid supports near the ends of the vertical j l pipmg legs. See Exhibit 4.4-4.

l When the piping shown in Exhibit 4.4-4 is cold the weight of the piping will be carried by both hangers shown. Upon warmup of the line, the piping will expand upward from hanger at the bottom. When this occurs, the pipe will lift off the support at the top of the riser and l all the weight will impose on the bottom hanger. D.is must be avoided by replacing one of the rigid supports with a variable hanger.

l l

e. Larce Valves Near Ecuioment Nozzles. Heavy valves should not be located in piping systems immediately adjacent to equipment nozzles. Enough piping must exist between the nozzle and the valve to allow installation of supports to prevent the equipment nozzle from supporting the weight of the valve.

Particular attention should be paid to the arrangement of piping near pump nozzles. Skid-mounted pumps are very sensitive to nozzle loads. Skid-mounted pumps consist of two sepa

  • rate pieces of machinery, a motor and a pump. The motor and the pump are mounted adjacent to one another on a skid. Their shafts are connected by a coupling. See Exhibit 4.4 5.

Excessive piping loads on the pump nozzles will distort the pump mounting structure and cause misalignment (shaft bending) problems. Alignment problems can be experienced even when t'ie nozzle loads are below manufacturer's allowable. Accordingly, norzle loads on skid-mounted pumps must be as low as practically possible.

lg&R8ENT$ LUMBY PIPING DESIGNER / ANALYST Project N:. 909603 USER'S GUIDE Page 4-15 APPENDIX G To allow the lowest reactions possible, any motormperated valves or heavy strainers must be located far enough away from the noules to permit the installation of several suppons between the valve or strainer and the pump noule,

f. Overstress and Ecuioment Problems. Overstress and equipment load problems caused by dead weight loading may be caused by overspanning, or the presence of one of the mechanisms discussed above. To solve the problem, identify the problem by inspection of the computer output and the physical arrangement of the system. Then add suppons to the system or relocate existing supports to alleviate the overstresses.

4.5 Dermal Expansion Analysis ne function of piping in a plant is to carry fluid from one piece of equipment to another. In most systems, the fluid is at a higher temperature than the surrounding atmosphere and the major building structures that support and restrain the pipe. When this conditiori exists, the individual legs of a piping system will expand, and move relative to the building structure. Generally, there will be anchors, rigid restraints and supports on the system for the purposes of seismic and weight control.

These restraints prevent the motion of the pipe, and in doing so, cause bending of the pipe. This bending gives rise to pipe stresses, restraint loads, and equipment loads that must be acknowledged in the design of the piping and its support and restraint system. These loads can be very high in a system that is improperly designed, and if the piping is large, they can be large enough to cause damage to major building structures and equipment.

l 1

Thermal expansion loads are accounted for in the design of piping systems by performing a thermal expansion analysis. A thermal expansion analysis is a static analysis that accounts for loading caused by the following mechanisms:

expansion of legs of piping that make up the system.

displacement of equipment noule connections caused by thermal expansion of the equipment.

displacements of piping connections to large headers caused by thermal expansion of the header piping, and a

cold springing of the piping when cold springing is used.

l3AasENT $ LUNDY PIPING DESIGNER / ANALYST Project No. 909643 m2*** -

USER'S GUIDE Page 416 APPENDIX G ne product of the analysis is a set of loads that are used for design of the piping system's restraint and suspension system, and a set of internal bending moments that are used to check compliance with piping code rules.

To evaluate thermal expansion loading for a piping system, a set of input information is required.

nat information consists of the following items for a given operating condition:

A detailed description of the temperature of all segments of the piping during that operating condition. This collection of information is called a thermal mode.

A detailed description of the displacement of each equipment connection, and connection to large headers which form boundaries of the system. These displacements are referred to as anchor movements of the corresponding thermal mode, nese two sets of information are discussed below.

4.5.1 Dermal Modes. A thermal mode is a detailed description of the temperature of the system during a specific plant operating condition. Dermal modes are described by using a schematic flow diagtsm of the subsystem, which shows all areas of the subsystem. He temperatures of the various areas of the piping are marked on the schematic diagram.

A thorough understanding of the thermal modes, which are required for each unique piping subsystem analysis, is critical. Misinterpretation of the thermal mode generally results in the incorrect design of all rigid restraints and hangers in the subsystem and could conceal several equipment load problems.

4.5.2 Anchor Movements. Each thermal mode will have associated with it a set of anchor movements.

nese movements will be the thermal expansion movement of an equipment nozzle or the thermal expansion movement of a large header that the system is a branch of. These displacements must be imposed at their specified locations in the analysis of every thermal mode. When the subsystem being analyzed is a branch line off a large header, the anchor movements of the header (translations and rotations) should be obtained from the latest analysis of the subsystem containing the header. In situations where the anchor movements are small, e.g., less than or equal to 1/16 inch in each of the three global directions, then an anchor displacement analysis generally need not be performed.

I lSARSENT@L5NSY PIPING DESIGNER / ANALYST Project No. 909643 [

  • ~ ' * -

USER'S GUIDE Page 4-17 APPENDIX G  !

4.5.3 Resolution of Design Problems. Dermal expansion design problems with piping systems fall into four basic categories. These categories are described below:

pipe overstress caused by excessive bending moments, '

equipment nozzle loading above manufacturer's specified limits, unreasonably high rigid support and restraint loads, and I excessive piping displacement. >

All of the problems listed above are caused by the same basic mechanism. Hat mechanism is shown in Exhibit 4.51.

He basic mechanism consists of four parts, the first being the base that the expanding leg pushes off from. De base could be an anchor, a rigid restraint, or a portion of the piping system that is not t

flexible. He second part is an expanding leg. The expanding leg expands when its temperature is  !

increased. The expanding leg could be a single pipe or a portion of the system consisting of several lines. He third part is the bending leg. The bending leg can also be a single leg or a portion of the i

system. The fourth part is the restraint. De restraint prevents the bending leg from moving freely [

with the end of the expanding leg and causes it to bend. He restraint could be an anchor, a rigid  !

restraint, or a portion of the system that is stiffer than it should be.

To correct a problem, the piping engineer must take one of the actions listed below, i

Do away with the base that the expanding leg is pushing off from or add more flexibility so that the net effect of the base and expanding leg is less than it was.

Shorten the expanding leg. i Lengthen the bending leg. 1 Do away with the restraint that is preventing the bending leg from moving.

To accomplish one of the corrective actions listed above, one must first identify the basic parts of the mechanism that is causing the problem, and then determine physically how one will adjust it to  ;

alleviate the pro'blem.  !

l r

1 lSARSENT$L5NBY PIPING DESIGNER / ANALYST Project No. 909643 l USER'S GUIDE Page 4-18  :

APPENDIX G -

i 4.6 Dyn=ic Anivsis of Pinine Systems Safety related piping systems, and their associated suspension and restraint systems, are designed to -

withstand seismic and any hydraulic transient loads that may be imposed on them. There are several types of dynamic analysis options that are available in various computer programs. These options are: r

  • Response spectrum method:

?

uniform response spectrum method, and l multiple support response spectrum method.

Forced vibration time history: j mode displacement method, mode acceleration method.

direct integration method with proportional damping, and direct integration method with variable damping.

Support excitation time-history analysis:

modal time-history analysis when all collinear supports are excited by the same acceleration time history using the mode displacement formulation, direct integration time-history analysis for systems with variable damping and subjected to uniform support acceleration excitation, direct integration time-history analysis for piping systems with proportional >

damping and subjected to multiple support displacement time-history excitation, modal time-history analysis for piping systems subjected to multiple support displacement time-history excitation using the mode acceleration formulation.

modal time-history analysis of systems subjected to multiple support acceleration or displacement time histories using the mode displacement formulation, and direct integration time-history analysis for systems with proportional damping and subjected to uniform support acceleration excitation.

Most dynamic piping analyses for seismic loading are performed using the uniform response spectrum method. For hydraulic transient-type loadings, mode displacement method or direct integration

'. hn38ENT$LWNRY PIPING DESIGNER / ANALYST Project No. 9096-03 l mmum- USER'S GUIDE Page 4-19 APPENDIX G l

l l

l methods with proportional damping are generally used. Only uniform response spectra method will ,

l be discussed here.

, i l

4.7 Uniform Resnonse St ectra Analysis 4.7.1 Descriptmo of Basic Procedure Used l

(

Most dynamic piping analyses for the vibration sources are performed using the uniform response spectrum method of analysis. His method consists of three separate analyses (one for each one of

{

three perpendicular excitation directions) and the combination of their results. A representation of

)

the physical situation that is analyzed is shown in Exhibit 4.7-1.

4.7.2 Procedure Used Stg 1. De response of the piping inside the box is calculated for a vibration of ,

the rigid box that is specified in the X direction. I Step 2. He response of the piping inside the box is calculated for a vibration of the rigid box that is specified in the Y direction.

Step 3. He response of the piping inside the box is calculated for a variation of the l rigid box that is specified in the Z direction.

Step 4. Le three responses are combined per the rule in Regulatory Guide 1.9-2 to obtain restraint loads and internal bending moments that are used for design.

It should be noted that the box used to represent the building is assumed to be completely rigid.

1 Since it is assumed to be rigid, the pipir.g system is excited with the same vibration at every attachment point to the box. This is the reason for the word " uniform" in the name " Uniform Base i

Excitation Response Spectrum Analysis."

In reality, different parts of the structure will be vibrating in different fashions during a given svent.

This means that different parts of the building will be moving relative to one another and bending the pipe, l.oads induced by such relative movements cannot be calculated by this method of analysis.

Design loads calculated using the response spectrum technique are referred to as " inertia loads."

They are, theoretically, only a portion of the total design loads generated by a given vibration condition. Generally, the relative movements between major structures in nuclear power stations are very smalt, since the building is designed to sustain earthquakes. There will usually be enough conservatism inherent in the response spectrum method to account for relative displacement induced

lSARSENT 8 LONBY PIPING DESIGNER / ANALYST Project No. 9096 03, 5"" -

USER'S GUIDE Page 4-20 APPENDIX G loads. Relative displacement loads are discussed later in this section and should be considered, unies it is demonstrated that these loads will be small and can be ignored.

4.7.3 Specification of the Forcing Functions and Its Use in the Calculations e-

a. Resoonse Soectra. To calculate the response of a piping system for a given direction of excitation, the computer programs break the structural model of the piping system down into a large number of single-mass spring systems (single-degree-of freedom oscillators). He operation used to break the model up into single-degree-of-freedom oscillators is called

" equation of motion decoupling." ne end result of the decoupling operation is a set of single- i degree of-freedom oscillators. Each single-degree-of-freedom oscillator corresponds to one mode of vibration of the system. De piping engineer specifies tha number of modes to be used in the calculation. Determination of an adequate number of modes for the analysis will be discussed later in this section.

After the equations of motion are decoupled, the computer programs calculate the maximum -

response of each single-degree-of-freedom oscillator (i.e., each mode) using the forcing function that is provided. '

He forcing function that is required is a graph of the maximum response (acceleration) of a spectrum of single-harmonic oscillators to the building vibration. Dese graphs are called response spectra.

To determine the maximum response of each single-degree-of-freedom oscillator (i.e., each mode), the computer programs simply read the graph that is input. His is the reason that this

^

technique is called response spectra analysis.

l After the maximum response of each single-degree-of-freedom oscillator is calculated, these  ;

maximum modal responses are combined according to the rules specified in Regulatory Guide 1.92 to get the total response.

b. Selection of Response Scectra. The response spectra that are used for piping analysis are calculated for all points of interest in the building (based on a building model). For a given load, at a given location in the building, there will exist spectra for each of the three directions

I l5ANSENT $LUNBY PIPING DESIGNER / ANALYST Project No. 9096-03 USER'S GUIDE Page 4-21 APPENDIX G of excitation used in the analysis. Also, for each location and direction there will be an assottment of spectra, each of which corresponds to a different amount of damping. To set up the analysis, the correct ones must be selected. His selection process consists of three steps, for a given loading, these being:

identifying all locations on the building stmeture to which the piping system is attached, e

selecting all response spectra that are required to describe the building vibration at all the locations identined in the first step, and a

selecting the correct damping.

Rese steps will be discussed below.

bl. Identi6 cation of Attachment Points. The 6rst step in the selection process is to identify all locations on the building structure to which the piping system is attached. To do this correctly, the support and restraint details for all supports and restraints in the model must be reviewed.

This is particularly important when the model is located near the interface between two portions of a structure, or two structures that have radically different responses. Examples of these cases are reactor building-auxiliary building interfaces, and containment wall-reactor building slab interfaces. If care is not taken in these areas, the design loads for the restraints and supports in the model may be underestimated; or, all restraint and support loads may be overestimated and cause unnecessary hardware replacement. He engineer must be familiar with every attachment point of the model to the structure. A tabulation of all attachment locadons should be made.

b2. Selectine the Actual Soectra. After tabulating all the structural attachment locations in the model, the next step is to review all the spectra that are available for the loading with which the engineer is concerned, and select the spectra that will be used for the analysis. His listing consisu of a drawing of the building model and a table of contents for the computer file containing the spectra. De building model drawing will show all the locations for which spectra are available, ne frequency and magnitude of the building vibration will be different at every attachment point in the model. Le goal, therefore, is to select a set of spectra that will be a conservative representation of the vibration at di locations in the building to which the piping model is

l5158ENT 8 LUNDY PIPING DESIGNER / ANALYST Project No. 9096-03

=5"2***

  • USER'S GUIDE Prj 4-22 APPENDIX G attached. One spectrum must be constructed from this set. He reason for this is that i" l analysis being run is a uniform response spectrum analysis, which means that only one l response spectrum (for each direction of excitation) is used in the analysis. This final spectrum l is constructed by a process called " enveloping." -

1 Enveloping simply consists of physically comparing all response spectra specified for enveloping, at every point in the defined frequency range, and then constructing a new spectrum from the maximum accelerations found at each frequency. He resulting spectrum is the actual spectrum that is used to calculate the response of the piping model. It is called the " enveloped response spectrum" and is model unique.

He responsibility of a piping engineer is to identify and specify the response spectra that are to be enveloped. To do this, follow the instructions listed below:

Step 1. Locate all the attachment points in the model on the building model ,

drawing.

  • Step 2. Identify all the structural model data points that surround the attachment points that were located in Step 1.

Step 3. Identify the response spectra that correspond to all the data points that were identified in Step 2. These are the spectra that will be specified for enveloping to analyze the system.

b3. Selection of the Amount of Damoine. The design leads and pipe stresses that the engineer will l be calculating are due to steady-state resonant vibration of the piping. The amplitude of steady-state vibrations is very sensitive to the amount of damping that c;ists in the piping and its support and restraint system. In response spectra analysis, by virtue of how it is done, l damping is accounted for when generating the response spectra. Response spectra are always calculated for an assortment of damping values. This requires that the engineer select the spectra corresponding to the correct amount of damping in the piping system he is analyzing.

Damping, a measure of the energy-loss mechanisms of the system, is defined as a percentage of the critical damping of the single-<fegree-of-freedom oscillator. He correct amount of damping to be used in the calculations is dependent on the size of pipe and the loading conditions being analyzed. NRC Regulatory Guide 1.61 and Code Case N-411 (see Regulatory

.lSARSBNT $ LSBBY PIPING DESIGNER / ANALYST Project No. 9096-03

't*****- USER'S GUIDE Page 4-23 APPENDIX G Guide 184 for acceptable conditions for its use) specify permissible amounts of damping for use in response spectra analysis and other types of dynamic analyses.

4.7.4 Selecsion of Number of Modes to be Used in Analysis. Previously this section discussed the basic procedure used to calculate the response of the piping. Hat procedure was to:

decouple the equations of motion of the piping into single-degree-of freedom oscillators, each of which represented a mode of vibration of the system, 1

calculate the maximum response of each single-degree-of-freedom oscillator using the enveloped response spectra, and combine the individual modal responses to obtain the total response.

To correctly estimate the maximum response of the piping, an adequate number of modes (single-degree-of freedom oscillators) must be used to do the analysis. If the number of modes  :

used to do the analysis is too small, the response will be underestimated. Typically cutoff frequency is speci6ed. The effect of the remaining modes is calculated as missing mass effect and added to the calculated response till the cutoff frequency. The effect of the missing mass  !

is usually added by SRSS.

4.7.5 Natural Frequency and Mode Shape Data Computer output generally contains the results of the equation of motion decoupling calculations. It consists of three sets of results, these being:

The natural periods of all the modes of vibration of the piping system that were used in the response calculation (eigenvalues).

The mode shape vectors of each mode of vibration (eigenvectors).

The participation factors for each mode of vibration for each direction of excitation.

These data are useful for reasoning through design problems, and conceiving modifications to correct them. Each set of data will be discussed below,

a. Natural Periods of Vibration and Orthoronality Checks. The total response of a piping system to the base excitation that the engineer specines is really a sum of the responses of the piping system in a number of individual modes of vibration.

(

l5&BSENT $ LONDY PIPING DESIGNER / ANALYST Project No. 9096 03

= 5"" -

USER'S GUIDE Page 4-24 APPENDDC G ,

A mode of vibration is a characteristic deflected shape of the piping. Each mode of vibration has its own natural frequency of vibration, and the response of the piping while vibrating in it is identical to the response of a single harmonic oscillator with the same natural frequency.

The orthogonality check for the modes of vibration is a check for numerical accuracy in the decoupling operation. Theoretically, all the modes should be numbers in the orthogonal to each other, if the deviations in orthogonality check are too large, an error message is usually printed out. The error message indicates that the decoupling process was not done accurately enough. These problems are caused by poor modeling. When such an error message occurs the engineer must search through the model for elements that are much stiffer or shorter than others. or areas of the model where the lumped masses are much smaller than lumped masses f in other regions of the model. These will always be easy to find when such deviations occur.

The must be locally adjusted to make the lumped masses and element stiffness more uniform in magnitude.

b. Mode Shane Vectors. The mode shape vectors or " mode shapes" are lists of numbers that describe the deflected shapes of the piping system that correspond to each mode of vibration

+

of the system. These vectors are proportional, at every instant in time, to the displacement of the piping in their corresponding modes of vibration.

c. Particioation Factors. Participation factors are measures of how sensitive a given mode is to j.

a given direction of excitation. Each mode of vibration will have an X-direction, a Y-direc- [

tion, and a Z-direction participation factor. If a given mode has an X-direction participation factor of 2, and Y and Z panicipation factors of 1, it would mean that the mode is twice as sensitive to X-direction excitation as it is to Y or Z excitations.

t 4.7.6 *Ibe Role of Natural Periods, Mode Shapes, and Participation Factors in the Response Calculations.

Every mode of vibration has a response to each one of the three directions of excitation. That response is proportional to the participation factor for the direction of interest, the response spectrum acceleration at the natural period of the mode, and the mode shape vector. The relationship between the parameters follows. [

5

l33333N78L5Nav PIPING DESIGNER / ANALYST Project No. 909643 USEWS GUIDE Page 4-25 APPENDIX G

" ~ ~

' Response of" X X-response spectra

~

' Mode' mode to a panicipation x acceleration at x shape

,X-excitation , ,

factor , ,

natural period ,vector

' ~

" Response of' Y "Y-response spectra" " Mode' mode to a participation x acceleration at x shape

,Y-excitation factor natural period v

, , ector ,

" Response of' Z 'Z-response spectra

~

" Mode' mode to a participation x acceleration at x shape

,Z-excitation factor natural period

, ,vector , l (Proportional to)

\

It can be seen that the combination of a large participation factor for a given direction, combined with a large response spectrum acceleration for that direction, will give a large response. This means large restraint loads and high stresses.

1 i

To optimally design a piping restraint system for a given load the engineer must locate restraints on the system that create the following situations:

All modes of vibration that have natural frequencies near peaks in the response spectra must have a low participation factor for the direction of excitation to which the cpectrum corresponds.

All modes of vibration have natural frequencies higher than the frequency of the response spectrum peaks (practical for small systems).

Locating restraints on piping systems to create these situations is called tuning. It is generally only possible on a large scale during the preliminary stages of plant design. The second situation is generally impossible to create for higher frequency loads.

If the engmeer is analyzing a system for which all the restraint hardware has been designed and purchased, and he finds out that a large number of restraints in the system will be overloaded by the loads he just calculated, he will have to tune the system to reduce the loads.

4 l5ARSENT $ LUNDY PIPING DESIGNER / ANALYST Project No. 9(TXM)3 4- USER'S GUIDE Page 4-26 APPENDIX G Dis data could be used for tracing back through the response to determine the locations of restraints that may be needed to add or rearrange to correct overstresses, equipment nozzle overloads, or large-scale restraint overloading. De accelerations printed out in the combined response contain the maximum accelerations of valve centers of gravity. Dese accelerations must be checked against . <

l allowable valve acceleration criteria to determine if they are acceptable. If they are too large, tne l situation will have to be corrected by adding, removing, or shifting restraints.  ;

4.7.7 Resolution of Design Problems for Response Spectrum Analysis j Most dynamic load design problems fall into three categories. nese categories are listed below:

  • pipe overstress caused by excessive internal bending moments.
  • excessive equipment loading, and  !

l a excessive valve accelerations.

He basic mechanism that is responsible for these problems is excessive local displacement of the piping. In the response spectrum method, maximum displacements for each mode are found as the product of the eigenvector (mode-shape) and displacements calculated from the modal participation factors, the modal frequency, and the response spectrum acceleration corresponding to that frequency.

Based on these maximum modal displacements, internal moments and forces and external reactions are calculated. These individual modal responses are then combined.

To a!!eviate problems, the engineer must identify the areas of the system that are deflecting exces-sively, and then determine how to modify the restraint and suspension system to reduce these, deflections. This may be accomplished by doing one of two things. Dese are:

  • Prevent the excessive local deflection from occurring by placing a restraint in the system at the deflected location in the direction of that displacement.
  • Adjust the natural frequencies and participation factors of the modes of vibration of the system to reduce their sensitivity to the building's vibration. Reducing acceleration in this manner is called tuning. Tuning is done by rearrangement of the piping restraint system.

l 1

i l

i l

  • l l5 ABSENT $LBMSY PIPING DESIGNER / ANALYST Project No. 9096-03 USER'S GUIDE Page 4-27 l APPENDIX G '

i i

l 4.8 Dyn=ic lead Forced Disolwanaa' Analysis  !

r During dynamic loading events, the various points of a;;tachment of the piping system to the building  ;

structure, and to the other piping systems, will mov. :.lative to one another. His relative movement t causes bending of the piping system. The bending results in restraint loads, equipment loads, and '

piping stress. According!y, the effect of the relative movements must be acknowledged in the design.  !

The loadings that are a result of this bending are referred to as " displacement loads" or " anchor movement loads." These loads fall into two categories:  !

Loads induced by the relative movement of piping system restraint attachment points  !

to the building structure. These loads are referred to as " building displacement '

loads." '

Loads induced by the dynamic displacement of headers at branch piping system  ;

connections. These loads are referred to as " header displacement loads."  ;

4.8.1 Building Displacements Building displacement loads are generally very small and, in most cases, the conservatism inherent in the traditional uniform response spectrum analysis used to determine inertial loads is adequate to account for them. The reason for this is that the building is also designed to withstand these loads.

The fact that the building is designed to withstand the dynamic loads generally requires that the -

relative displacement between adjacent points in the structure be small to avoid overstressing of the  ;

building. Building displacement analysis need not be performed for piping located in zones of the  !

building where the maximum building displacement is known to be less than or equal to 1/8 inch. i I

4.8.2 Dynamic Header Displacements t i

The displacement of header piping during dynamic loading events can be very significant to the design of branch piping. Overload and overstress problems can occur near the branch pipe header pipe f

connection if sufficient flexibility does not exist in the branch pipe routing near the intersection.

I

, it is poor design practice to restrain branch piping near its intersection with the larger header because '

it causes the small branch pipe to constrain free movement of the header. The placing of restraints  ;

on branch lines close to header connections must always be carefully reviewed for this reason.  !

Earthquake experience database shows failures in situations like this. '

i a

lSARSEMT $ LUNDY PIPING DESIGNER / ANALYST Project No. 909603

""*'8- USER'S GUIDE Page 4-28 APPENDIX G Header displacemeat analysis may be significant in many cases. However, in situations where the header displacements are small, i.e., less than or equal to 1/16 inch in each of the three global directions, then a header displacement analysis need not be performed. Header displacement analysis is also not required in situations where the header displacements are less than or equal to 1/8 inch in each of the three global directions provided that no support / restraint is located within a distance "L" -

from the header / branch interconnection anchor, where "L" is as defined as follows:

Nominal Pipe Size L (fea) 2 7 4 10 6 13 8 14 10 16 12 17 .

20 21 24 23 When a displacement analysis is determined to be required, it should be performed in accordance with the guidelines discussed in the following sections.

a. Loadine Definition Data. To perform a header displacement analysis, the global direction displacements of all header pipes that the system ties into are required. A set of displacements at each branch location is required for each dynamic loading for which the piping is to be designed. Each set of displacements consists of the six numbers listed below for each dynamic load:

the maximum amplitude of the Global X direction displacement of the header pipe, e the maximum amplitude of the Global Y direction displacement of the header pipe, l

  • the maximum amplitude of the Global Z direction displacement of the header pipe,
  • the maximum amplitude of the rotation about the Global X axis, l

l

, +

+

lSANSENTfd LONSY PIPING DESIGNER / ANALYST Project No. 90E03 l

= mas" -

USER'S GUIDE Page 4-29 APPENDIX G the maximum amplitude of the rotation about the Global Y axis, and  :

the maximum amplitude of the rotation about the Global Z axis.

i nese displacements are obtained from the response spectra analyses of the run pipe system.  !

b. Basic Procedure Used. To perform a header displacement analysis, an individual static i

1 analysis is performed for each displacement amplitude comvnent that is specified. He static analysis is identical to the static analysis used for thermal expansion loads, except that all snubbers (active for dynamic loads) are assumed to be rigid. Each one of these individual '

analyses is referred to as a " displacement group." .

i After all required individual analyses are performed, the results of the analysis for each group are combined by the square root of the sum of the squares method. He process is very  !

similar to that used for response spectra analysis. He reason for this is that the displacements that are being analyzed are uncorrelated and time variant. No specific knowledge about the j

time phasing (synchronization) of any two components exists. Because this knowledge does '

not exist, their individual effects must be determined separately and combined based on a i probabilistic technique.

For a given load 6 groups are required for each header connection in a system. A system that i branches from two headers will require 12 groups. A system that is connected to three headers >

will require 18 groups, etc.

t 4.8.3 Building Displacemer.t loads 1

When two adjacent structures in the plant move relative to one another during dynamic events, and those relative movements are large, the movements must be accounted for in the design of any piping systems attached to those structures. Problems occur near interfaces between independent structures.

r l

Rese effects are plant and load unique. In most cases, these relative movement induced loads may be adequately covered by the conservatism inherent in the response spectrum analysis used to l calculate the inertia load. In cases where they are not, an additional atu'ysis is required to account for them in the design of the piping system. Guidelines for performance of the analyses are discussed as follows.

I l$AE8ENT8LUMBY PtPING DESIGNER / ANALYST Project No. W3 I

't"*- USER'S GUIDE Page 4-30 l APPENDIX G

a. Basic Procedure Used. Performance of a building displacement analysis on a general piping system consists of two steps. Rese steps are:

Identify the source of the displacement field.

Identify the deflected shape of the structure (displacement field) that will -

govern the design of the piping system.

Perform a structural analysis using the governing displacement field.

Guidelines for performance of these two steps are discussed below,

b. Governine Disolacement Field. During dynamic loading events, the structures to which the piping is attached will be in motion. At each instant in time the structure will have a deflected shape. This deflected shape is described by a list of the displacements of a representative number of locations on the structure. His list of displacements is called a displacement field.

The displacement fields are calculated during the analysis o'the building, and saved. Dere will be a displacement field on the file for every instant in time required to accurately describe ,

the motion of the structure.

During the dynamic loading condition, the piping attached to the structure will deflect to accommodate the deflected shape of the structure. To account for this in the design, a static forced displacement analysis is required. The analysis consists of forcing the deflected shape of the structure on the piping. This is done by forcing the displacement of the structure at all the piping system attachment locations, on the piping. These displacements are contained in the displacement fields saved on the computer files.

To determine the maximum building displacement effects on the piping system (that are needed for design), a static analysis for each displacement field saved on the file is required.

Generally, there will be from 1000 to 5000 displacement fields saved on the file. Performing an individual analysis for each displacement is not practical because of the large number of analyses that would have to be done. To reduce the number of analyses required two different methods are usually used,1) a random sampling method is to select the displacement fields that will be used for the static analysis for various buildup locations. The random sampling process is usually designed to select the number of fields required to result in a 95% confidence that the calculated response has a 95% probdiity of nonexceedance. 2) A static analysis similar

l l

lSAESENT $ LUNDY PIPING DESIGNER / ANALYST Project No. 909643

't***-

USER'S GUIDE Page 4-31 APPENDIX G to header displacement analysis using maximum displacement for each location of attached piping.

4.8.4 Design Pmblems and Resolutions Design problems resulting from relative header or building displacements during dynamic loading events are always caused by the same mechanism. That mechanism consists of two restraints that oppose each other and force excessive relative displacements on the portion of the piping system between them. Design problems fall into two categories. These being:

a piping overstressing, and excessive restraint and equipment loading.

Pipe overstress problems are generally associated with header displacement loadings, ney seldom occur as a result of relative building displacement. Excessive building displacements will cause excessively high restraint loads and equipment reactions in isolated areas of a system.

Resolving these problems consists of first identifying the mechanism response for the condition, and then making restraint-support system modifications to remove the aggravating mechanism from the system.

4.9 Code Eauarion Aeolicability and Nier Reauirements ne individual analyses discussed above are performed to generate input for following operations:

ASME code evaluation of piping system, flange joint evaluation, e

design loads for support and restraint system, equipment loading induced by piping, i

  • flued head evaluation, i

welded attachment evajuation.

valve accelerations.

piping displacements, and 1 1

functional capability.

l

i l5 ABSENT 8I.ONDY PIPING DESIGNER / ANALYST Project No.,9096 03

" "- USER'S GUIDE Page 4-32 APPENDIX G 4.9.1 ASME Code Evaluation of Piping System Piping stress analysis is performed for various loading conditions. In addition to pressure, these loading conditions include static loads, such as the weight of pipe and its contents, or dynamic loads, ,

such as equipment vibration, earthquake, or fluid transients in the pipe. He resulting stresses from ,

these loads must be limited to certain allowables based on applicable code. Class 1 piping requirements are very complex and Class 2 and 3 requirements are simple and straightforward. These requirements are as follows:

a. Class 1 Pining Analysis NB-3650. Class I piping analysis requirements are given in- Article NB 3650. Dese requirements provide a relatively simplified " cookbook-type" methodology in comparison to general requirements (NB-3200) for analysis of Class I components. To meet NB-3650 requirements the stress results are checked against simplified equations: NB-3650 conceptually addresses the following modes of failure.

Failure Due to Primary 1.oads. Limit loads such as pressure, dead weight, and non reversing dynamic loads such that gross plastic deformation is prevented. -

Failure Due to Reversing Dynamic Loads. Limit loads such as seismic inertia so that failure can be prevented.

Failure Due to Fatigue. Limit the loads that are cyclic so that fatigue failure is prevented, l

l

  • Dermal Racheting. Checked only if secondary stresses exceeds 3 S limit.

Code Equations employ the concept of stress indices (NB-3681(a)-1) for evaluation against allowable stresses. There are three types of stress indices that are used in Class I analysis:

l B indices. B indices are used in primary stress equations and are intended to prevent gross plastic deformation due to sustained loads or failure due to reversing dynamic loads.

C indices. C indices are used in Secondary stress equations. These indices represent primary plus secondary membrane and bending stresses. Secondary stresses are those that are generated by deflections rather than loads imposed

, on the system, or by discontinuity stresses. -

1 1

  • K Indices. K indices are used in fatigue evaluation. These indices represent ,

peak stresses due to concentrations and discontinuities.

The flow chart for evaluation of Class I piping systems is presented in Exhibit 4.9-1.

l l

t

.l5&NSENT$L5NBY PIPING DESIGNER / ANALYST Project No. 90VA3 8'"**- USER'S GUIDE Page 4-33 APPENDDC G

b. Class 2 and 3 Pinine Analysis NC/ND-3650. Class 2 and 3 piping analysis rezuirements are t given in Articles NC/ND-3650. De analysis requirements for Classes 2 and 3 are simpler and easier to use than Class I analysis rules. The code uses a concept of B-type stress indices for evaluation of primary loads, and stress intensification factors for evaluating secondary loads. .

The B type stress indices have been discussed previously. The stress intensification factors (i-factors) are based on cyclic fatigue tests performed by Marki. The 1-factors indicate fatigue [

strength of a piping component relative to the fatigue strength of a typical girth butt weld. The relationship between I-factors, stress, and number of cycle for various types of pipe fittings and ;

components was established by the Mark! test as follows: i iS - 245,000 N#'

where:

i S = applied stress (arrplitude)

N = number of cycles i = stress intensification factor (i = 1 for girth butt weld)  ;

i The analysis requirements for Class 2 and 3 piping systems are outlined in NC/ND-3650. The

[

flow chart for evaluating Class 2 and 3 Piping is presented in Exhibit 4.9-2.

c. Flance Evaluation The effect of moment loading on flanged connections must be checked per the requirements of NB/NC/ND 3658. This section of the code evaluates the flange for leakage undet applied i

moments, For flanges conforming to the standard ANSI B16.5, the calculations are simple.

For nonstandard flanges the calculations are complicated. Nonstandard flanges must be analyzed and the stresses evaluated using the methods given in Appendix XI of AMSE Section 1

III Code. For Class I piping, the nonstandard flanges must be designed per the rules given in i l

NB 3200, which may require a big effort. For this reason standard B16.5 flanges should be i used.

I l

l

l

. l I

Il5&BSENT E LUNDY PIPING DESIGNER / ANALYST Project No. 909643 I w m- l USER'S GUIDE Page 4-34 APPENDIX G l

d. Desien Loads for Sucoort and Restraint System After an acceptable piping and suspension restraint system has been determined, all hardware associated with the piping system must be desigr.ed. These designs will be based on the loading the support designer receives from the pipe designer. The following information from piping analysis is needed for the support design.

Type of restratat-identifies the type of support the pipe designer used for analysis purposes (rigid, variable, snubber);

Location and pipe coordinarm-identifies the node number in piping model and pipe coordinates:

Direction of restraint.

Location and global thermal movements-from the movements, the envelope of pipe thermal movements can be calculated. This information is needed for hanger settings.

Combined loads and displacement for each service level-these give information about maximum loads and displacements. The loads can be used to design the support various service levels and the displacements can be used to check the functionality and clearance around the support.

e. Eauiement Loadine Induced bv Pinine For piping connected to equipment nozzle, the piping reactions imposed on the equipment nozzle must be evaluated, nis must ce done for all equipment in the system. The reason for doing this is to ensure that the piping system will not impose unacceptable loads on the equipment. If poorly designed, piping can place loads on equipment that are many times the acceptable limit. Excessive loading on equipment can cause structural failures of the equipment, or prevent if from operating properly during loading events when its service is required. Excessive loading can also significantly reduce its service life and cause costly unplanned outages. If equipment loading is exceeded, vendor approval is required. If loads are not acceptable to the vendor, the piping suspension-restraint system may need to be redesigned as discussed earlier.
f. Flued Head Evaluation There are usually no allowable loads for flued head or structural anchor. Dese need to be evaluated on a case-by-case basis using finite element computer programs.

4 l5 ABSENT $L5NSY PIPING DESIGNER / ANALYST Pmject No. 909643 USER'S GUIDE '

Page 4-35 APPENDIX G ,

g. Welded Attachment Evaluations) '

Piping codes do not give any techniques for analysis procedure except that Paragraph NB/NC/ND-3645 requires that effect of integral attachments on pressure retaining members ,

be taken into account when checking against the allowable stress value. in the early years of piping design, the designers based the attachment design on experience or whatever material was available; everyone came up with their own unique design. In the 1950s Professor Bijlaard developed methods to evaluate localized stress produced by utachment Ic. tis. Ills

.{

work led to the publication of WRC-107. In 1974, WRC-198 % published that gave  !

simplified procedures for evaluation of lugs. Based on the work in WRC-198 an' d data

{

available in literature. ASME Code put together code cases for evaluation of welded attachments. Rese code cases are:

N 122 Stress Indices for Integral Structural Attachment, Section

!!!, Division 1, Class 1

  • N-318-3 Procedure for Evaluation of the Design of Rectangular i

Cross Section Attachments on Class 2 or 3 Piping, Section ~

111, Division 1.

N-391 Procedure for Evaluation of the Design of Hollow Circular Section Welded Attachments on Class 1 Piping, Section Ill.

Division 1 3 N-392 Procedure for Evaluation of the Design of Hollow Circular Cross Section Welded Attachments on Class 2 and 3 Piping, Section 111, Division I t

nese code cases give simplified methodology for evaluation of welded attachments. Rese

{

evaluation procedures can be further simplified by developing standard forms and stress indices for standard attachment sizes, thereby making the calculation easier.

h. Valve Accelerations Valves impose additional requirements and restrictions on a piping analysis. Active valves on '

safety-related systems usually have accelerations and/or end reaction allowables.

i. Picine Disolacements Piping displacements due to design loading conditions should be evaluated so they are within reasonable limits; These displacements are needed

l5 ARSENT 2 LUNDY PIPING DESIGNER / ANALYST Project No. 909643

"**"'8- USER'S GUIDE Page 4-36 APPENDIX G

  • to make sure piping is moving in the predicted direction during hot functional walkdown.

to check interference with other components and for proper design of supports --

l 1

j. Functional Canability Satisfaction of code requirements provides asstarance of functional capability.

4.10 Supoort Placement and Recommended Desien Practice The goal of the piping analyst should be to optimize piping design for actual loading normally expected to occur in power piping systems. This must be accomplished with reasonable cost for design, fabrication and erection. Some of the practices outlined in the following section have been successfully implemented in the design of power piping.

4.10.1 Optimize Pipe Suppons De goal of piping engineer should be to minimize, to the extent possible, the number of supports on a given piping system. Venical support locations, in general, will be controlled by limits on pipe weight deflections of no more than 0.2" rather than stress limits, in order to minimize support locations for seismic loads, guides should generally be located at vertical suppon points.

4.10.2 Maximum Use of Wall and Slab Pencxration as Supports The use of penetration anchors and grouted guides will minimize supports and potential interference problems in the design. However, at all penetrations the fill material must be identified and a determination should be made if the material should be considered for its effect on the piping analysis.

Use of penetration will reduce space needed for supports and increase plant accessibility for maintenance and equipment removal. Reducing supports through the use of penetration, will also reduce construction time and cost by limiting the tonnage of aux. steel required by the field to cut and weld supports, and by limiting the cost of ordering standard component hardware.

4.10.3 Minimin Structural Anchors and Welded Anmehments The use of structural anchors requiring aux steel and welded attachment should be avoided. For places where welded attachments are necessary, standard we!ded attachments such as trunnions,

t.

lSANSENT$LONNY PIPING DESIGNER / ANALYST Project No. 9096 03 o"=as -

USER'S GUIDE '

Page 4-37 APPENDIX G '

stanchions or lugs should be used on straight pipes away from discontinuities. Welded attachments on elbows should be avoided. Project should set up standardized design to be used for various size of pipes and approximate load ratings. This will avoid design iterations.

4.10.4 Maimaming Design Margin in lastial Analysis i

As far as practical, each allowable limit, including code stress allowable for each equation, equipment, valve, penetration, flange allowable, etc., should be met with a minimum of 30% margin.

i This margin will allow as built discrepancies to be resolved relatively easily.

t 4.10.5 Maximum Routing Symmetry and Duplication  !

Maximize the routing symmetry will cut the cost of analysis and installation.

4.10.6 Use Frivia: FMM Supports should be located near the existing embedment plates as much as possible. An extensive ,

syste:n of embedment plates should be layed out for the purpose of supporting piping and other components. It is important that final pipe suppon load and locations and embedded plate layout are determined based on the preliminary pipe layout. Effective control over pipe layout and support  ;

configuration will eliminate the use of drilled in concrete anchors.

  • 4.10.7 Do Not Locate Supports Close to Equipment Except for spring hangers, suppons should not be located close to equipment nozzies. If supports are located near the equipment the loads predicted by the computer model may not be realistic. For

[

example, if a suppon is located only a few feet from an equipment nozzle, and the suppon has a small gap or deflect under the load, it is possible that all of the load will be taken by the equipment i nozzle, even though the computer model shows load sharing.

4.10.8 Use of Appropriate Slab Response Spectra and Header Enveloped Spectra

(

a. Slab Spectra a

Where venical supports are attached to slabs more than 2 structural slab thickness away from ,

the face of a shear wall, the slab spectra should be used in the analysis.

l51RSENT 8 LUNBY PIPING DESIGNER / ANALYST Project No. 909603 D***-

USER'S GUIDE Page 4-38 APPENDIX G

b. Header Spectra When piping is decoupled from header pipe, the response spectra of header tee connection should be input to correctly evaluate the decoupled system. However, the response spectra at this location is usually not available. An acceptable solution is to either use the envelope response spectra of the header system in analyzing decoupled system, or limit the header spectra to those applicable for two supports in each direction on both sides of the header connection.

4.10.9 Stress Margins at Decoupled Branch locations For qualifying the intersection point of decoupled systems, the stresses from decoupled systems must be added to stresses from large bore system. Sufficient margins must be maintained in the two analyses. Also at these locations, correct stress indices should be specified. In order to minimize total are sses at branch location, the use of full size tee with a reducer can be specified in place of a rcduciag tee.

Vent and drain lines should be located a straight pipes. Vent and drain lines on elbows should be avoided.

4.10.10 Local Stresses in Thin Wall Pipe at Support Locaticr Criteria should be developed for supporting large diameter thin wall pipes at box type supports.

Welded pads or sleeves should be avoided. Preference should be given to struts with clamps or wider aux. steel with welded pads.

4.10.11 Thermal Analysis for Cold Piping (< 150*F)

Thermal analysis for piping where all the thermal modes are less than 150*F need not be performed.

However, the piping designer should make sure that enough thermal piping flexibility exists in the piping system to avoid large loads or equipments.

4.10.12 Effect of Friction on Piping Model In long runs of pipe, where many friction type supports are used consecutively, the effect of friction should be evaluated. The use of consecutive pipe stanchion friction supports or box guides should be avoided.

4 lganggNT$bONSY PIPING DESIGNER / ANALYST Project Ns. 9096 03 seen" -

USER'S GUIDE Page 4-39 APPENDIX G 4.10.13 Pipe Suppon Stability For piping systems where only vertical supports are required by analysis, horizontal stability should be considered, so that piping is not susceptible to external loads applied during maintenance and l operation of the plant.

Venical struts loaded under compression weight loads are not stable unless there are lateral suppons that control the horizontal movements to reasonable vales at the strut location.

4.10.14 Pressure for Elbow Flexibility Calculations l

ASME Code requires that when performing piping analysis for Class I systems, the effect of pressure stiffening of elbow should be considered. Use of normal operating pressure is recommended when performing piping structural evaluations.

i l

4.10.1S Daign Tolerance for Support locations and Tolerances I

The guidelines given in NCIG-05 should be used when evaluating as built and as analyzed conditions. i I

4 4.10.16 Support Hardware Weight Pipe suppons should generally be designed to avoid requiring pipe to carry excessive mass from the suppon especially in directions other than the loaded axis. For supports partially supponed by the pipe, the estimated lurnped mass of suppon should be modelled at pipe support location. Suppon mass less than one foot weight of the pipe need not be modelled in the analysis.

4.10.17 Design Consideration for Branch Connection and Tees It is recommended that butt welding tees rather than UFT's (unreinforced fabricated tee) be used for branch connections where diameter ratio of branch to run exceed 0.5.

4.10.18 Area Replacement Calculation at Branch Connection Area reinforcement calculations must be performed if UFT or reinforced branch corecctions are used.

These calculations must be documented in the piping stress report.

[5&BSENT!B L5NST PIPING DESIGNER / ANALYST Project No. 909643

= =- USER'S GUIDE Page 4-40 APPENDIX G 4.10.19 Code Case N-319 for Class 1 Piping For ASME Class I piping, Code Case N-319 may be used to lower pipe stresses. When using Code Case N-319, the flexibility factor given in the code case must be specified in the piping analysis. ,

l 4.10.20 Use of Rod Hangers For rod hangers it is important to verify that the downward weight load is greater than the upward thermal load. If upward load (thermal) is more than 70% of the downward load (weight), rods should l not be used.

l 4.10.21 Mimmmng the Use of Snubbers l

Since snubbers have been shown to be unreliable and require cosdy in-service inspections, the minimization er elimination of snubbers should be a priority when initially designing pipmg j subsystems, ne most effective method for minimizing snubbers is for the piping layotst, the pipe support and the piping stress engineers to work closely together to route pipe with enougd inherent I ,,

flexibility to eliminate the need for snubbers. Piping layouts should not be finalized until the pipe ,

stress engineer is able to analyze and adequately support the piping. De use of a scale model can I dramatically improve communication and coordination between the groups. Enough lead time needs t

to be provided in the overall design schedule so that drawing issue dates for construction will net be delayed by the additional iterations required in eliminating snubbers.

l 1

l l

l

. . . l3agegNT$L5NSY PIP!NG DESIGNER / ANALYST Project No. 9096 03

=o""***- j USER'S GUIDE Page 4-41 APPENDIX G Eahibit 4.1-1 ASME Documents ASME Boiler and Pressure Vessel Code (ASME B&PV Code)

I Section 11 Material Specifications

, Section Ill Nuclear Power Components - Division i Subsections NCA, NB, NC, ND, NE, NF, AppendicesSection VIII Pressure Vessels Division I and 2 Section XI Rules for Inservice Inspection of Nuclear Power Plant Components ASME B&PV Code, Code Cases American National Standards. ANSI B31.1 (Power Piping)

Federal Reculatory Documeau Code of Federal Regulations ...such as 10 CFR 50,10 CFR 100 Nuclear Rerulatory Commission Documents (NRC)

NRC Regulatory Guides NRC Standard Review Plans NRC Office of Inspection and Enforcement IE Bulletins IE Information Notices Licensine Documents i PSR, SER, FSAR I 1

Industrial Standards American Society for Testing and Materials (ASTM) Specifications j Manufacturers Standardization Society (MSS) Standard Practices Project Uniaue Standards and Procedures Mechanical Engineering Standards l

. l l5 ABSENT $ LOMBY PIPING DESIGNER / ANALYST Project No. 9096-03 I

'""- USER'S GUIDE Page 4-42 APPENDlX G l

Mechanical Standard Specifications i

Mechanical Specification Worksheets  :

Mechanical Standard Drawings Mechanical Administrative Standards i Quality Assurance Manual l Project-Uniaue Documents Project Scope of Work Design Criteria Project Instructions Purchase / Design Specifications  ;

System Descriptions Project-Unique Design Tables Line Lists Valve Lists Equipment Lists Drawing (including P&lD, C&ID, Composites. Analytical, Component Support, Single Line, Spool Piece, etc.)

NES:

The documents, standards and procedures are constantly in the process of revision. When referencing them, it is important that the analyst be aware of which version pertains to his project in their application.

t e

I i

r

. . lSARSENT $ LONST PIPING DESIGNER / ANALYST Project No. 9096-03

= " " -

USER'S GUIDE Page 4-43 APPENDIX G Exhibit 4.2-1 Motor Operated Valves VALVE C.G.

(LUMP MASS)

)(

THREE WEIGHT LESS ELEMENTS i a

w v

e 6 a

w r v w  ;

i

. )

lSANSENT $ LONSY PIPING DESIGNER / ANALYST Project No, m3 -

z ensonne .

USER,S GUIDE Page 4 44 APPENDDC G ,

V Exhibit 4.41 i

Uneven Weight Support Spacing C

WILL LOA 0 UPWARD st/ uw af OR HAVE RELAT!YELY SMALL 00VNWARD LOAO 0, , ,..............,-

  • 4,
    • 98eeeGGSeeSS888*O I

?

I I

e e.

P p

I r

r

lSANSENT $ b5NBY PIPING DESIGNER / ANALYST Project N3. 909643 8"*"- USER'S GUIDE Page 4-45 APPENDIX G Exhibit 4.4-2 Riser Support Configurations uW I c

> Cm ', ,  !

UW UW Il le .I  ;

1 i i

t t t 7 1

)

Desirable Desirable 1

l uw

' C

) ,

U/.0 Unstable C '

Arrangement  ;

lSARSENT $ LONST PIPING DESIGNER / ANALYST Pmject No. 9096-03

[

USER'S GUIDE Page 4-46 ,

APPENDDC G Exhibit 4.4-3 Support of Bends UW uw N 1

's uW .

. .t N

e uw

  • uw ~

.. *.... **. r Undesirable Desirable i

}

I i

k l

[

i l j r

l i

l3333gNT $L8MOY PIPING DESIGNER / ANALYST Project No. 909643

= =- USER'S GUIDE Page 447 APPENDIX G Exhibit 4.4-4 Weight Shifting at Risers l

\ l I

UW LL W l Cold Hot i

40/ t.LW 0 #

3 0 ',

4 0

__._______._._________.______.__.____.._.j

lSARSENT$LOMBY PIPING DESIGNER / ANALYST Project Ns. 909tW)3

"'"*8"- USER'S GUIDE Page 4-48 APPENDIX G Exhibit 4.4-5 Typical Pump-Motor Configuration PUMP -

MOTOR Mmm -

~

I\ l\

l l \.

SKID

.. . _ . _ _ . _ _ . , _ _ --.- _. __-----a_ _ _ - - - - - - _ - _ _ _ . _ _ - _ - . - _ _ _ _ . _ - - - - _-----_-_--_A

i I

j

^

, , lSARSENT $L555Y PIPING DESIGNER / ANALYST Project No. 909643 mesea'" - USER'S GUIDE Page 4-49 APPENDIX G i

l Exhibit 4.5-1 Basic Thermal Expansion Mehanism OVERLOADED AREA RESTRAINT BENDING LEO T Y

8 a

O b l 9 I a i i

w l l

l l

1 l

)

l BASE  !

1

lSARSENT $ LONSY PIPING DESIGNNR/ ANALYST Pmject N2.,909643 o'"* * -

USER'S GUIDE Page 4-50 APPENDIX G ,

Exhibit 4.7-1 A Presentauon of Physical Sitraion Be,ing Analyzed ,

l X M i

i 8

l t

i BOX VIBRATES l

!N Y DIRECTION kI I kM J i y I

,J-_______________. _ _ _ _ _ _ _ _ _ , BOX VIBRATES

,- _ IN X O!RECTION *

,, X >

/

Z R1010 BOX THAT s BOX VIERATES REPRESENTS THE IN Z O!RECTION BUILDING t

1 I

h I

6

  • l5ARSENT $ b8MBY PIPING DESIGNER / ANALYST Project NJ. 90403 om esas -

USER'S GUIDE Page 4-51 APPENDIX G Exhibit 4.9-1 i

NB-3600 I LEVEL B SERVICE LOADING WHICII INCLUDES REVERSING DYNAMIC LOADS LOADS (NB-3622.2) l Are Non-Reversing Dynamic (2)

Loads (N8-3622.4) Included YES In the Same Load Combination .

7 I Satis fy (1) N8-3652 NO EQ (9) Using 1.8Sm s 1.5Sy As ATlowable y Stress Satisfy NB-3653.1 ,,

EQ. (10)

Satisfy p N8-3653.1 Satisfy NB-3653.2 EQ. (10)

EQ. (11) p d'

Satisfy NB-3653.2 Satisfy EQ. (11)

N8-3653.3 ,

N6-3653.4 N8-3653.5 Satisfy N8-3653.6 NB 3653.3 N8-3653.7 NB 3653.4 NB-3653.5 NB 3653.6 NS 3653.7 Holts:

(1) Rules are provided in NB 3654.2(b)

(2) Rules are provided in NB-3654.2(a)

3 . _

s . , . - . __ .m.. ._

. i lSARSENT$b5NST PIPING DESIGNER / ANALYST Pmjem No. 909641 USER'S GUIDE Page 4-52  !

. APPENDDC G j i

r .

Exhibit 4.9-1 l i

LEVEL C OR D SERVICE LOADING i WHICH INCLUDES REVERSING DYNAMIC ~

LOADS (NB-3622.2) . I Are Non-Reversing Dynamic (2) .;

included YES (

. Loads In The Same (NB-3622.4)

Load Combination  :

. i , I (1) Level C Level D f NO ,

, I i .  :

u  !

- t EQ. (9 Using EQ. (9 Using l 2.255 )s 1.8S Pressure s Design y 3.0 S )s 2.0yS  :

Pressure As AlYowable AsAliowable Stress Stress -

j

\ l Sustained Stress I Due to Weight  :

Effects  !

Do 8 Mi s 0.55m 5 0.25Sy  !

2 21 i

F j Reversing Dynamic Load in Combination  ;

~With Coincident Level C/D Pressure '

l PDo Do l B1 +B M 2t 2 21 E s 4.55,s 4.0Sy ,

I h

P.ange of Resultant Moment  !

Due to Reversing Dynamic .

Load Anchor Motions 51 1 '

HAM $

. C2 Do Si s 12Sm s 5.05y l' f

-(Continued)

, lSARSENT$L52BY PIPING DESIGNER / ANALYST Project No. 909643

= =- USER'S GUIDE Page 4-53 APPENDIX G Exhibit 4.9-1 NB-3600 (CoeanM) 1 f

Amplitude of Longitudinal Force Due to Reversing Dynamic Load Anchor Motions FAg s Sz Ag 52 5 1.5SM5Sy Notes:

(1): Rules ~are provided in NB-3655.2(b) and NB 3656.2(b)

(2): Rules are provided in NB 3655.2(2) and NB-3656.2(a) i

PIPING DESIGNER / ANALYST Pmject No. 9096-03 lSARGENT 8 4-LBMBY USER'S GUIDE Page 4-54 APPENDIX G Exhibit 4.9-2 Are Non-Reversing Dynamic -

Loads (NC-3622.5) Included xYES In the Same Load Combination N o _

Satisfy NC-3653.1(a)

EQ. (9a)

NO L

y Satisfy NC-3653.2 EQ. (10)

Satisfy NC-3653.1(b) or EQ. (Sb) EQ. (11) f .

Satisfy NC-3653.2 .

EQ. (10) or EQ. (11) 4 m

~.

lsasagNTEL553Y PIPING DESIGNER / ANALYST Pmject Ns. 9096 03

    • **- USER'S GUIDE Page 4-55 APPENDDC G Exhibit 4.9-2 NC/ND-3600 LEVEL C OR D SERVICE LOADING WHICH INCLUDES REVERSING DYNAMIC l

LOADS (NC-3622.2) 3 i

Are Non-Reversin Dynamic (2) i Loads (NB-3622.4 Included YES In The Sane Lead Combination t t (I) Level C Level D i <

NO k

Satisf NC-2653(a) Satisf NC-3653(d Coincident level C/D E0. 9 Using EQ. 9 Using Pressure s Design 2.25 s 1.8Sy 3.0 s 2.0 Sy Pressure As Al owable As Al owable Stress Stress Sustained Stress Due to Weight ffects 82 MA s 0.SSh 5 0.25 Sy 21 f

Reversing Dynamic Load in Combination with Coincident Level C/D Pressure PDo Do B1

+B Mt s 5 0Sh s 4.0 Sy 2t 2 21 f

Range of Resultant Moment Due to Reversing Dynamic Load Anchor hetions Sj !

MAM 5 C2 Do S} s 16Sh s 5.0 Sy (Continued)

4 l

lSARSENT$LONST PIP!NG DESIGNER / ANALYST Project No. 909643, USER'S GUIDE Page 4-56 APPENDIX G l

l l

Exhibit 4.9-2 NC/ND-3600 (Continued) y ,

Amplitude of Longitudinal Force Due to Reversing Dynamic Load Anchor Motions FAM s 52 Ag ,

52 s 1.5Sh s 1.0Sy P

4 Notes:

(1) Rules are provided in NC 3654.1 and NC-3655.1  !

(2) Rules are provided in NC-3654.2 and NC-3655.2 t

4

^ '

  • lSANSENT $LONSY PIPING DESIGNER / ANALYST Project No. 909643

" ~ ' * -

USER'S GUIDE Page 5-1 APPENDIX G SECTION 5 5.0 PIPE SUPPORT DESIGN GUIDFi.fNES Acceptable quality pipe support design is only Schievable if the pipe system has been effectively routed with due consideration given to conceptual design of the pipe supports. Adequate space must be provided between the pipe, adjacent components and thc structure to permit installation of standard .

pipe support hardware. Use of welded frames and complicated auxiliary steel arrangements are costly and time consuming to install and therefore not desirable. These types of supports can be precluded  ;

by effective pipe routing.

i Optimal support design can be achieved in congested areas, such as pipe tunnels, through 2e use of simple gang supports.

5.1 FMM Plate layout A system of embedded plates should be laid out throughout the plant based on preliminary design of the piping, cable tray, HVAC, conduit and instrumentation system. The typical embMded plate used in this layout should be designed to have a capacity required for most of the component support reactions.

  • Large bore piping support reactions in excess of 10 kips will require special higher capacity embedded plates to be located based on the preliminary piping analysis cycle.

1 A disciplined approach to pipe routing and support configuration subsequent to the establishment of the embedded plate system will preclude the use of drilled in concrete anchors. These types of anchorages have proven to be costly to install and a regulatory nuisance and therefore should be avoided.

5.2 Suonort Confiruration Effective routing of the pipe system will result in simple support designs using standard piping support hardware welded directly to the in-place structure. As a general rule support installation should require welding only at the support structure interface point in order to be cost effective.

'. i lSARSENTSLONSY PIPING DESIGNER / ANALYST . Projecs No. 9096 03

  • * * = -

USER'S GUIDE Page 5-2 l APPENDIX G l l

l Recommendations regarding support configurations discussed in the fo!!owing are shown in pages 5-5  :

1 through 5-8.

l Standard pipe support hardware attached directly to the in-place structure should be used for all large diameter piping. Rod or strut hardware can be used in most applications. Costly welded frame guide ,

type supports can be replaced with 2 struts installed at opposing angles (mostly 90') thus behaving [

as a truss.

i Use of standard hardware will achieve the following: I

  • reduce cost of design  !

reduced cost of installation reduced schedule for installation l improved pipe behavior and performance reliability (no friction type supports)

  • i' improve space in plant- -

Simple cantilever members with U bolts or straps can be used effectively for small diameter piping.  !

In these cases, the member size can be standardized to simplify construction and design.

t t

5.3 G== Sunnorts i Effective routing of piping systems in congested areas, such as pipe tunnels, can greatly reduce the number and complexity of pipe supports. Large structural beams can be located in these areas such l that the pipes can rest directly on top of the beam. In these cases the gang support is a single wids' flange section sized with significant margin to allow the development of the pipe' design and the  !

addition of pipes throughout the life of the plant.  !

l ne merit of using frame type gang supports should be evaluated on a plant by plant basis. The cost -

of installation and subsequent configuration control issues related to these auxiliary structures may {

preclude their use, except in special applications. l f

5.4 Penetration Sleeves [

ne initial locations for pipe supports should be established to optimize the use of the concrete  ;

structure directly at penetrations. The concrete elements have significant in-plane load carrying j

1

- ~' '

lSARSENTIBL5NBY " "

PIPING DESIGNER / ANALYST Project N3. 90%C3 USER'S GUIDE Page 5-3 APPENDIX G capacity and thus can always be used as guides with no design penalty. This is panicularly true in places where concrete elements have been thickened due to shielding requirements. Using the concrete elements to directly support the pipe systems is an effective use of the plant.

Additional supports, utilizing standard hardware, should be located between the penetration locations only after the penetration locations have been fully utilized.

Cold pipes may be supported at the penetration by merely grouting the void between the penetration sleeve and the pipe. Hot piping can be guided at the penetration by simply welding angle support members to the sleeve. Pipes can be anchored at the penetration by use of welded pipe head plates.

l Optimal use of the penetrations for pipe support will achieve the following:

a u reduce the number of pipe hangers l improve space in the plant

  • i reduce installation and design costs l reduce schedule for installation l

i 5.5 Desian criteria '

l implementation of pipe support design based on the guidelines previously outlined will preclude many '

of the complicated technical issues that evolved during recently completed nuclear plants. In an effort to simplify the design and construction process of pipe supports, many in the industry have been .

Investigating alternatives to some of the ASME Section 111, Subsection NF requirements as presented in the EPRI ALWR Constructability Design Requirements and the Welding Research Counci! Bulletin (WRC) 353, Position Paper on Nuclear Plant Pipe Supports. Significant cost savings could be realized if exceptions to the ASME code requirements are taken in the following areas for-example:

Material Procurement - procure material nuclear grade rather than per ASME III.

Welder Qualification - qualify welders per AWS DI.1 in lieu of ASME IX, i

Weld Inspection - inspect welds per ANSI N45.2.5 or AWS Dl.1 in lieu of ASME IX.

l i

  • Material Traceability - hardmark identification rather than heat numbers per ASME 111.

+

l5&BSENT $ LONEY PIPING DESIGNER / ANALYST Project Ns. 90%C3

    • maa' USER'S GUIDE Page 5 i APPENDIX G Documentation - construction checidists and FQC inspection reports in lieu of  !

ASME Control Drawings and Weld Data Sheets.

The above items will result in cost savings and are potentially defendable provided that the alternate +

programs are clearly defined at the beginning of the project.

The WRC Bulletin 353 provides current recommendations for consideration in pipe support design.

This document may be referenced for guidelines relative to the following aspecu of detailed technical design, fabrication and construction:

Jurisdictional boundaries Loads and load combinations Functional requirements Support stability Thermal / seismic movements Fatigue and ratcheting U-bolts Gang supports i Inspection requirements Tolerances Applicable design codes and standards Applicable fabrication and installation codes and standards t

' ' lStaQ8ENTEb5NSY P1 PING DESIGNER / ANALYST Pmjea No. 909603 USER'S GUIDE Paite 5-5 .

APPENDIX G i

TYPICAL SUPPORT CONFIGURATIONS i

PREFERRED CONFIGURATIONS NOT RECOMMENDED E E E I  !

l I  ! l  !

! I l l l l LJ LJ t

ROD OR STRUT t

_. L I i 5 l  ! Wl  ;

i -

SINGLE DIRECTION DOUBLE CANTILEVER I

i l

l l

1

e b .

lSANSENT$b5NOT PIPING DESIGNER / ANALYST Project No. 909643 USER'S GUIDE Page 5 6  :

APPENDIX G I

t l

t PREFERRED CONFIGURATION NOT RECOMMENDED -

l C C (' (

sk L

! ' I I l l  ! l l l l t l iii i ii

& k$)

~

! l E t STRUTS j >

(' i t

L n .1' :n  !'1  !

[ \ -

. _%8_ LIFA __ l i -l l

  • ..,6 .

i ..

't.. t ll r

__ LL i

GUIDE FRA ME-GUIDE i

l t

I L

I e

_ _ . _ . _ .- . - , , __.,-- --._.--__ - = _ - _ . . ._ .-r

v-j

~

-s l

, , , , lSARSENT $bMBY PIPING DESIGNER / ANALYST Pmject N3. 909643 l

=- USER'S GUIDE Page 5-7 APPENDIX G l

l RECOMMENDED CONFIGURATION NOT RECOMMENDER, l

)

l

(' SLEEVE  !

GROUT

  • (. (,

%W, '

g -. .s

?

NO

, SUPPORT

{ a.

R~ - l COLO r31PE d ..- i- ,9 i 1

) l (

,l. MBI

...7..;q \  :

.[

SLEEVE t s'

===== j9 .

i T P i i HOT P!PE l

PENETRATION PENETRATION l

4 l

l l

l l

m

, (

lSARSENT $ LONSY PIPING DESIGNER / ANALYST Proja.t N3. 90W01 .

D*"**-

USER'S GUIDE Page 5-8 APPENDtX G 4

RECOMMENDED CONFIGURATION NOT RECOMMENDED la Ge@@@ w i

. 4 . . . .. .o , -,

&p- - -

i 8 3 -

8 l3

p .

_ _, 11 11 11 11 AI l s

GANG GANG FRAME Ncts: Careful pipe layout arrangement simplifies support design.

m 1 <

l .

[ 4 .

.lSAS4ENT8b5NBY' PIPING DESIGNER / ANALYST Project Ns. 909603 USER'S GUIDE Page 61 '

APPENDIX G l 1

SECTION 6 6.0 DERNrrlONS I

(

6.1 Subsystem i

The part of piping and pipe support arrangement of a system comprising one structural analysis problem. l, 6

. 6.2 Pee Sngel: '

A shop fabricated spool of pipe bounded by field welds and has a unique identification number.

i 6.3 12vout' '

The group responsible for piping layout.  !

6.4 Stress

i

'Ihe group responsible for pipe stress analysis. t 6.5 Suonott-The group responsible for pipe supports.

I i

6.6 Sver= Enriw: The group responsible for specifying the system's equipment, components sizes, 1

operating modes, control and instrumentation and configuration required to ensure that the system can 1 meet its intended functions. i 1

j 1

l