ML20087P594

From kanterella
Revision as of 11:54, 25 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Bulletin 83-08 Re Reactor Trip Breaker Failures.Westinghouse Db,Ds & GE AK-2 or Similar Breakers,W/ Undervoltage Trip Attachments,Not Used in safety-related Applications
ML20087P594
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/22/1984
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
0982-L, 982-L, IEB-83-08, IEB-83-8, U-0703, U-703, NUDOCS 8404090199
Download: ML20087P594 (1)


Text

U- 0703 0982-L LO8 (IEB83-08)-84(03-22 )-L

.lLLINDIS POWER COMPANY '

JP CLINTON POWER STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

> Subj ect: Clinton Power Station Unit 1 ,

IE Bulletin No. 83-08 o

Dear Mr. Keppler:

This'is in response to the subject IE Bulletin No. 83-08 on the matter of reactor trip breaker failures. Westinghouse DB, Westinghouse DS, General Electric AK-2 or similar breakers with undervoltage trip attachments (UVTA) are not used in safety related applications at the Clinton Power Station.

I hereby affirm that the information in this letter is correct to the best of my knowledge.

Sincerely yours,

. . Hall Vice President GEW: lam cc: G. A. Harrison, NEC Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety Director - Office of I&E USNRC, Washington, DC 20555 8404090199 840322 PDR ADOCK 05000461 G PDR MAR 2 81984 Jeg 1h6