Notifies of Completion of Actions Identified in Re SPDS Action Plan.Meeting Requested W/Nrc on 850220 to Discuss Sys,Evaluations,Proposed Changes & Schedules for Implementation & Audit
ML20106G967
Person / Time
Site: Clinton Constellation icon.png
Issue date: 02/08/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
U-0793, U-793, NUDOCS 8502150123
Download: ML20106G967 (2)


Text

..- .- . . -. . - - . . . - . _- . _ - -_. .

' % . X; ..,

o U-0793 L30-85 (02-08)-L 1A.120 ILLIN018 POWER COMPANY CLINTON POWER STATION, P.O. BOX 678 CLINTON. ILLINOIS 61727 February 8,1985 Docket No. 50-461

. Director of Nuclear Reactor Regulation Attention: Mr. A Schwencer, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Clinton Power Station Unit 1 Safety Parameter Display System Request for NRC/IP Meeting

Dear Mr. Schwencer:

The NRC Staff performed a Pre-Implementation Audit of the Clinton Power Station (CPS) Safety Parameter Display System (SPDS) on December '

12-13, 1984. As'a result of the NRC Staff concerns. identified in the audit. exit meeting, Illinois Power (IP) submitted to the Staff an SPDS Action Plan via IP letter U-0771,. dated December- 21, 1984. The actions identified in this plan have been completed.

Due to the critical nature of the SPDS issues with respect to the CPS project schedule, it is crucial that IP meet with the NRC Staff to

  • discuss the following:
1) Overall status of the SPDS
2) Results, cl.khe SPDS Action Plan evaluations '(this will include-a detailed rpresentation of the methodology used);

3)

?

Identification of proposed changes to the SPDS display formats,' parameter selection and. human factors considerations;

4) ' Schedule for implementation of the SPDS design changes;..and -
5) Identification of the schedule for-the next NRC audit of SPDS..

The primary objective of the meeting is to achieve.NRC Staff closure'of the Pre-Implementation Audit through acceptance of the results of the CPS SPDS Action Plan so that implementation may proceed without impact on the' CPS project schedule.

,.s 1 Y Jwanms [

1 u

_g. -o U-0793 L30-85(02-08)-L 1A.120 Discussions with Mr. Byron Siegel of your staff (NRC Clinton Licensing Project Manager) indicate that February 20, 1985, is an acceptable date for this. meeting.

Please contact us if you should have any questions on this matter.

Sincerely yours, o .

F. A. Spangenberg h

i Director - Nuclear Licensing and Configuration Nuclear Station Engineering TLR/1s cc B. L. Siegel, NRC Clinton Licensing Project Panager NRC Resident Office Regional Administrator, Region III USNRC Illinois Department of Nuclear Safety p .