Category:Letter
MONTHYEARNL-24-0320, License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,.2024-09-27027 September 2024 License Amendment Request Proposing a New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods That Exceed the Linear Heat Generation Rate Limit Detailed in Regulatory Guide 1.183, Table 3,. NL-24-0349, Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided2024-09-20020 September 2024 Units 1 and 2 - 10 CFR 26.719(c)(1) 30-Day Report Blind Performance Test Results Inconsistent with Sample Provided NL-24-0341, Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-09-10010 September 2024 Response to Request for Additional Information Related to the Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency IR 05000348/20244012024-09-10010 September 2024 Security Baseline Inspection Report 05000348-2024401 and 05000364-2024401 ML24247A1102024-09-0505 September 2024 Corporate Notification Letter Aka 210-day Letter NUREG Rev 12 NL-24-0259, License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes2024-09-0404 September 2024 License Amendment Request to Revise Technical Specification 3.4.14, Reactor Coolant System Pressure Isolation Valve Leakage, Surveillance Requirement 3.4.14.3 Acceptance Criteria and Miscellaneous Obsolete Changes NL-24-0340, Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R322024-09-0404 September 2024 Unit 1 - Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 1 R32 ML24242A1332024-08-29029 August 2024 Issuance of Amendment Nos. 250 and 247, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions (EPID L-2024-LLA-0098) - Non-Proprietary ML24240A0812024-08-27027 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Revised Completion Time ML24233A0022024-08-27027 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request Supplement to Change Technical Specification 3.6.5, Containment Air Temperature Actions IR 05000348/20240052024-08-26026 August 2024 Updated Inspection Plan for Joseph M. Farley Nuclear Plant, Units 1 and 2 - Report 05000348/2024005 and 05000364/2024005 IR 05000348/20244022024-08-26026 August 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000348/2024402 and 05000364/2024402 ML24226B2112024-08-22022 August 2024 Regulatory Audit Summary in Support of License Amendment Requests to Revise Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0321, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information2024-08-16016 August 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions - Supplemental Information IR 05000348/20240022024-08-12012 August 2024 – Integrated Inspection Report 05000348-2024002 and 05000364-2024002 and Exercise of Enforcement Discretion ML24215A3772024-08-0707 August 2024 2024 Farley Requal Inspection Corporate Notification Letter ML24201A2032024-08-0101 August 2024 Request for Withholding Information from Public Disclosure for Joseph M. Farley Nuclear Plant, Units 1 and 2, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions ML24200A1392024-07-25025 July 2024 Regulatory Audit in Support of Review of the License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature ML24199A2072024-07-24024 July 2024 TS 3-6-5 LAR - Individual Notice Transmittal Letter and NSHC - Rev 1 (1) - Letter NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0281, License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions2024-07-18018 July 2024 License Amendment Request to Change Technical Specification 3.6.5, Containment Air Temperature Actions NL-24-0227, Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2024-07-0303 July 2024 Proposed Inservice Inspection Alternative GEN-ISI-AL T-2024-03 for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML24184A0452024-07-0202 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A3762024-07-0101 July 2024 Nonacceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, Using Risk-Informed Process for Evaluations NL-24-0234, Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown2024-06-28028 June 2024 Application to Revise Technical Specifications to Adopt TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown NL-24-0230, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-3602024-06-28028 June 2024 License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-500, Revision 2, DC Electrical Rewrite – Update to TSTF-360 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0235, Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-06-19019 June 2024 Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0201, Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2024-06-18018 June 2024 Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) NL-24-0221, Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift2024-06-17017 June 2024 Pressurizer Safety Valve Lift Pressure Outside of Technical Specifications Limits Due to Setpoint Drift NL-24-0238, RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information2024-06-14014 June 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions, Supplemental Information NL-24-0229, Notice of Intent to Pursue Subsequent License Renewal2024-06-0707 June 2024 Notice of Intent to Pursue Subsequent License Renewal ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, ML24143A0412024-05-28028 May 2024 Supplemental Information Needed for Using the Risk-Informed Process for Evaluation for the LAR to Change Technical Specification 3.6.5, Containment Air Temperature, Actions NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0188, Cycle 33 Core Operating Limits Report2024-05-0101 May 2024 Cycle 33 Core Operating Limits Report NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 IR 05000348/20240012024-04-24024 April 2024 Integrated Inspection Report 05000348/2024001 and 05000364/2024001 NL-24-0137, RIPE License Amendment Request to Change Containment Air Temperature Actions2024-04-19019 April 2024 RIPE License Amendment Request to Change Containment Air Temperature Actions IR 05000348/20240102024-04-16016 April 2024 NRC Inspection Report 05000348/2024010 and 05000364/2024010 NL-24-0123, for Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel2024-04-15015 April 2024 for Manual Reactor Trip Due to Loss of Power to the 2A 125 Volt DC Distribution Panel NL-24-0134, Renewed National Pollutant Discharge Elimination System (NPDES) Permit2024-04-12012 April 2024 Renewed National Pollutant Discharge Elimination System (NPDES) Permit IR 05000348/20240112024-04-12012 April 2024 Fire Protection Team Inspection Report 05000348/2024011 and 05000364/2024011 NL-24-0088, Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency2024-04-0505 April 2024 Application to Revise Technical Specifications Regarding Change to Containment Spray Nozzle Test Frequency NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. ML24061A1692024-03-22022 March 2024 PM Reassignment Letter Farley March 2024 NL-24-0092, Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R292024-03-15015 March 2024 Inservice Inspection Program Owners Activity Report (OAR-1) for Outage 2R29 2024-09-05
[Table view] Category:License-Operator
MONTHYEARML23221A3292023-08-0909 August 2023 Post Examination Comments from Applicants and Facility.Pdf NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. IR 05000348/20233012022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 ML22213A0482022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21286A6692021-10-13013 October 2021 301 2B ML21216A1022021-08-0404 August 2021 File 2A3 Exam Administrative Items ML21216A0992021-08-0404 August 2021 File 2B Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 IR 05000348/20203012020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 2A-3 Exam Admin Items - Delayed Release ML20342A2062020-12-0707 December 2020 2A-2 Final Op Test Items - Delayed Release ML20342A1382020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 Adams 2B Exam Admin Items - Normal Release ML20276A1282020-10-0202 October 2020 301 Post Exam Comments (PII Redacted) ML20276A1292020-10-0202 October 2020 Final RO Exam Farley 2020-301 ML20276A1302020-10-0202 October 2020 Final SRO Exam Farley 2020-301 NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19239A4582019-08-27027 August 2019 Farley 2019 Post Examination Comments and Documentation ML19100A3572019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Joseph M. Farley Nuclear Plant ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18312A0902018-11-0808 November 2018 Exam Corporate Notification Letter Aka 210-day Letter NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17212A4102017-07-31031 July 2017 301 Exam Administrative Items - Delay Release 2 Yrs ML17212A3752017-07-31031 July 2017 301 Exam Final Items - Delay Release 2 Yrs ML17212A4482017-07-31031 July 2017 301 Exam Administrative Items ML17137A3392017-05-17017 May 2017 301 Post Exam Comments ML17137A3342017-05-17017 May 2017 301 Final As-Given SRO Written Exam with Answer Key - (Delay Release 2 Years) ML17137A3162017-05-17017 May 2017 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Years ML17137A1812017-05-17017 May 2017 Update SRO Written Answer Key Post Appeal ML17102B2332017-04-0707 April 2017 Operator Written Examination Approval 05000348/2017301 and 05000364/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16259A0202016-09-13013 September 2016 Notification of Licensed Operator Initial Examination 05000348/2017301 and 05000364/2017301 ML16049A5112016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative JPMs ML16049A5012016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative JPMs ML16049A5022016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative Documents ML16049A4932016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative Documents ML16049A4942016-02-18018 February 2016 Initial Exam 2015-301 Draft RO Written Exam ML16049A5002016-02-18018 February 2016 Initial Exams 2015-301 Draft Sim In-Plant JPMs ML16049A4982016-02-18018 February 2016 Initial Exam 2015-301 Draft Simulator Scenarios ML16049A5062016-02-18018 February 2016 Initial Exam 2015-301 Final Simulator Scenarios ML16049A4952016-02-18018 February 2016 Initial Exam 2015-301 Draft SRO Written Exam ML16049A5122016-02-18018 February 2016 Initial Exam 2015-301 General Correspondence ML15316A1342015-11-10010 November 2015 Initial Exam 2015-301 Final SRO Written Exam ML16021A5012015-11-10010 November 2015 Initial Exam 2015-301 Post Exam Comments - PII Removed ML15316A1292015-11-10010 November 2015 Initial Exam 2015-301 Final RO Written Exam ML15120A4052015-04-28028 April 2015 Notification of Licensed Operator Initial Examination - 05000348/2015301 and 05000364/2015301 ML14351A0542014-12-17017 December 2014 301 Draft Administrative Documents 2023-08-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23221A3292023-08-0909 August 2023 Post Examination Comments from Applicants and Facility.Pdf NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. IR 05000348/20233012022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 ML22213A0482022-08-0101 August 2022 Notification of Licensed Operator Initial Examination 05000348/2023301 and 05000364/2023301 NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations ML21286A6692021-10-13013 October 2021 301 2B ML21216A0992021-08-0404 August 2021 File 2B Administrative Items ML21216A1022021-08-0404 August 2021 File 2A3 Exam Administrative Items IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20342A2062020-12-0707 December 2020 2A-2 Final Op Test Items - Delayed Release IR 05000348/20203012020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 2A-3 Exam Admin Items - Delayed Release ML20342A1382020-12-0707 December 2020 05000348/2020301 & 05000364/2020301 Adams 2B Exam Admin Items - Normal Release ML20276A1292020-10-0202 October 2020 Final RO Exam Farley 2020-301 ML20276A1302020-10-0202 October 2020 Final SRO Exam Farley 2020-301 ML20276A1282020-10-0202 October 2020 301 Post Exam Comments (PII Redacted) NL-20-0265, SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations2020-03-16016 March 2020 SNC Response to Regulatory Issue Summary 2020-01: Preparation and Scheduling of Operator Licensing Examinations ML19239A4582019-08-27027 August 2019 Farley 2019 Post Examination Comments and Documentation ML19100A3572019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for Joseph M. Farley Nuclear Plant ML18312A0902018-11-0808 November 2018 Exam Corporate Notification Letter Aka 210-day Letter NL-18-0550, Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations2018-04-23023 April 2018 Response to Regulatory Issue Summary 2018-02 - Preparation and Scheduling of Operator Licensing Examinations ML17212A4482017-07-31031 July 2017 301 Exam Administrative Items ML17212A4102017-07-31031 July 2017 301 Exam Administrative Items - Delay Release 2 Yrs ML17212A3752017-07-31031 July 2017 301 Exam Final Items - Delay Release 2 Yrs ML17137A3342017-05-17017 May 2017 301 Final As-Given SRO Written Exam with Answer Key - (Delay Release 2 Years) ML17137A1812017-05-17017 May 2017 Update SRO Written Answer Key Post Appeal ML17137A3162017-05-17017 May 2017 301 Final As-Given RO Written Exam with Answer Key - Delay Release 2 Years ML17137A3392017-05-17017 May 2017 301 Post Exam Comments ML17102B2332017-04-0707 April 2017 Operator Written Examination Approval 05000348/2017301 and 05000364/2017301 ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16259A0202016-09-13013 September 2016 Notification of Licensed Operator Initial Examination 05000348/2017301 and 05000364/2017301 ML16049A4952016-02-18018 February 2016 Initial Exam 2015-301 Draft SRO Written Exam ML16049A5122016-02-18018 February 2016 Initial Exam 2015-301 General Correspondence ML16049A5062016-02-18018 February 2016 Initial Exam 2015-301 Final Simulator Scenarios ML16049A4982016-02-18018 February 2016 Initial Exam 2015-301 Draft Simulator Scenarios ML16049A5002016-02-18018 February 2016 Initial Exams 2015-301 Draft Sim In-Plant JPMs ML16049A4942016-02-18018 February 2016 Initial Exam 2015-301 Draft RO Written Exam ML16049A4932016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative Documents ML16049A5022016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative Documents ML16049A5012016-02-18018 February 2016 Initial Exam 2015-301 Draft Administrative JPMs ML16049A5112016-02-18018 February 2016 Initial Exam 2015-301 Final Administrative JPMs ML15316A1292015-11-10010 November 2015 Initial Exam 2015-301 Final RO Written Exam ML16021A5012015-11-10010 November 2015 Initial Exam 2015-301 Post Exam Comments - PII Removed ML15316A1342015-11-10010 November 2015 Initial Exam 2015-301 Final SRO Written Exam ML15120A4052015-04-28028 April 2015 Notification of Licensed Operator Initial Examination - 05000348/2015301 and 05000364/2015301 ML14351A0802014-12-17017 December 2014 301 Draft Simulator Scenarios ML14351A0712014-12-17017 December 2014 301 Draft SRO Written Exam ML14351A0652014-12-17017 December 2014 301 Draft RO Written Exam ML14351A0542014-12-17017 December 2014 301 Draft Administrative Documents ML14351A0832014-12-17017 December 2014 301 Draft Simulator and in Plant Jpms 2023-08-09
[Table view] |
Text
August 1, 2022
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000348/2023301 AND 05000364/2023301
Dear Mr. Erb:
During a telephone conversation on July 28, 2022, between Mr. S. Jackson, Nuclear Operations Instructor, and Mr. M. Meeks, Senior Operations Engineer, arrangements were made for the administration of operator licensing examinations at the Farley Nuclear Plant. The on-site preparatory week is scheduled for the week of April 17, 2023. The operating test is scheduled to be administered during the weeks of May 22 - 29, 2023. The written examination is scheduled to be administered the week of June 5, 2023.
As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 12 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test outline by December 27, 2022. The previously assigned Chief Examiner, Mr. J. Viera, provided the written examination outline to your staff in March, 2022. The operating test, written examination, and the supporting reference materials identified in NUREG-1021, Examination Standard (ES)-2.1, Preparing for Operator Licensing Initial Examinations, will be due by March 8, 2023. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Delays in receiving the required materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be cancelled or rescheduled.
To conduct the requested written examinations and operating tests, your staff will need to provide adequate space and accommodations and to make the simulation facility available on the dates noted above. In accordance with ES-3.5, Administering Operating Tests, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes licensing action on all the applications and any adjudicatory actions on any hearing demands are complete.
ES-1.2, Guidelines for Taking NRC Examinations, contains a number of NRC guidelines for the written examinations and operating tests as they are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management and Budget (OMB) control number 3150-0090) at least 60 days before the first examination date (if possible). Contact Mr. Meeks to determine the method for submission of the waiver or excusal requests. Preliminary reactor operator and senior reactor operator license applications (OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date. If the NRC does not receive the preliminary applications at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before the first examination date.
Although the guidelines for waiver or excusal requests call for their receipt at least 30 days before the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline above). Resolutions resulting from verbal inquiries by the facility licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form 398 or as directed by Mr. Meeks when contacting him to determine the method for submission). The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC Form 398 submitted for the applicant. The NRC will not provide its decision until the final application is submitted to the agency.
Paperwork Reduction Act Statement This letter contains information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the OMB, approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average 2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per examination or response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information collections. Send comments regarding this information collection to the FOIA, Library, and Information Collections Branch (T6-A10M),
U.S. Nuclear Regulatory Commission, Washington, DC 20555 0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the OMB reviewer at: OMB Office of Information and Regulatory Affairs (3150-0018), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street, NW Washington, DC 20503; e-mail:
oira_submission@omb.eop.gov.
Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number. In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter and its enclosures will be available electronically for public inspection through the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible on the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Jackson has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Meeks at (404) 997-4467, (Internet E-mail: Michael.Meeks@nrc.gov ), or me at (404) 997-4662, (Internet E-mail:
Eugene.Guthrie@nrc.gov ).
Sincerely,
/RA/
Eugene Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-348, 50-364 License Nos.: NPF-2, NPF-8 cc: Distribution via ListServ
ML22213A048 SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII/DRS/OBI RII/DRS/OBI RII/DRS/OBII NAME D>Egelstad M.Meeks E.Guthrie DATE 7/29/2022 7/29/2022 8/ 1/ 2022 2022