ML15120A405

From kanterella
Jump to navigation Jump to search
Notification of Licensed Operator Initial Examination - 05000348/2015301 and 05000364/2015301
ML15120A405
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/28/2015
From: Gerald Mccoy
Division of Reactor Safety II
To: Gayheart C
Southern Nuclear Operating Co
References
IR 2015301
Download: ML15120A405 (4)


See also: IR 05000348/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 28, 2015

Mrs. Cheryl A. Gayheart

Vice President

Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant

7388 North State Highway 95

Columbia, AL 36319

SUBJECT:

JOSEPH M. FARLEY NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION - 05000348/2015301 AND

05000364/2015301

Dear Mrs. Gayheart:

In a telephone conversation on April 22, 2015, between Mr. Billy Thornton, OPS Training Lead

Instructor, and Mr. David Lanyi, Senior Operations Engineer, arrangements were made for the

administration of licensing examinations at the Farley Nuclear Power Plant. The operating test

is scheduled to be administered during the weeks of October 5 and 12, 2015. The written

examination is scheduled to be administered the week of October 19, 2015. The on-site

preparatory week is scheduled for the week of September 14, 2015.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 10, of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by July 13, 2015. Mr. Lanyi provided the written examination outline to your staff in

January, 2015. The operating test, written examination, and the supporting reference materials

identified in Attachment 3 to ES-201 will be due by August 14, 2015. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline, examination, and test before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

C. Gayheart

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,

2016. The public reporting burden for this collection of information is estimated to average 2500

hours per response, including the time for reviewing instructions, gathering and maintaining the

data needed, writing the examinations, and completing and reviewing the collection of

information. Send comments on any aspect of this collection of information, including

suggestions for reducing the burden, to the Information and Records Management Branch

(T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet

electronic mail to infocollect.resource@nrc.gov ; and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page

of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

C. Gayheart

3

Thank you for your cooperation in this matter. Mr. Thornton has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Lanyi at (404) 997-4487, (Internet

E-mail: David.Lanyi@nrc.gov), or me at (404) 997-4551, (Internet E-mail:

Gerald.McCoy@nrc.gov).

Sincerely,

/RA/

Gerald J. McCoy, Chief

Operations Branch I

Division of Reactor Safety

Docket Nos.: 50-348, 50-364

License Nos.: NPF-2, NPF-8

cc: Distribution via Listserv

_________________________

x

SUNSI REVIEW COMPLETE

FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

DRL2

GJM1

NAME

LANYI

MCCOY

DATE

4/28/2015

4/28/2015

5/ /2015

5/ /2015

5/ /2015

5/ /2015

5/ /2015

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO