ES-401 Site-Specific SRO Written Examination Form ES-401-8 Cover Sheet U. S. Nuclear Regulatory Commission Site-Specific SRO Written Examination Applicant Information Name:

Date: 18 APRIL 2017 Facility I Unit FARLEY 1 & 2 Region: I [1 Ii Ill El IV Reactor Type: W ]CEE BW El GEE Start Time: Finish Time:

Instructions Use the answer sheets provided to document your answers. Staple this covet sheet on top of the answer sheets. To pass the examination you must achieve a final grade of at least 80 percent overall, with 70 percent or better on the SRO-only items if given in conjunction with the RO exam; SRO-only exams given alone require a final grade of 80 percent to pass. You have 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to complete the combined examination, and 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> if you are only taking the SRO portion.

Applicant Certification All work done on this examination is my own. I have neither given nor received aid.

Applicants Signature Results RO/SRO-Only/Total Examination Values 75 / 25 I 100 Points Applicants Score I I Points Applicants Grade I I Percent ES-401, Page 38 of 50 4

1. Unit 1 is operating at 100% power when the following events occur:
  • FK-122, CHG FLOW, demand indicates 100% in AUTO.
  • LK-459F, PRZR LVL, demand indicates 0% in AUTO.
  • EA2, CHG HDR FLOW HI-LO, is in ALARM.
  • HA2, PRZR LVL DEV HI B/U HTRS ON, is in ALARM.
  • VCT LVL is 38% and slowly lowering.

Which of the following completes the statements below?

(1) controller has failed.

VCT level will (2)

A. (1) FK-122 (2) lower until the operators realign Charging Pump suctions to the RWST B. (1) LK-459F (2) lower until the operators realign Charging Pump suctions to the RWST C. (1) FK-122 (2) cycle between 20% and 40%

D. (1) LK-459F (2) cycle between 20% and 40%

2. Unit I is at 45% power and the following conditions exist:

Preparation to recover dropped control rod P8 per AOP-1 9.0, Malfunction of Rod Control System, is in progress.

Using the Lift Coil Disconnect Panel figure above, which of the following completes the statements below to recover rod P8?

Reposition switch(es) (1) at the Lift Coil Disconnect Panel.

Per AOP-19, the ROD CONTROL BANK SELECTOR SWITCH will be placed in the (2) position to withdraw or insert the rod(s) and restore the bank.

A. (1)P8ONLY (2) MAN B. (I)P8ONLY (2) CB D C. (1) H2, B8, H14, F6, FlO, K10 and K6 (2) CB D D. (1) H2, B8, H14, F6, FlO, K10 and K6 (2) MAN

3. trip has occurred on Unit 1 with the following conditions: -
  • 1A, lB and 1C 4160V busses are deenergized.

Subsequently, the crew is in ESP-0. 1, Reactor Trip Response, evaluating RCP support conditions and the following is observed:

  • 1A, lB and 1C 4160V busses are energized.
  • RCS Pressure: 2160 psig
  • RCS Tavg: 548°F
  • HH2, RCP 1 B BRG UPPER/LOWER OIL RES LO LVL, is in ALARM.

IARCP 1BRCP ICRCP Shaft Seal Flow 8 gpm 8 gpm 9 gprn No. 1 Seal Leakoff 2.5 gpm 3 gpm 2.5 gpm

  1. 1 Seal >400 psid >400 psid >400 psid Per ESP-0.1, the operating crew will start Reference Provided A. No RCPs B. IBRCPONLY C. IA RCP ONLY D. 1A RCP and 10 RCP ONLY

4.Urntlhasjustsynched the Main Generator to the grid when the foHowhg occurs:

The 1C RCP trips.

Which one of the following completes the statement below?

Following the 1 C RCP trip, the flow in the 1 C RCS loop will lower to zero (1) and Tave in the 1C RCS loop will (2)

A. (1) then rise (2) rise B. (1) and remain atzero (2) rise C. (1) then rise (2) lower D. (1) and remain at zero (2) lower

5. Unit lisat 100% power when the following occurs:
  • TK-144, LTDN HX OUTLET TEMP controller, demand fails low (0%).

Which one of the following completes the statements below?

The temperature of the letdown water exiting the Letdown Heat Exchangerwill (1)

This will result in a (2)

(1) (2)

A. lower dilution B. lower boration C. rise dilution D. rise boration

f Whh one of the foflowing completes the statements b&ow?

MOV-8701A, 10 RCS LOOP TO 1A RHR PUMP, is powered from (1)

MOV-8701B, 10 RCS LOOP TO 1A RHR PUMP, is powered from (2)

A. (1)600VMCC1U (2) 600V MCC lv B. (1)600VMCCJU (2) 600V MOO 1 U C. (1)600VMCC iF (2) 600V MCC 1G D. (1) 600V MOO iF (2) 600V MOO iF

7. Unit 1 has experienced a large break LOCA with the following conditions:
  • MLB-1 1-1 and 11-1, SAFETY INJECTION, are LIT.
  • BYP & PERMISSIVE SAFETY INJECTION ACTUATED, status light is LIT.
  • CH4, RWST LVL A TRN LO-LO, is in ALARM.
  • CH5, RWST LVL B TRN LO-LO, is in ALARM.

Which one of the following would be the expected automatic response of the RHR system assuming no manual operator actions?

MOV-8701NB (1) automatically open.

MOV-881 1N12A (2) automatically open.

Nomenclature: MOV-8701NB, 1C RCS LOOP TO 1A RHR PUMP MOV-8811N12A, CTMT SUMP TO 1A RHR PUMP (1) (2)

A. will NOT WILL B. will NOT will NOT C. WILL WILL D. WILL will NOT

8. Unit 1 is operating at 100% power when the following occurs:

At 1000:

  • AReactortrip.

At 1005:

  • Operators are monitoring Intermediate Range Nuclear Instrumentation operation.

At 1020:

  • The operators are at the step of ESP-0. 1, Reactor Trip Response, to Check Source Range Detectors Energized Which one of the following completes the statements below?

At 1005: Intermediate Range startup rate is (1)

At 1020: The Source Range Nuclear Instruments energized.

A. (1) -1/3DPM (2) ARE B. (1) -1/3DPM (2) are NOT C. (1) -1/2DPM (2) ARE D. (1) -1/2DPM (2) are NOT

9. Which of the following completes the statement below?

Alternate cooldown of the PRT is accomplished by (1) flow to the (2)

A. (1)DeminWater (2) bottom of the PRT via a sparger pipe B. (1)DeminWater (2) top of the PRT via spray nozzles C. (1) Reactor Makeup Water (2) top of the PRT via spray nozzles D. (1) Reactor Makeup Water (2) bottom of the PRT via a sparger pipe

10. Which of the following completes the statement below?

HV-3184,CCW FROM RCP THRM BARR, will automatically close on a (1) if the COW return line from any RCP Thermal Barrier reaches (2)

A. (1)Tsignal (2) 160 gpm B. (1)Tsignal (2) 75 psig C. (1) P signal (2) 160 gpm D. (1) p signal (2) 75 psig

11. A Pressurizer Steam Space break has occurred on Unit 1 with the following conditions:
  • EEP-1, Loss of Reactor or Secondary Coolant, is in progress.
  • Both RCS WR PRESS instruments indicate 500 psig and lowering.
  • CTMT Press is 13.0 psig and rising.

Which of the following completes the statements below for the current plant conditions?

RHR injection flow (1) greater than 1500 gpm.

MOV-3185A, CCWTO 1A RHR HX, (2) required to be opened.

A. (1)isNOT (2) is NOT B. (1) is NOT (2)IS C. (fliS (2)IS D. (1)IS (2) is NOT

12. Unit 1 is operating at 100% power with the following conditions:

At 1000:

  • A Train is the On Service Train.
  • AA4 and AB4, CCW SRG TK LVL A (B) TRN HI-LO, are in ALARM.

At 1200:

    • AA5, CCW SRG TK LVL A TRN LO-LO, is in ALARM.

L13027A, COW SRG TK LVL, is 19 and falling.

  • L13027B, COW SRG TK LVL, is 30 and stable.

Which one of the following completes the statements below?

A leak has developed in the (1)

(2) is the backup source of make up water for the CCW Surge tank.

A. (1) Seal Water Hx (2) Reactor Makeup Water B. (1) Letdown Hx (2) Reactor Makeup Water C. (1) Seal Water Hx (2) Fire Water D. (1) Letdown Hx (2) Fire Water

13. Unit 1 is operating at 100% with the following conditions:

AOP-1.0, RCS Leakage, has been entered and operators have determined the following:

- Identified leakage: 9.5 gpm

- Unidentified leakage: 0.9 gpm Which one of the following completes the statements below?

Entry into a REQUIRED ACTION Statement of Technical Specification 3.4.13, RCS Operational leakage, (1) required.

If conditions degrade and Pressurizer Level cannot be maintained near program or stable, the operating crew is required to (2)

A. (1)IS (2) trip the Reactor and actuate SI B. (1)15 (2) align Charging pump suction to RWST and commence unit shutdown C. (1) is NOT (2) trip the Reactor and actuate SI D. (1) is NOT (2) align Charging pump suction to RWST and commence unit shutdown

14. Which one of the following completes the statements below for Unit 1?

Pressurizer Heater Group 1A is powered from 600V (1)

Pressurizer Heater Group 1 B is powered from 600V Jj.

A. (1)LC1A (2) LC IN B. (1)LC1M (2) LC iN C. (1)LC1M (2) LC 1C D. (1)LC1A (2) LC 1C

15. Unit 1 was operating at 100% power when the following occurred:

At 1000

  • A Large break LOCA occurs.

At 1430

  • The crew exits ESP-1 .3, Transfer to Cold Leg Recirculation, and transitions back to EEP-1 Loss of Reactor or Secondary Coolant.
  • The control room staff is evaluating conditions for entry into ESP-1 .4, Transfer to Simultaneous Cold and Hot Leg Recirculation.

Which one of the following completes the statements below?

The earliest time the operating crew may transfer to Simultaneous Cold and Hot Leg Recirculation is at (1)

The reason to transfer to Simultaneous Cold and Hot Leg Recirculation is to (2)

A. (1)1730 (2) ensure refill of the reactor vessel and downcomer region B. (1)2200 (2) ensure refill of the reactor vessel and downcomer region C. (1) 1730 (2) prevent boron precipitation that could adversely affect core cooling D. (1) 2200 (2) prevent boron precipitation that could adversely affect core cooling

16. Unit 1 is at 90% power with the following conditions:
  • Pressurizer pressure is 2220 psig.
  • RCS Tavg is 570° F.
  • AFDis+4%.

Which one of the following will cause an OTAT trip setpoint to lower?

A. An RCS boration occurs.

B. PT-456, PRZR PRESS, fails low.

C. Pressurizer Backup Heaters are energized.

D. N44, POWER RANGE, upper detector current, fails high.

17. A Reactor shutdown is being performed with the following conditions:
  • At 50% power, N135, Intermediate Range, fails high.

Which one of the following completes the statements below?

If the shutdown continues and no action is taken, an automatic Reactor trip will occur when the (1) light on the Bypass and Permissive Panel extinguishes.

Per AOP-100, Instrumentation Malfunction, the operators are required to (2)

A. (1)P-10 (2) remove the N135 control power fuses B. (1)P-6 (2) remove the N135 control power fuses C. (1)P-10 (2) Place the N135 LEVEL TRIP switch in BYPASS D. (1)P-6 (2) Place the N135 LEVEL TRIP switch in BYPASS

Which one of the following completes the statement below?

The Unit 1 Solid State Protection System B Train Output Cabinet Slave Relays are powered from A. 1 20V Vital Panel 1 C B. 120V Vital Panel 1D C. 125VDCPaneI1B D. 125VDCPaneI1E

19. Unit 1 is at 100% power with the following conditions:
  • PT-951, CTMT Pressure, bistables have been placed in the position required by Technical Specification, 3.3.2, Engineered Safety Feature Actuation System Instrumentation Which one of the following completes the statements below?

A Safety Injection will occur when a minimum of (1) additional Containment pressure bistable(s) reach(es) the appropriate setpoint.

Containment Spray will actuate when a minimum of (2) additional Containment pressure bistable(s) reach(es) the appropriate setpoint.

(1) (2)

A. 1 2 B. 1 1 C. 2 2 D. 2 1

20. Which one of the following completes the statements below?

The signals that drive the group step counters (1) come from the Rod Control Logic Cabinet.

C-i 1, Bank D Rod Stop, (2) stop auto outward rod motion on bank D rods at 220 steps.

A. (i)DO (2) WILL B. (i)doNOT (2) WILL C. (i)DO (2) will NOT D. (1)do NOT (2) will NOT

21. A Unit 1 Reactor trip has just occurred with the following conditions:
  • FB2, Nl-35 LOSS OF COMPENSATING VOLTAGE, is in ALARM.
  • N135B, IR1 CURRENT, is indicating 4 x 10-10 amps and is stable.
  • N136B, 1R2 CURRENT, is indicating 8 x 10-11 amps and is slowly lowering.

Which one of the following describes the operation of the Source Range Nuclear Instruments?

Nomenclature: N31, SOURCE RANGE N32, SOURCE RANGE A. N131 and N132 cannot be energized.

B. Both N131 and N132 have automatically energized.

C. N132 has automatically energized and N131 is de-energized.

D. Both N131 and N132 will remain de-energized unless operator action is taken.

22. Unit 1 is at 50% power with the following conditions:

A Loss of Service Water is in progress.

The following trends are reported for the 1A RCP:

1000 1010 1020 1030 UPPER RADIAL BEARING 190°F 200°F 220°F 225°F UPPER ThRUST BRG 170°F 180°F 195°F 195°F LOWERTHRUSTBRG 140°F 150°F 160°F 165°F STATOR WINDING 225°F 250°F 310°F 350°F LOWER RADIAL BRG 170°F 180°F 195°F 195°F LOWERSEALWAThRBEARING 180°F 190°F 195°F 205°F SEAL WATER OUTLET 200°F 210°F 215°F 225°F Which one of the following is the earliest time 1A RCP must be secured?

A. 1000 B. 1010 C. 1020 D. 1030

23. Unit I is operating at 100% power and the following occurs:

The controlling channel, FT-487, lB SG FW, fails high.

Which one of the following completes the statements below?

Immediately after the failure, the I B SG FRV will start to (1)

Per AOP-100, Instrument Malfunction, the operator (2) required to place the lB SG STM FLOW SEL SWITCH to the non-affected channel.

A. (1) OPEN (2) is NOT B. (1) OPEN (2) IS C. (1) CLOSE (2) is NOT D. (1) CLOSE (2) IS

24.Unitlis operating at 100% when the following occurs At 1000:

  • A Loss of all Offsite power occurs.
  • The lB DG fails to start.

At 1010:

  • A large steam break occurs in Containment.
  • Containment pressure is 37 psig and rising.

Which one of the following completes the statements below?

At 1015, (1) CTMT cooler fan(s) automatically started in slow speed.

Containment pressure (2) exceed 54 psig.

(1) (2)

A. 1 WILL B. 2 WILL C. 1 will NOT D. 2 will NOT

25. Unit 1 is operating at 100% power with the following conditions:
  • PRZR LVL CONT CH LS1459Z is in the I/Il (LT459/60) position.

Subsequently, LT-459, PRZR LVL, fails high.

Which one of the following describes the long term affect of the automatic response of the Pressurizer level control system?

Pressurizer level will Assume no operator action A. remain stable B. lower until a Low Pressure SI occurs C. initially rise and keep rising until a\Pressurizer High Level Reactor trip occurs D. initially lower then rise until a Press rizer High Level Reactor trip occurs B. lower until a Pressurizer Low Pressure SI occurs

26. A Reactor trip occurred on Unit I with the following conditions:
  • RCS Tavg is 535° F and stable.

Which one of the following completes the statements below?

Per ESP-0.1, Reactor Trip Response, the operating crew is required to Emergency Borate a minimum of (1) gallons.

The reason for the required amount of boration is to ensure (2)

A. (1)5000 (2) adequate shutdown margin is established B. (1) 5000 (2) cold shutdown boron concentration is achieved C. (1)5420 (2) adequate shutdown margin is established D. (1)5420 (2) cold shutdown boron concentration is achieved

27. The following conditions exist on Unit 1:
  • The Unit is in Mode 5, drained to just above mid-loop.
  • 1A RHR pump is in service, when the RO notes the following indications:

RHR flow as indicated on FI-605A, is unstable.

1A RHR pump amps are oscillating.

  • The Rad Side SO reports that the noise level of the IA RHR pump has increased significantly from last observation.

Per AOP-12.O, Residual Heat Removal Malfunction, which one of the following describes the next required action(s) to be taken?

A. Initiate makeup to the RCS ONLY.

B. Slowly close HIK 603A, 1A RHR HX DISCH VLV.

C. Start the 1 B RHR pump and when running, stop the IA RHR pump ONLY D. Initiate makeup to the RCS, then start the 1 B RHR pump and when running, stop the 1A RHR pump.

28. A Large Break LOCA has occurred on Unit 1 with the following conditions:

At 1000:

  • Both CS Pumps are running aligned to the RWST.
  • Containment pressure is 22 psig and lowering.
  • No ESF actuations have been Reset.
  • CH4, RWST LVL A TRN LO-LO, is in alarm.
  • CH5, RWST LVL B TRN LO-LO, is in alarm.

At 1001:

  • MOV-8820A, IA CS PUMP TO SPRAY HDR ISO, handswitch is taken to CLOSE and allowed to spring return to AUTO.

Which one of the following completes the statements below?

At 1000, MOV-8826A & 8827A, CTMT SUMP TO 1A CS PUMP and MOV-8826B & 8827B, CTMT SUMP TO lB CS PUMP, (1) automatically open.

At 1005, after all valve motion is complete, MOV-8820A will be (2)

(1) (2)

A. will NOT closed B. WILL closed C. will NOT open D. WILL open

29. Unit 1 is in Mode 3 with the following conditions:
  • 4160V F and G buses are 3800V and stable.

The following annunciators are in alarm:

- VE2, 1G, 4KVBUS OV-OR-UVOR LOSS OF DC

- WE2, 1 F, 4KV BUS OV-OR-UV OR LOSS OF DC Which of the following completes the statements below?

The operating crew (1) required to enter a REQUIRED ACTION Statement of Technical Specification 3.3.5, Loss of Power (LOP) Diesel Generator (DG)

Start Instrumentation.

Per AOP-5.2, Degraded Grid, the operating crew is required to (2)

A. (1) IS (2) start the Diesel Generators in preparation for a loss of offsite power B. (1) is NOT (2) start the Diesel Generators in preparation for a loss of offsite power C. (1) IS (2) align the Diesel Generators for autostart D. (1) is NOT (2) align the Diesel Generators for autostart

30. Unit 1 is at 100% power with the following conditions:
  • PT-444, PRZR PRESS, transmitter has failed low.
  • Operators have entered AOP-100, Instrument Malfunction.
  • PK-444A, PRZR PRESS REFERENCE, is in MANUAL and set at 35% demand.
  • ALL Backup Heaters are in the ON position.
  • PK-444C, JA LOOP SPRAY VLV, is in MAN and 0% demand.
  • PK-444D, I B LOOP SPRAY VLV, is in AUTO and 20% demand.
  • RCS pressure is 2270 psig and stable.

Which one of the following will be effective in lowering RCS pressure?

A. Place PK-444C in AUTO.

B. Place PK-444A in AUTO.

C. Raise the demand on PK-444A to 57.5%.

D. Place PK-444D in MAN and lower the demand on the controller to 0%.

f 31. Which one of the foflowing compietes the statements below?

During the post LOCA recirculation phase, to maximize absorption of Iodine from the Containment atmosphere, the Containment Spray System sprays water with (1) added at a pH of approximately (2)

(1) (2)

A. Trisodium Phosphate 4.5 B. Sodium Hydroxide 7.5 C. Trisodium Phosphate 7.5 D. Sodium Hydroxide 10.5

32. The following conditions exists on Unit 1:
  • FRP-S.1, Response to Nuclear Power Generation I ATWT, is in progress.

Subsequently, the Rover opened both Reactor Trip breakers locally.

  • RCS Tavg is 560°F.

Which one of the following describes the direct effect of this action?

A. The MDAFW pumps automatically start.

B. Resets the High Steam flow setpoint to 10%.

C. The Steam Dumps arm and the plant trip controller is enabled.

D. The Main FRV and FRV Bypass valves will interlock close immediately.

33. Unit I is operating at 40% power when the following occurs:

lB SG MSIV, Q1N11HV3369B closes.

Which of the following completes the statements below?

An automatic Reactor trip (1 occur.

I B SG level initially (2)

(1) (2)

A. WILL rises B. will NOT rises C. WILL lowers D. will NOT lowers

34. Unit I is responding to a SGTR in the 1A SG with the following conditions:

At 1000:

  • HIGHEST CORE EXIT TEMP CHAN A and B on the IPC, indicates 530°F.
  • IA SG PRESS is 810 psig.
  • Pl-403A, 1A LOOP RCS WR PRESS, indicates 1230 psig.
  • RCS cooldown is in progress.
  • The required RCS temperature is 494°F.

At 1045:

  • HIGHEST CORE EXIT TEMP CHAN A and B, on the IPC indicates 430°F.
  • 1A SG PRESS is 300 psig.
  • PI-403A, 1A LOOP RCS WR PRESS, indicates 765 psig.

Assume that the SGTR size and geometry remain constant Which one of the following completes the statements below?

The reason the RCS is initially cooled down is to (1)

Compared to the conditions at 1000, SG tube leakage rate at 1045 has (2)

A. (1) Prevent 1ASG Safeties from lifting (2) risen B. (1) Increase RCS subcooling for the subsequent RCS depressurization (2) risen C. (1) Prevent 1A SG Safeties from lifting (2) lowered D. (1) Increase RCS subcooling for the subsequent RCS depressurization (2) lowered

35. Unit 1 is at 12% power, and the following conditions exist:

R-15A, SJAE EXH, has failed.

R-15B, TURB BLDG VNTL, is trending up but not in alarm.

Which one of the following completes the statements below?

(1) will be the first radiation monitor to alarm and provide indication that a SG tube leak exists.

After placing the SJAE Filtration System in service, R-15B, TURB BLDG VNTL, reading will (2)

Nomenclature: R-19, SGBD SAMPLE R-70A, IA SG TUBE LEAK DET (1) (2)

A. R-19 lower B. R-19 continue rising C. R-70A lower R-70A continue rising

36. Unit 1 is in Mode 3 after a Reactor trip with the following conditions:
  • An RCS cooldown is in progress.
  • RCS Tavg is 520° F and slowly lowering.
  • RCS pressure is 1900 psig and stable.

The Steam Dumps are in service in the STM PRESS mode with the following conditions:

  • STM DUMP INTERLOCK A and B TRN switches are in ON after both switches were taken to BYP INTLK and released.
  • PK-464, STM HDR PRESS, is in AUTO with 5% demand.
  • All ESF blocks required for these conditions have been performed.

Which one of the following describes the effect of PT-464, STM HDR PRESS, pressure transmitter failing high?

A. The steam dump valves will immediately close resulting in a heat up transient of the RCS.

B. Some Steam Dumps will fully open and the RCS will experience a cooling transient which will continue until operator action is taken.

C. Closure of the MSIVs will occur due to high steam flow condition coincident with LO LO Tavg.

D. Some Steam Dumps will fully open and the RCS will experience a cooling transient which will be followed by a closure of the MSIVs due to low SG pressure.

37. The following conditions exist on Unftl:
  • 1 B SG is faulted and the operating crew is performing the actions of EEP-2, Faulted Steam Generator Isolation.
  • The MSVR is not accessible.
  • Only the TDAFW pump is running.

- 1A=19%

- 1B=O%

- 1C15%

Per EEP-2, which one of the following completes the statements below?

Airisrequiredtobefailedto (1)

HV-3235N3226 (2) required to be placed in LOCAL then STOP at the HSDP.

Nomenclature: HV-3235A, TDAFW STM SUPP FROM 1 B SG HV-3226, TDAFWP STM SUPP ISO HV-3235N3226, TDAFWP STM SUPP FROM lB SG (1) (2)

A. HV-3235A is NOT B. HV-3226 is NOT C. HV-3235A IS D. HV-3226 IS

38. Unit 2 is operating at 50% power with the following conditions:

At 1000:

  • Condenser pressure starts to rise.
  • KK1, TURB COND VAC LO, comes into alarm.

At 1015:

  • Power has been reduced to 37% and the unit is ramping down.
  • KK2, TURS COND VAC LO LO, comes into alarm.
  • Condenser pressure has risen to 3.9 psia.

Which one of the following completes the statements below At 1015?

The Main Turbine (1) automatically trip.

A manual Reactor trip (2) required.

(1) (2)

A. DID IS B. did NOT IS C. DID is NOT D. did NOT is NOT

39. The following conditions exist on Unit 1:
  • FRP-H.1, Response to Loss of Secondary Heat Sink, is in progress.
  • All SG wide range levels are 40% and slowly lowering.
  • All efforts to establish AFW flow to any SG have failed.

Which one of the following completes the statement below?

The operating crew is required to stop (1) to (2)

A. (1) ALL RCP5 (2) minimize heat input to the RCS ONLY B. (1) ALL but one RCP (2) minimize heat input to the RCS while maintaining spray capability C. (1) ALL RCPs (2) minimize heat input to the RCS while preventing damage to RCP seals during pressure reduction D. (1) ALL but one RCP (2) minimize heat input to the RCS while maintaining forced flow cooling

40. A loss of all AC power has occurred on Unit 1 and the following conditions exist:
  • The operating crew has completed the step in ECP-0.0, Loss Of All AC Power, to verify breakers for major loads OPEN.
  • A Safety Injection occurs on Unit 1.
  • The Shift Supervisor has directed operators to start the 2C DC and supply powerto Unit 1.

Which one of the following completes the statements below?

The 2C DG will be started from the EPB in (1) using the START pushbutton.

After the 2C DG is started, ESF loads (2)

A. 1)Mode2

2) will automatically start B. 1)Mode2
2) have to be manually aligned C. 1) Model
2) will automatically start D. l)Model
2) have to be manually aligned
41. A Loss of all Offsite Power has occurred on Unit I with the following conditions:
  • 1 B DG is Tagged Out.
  • 1-2A DG failed to autostart.
  • Operators are performing step 1 of ECP-O.O, Loss of All AC power.

Which one of the following completes the statement below?

Reactor trip and Bypass Breaker indication (1) available.

DRPI indication (2) available.

(1) (2)

A. IS is NOT B. is NOT IS C. IS IS D. is NOT is NOT

42. Unit 2 is operating at 100% power when a SG tube leak occurs and the following conditions exist:
  • R-23B, SGBD TO DILUTION, alarms.
  • No other radiation monitors are in alarm.

Which one of the following completes the statement below?

FCV-1 152, SGBD HX OUTLET FCV (1) automatically close as a direct result of R-23B alarming.

Per FH1, RMS HIGH RAD, the SGs (2) required to be sampled.

(1) (2)

A. will NOT ARE B. will NOT are NOT C. WILL ARE D. WILL are NOT

43. Unit 1 is operating at 33% power and the following conditions exist:
  • IA and lB Condensate pumps are running.
  • 1A SGFP is running.

Subsequently, the following conditions are observed:

KB4, SGFP SUCTION PRESS LOW, comes into alarm and the operating crew observes the following on PR4039, SGFP SUCT PRESS:

Time Osec l0sec 20sec 30sec 300 psig 275 psig 265 psig 300 psig Which one of the following completes the statements below?

At time 30 seconds, SGFP suction pressure improved because the (1)

Pet AOP-1 3, Condensate and Feedwater Malfunction, the operating crew is required to (2)

A. (1) standby Condensate pump started (2) rapidly reduce Turbine load using AOP-17.1, Rapid Turbine Power Reduction, and ensure SGFP suction pressure stabilizes above 275 psig B. (1) standby Condensate pump started (2) check SGFP suction pressure stabilizes above 275 psig C. (1) lASGFPtripped (2) trip the Reactor and enter EEP-0, Reactor Trip or Safety Injection D. (I) lASGFPtripped (2) trip the Main Turbine and enter AOP-3.0, Turbine Trip Below P-9 Setpoint

44. Unit 1 is in MODE 4 with the following conditions:
  • A heatup is in progress pet UOP-1.1, Startup of Unit from Cold Shutdown to Hot Standby.
  • 1A MDAFW pump is running.
  • SG NR Levels are being maintained at 61-69%.

Subsequently, the following annunciator alarms:

  • JJ1, 1AMDAFWPOVERCURRENTTRIP Which one of the following completes the statements below?

The earliest time that the 1 B MDAFW will start is when (1)

MDAFW FCVs will (2) when the I B MDAFW auto starts.

A. (1) any two SG NR levels teach their Lo-Lo Level setpoint (2) remain throttled B. (1) any two SG NR levels reach their Lo-Lo Level setpoint (2) fully open C. (1) any one SG NR level reaches its Lo-Lo Level setpoint (2) remain throttled D. (1) any one SG NR level reaches its Lo-Lo Level setpoint (2) fully open

45. Unit 1 is performing a plant heatup with the following conditions:

1A RHR pump control power breaker is opened.

Which of the following completes the statements below?

JA RHR pump breaker, DF-09, (1) be locally closed without control power.

DF-09 indication (2) available at the MCB.

(1) (2)

A. CAN is NOT B. CANNOT is NOT C. CAN IS D. CANNOT IS

46. Unit us operating at 100% when the followg occurs:
  • JA Start Up transformer becomes de-energized.
  • A Safety Injection occurs.

Which one of the following completes the statements below?

Per Attachment 3 of EEP-0, Reactor Trip or Safety Injection, MOV-515 &

MOV-517, SW TO TURB BLDG ISO A & B TRN are verified (1)

The purpose for MOV-515 & MOV-517 being in their current position isto (2)

A. (1) Closed (2) ensure adequate Service Water flow to safety related equipment during accident conditions B. (1) Closed (2) ensure a break in non-safety related piping will not result in loss of cooling during accident conditions C. (1) Throttled (2) ensure adequate Service Water flow the Service Air Compressors D. (1) Throttled (2) ensure adequate Service Water flow to lube oil coolers in the Turbine Building

47. Which one of the following completes the statement below?

An Undervoltage condition on the will directly result in the auto start of the 1 -2A Diesel Generator.

A. lH4l60voltbus B. lA4l6Ovoltbus C. lF4l6Ovoltbus D. 1K 4160 volt bus

48. Which one of the following completes the statement below?

Each Aux Building Battery Charger is designed to restore the associated battery from fully discharged to fully charged in (1)

The method to ensure that only one DC bus at a time is supplied from the JC Aux Building Battery Charger is the use of (2) interlocks.

A. (1)2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) electrical B. (1)2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> (2) key C. (1) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (2) electrical D. (1) 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> (2) key

49. Given the following conditions:

The lB DG is being paralleled with the JG bus.

The Synch roscope is turning fast in the FAST direction.

Which one of the following completes the statements below?

The (1) has the highest Frequency.

The (2) switch must be adjusted to slow the Synchroscope.

(1) (2)

A. 1G Bus VOLTAGE ADJUST VOLTS/MVARS B. IG Bus GOVERNOR MOTOR SPEED/MW C. lB DG VOLTAGE ADJUST VOLTS/MVARS D. lB DG GOVERNOR MOTOR SPEED/MW

50. Unit ifs at 10% power with the following conditions:

At 1000:

  • The UO is in the process of transferring from FRV Bypass to Main FRV:

- All Main Feed Regulating Valve controllers are in MAN.

- All Main Feed Regulating Valves Bypass controllers are in AUTO.

At 1005:

  • The following MCB alarms are in alarm:

- KD1, IATO PENE RM PRESS LO

- KD2, IA PRESS LO

- KD3, SA PRESS LO

  • Pl-4004B, INST AIR PRESS, reads 35 psig and lowering.
  • All Main Feed Regulating Valves Bypass controller demands are rising.
  • NR SGWL are all 35% and lowering.

Which of the following completes the statements below?

At 1005, per AOP-6.0, Loss of Instrument Air, a Reactor Trip (1) required.

When required, per AOP-6.0, a method the operating crew can use to control Pressurizer level is alternately cycling open and closed (2)

A. (1) IS (2) MOV-8107 or MOV-8108, CHG PUMPS TO REGENERATIVE HX B. (1) IS (2) MOV-8803A or MOV-8803B, HHSI TO RCS CL ISO C. (1) is NOT (2) MOV-8107 or MOV-8108, CHG PUMPS TO REGENERATIVE HX D. (1) is NOT (2) MOV-8803A or MOV-8803B, HHSI TO RCS CL ISO

51. A VCT purge is in progress to the Waste Gas system with the following conditions:
  • The Waste Gas H2 recombiners are bypassed.
  • Gas concentrations in the Waste Gas System are currently as follows:

- Hydrogen Levels: 4%

- Oxygen Levels: 6%

Which of the following completes the statements below?

Under the current plant conditions, monitoring of hydrogen and oxygen concentration in the Waste Gas system is performed by (1)

PerTRM 13.12.3, Waste Gas Monitoring, operators are requited to immediately (2)

A. (1) Chemistry sampling activities (2) place a Waste Gas H2 recombiner in service to lower H2 gas concentration B. (1) Chemistry sampling activities (2) secure the VCT purge to waste gas C. (1) an operator obtaining readings locally (2) place a Waste Gas H2 recombiner in service to lower H2 gas concentration D. (1) an operator obtaining readings locally (2) secure the VCT purge to waste gas

52. Unit 1 is in Mode 6 with the following conditions:
  • Fuel movement preparations are in progress in the Unit 1 Spent Fuel Pool.
  • R-5, SFP RM, loses instrument power.

Which one of the following completes the following statement?

R-5 losing instrument power (1) cause an audible alarm in the SFP.

A REQUIRED ACTION of TR 13.3.4, Radiation Monitoring System, (2) required to be performed.

A. (1) wilINOT (2) is NOT B. (1) wilINOT (2) IS C. (1) WILL (2) is NOT D. (1) WILL (2) IS

53. Unit 1 is operating at 100% when the following condition occurs:

R-19, SGBD SAMPLE, fails HIGH.

Which one of the following completes the statements below?

(1) valves will automatically close.

Per SOP-45.0, Radiation Monitoring System, the actions required to allow the Shift Chemist to obtain a sample of the SGs is to (2)

A. 1) HV-3328, HV-3329 AND HV-3330, STEAM GEN lA/lB/iC SAMPLE ISO,

2) pull the INSTRUMENT power fuses for R-19 B. 1) HV-3328, HV-3329 AND HV-3330, STEAM GEN lA/lB/iC SAMPLE ISO,
2) place R-1 9 Operations Selector Switch to the RESET position C. 1) HV-3179A, 3180A, AND 3181A, STEAM GEN lA/lB/iC LOWER B LOWDOWN,
2) pull the INSTRUMENT power fuses for R-19 D. 1) HV-3179A, 3180A, AND 3181A, STEAM GEN lA/lB/iC LOWER B LOWDOWN,
2) place R-i 9 Operations Selector Switch to the RESET position
54. Which one of the foowing completes the statement below?

When directed by FRP-C.1, Response to Inadequate Core Cooling, all RCP5 are stopped A. to enhance LHSI flow to the core B. to minimize heat input to the SGs allowing them to depressurize faster C. to increase subcooling margin by reducing heat input from RCPs D. in anticipation of a loss of RCP #1 seal z\P requirements

55. The following condition exists on Unit 1:

DF02-1, 1 F 4160 V bus tie to 1 K 4160 V bus, has tripped.

Which one of the following completes the statement below?

The has lost Service Water cooling.

A. 600V LC 1 E Cooler B. 1A Instrument Air Compressor C. 1A Reactor Coolant Pump Motor Air Cooler D. 1 C Component Cooling Water Heat Exchanger

56. Gien the following condition on Unit 1:

PI-4004B, INST AIR PRESS, reads 70 psi9 and stable.

Which one of the following completes the statement below?

KD2, IA PRESS LO, (1) in alarm.

V-901, SERVICE AIR HDR AUTO ISO, (2) closed.

(1) (2)

A. IS is NOT B. IS IS C. is NOT is NOT D. is NOT IS

57. Whh one of the foflowing completes the statements below? -___________________

(1) will isolate instrument air to the Turbine Building.

The highest pressure that will result in isolation of Instrument air to the Turbine Building is (2)

(1) (2)

A. V-903, ESSENTIAL IA HDR AUTO ISO 55 PSIG B. V-903, ESSENTIAL IA HDR AUTO ISO 45 PSIG C. V-904, NON-ESS IA HDR AUTO ISO 55 PSIG D. V-904, NON-ESS IA HDR AUTO ISO 45 PSIG

58. Which one of the following completes the statement below?

The capacity of each Fire Protection Storage Tank is (1) and the normal source of makeup is from (2)

(1) (2)

A. 500,000 gallons Service Water B. 300,000 gallons Service Water C. 500,000 gallons Well Water D. 300,000 gallons Well Water

59. ALr [OAha occurred on Unit 2 and the following condition exists:

Containment pressure has risen to 18 psig and is stable.

Which one of the following completes the statements below?

R-11, CTMT PARTICULATE and R-12, CTMT GAS, (1) isolated.

MOV-8100, RCP SEAL WTR RTN ISO, (2) closed.

(1) (2)

A. ARE is NOT B. ARE IS C. are NOT is NOT D. are NOT IS

6O. Unit 1 performing core offload.

Which one of the following completes the statements below?

Containment Main Purge (1) be running.

Per STP-18.4, the Maintenance Closure Response Team must be able to complete installation of the Equipment Hatch in a maximum of (2)

Nomenclature: STP-18.4, Containment Mid-Loop And/Or Refueling Integrity Verification And Containment Closure A. CANNOT 1 hr B. CANNOT 2hrs C. CAN lhr D. CAN 2hrs

61. Unit 1 is at 100% power with the following conditions:
  • Multiple alarms have occurred.
  • Performance of Immediate Operator Actions (lOAs) of AOP-1 00, Instrument Malfunction, is in progress.

Which one of the following completes the statements below?

When the operator makes the initial communication that they are performing lOAs, the Shift Supervisor (1) required to repeat back the communication.

If any subsequent alarms occur during performance of AOP-1 00, (2) must be announced.

(1) (2)

A. IS only significant alarms B. is NOT only significant alarms C. IS all alarms D. is NOT all alarms

62. Which one of the following completes the statements below?

The (1) has a relief valve that will direct its discharge directly to the (2)

A. PRT RCDT B. COW Surge Tank Floor Drain Tank C. PRT Containment Sump D. COW Surge Tank Waste Holdup Tank

63. Both Units are operating at 100% power with the following conditions:
  • A non-licensed Fire Protection Administrator who is qualified as a Shift Communicator is on shift.

Which one of the following completes the statements below?

Per EIP-0.0, Emergency Organization, a minimum of (1) licensed Plant Operators are required to staff the current shift.

Per Technical Specifications, if one of the required licensed Plant Operators goes home sick, a replacement must be provided within (2)

(1) (2)

A. 3 ihour B. 3 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> C. 4 ihour D. 4 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />

64. Unit 1 is at 30% power and the following conditions exist:

All SG NR levels are 65% and stable.

The IA SGFP is in service and in manual control.

The foUowing is observed:

P1 P1 464A 508 12 1.4 12 06 04 06 P  :  : P

-H 13 02 13 x x 0  :  : 10 0 02 SIM FW HDR HOR PRESS PRESS

  • The Main Feedwater Regulating Valves are approximately 25% demand and in AUTO.
  • The Feedwater Bypass Valves are approximately 10% demand in MANUAL.

Which one of the following completes the statements below?

1A SGFP speed (1) required to be adjusted.

Per UOP-3. 1, Power Operation, the Feedwater Bypass Valves are required to be closed prior to exceeding (2) Reactor power.

(1) (2)

A. is NOT 35%

B. is NOT 50%

C. IS 35%

D. IS 50%

65. The following plant conditions exist:
  • Unit 1 is operating at 100% power.
  • Unit 2 is in Mode 5.

Subsequently, the following conditions exist:

  • All uff-it taisrnission lines to the 230
  • No other damage has been reported.

Which one of the following completes the statements below?

Unit 1 - REQUIRED ACTION(S) per LCO 3.8.1, AC Sources Operating, is (1)

Unit 2 - REQUIRED ACTION(S) per LCO 3.8.2, AC Sources Shutdown, is (2)

A. (1) NOT required (2) REQUIRED B. (1) REQUIRED (2) NOT required C. (1) NOT required (2) NOT required D. (1) REQUIRED (2) REQUIRED

  • All 230KV offsite lines to the High Voltage Switchyard were knocked down.
66. Unit 1 has experienced a Steam Generator Tube Rupture on the IC SG.

The operating crew is at the step in EEP-3, Steam Generator Tube Rupture, to isolate flow from the ruptured SG.

Which one of the following completes the statement below?

PC-3371 C, 10 MS ATMOS REL VLV, controller is required to be verified in (1)

HV-3235B, TDAFWP STM SUPP FROM 10 SG (2) required to be placed in LOCAL and stopped at the HSDP.

A. (1) MANUAL and closed (2) is NOT B. (1) MANUAL and closed (2) IS C. (1) AUTO and set to approximately 1035 psig (2) is NOT D. (1) AUTO and set to approximately 1035 psig (2) IS

67. Which one of the following completes the statements below for operation of R-18, LIQ WASTE DISCH, radiation monitor?

Placing the OPERATION SELECTOR handswitch in the CHECK SOURCE position (1)

The CHECK SOURCE position is used to (2)

A. (1) exposes the detector to a known radioactive substance (2) verify proper monitor response B. (1) injects an electronic signal downstream of the detector (2) verify proper monitor response C. (1) exposes the detector to a known radioactive substance (2) provide a signal for monitor calibration D. (1) injects an electronic signal downstream of the detector (2) provide a signal for monitor calibration

68. Unit 1 has just experienced a Reactor Trip and Safety Injection, and the following conditions exist:
  • The OATC and the Unit Operator UO are in the Control Room.
  • CCW pumps and AFW pumps did not auto start, but all other equipment functioned as designed.
  • The OATC is performing the Immediate Operator Actions (lOAs) of EEP-O, Reactor Trip or Safety Injection, from memory.

Which one of the following completes the statements below?

Per SOP-O.8, while the OATC is performing the lOAs from memory he (1) required to manually start CCW and AFW pumps.

The UO is required to (2)

Nomenclature: SOP-O.8, Transient Response Procedure Users Guide.

A. (1) IS (2) separately perform all IOAs B. (1) IS (2) ensure the OATC performs the lOAs correctly C. (1) is NOT (2) separately perform all IOAs D. (1) is NOT (2) ensure the OATC performs the lOAs correctly

69. Unit 1 is at 100% power with the following conditions:

At 1000:

  • A malfunction has occurred affecting N141, POWER RANGE NI.

- FC1, PR HI FLUX-HI RNG RX TRIP ALERT

- FC3, PR HI FLUX RATE ALERT

- FD2, PR OVERPOWER AUTO/MAN ROD STOP At 1010:

Which one of the following completes the statements below?

At 1010: Entry into AOP-35.0, Loss of Main Control Board Annunciators, (1) required.

To check the status of the associated annunciator cabinet, an operator must be dispatched to the (2)

(1) (2)

A. is NOT l39ftAux Building Electrical Penetration Room B. IS l39ftAux Building Electrical Penetration Room C. is NOT Cable Spreading Room D. IS Cable Spreading Room

70. Unit us Operating at 25% Reactor Power when the following conditions occur:

1000 1002 1003 1ASGNRLEVEL(%) 26 24 21 lB SG NR LEVEL (%) 34 29 25 IC SG NR LEVEL t%) 34 31 27 1ASGFPSTATUS RUNNING TRIPPED TRIPPED lB SGFP STATUS RUNNING TRIPPED TRIPPED Which one of the following completes the statements below?

The earliest time that an automatic Reactor trip should have occurred is (1)

The earliest time that all AFW pumps should have automatically started is (2)

(1) (2)

A. 1000 1002 B. 1002 1002 C. 1000 1003 D. 1002 1003

71. A Reactor Trip and Safety Injection occurred on Unit 1 and the following conditions exist:
  • The operating crew is performing actions of ESP-1.1, SI Termination.
  • Containment Pressure is 17 psig and slowly lowering.
  • Normal Charging has been established.
  • Pressurizer level is 55% and lowering.

Following completion of the step in ESP-1.1 to secure LHSI, the following conditions exist:

  • Pressurizer Level indicates 35% and lowering.
  • Charging flow is at maximum.

Which one of the following completes the statement below?

Per ESP-1.1, the operating crew is required to A. establish HHSI flow B. start an additional charging pump ONLY C. continue with the procedure and verify PHASE A CTMT ISO reset D. open pressurizer spray valves to reduce RCS pressure and refill the Pressurizer

72. Unit 1 tripped from 100% powerwith the followig conditions:
  • A Steam Line break occurred in Containment.
  • FRP-H.1, Response To Loss Of Secondary Heat Sink, is in progress.
  • Containment pressure is 40 psig and slowly lowering.

Which one of the following completes the statements below?

Bleed and Feed criteria is met as soon as two SG wide range levels are LESS THAN (1)

Phase B isolation is reset in FRP-H.1 to (2)

A. (1)12%

(2) restore CCW cooling to the RCPs B. (1)12%

(2) restore Instrument Air to Containment C. (1)31%

(2) restore CCW cooling to the RCPs D. (1)31%

(2) restore Instrument Air to Containment

73. A Reactor trip has occurred on Unit 1 and the following conditions exist:

At 0958:

  • All SG NR levels are being maintained at 65%.

Subsequently, the following indications are observed on the 1C SG:

Time 1CSG Pressure 1000 1035 psig 1010 1075 psig 1020 1135 psig 1030 ll63psig Which one of the following completes the statement below?

is the earliest time that parameters meet the requirements for entry into FRP-H.2, Response to Steam Generator Overpressure?

A. 1000 B. 1010 C. 1020 D. 1030

74. Unit Ihas the following conditions: -
  • Containment pressure is 29 psig and slowly lowering.
  • Phase B failed to automatically actuate.
  • FRP-Z.1, Response to High Containment Pressure, has just been entered.

Subsequently, The operating crew reaches the step to evaluate Containment Spray and the readings on the IPC as given on the next page:

Which one of the following completes the statements below?

Per FRPZ.1, Phase B actuation (2) required.

When required, the operation of a minimum of (2) PHASE B CTMT ISO CS ACTUATION handswitch(es) will actuate Phase B Containment Isolation.

(1) (2)

A. IS one B. IS two C. is NOT one D. isNOT two

r I

tdatabase inputs to a pointt POINT ID VALUE UNITS QUAL I DESCRIPTION Pagel oil PC15O1 PSIG NARROW RANGE CTMT PRESSURE AVG PT0951 PSIG CTMT PRESSURE CHAN 2 PT0952 PSIG CTMT PRESSURE CHAN 3 PT0953 PSIG CTMT PRESSURE CHAN 4

f 75. A Reactor Trip and Safety Injection has occurred on Unit 1 with the following conditions:

  • RCS Pressure has stabilized at 1600 psig.
  • The Containment CSF is YELLOW, all others are GREEN.
  • Containment Pressure is 3 psig.
  • Ll-3594A, CTMT SUMP LVL, reads 5.3 Ft and rising slowly.
  • R-2, CTMT 155 ft, is in HIHI alarm reading 2.4 R/HR and rising.
  • R-7, SEAL TABLE, is in HIHI alarm reading 2.5 R/HR and rising.

Which of the following completes the statements below?

Adverse Containment values (1) required to be used for this event.

The applicable procedure is (2)

A. (1)areNOT (2) FRP-Z.2, Response to Containment Flooding.

B. (1) ARE (2) FRP-Z.2, Response to Containment Flooding.

C. (1) are NOT (2) FRP-Z.3, Response to High Containment Radiation.

D. (1) ARE (2) FRP-Z.3, Response to High Containment Radiation.

76. Unit 1 is at 12% Power with the following conditions:
  • The crew is ramping up in accordance with UOP-1 .2, Startup of Unit From Hot Standby to Minimum Load.

Subsequently, the following occurs.

  • N35 indicates 3.2x105 AMPERES.
  • N35, 1 18V, 5A, AC INSTR. POWER fuse holder is NOT lit.
  • N35, 1 1 8V, 5A AC CONTROL POWER fuse holder is lit.
  • TSLB3 2-1, IR HI Q NC-35, is lit.
  • TSLB3 3-1, IR P6 NC-35D, is not lit.

Which one of the following completes the statements below:

N35 has a blown (1) fuse.

Per AOP-100.O, Instrumentation Malfunction, the crew is (2)

Procedure Names:

UOP-1 .2, Startup of Unit From Hot Standby to Minimum Load UOP-2.1, Shutdown of Unit from Minimum Load to Hot Standby (1) (2)

A. Control Power allowed to continue ramping up per UOP-1 .2 B. Control Power required to shutdown to MODE 3 per UOP-2.1 C. Instrument Power allowed to continue ramping up per UOP-1 .2 D. Instrument Power required to shutdown to MODE 3 per UOP-2.1

77. Unit 1 is at 88% Power when the following occurs:
  • The OATC withdraws Control Bank D rods to 205 steps.
  • Rod H-2 repositions to 150 Steps.
  • Reactor Power stabilizes at 85%.

Which one of the following completes the statements below.

The crew (1) required to reduce power from the current power level.

Operators are required to take corrective action in accordance with AOP-19.0, Malfunction of Rod Control, (2)

A. (1)IS (2) Section 1.2, Misaligned Rods in MODE 1 B. (1)lS (2)Section 1 .3, Dropped Rods In MODE 1 C. (1) is NOT (2) Section 1 .2, Misaligned Rods in MODE 1 D. (1) is NOT (2) Section 1.3, Dropped Rods In MODE 1

78. Unit us operating at 100% Power when the following occurs:
  • PCV-445A, PRZR PORV, indicates open.
  • P1-444, PRZR PRESS, indicates 2100 psig and lowering.
  • P1-445, PRZR PRESS, indicates 2500 psig and stable.
  • P1-402, RCS PRESS, indicates 2100 psig and lowering.
  • P1-403, RCS PRESS, indicates 2100 psig and lowering.
  • The OATC manually shuts PCV-445A.

Subsequently, the following is observed:

  • PRT Parameters have stabilized.

Which one of the following completes the statements below?

Entry into a REQUIRED ACTION statement of TS 3.3.1, Reactor Trip System Instrumentation (1) required.

PCV-445A (2) OPERABLE per Bases of TS 3.4.11, PORVs.

A. (1)15 (2) is NOT B. (1) is NOT (2) is NOT C. (1)15 f2)lS D. (1) is NOT (2) IS

79. Unit 1 was operating at 100% Power when a Reactor Trip setpoint was approached. The following actions were taken PRIOR to an automatic Reactor Trip setpoint being exceeded:
  • After the OATC placed the first Reactor Trip handswitch to TRIP:

- Reactor Trip Breaker A is CLOSED.

- Reactor Trip Breaker B is CLOSED.

  • After the OATC placed the second Reactor Trip handswitch to TRIP:

- Reactor Trip Breaker A is OPEN.

- Reactor Trip Breaker B is CLOSED.

Which one of the following completes the statements below?

The Main Turbine (1) automatically trip.

An emergency classification threshold value (2) been exceeded per NMP-EP-1 I 0-GLO1, FNP EALS ICs, Threshold Values And Basis.

(1) (2)

A. DID HAS B. DID has NOT C. did NOT HAS D. did NOT has NOT

80. Unit 1 is operating at 100% Power when the following occurs:

At 1000:

  • A steam line break in the 1A Steam header.
  • Containment Pressure is 15 psig and rising.
  • The indications in the table below are observed.

At 1010:

  • The crew enters EEP-2.0, Faulted SG Isolation.
  • Operators take all MSIV-TRIP handswitches to the CLOSE position.

At 1012:

  • The indications in the table below are observed.

At 1000 At 1012 1A SG Pressure 520 PSG and falling 500 PSIG and falling 1A Steam Flow 1.1 LBS/HR X 106 .9 LBS/HR X 106 1A MSIVs Red light LIT, Green light OUT Red light LIT, Green light LIT lB SG Pressure 520 PSIG and falling 500 P516 and falling lB Steam Flow 1.1 LBS/HR X 106 .9 LBS/HR X lO6 lB MSIVs Red light LIT, Green light OUT Red light LIT, Green light OUT C SG Pressure 520 PSIG and taIling 500 PSIG and falling C Steam Flow 1.1 LBS/HR X l06 .9 LBS/HR X l06 C MSIVs Red light LIT, Green light OUT Red light LIT, Green light OUT Which one of the following completes the statements below?

There is a steam line break located (1) of the 1A MSIV.

At 1012 the crew (2) required to transition to ECP-2.1, Uncontrolled Depressurization of All Steam Generators.

(1) (2)

A. Downstream is NOT B. Downstream IS C. Upstream is NOT D. Upstream IS

81 Unit 1 experiences a Large Break LOCA with the following conditions.

  • The crew is executing EEP-1, Loss of Reactor or Secondary Coolant, and are at the step that directs measuring CTMT hydrogen concentration.
  • CTMT Pressure is 3 psig.

Which one of the following completes the statements below?

The crew will (1) ,within one hour of (2)

A. (1) place hydrogen recombiners on service per Attachment 3 of EEP-1 .0, Loss of Reactor or Secondary Coolant.

(2) the start of the event B. (1) place hydrogen recombiners on service per Attachment 3 of EEP-i .0, Loss of Reactor or Secondary Coolant (2) reaching 0.5% hydrogen concentration in Containment C. (1) initiate actions to vent containment per SOP-i 0.0, Post LOCA CTMT Pressurization and Vent System (2) the start of the event D. (1) initiate actions to vent containment per SOP-10.0, Post LOCA CTMT Pressurization and Vent System (2) reaching 0.5% hydrogen concentration in Containment

82. Unit I is operating at 8% power with the following condition:

A Pressurizer Level control malfunction results in Pressurizer level reaching 65%.

Which one of the following completes the statements below?

The Pressurizer (1) OPERABLE.

Per the Bases of TS 3.4.9, Pressurizer, the purpose of the Pressurizer water level required for operability is to (2)

A. (1) is NOT (2) ensure a sufficient steam space exists to prevent the consequences of an overpressure transient B. (1)15 (2) ensure a sufficient steam space exists to prevent the consequences of an overpressute transient C. (1) is NOT (2) prevent water relief through Pressurizer Code Safeties D. (1)IS (2) prevent water relief through Pressurizer Code Safeties

83. Unit 1 is in MODE 6 with refueling operations in progress.

Which of the following completes the statements below?

(1) permission is required prior to placing the Manipulator Crane Overload Bypass switch to the ON position, per FHP-1.O, Refueling Operations.

The Manipulator Crane Overload Cut Off Limit ensures the (2) will not be damaged by excessive lifting forces, per Bases of TRM 13.9.3, Manipulator Crane.

(1) (2)

A. Shift Manager Reactor Lower Internals B. Refueling SRO Reactor Lower Internals C. Shift Manager Manipulator Crane D. Refueling SRO Manipulator Crane

84. Unit 1 is operating at 100% Power when a Main Steam Line Break from the 1 B SG occurs in CTMT with the following conditions:
  • CTMT pressure peaked at 30 psig and is dropping slowly.
  • No CTMT Cooler Fans are running.

Which one of the following completes the statements below?

FRP-Z.1, Response to High Containment Pressure, entry (1) required.

A LOSS or POTENTIAL LOSS of Containment (2) exist per NMP-EP-110-GLO1, FNP EALs ICs, Threshold Values and Basis.

Reference Provided (1) (2)

A. is NOT does NOT B. is NOT DOES C. IS does NOT D. IS DOES

8Un[t1 is operathig at 100% Power when the foiiowhg OCCUrS At 1000:

  • DF-01, IA S/U XFMR to 4160V BUS iF, trips.

At 1010:

  • The 1-2A DG trips.

Which one of the following completes the statement below?

At 1005 the A Train Inverters (1) OPERABLE, per TS 3.8.7, Inverters -

Operating.

At 1010 entry into a REQUIRED ACTION statement of IS 3.8.1, AC Sources -

Operating (2) required.

(1) (2)

A. ARE is NOT B. are NOT is NOT C. ARE IS D. are NOT IS

8Urut 1 is operating at 100% power when the foowhig occurs:

Control Room Evacuation is requited pet AOP-28.O, Control Room Inaccessibility.

Which one of the following completes the statements below?

Prior to evacuating the Main Control Room the operating crew (1) required to trip the Reactor Coolant Pumps.

After control room re-entry is achieved and all required actions of AOP-28.O are complete the crew is requited to transition to (2)

(1) (2)

A. IS EEP-O, Reactor Trip or Safety Injection B. IS UOP-2.3, Shutdown of Unit Following Reactor Trip C. is NOT EEP-O, Reactor Trip or Safety Injection D. is NOT UOP-2.3, Shutdown of Unit Following Reactor Trip

87. Unit us operang at 100% Power when the following occurs:

Maintenance is preparing to de-energize R-5, SEP RM, for troubleshooting and repair on Unit 1.

At 1000:

  • An electrical lead is lifted that disables the alarm function of R-5, however, the radiation monitor indication is reading correctly and is still valid.

At 1030:

  • The power supply to R-5 is de-energized and Tagged Out.

Which one of the following completes the statements below?

The first time that R-5 rad monitor was no longer FUNCTIONAL, in accordance with TRM 13.3.4, Radiation Monitoring Instrumentation, was at (1)

De-energizing R-5 (2) cause the Penetration Room Filtration System to automatically start.

(1) (2)

A. 1000 WILL B. 1000 will NOT C. 1030 WILL D. 1030 will NOT

88. Unit us at 100% Power with the foIngcondftions:
  • An equalizing battery charge is in progress on the lAAux Building Battery.
  • LG3, JA BATT RM EXH FAN FAULT, has come into alarm on the BOP.
  • Upon investigation, maintenance has determined that the 1A BATT RM EXH FAN has a seized bearing and cannot be returned to service.

Which one of the following completes the statements below?

The operational concern of the exhaust fan malfunction is excessive Battery Room (1)

The 1A Aux Building Battery (2) OPERABLE, per TS 3.8.4, DC Sources -

Operating.

A. (1) hydrogen concentration (2)15 B. (1) hydrogen concentration (2) is NOT C. (1)temperature (2) IS D. (1)temperature L (2)is NOT

ni iso tatIopn the foflowhig

  • The instrument air supply line connected to the actuator for HV-3235A, TDAFWP STM SUPP FROM 1 B SG, ruptures.
  • The air rupture is isolated using the closest upstream isolation valve.

Which one of the following completes the statements below?

Air supply to HV-3235B, TDAFWP STM SUPP FROM 1C SG, (1) affected by isolating air to HV-3235A.

Entry into a REQUIRED ACTION statement of TS 3.7.5, AFW System (2) required.

(1) (2)

A. is NOT is NOT B. is NOT IS C. IS is NOT D. IS IS

90. Unit 1 is at 100% power when the following occurs:
  • A Train is the ON SERVICE train.
  • The 1 E SW pump trips on over current.

Which one of the following completes the statements below?

The crew (1) requited to perform REQUIRED ACTION statement(s) of TS 3.7.7, Component Cooling Water System.

The crew (2) requited to perform REQUIRED ACTION statement(s) of TS 3.8.1, AC Sources Operating.

(1) (2)

A. IS IS B. isNOT IS C. IS is NOT D. is NOT is NOT

91. Unit 1 is in MODE 4 with the following conditions:
  • A Containment entry is planned for repair of a pressure transmitter.
  • A 10 pound aluminum toolbox with appropriate tools is required to complete the repairs.

Which one of the following completes the statements below per STP-34. 1, Containment Inspection (Post Maintenance)?

During the Containment entry, an FME Monitor (1) required.

It (2) allowed to leave the aluminum toolbox unattended inside Containment, without further engineering evaluation, while the workers exit Containment for two hours in order to modify the Work Package.

(1) (2)

A. is NOT is NOT B. is NOT IS C. IS is NOT D. IS IS

92. Unit 1 is in MODE 6 with the following condition:

The core is fully loaded.

Which one of the following completes the statements below?

(1) must be directly supervised by an active Senior Reactor Operator in Containment in accordance with FHP-1 .0, Refueling Operations?

Gamma-Metrics (2) be used to meet the source range neutron flux monitoring requirement of T.S. 3.9.2, Nuclear Instrumentation.

A. (1) Lifting the Reactor Vessel Head (2) CANNOT B. (1) Lifting the Reactor Vessel Head (2) CAN C. (1) Control Rod latching and RCCA Drag Testing (2) CANNOT D. (1) Control Rod latching and RCCA Drag Testing (2) CAN

93 Unit 1 is Shutdown with the following condiUons.

  • An Emergency Operating Procedure is in progress.
  • The Shift Supervisor determines that actions that meet I OCFR5O.54(x) criteria are required.

Which one of the following completes the statements below in accordance with NMP-AP-003, Procedure and Work Instruction Use and Adherence?

Prior to taking the action, at a minimum (1) approval is (are) required for the action.

The NRC is required to be notified within (2)

A. (1) ONLY Shift Supervisor (2) ONE hour B. (1) BOTH Shift Supervisor and Shift Manager (2) ONE hour C. (1) ONLY Shift Supervisor (2) FOUR hours D. (1) BOTH Shift Supervisor and Shift Manager L(2)

FOh oLrs

94. Unit 2 is at 30% Power with the following conditions:
  • Maintenance is required on the Main Turbine Generator control system.
  • The Power System Stabilizer (PSS) will be taken out of service during the maintenance period.

Which one of the following completes the statements below?

The Alabama Control Center (ACC) (1) required to be informed of the PSS status.

The ACC is requited to be informed within a maximum of (2) minutes of operating the turbine manually (e.g. GV CLOSE INTERFACE).

(1) (2)

A. IS 60 B. is NOT 60 C. IS 30 D. is NOT 30

95. Unft 1 is at 100% power wfth thefoHowhgcondWons:
  • The packing was replaced on MOV-8812B, CTMT SUMP TO lB RHR PUMP.
  • The MDV was left in the closed position.
  • The Return to Service Tagout is in progress and power has been restored to the MOV.

Which one of the following completes the statements below?

Post Maintenance Testing of MOV-8812B (1) required to be included in the associated Work Order Package per NMP-MA-050, Work Package Preparation.

Per STP-1 1 .6, RHR Valves Inservice Test, the minimum required to declare MOV-8812B OPERABLE is satisfactorily (2)

(1) (2)

A. IS time stroking of the MOV B. IS stroking the MDV open and closed ONLY C. is NOT time stroking of the MOV D. is NOT stroking the MDV open and closed ONLY

96. AOP-2.0, Steam Generator Tube Leakage, is in progress on Unit 1 with the following indications given in 30 minute intervals:

1100 1130 1200 1230 1300 R-70A 2SGPD 48GPD SOGPD 77GPD 7OGPD R-70B OGPD OGPD 1OGPD 2OGPD 3OGPD R-70C 2OGPD 150 GPD 2OGPD 2OGPD 2OGPD R-15 40 CPM 68 CPM 82 CPM ill CPM 122 CPM R-23A 45 CPM 67 CPM 85 CPM 117 CPM 124 CPM R-238 4OCPM 61CPM 8OCPM 11OCPM 12OCPM Which one of the following completes the statements below with regards to the data in the chart above?

Consider each Action Level INDEPENDENTLY.

The criteria for Action Level 2 (1) met.

The criteria for Action Level 3 (2) met.

REFERENCE PROVIDED (1) (2)

A. ARE ARE B. ARE are NOT C. are NOT ARE D. are NOT are NOT

97. The following conditions exist on Unit 1:
  • SI termination is in progress per ECP-21, Uncontrolled Depressurization of All Steam Generators.

Subsequently, the following actions are taken:

  • 1A SG Pressure has risen 20 psig due to manual pressure boundary isolation.

The following indications exist:

AFW FLOW WR LEVEL PRESSURE (throttled) 1A SG 23% 305 psg 20 gpm lB SG 11% 295 psig 20 gpm 1C SG 12% 290 psig 20 gpm Per ECP-2.1, which one of the following describes the required action(s)?

A. Immediately transition to EEP-2, Faulted Steam Generator Isolation.

B. Immediately transition to FRP-H. 1, Response to Loss of Secondary Heat Sink.

c Remain in ECP-2.1 until SI is terminated, then transition to EEP-2, Faulted Steam Generator Isolation.

D. Remain in ECP-2.1 until SI is terminated, then transition to FRP-H.1, Response to Loss of Secondary Heat Sink.

98. A Sfte Area Emergency has been deared due to an event on Unit 1.

Per NMP-EP-11O, Emergency Classification Determination and Initial Action, the Emergency Director can delegate A. the decision to dismiss nonessential personnel from the site after assembly and accountability has been completed B. directing the activation of the emergency organization (ERO callout)

C. recommending Protective Actions (PARS) to offsite authorities D. authorizing the use of Potassium Iodide (KI) tablets

99. The following condition exists on Unit 1:
  • A Site Area Emergency has been declared by the Emergency Director (ED).
  • The crew is executing ECP-1 .2, LOCA Outside Containment.

Subsequently, the following occurs:

  • The RCS leak is isolated.

Which one of the following completes the statements below?

Per ECP-1 .2, the crew will transition to (1)

Per NMP-EP-1 11, Emergency Notificiations, State and County agencies must be notified of the Emergency within 15 minutes of the (2)

(1) (2)

A. ES P-i .1, SI Termination start of the event B. EEP-1, Loss of Reactor or Secondary Coolant start of the event C. ESP-1.1, SI Termination declaration by the ED D. EEP-1, Loss of Reactor or Secondary Coolant declaration by the ED

100. The following conditions exist on Unit 1:

  • FRP-H.1, Loss of Secondary Heat Sink, is in progress.
  • RCS Bleed and Feed has commenced.
  • PCV-444B, PRZR PORV, will NOT open.
  • PCV-445A, PRZR PORV, is open.

Which one of the following describes the actions operators are required to take?

A. Stop further attempts to establish an SG heat sink because one Pressurizer PORV will provide sufficient flow to maintain the core cool in all situations.

B. Terminate RCS Bleed and Feed because with only one PORV open RCS pressure will increase and both SI flow and RCS inventory will decrease.

C. Reduce SI flow as necessary to prevent rapid over pressurization of the RCS.

D. Establish alternate bleed paths and cooling methods because one Pressurizer PORV may not depressurize the RCS sufficiently to permit adequate SI flow.

UNIT FNP-1-E$P-0.1 REACTOR TRIP RESPONSE Revision 35.0 FIGURE 1 NO. 1 SEAL NORMAL OPERATING RANGE 2400 2250 2200 2000 1800 1600 No.1 Seal 1400 01ff e n t a 1 Pressure (P510. See Note 1) 1200 1000 800 600 400 200 0

0 .2 1 2 3 4 5 No. I Seal teak Rate (GPM)

Note 1 lot No. I Seal D1fterentia Pressures greater than 400 psid, USC RCS pressure in psig.

UNIT I FNP-l-ESP-0.l REACTOR TRIP RESPONSE Revision 35.0 FIGURE 2 RCP PRESSURE-TEMPERATURE OPERATING LIMITS 1800 1700 1600 1500 1400 1300 1200 1100 1000 RCS 900 Pr,sute (psig) 800 700 600 500 400 300 200 100 0

0 100 200 300 400 500 600 RCS Hot Leg Tempetature (1)

1-it 01/04/17 10:38:37 FNP-1-AOP-2.0 STEAM GENERATOR TUBE LEAKAGE Version 36.0 Step ActionlExpected Response Response Not Obtained NOTE: The Action Level 3 limit of 100 gpd applies to leak rate spikes that are confirmed. A spike is considered confirmed if two independent radiation monitors, such as; R-15/R-70, R-70/R-23A(B),

or R- I 5/R-23A(B) trend in the same direction with the same order of magnitude.

11 Take the appropriate action in the 11 if leak rate does not meet the action level following table based on leak rate criteria, determination in step 9. THEN perform the following:

11.1 11.1 [CA] Continue monitoring as directed by plant management.

11.2 Go to procedcire and step in effect.

FNP-O-ACP-16 Primary to Secondary Action TUBE LEAK PROGRAM Leak Rate Criteria Response Action Level 100 gpd leak rate in any Action steam generator Proceed to Step 12 Level 3 75 gpd sustained leak Action rate for >1 hr in any steam Level 2 generator Proceed to Step 13

. Proceed to Step 14 Action 30 gpd leak rate in Level I any steam generator Increased Monitoring 5 gpd total Proceed to Step 15 leak rate Page 7 of37

Containment Barrier

[ Potential Loss

1. Critical Safety function Status (p. L Critical Safety Function Status (p 37)

Not Applicable Containment-RED

2. Containment Pressure (p 37) 2. Containment Pressure (p. 37)

Rapid unexplained CThIT pressure lowering following initial pressure nse CThff pressure greater than 54 psig and rising Q

Intersystem LOCA indicated by CThIT pressure or smnp level response not consistent CThff hydrogen concentration greater than 6%

with a loss of primary or secondary coolant CThff CSF ORANGE AN])

Less than the following minimum operable equipment One CTh1T tin cooler AN])

One train of CTMT spray

3. Core Exit Thermocoimle Reading (p.37) 3. Core Exit Thermocouple Reading (p. 37)

Not applicable -

CORE COOLING CSF RED OR ORANGE for greater than 15mm AN])

RVLS LEVEL less than 0%

4. SO Secondary Side Release with P-to-S Leakage (p. 3$)
4. 5G Secondary Side Release with Primary to Secondary Leakage (p. 38)

RUPTURED S/G is also FAULTED outside of containment Not applicable OR Piimaiy-to-Secondaiy leakrate greater than 10 gpm with nonisolable steam release from affected S/G to the environment (p. 3$) 5. CThfT Isolation Valves Status After CTMT Isolation (p. 38)

5. CT1ff IsoLation Valves Status After CflH Isolation CThIT isolation valves OR dampers NOT closed AND dowiistieam pathway to the Not Applicable envfonment exists after Containment Isolation (p.
6. Signiftcant Radioactive Inventory in Containment (p. 38) 6. Significant Radioactive Inventory in Contahunent 39)

Not Applicable CThIT Rad monitor RE-27 AOR B greater than 7970 Ribr

7. Other Indications (p. 39) 7. Other indications (p. 39)

Pathway to the environment exists based on VALID RE-b. RE-14. RE-21, OR RE-22 Not applicable Alarms

8. Emergency Director Judgment (p. 39)
8. Emergency Director Judnment (p. 39)

Judgment by the ED that the CTMT Barrier is lost. Consider conditions not addressed Judgment by the ED that the CTMT Banier is potentially lost. Consider conditions not and inability to determine the status of the CThff Barrier addressed and inability to determine the status of the CThIT Barrier

Answers

  1. 0 1 C 2 C 3 D 4 C 5 A 6 A 7 A 8 A 9 C 10 D 11 B 12 A 13 C 14 D 15 C 16 B 17 C 18 B 19 A 20 A 21 D 22 B 23 D 24 C 25 D 26 A 27 B 28 C 29 C 30 A 31 C 32 C 33 C 34 B 35 A 36 B 37 D 38 B 39 A 40 D 41 A 42 A 43 B 44 D 45 A 46 A 47 C 48 D 49 D 50 A

ANSWER KEY REPORT for RO-SRO KEY Test Form: 0 Answers

  1. 0 51 B 52 D 53 B 54 D 55 D 56 B 57 B 58 D 59 B 60 D 61 B 62 B 63 B 64 C 65 C 66 D 67 A 68 D 69 D 70 C 71 A 72 D 73 C 74 B 75 C 76 A 77 B 78 D 79 B 80 D 81 C 82 A 83 B 84 A 85 C 86 D 87 B 88 A 89 B 90 B 91 C 92 D 93 A 94 C 95 A 96 D 97 C 98 B

ANSWER KEY REPORT for RO-SRO KEY Test Form: 0 Answers

  1. 0 99 D 100 D