MONTHYEARNOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With NOC-AE-000385, Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Stp,Units 1 & 2. with NOC-AE-000357, Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for STP Electric Generating Station,Units 1 & 2.With NOC-AE-000329, Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Stp,Units 1 & 2. with NOC-AE-000296, Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for South Texas Project,Units 1 & 2.With NOC-AE-000256, Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for STP Electric Generating Station,Units 1 & 2 NOC-AE-000233, Monthly Operating Repts for June 1998 for Stp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Stp,Units 1 & 2 NOC-AE-000202, Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for South Tx Project Electric Generating Station,Units 1 & 2 NOC-AE-000172, Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for South Texas Project Units 1 & 2 ML20216G4911998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for South Texas Project,Units 1 & 2 NOC-AE-000108, Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for South Texas Project Electric Generating Station,Units 1 & 2 NOC-AE-000090, Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for South Tx Project, Units 1 & 2 NOC-AE-000061, Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station1997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for South Texas Project Electric Generating Station NOC-AE-000039, Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for South Texas Project Units 1 & 2 ML20199K0571997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for South Texas Project Unit 1 & 2 ML20198J9221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for South Texas Project,Units 1 & 2 ML20216H9651997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20210K5201997-07-31031 July 1997 Monthly Operating Repts for July 1997 for STP ML20141H3041997-06-30030 June 1997 Monthly Operating Repts for June 1997 for South Tx Project, Units 1 & 2 ML20148K5871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20141G2841997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for South Texas Project Electric Generating Station Units 1 & 2 ML20137X5811997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for South Tx Project Units 1 & 2 ML20137X6011997-02-28028 February 1997 Revised Monthly Operating Rept for Feb 1997 for South Tx Project Unit 2 ML20137B3981997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for STP ML20134M7421997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for South Texas Project Electric Generating Station,Units 1 & 2 ML20133P3191996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20132C1301996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20134M7431996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for South Texas Project Electric Generating Station,Units 1 & 2 ML20129A5961996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for South Texas Project Units 1 & 2 ML20129A6361996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for South Texas Project Electric Generating Station ML20129A6541996-07-31031 July 1996 Revised Monthly Operating Rept for July 1996 for South Texas Project Electric Generating Station Unit 1 ML20116M6721996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for South Texas Project Electric Generating Station ML20115H0321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for South Tx Project, Units 1 & 2 ML20112H9921996-05-31031 May 1996 Monthly Operating Repts for May 1996 for South Texas Project Electric Generating Station Units 1 & 2 ML20117G0101996-04-30030 April 1996 Monthly Operating Repts for April 1996 for STP ML20100R2861996-02-29029 February 1996 Monthly Operating Repts for South Texas Project Electric Generating Station Units 1 & 2 ST-HL-AE-0053, Monthly Operating Repts for Jan 1996 for STP1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for STP ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for South Texas Project ST-HL-AE-5256, Monthly Operating Repts for Nov 1995 for STP Units 1 & 21995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for STP Units 1 & 2 ST-HL-AE-5239, Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 21995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for South Texas Project Units 1 & 2 ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project1995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for South Tx Project ST-HL-AE-5178, Monthly Operating Repts for Aug 1995 for STP Electric Generating Station1995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for STP Electric Generating Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217K9441999-10-15015 October 1999 SER Accepting Util Alternative Proposed Relief Request RR-ENG-2-4 for Second 10-year ISI Interval at Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) ML20217K9151999-10-15015 October 1999 SER Authorizing Util Relief Request RR-ENG-2-3 for Second 10-year ISI Interval of Stp,Units 1 & 2 Pursuant to 10CFR50.55a(a)(3)(i) NOC-AE-000676, Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for South Texas Project,Units 1 & 2.With ML20217D0531999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20217D0481999-09-30030 September 1999 Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 Colr ML20211P8411999-09-0909 September 1999 Safety Evaluation Supporting Alternative Proposed by Licensee to Surface Exam to Perform Boroscopic VT-1 Visual Exam of Pump Casing Welds within Pump Pits for Welds Covered by Relief Request RR-ENG-24 ML20211P7811999-09-0909 September 1999 SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2 ML20211Q6731999-09-0909 September 1999 Safety Evaluation Accepting First 10-yr Interval ISI Program Plan Request for Relief from ASME Code Case N-498 NOC-AE-000643, Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for South Texas Project,Units 1 & 2.With ML20212E5191999-08-31031 August 1999 Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment ML20211F4531999-08-24024 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative to Defer Partial First Period Exams of flange-to-shell Weld to Third Period & Perform Required Ultrasonic Exams,Both Manual & Automated,During Third Period ML20211F5111999-08-23023 August 1999 Safety Evaluation Supporting Licensee Proposed Alternative Contained in Request for Relief RR-ENG-30 ML20210C9411999-07-31031 July 1999 Rev 1 to SG-99-07-002, South Tx,Unit 1 Cycle 9 Voltage- Based Repair Criteria 90-Day Rept, Jul 1999 ML20210R3631999-07-31031 July 1999 Monthly Operating Repts for July 1999 for South Tx Project, Units 1 & 2.With ML20210D9161999-07-23023 July 1999 Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test Frequency ML20210D4821999-07-21021 July 1999 1RE08 ISI Summary Rept for Steam Generator Tubing of South Texas Project Electric Generating Station Unit 1 ML20210D4491999-07-21021 July 1999 Revised Chapters to Operations QA Plan, Including Rev 9 to Chapter 1.0, Organization & Rev 6 to Chapter 16.0, Independent Technical Review NOC-AE-000583, LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With1999-07-15015 July 1999 LER 99-S03-00:on 990619,failure to Revitalize Sdg Number 11 Was Noted.Caused by Failure to Communicate Status of Sdg. Subject Sdg Revitalized on 990619 & Licensee Will Develop Security Force Instruction Re Sdgs.With ML20207H6361999-07-0808 July 1999 Safety Evaluation Approving 2nd 10 Yr Interval ISI Program Plan Request to Use ASME Section XI Code Case N-546 for Licenses NPF-76 & NPF-80,respectively ML20216D7481999-07-0707 July 1999 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1 NOC-AE-000593, Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Stp,Units 1 & 2. with NOC-AE-000570, LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With1999-06-28028 June 1999 LER 99-S01-00:on 990527,discovered That Unescorted Access Had Been Inappropriately Granted.Caused by Failure to Follow Procedure.Util Verified That Individual Did Not Have Current Unescorted Access at STP or Any Other Util.With ML20196G5821999-06-23023 June 1999 LER 99-S02-00:on 990601,failure to Maintain Positive Control of Vital Area Security Key Was Noted.Caused by Lack of Attention to Detail.Discussed Event with Operator Involved IAW Constructive Discipline Program ML20195J6871999-06-17017 June 1999 Safety Evaluation Supporting Proposed Alternative Contained in RR-ENG-2-5.Proposed Alternative Authorized Per 10CFR50.55a(a)(3)(i) for 2nd ISI Interval ML20196A2391999-06-15015 June 1999 Change QA-042 to Rev 13 of Operations QAP, Reflecting Current Organizational Alignment for South Texas Project & Culminating Organizational Realigment That Has Been Taking Place During Past Several Months NOC-AE-000563, Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Stp,Units 1 & 2. with ML20206U5411999-05-18018 May 1999 Non-proprietary Errata Pages for Rev 2,Addendum 1 to WCAP-13699, Laser Welded Sleeves for 3/4 Inch Diamete Tube Feedring Type & W Preheater SGs Generic Sleeving Rept ML20206A7721999-04-30030 April 1999 STP Electric Generating Station Unit 1 Cycle 9 Colr NOC-AE-000543, Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Stp,Units 1 & 2. with ML20205H0321999-03-31031 March 1999 Change QA-040 to Rev 13 of Operations QA Plan NOC-AE-000507, Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Stp,Units 1 & 2. with ML20205A3781999-03-22022 March 1999 STP Electric Generating Station Simulator Certification Four Yr Rept for Units 1 & 2 ML20204B2711999-03-15015 March 1999 Safety Evaluation Authorizing 990201 Request to Authorize Alternative to Regulations Per 10CFR50.55a(a)(3)(i) That Would Revise Start of Second 120-month IST Interval to No Later than 011201 ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results NOC-AE-000468, Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for South Texas Project Electric Generating Station.With ML20207D1101999-02-24024 February 1999 Change QA-039 to Rev 13 of Operations QA Plan, for STP ML20203H8361999-02-17017 February 1999 Safety Evaluation Supporting Request for Relief from ASME Code Requirements for Class 3 Piping for Plant ML20202H9621999-02-0303 February 1999 SER Accepting Change to EALs Used in Classification of Emergency Conditions ML20202E8471999-01-31031 January 1999 2RE06 ISI Summary Rept for SG Tubing of STP Electric Generating Station,Unit 2 ML20216G2011999-01-31031 January 1999 City Public Svc of San Antonio Annual Rept 1998-1999 ML20199G5961999-01-31031 January 1999 Cycle 7 Voltage-Based Repair Criteria Rept for Jan 1999 ML20199K7711999-01-21021 January 1999 Safety Evaluation Accepting ISI Program Request for Relief for ASME Cose Repair Requirements for Code Class 3 Piping ML20199G8161999-01-19019 January 1999 SER Accepting Util 970707 Response to NRC 970509 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers. NRC Finds No Significant Safety Hazards Based on Application of Util Ampacity Derating Methodology ML20199H4981999-01-11011 January 1999 2RE06 ISI Summary Rept for Welds & Component Supports of Stp,Unit 2 ML20206Q3751999-01-0404 January 1999 2RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) ML20206Q3721999-01-0404 January 1999 2RE06 ISI Summary Rept for Repairs & Replacements ML20216G2171998-12-31031 December 1998 Houston Industries 1998 Annual Rept. App a 1998 Financial Statements & Us Securities & Exchange Commission Form 10-K Encl NOC-AE-000403, Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for South Texas Project Unit 1 & 2.With ML20216G1521998-12-31031 December 1998 Central & South West Corp 1998 Summary Annual Rept & Securities & Exchange Commission Form 10-K ML20198M3431998-12-28028 December 1998 SER Accepting Util Request for Relief from ASME Code Repair Requirements for ASME Code Class 3 Piping for South Texas Project,Unit 2 1999-09-09
[Table view] |
Text
_
o I
t 1
l i
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING F2EORT FOR AUGUST 25 - 31 HOUSTON LIGHTING AND PCUER C'. u NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 1
Prepared by: MIrf 9 8 4
Lead Pe'rformanc4 Tec$1cian Date Reviewed by: s ,
_s T!82 Per ance Technician Supervisor Date
}
Reviewed By / W P aiWErfgi sering nager 4 ffW V Dite u
\ .
j Reviewed By: mm.
~
S ff 7 i
PiantSper1tendeht Date' Approved By: ll
- eaie
'PiantNanag, 1
l i
' 8809220035 880831 PDR ADOCK 05000498
] R PDC ,
i
OPERATING DATA REPORT DOCKET NO. 50-498 UNIT 1 DATE Aucust 11. 1988 COHPLETED BY A.P. Kent TELEPH0tTE 512-972-7786 OPERATING STATUS
- 1. REPORTING PERIOD: 08/25-08/31 GROSS HOURS IN REPORTING PERIOD: 168
- 2. CURRENTLY AUTHORIZED POWER LEVEL (HWt): 3817 MAX. DEPEND. CAPACITY (HWe-Net): 1250.6 DESIGN ELECTRICAL RATING (HWe-Net):1250.6
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY)(HWe-Net): None
- 4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
- 5. NUMPER OF HOURS REACTOR WAS CRITICAL...... 96.0 96.0 96.0
- 6. REACTOR RESERVE SHUTDOWN HOURS............. 0 0 0 ,_
- 7. HOURS GENERATOR ON LINE.................... 74.5 74.5 74.5
- 8. UNIT RESERVE SHUTDOWN HOURS................ 0 0 0
- 9. GROSS THERHAL ENERGY GENERATED (HVH)..... 200457.6 __
200457.6 200457.6 10.
GROSS ELECTRICAL ENERGY GENERATED (HWH).... 60720 60720 60720 11.
NET ELECTRICAL ENERGY GENERATED (HWH)..... 50420 50420 50420
- 12. REACTOR SERVICE FACTOR..................... 57% 57% 57%
- 13. '.EACTOR AVAILABILITY FACTOR............... 577 57% 57%
14 LNIT SERVICE FACT 0R....................... 44% 44% 44%
- 15. UNIT AVAILABILITY FACTOR.................. 44% 44% 44%
- 16. UNIT CAPACITY FACTOR (Using HDC)..........._24% 24%_ 24%
- 17. UNIT CAPACITY FACTOR (Using Design HWe)... 24% __24% 24%
- 18. UNIT FORCED OUTAGE RATE................... _$6% 56% 56%
19.
SHUTDOWNS SCHEDULED OVER NEXT 6 HCNTHS (TYPE, DATE, AND DURATION OF EACH):
Scheduled 14 day outage to begin September 23, 1988 and February 1, 1989 for Bottom Mounted Instrumentation Inspection.
- 20. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OT STARTUP 09/02/88 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 03/08/38 03/08/88 INITIAL ELECTRICITY 03/30/88 03/30/88 COMMERCIAL OPERATION 08,/25/88 08/25/88 NL.NRC.R.APR.AT (C68)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 ~
UNIT NAME 1 -
DATE An cm m t 1I_ 19h8 COMPLETED BY A.P. Kent TELEPHCIE 512-972-7786 .
REPORT MONTH August -
1 2 No. Date Type Duration Reason Methed of Licensee Cause & Corrective Systgm Compongnt (Hours) Shutting Event Code Code Action to 3
Down Reactor Report # Prevent Recurrence 88-01 880826 F 45.2 A 3 88-049 SB FUB Turbine / Reactor trip from 100% power.
Cause unknown at the time of the event.
88-02 880828 F 12.1 A 9 N/A SB FUB Turbine trip from 23%
power. Cause unknown at the time of the event. (Subsequent investigation determined that the trip was caused by a failed fuse block in the Stator Cooling Vater turbine trip circuitry. This was determined to be th cause of ever.t 88-01. )
I F: Forced Reascn: Method: IEEE 805-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 5 4-Cont. of Existing IEEE 803A-1983 E-Operator Training & License Examination Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain) l l
l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 .
UNIT NAME 1 -
DATE August 11, 1988 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 "
REPORT '"" mi August 1 2 No. Date Type Laration season Method of Licensee Systgm Compongnt Cause & Corrective (Hours) Shutting 3
Event Code Coce Action to Down Reactor Report # Prevent Recurrence 88-03 880830 F 36.3 B 1 N/A SB PFF Steam leak. Cracked weld repair in Steam 1
Generator main steam 1 vent line. Various other welds were l
penetrant tested to ensure problem was not
! common to other areas.
l l
l l
l I
i I
k l
l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT 1 DATE August 11, 1988 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 4 4 HON 7H August DAY AVERAGE DAILY POWER LIVIL DAY AVERAGE DAILY PolMR LEVEL (HWe-Nat) (MWe-Net) 1 N/A 17 N/A 2 N/A 10 _
N/A 3 N/A 19 N/A 4 N/A 20 N/A 5 N/A 21 N/A 6 N/A 22 N/A 7 N/A 23 N/A 8 N/A 24 N/A 9 N/A 25 1179 10 N/A 26 841 11 N/A 27 0 12 N/A 28 0 13 N/A 29 82 14 4
_N/A 30 160 15 N/A 31 0 i
16 N/A t
f e
i >
NL.NRC.R.APR.AT (C68)
,s
- Monthly Summary South Texas Project Unit i declared commercial operational status August 25 at 0001.
On August 26 a turbine / reactor trip occurred due to low stator water differential pressure. Subsequently a Safety Injection occurred due to low compensated steamline pressure. After the unit was placed on line on August 28, a turbine trip occurred delaying power ascension. By August 29 the unit was again on line.
Power ascension to 45% load commenced to allow troubleshooting tse the cause of the previous turbine trips. On August 30 the unit was reduced to 0% power to repair a steam leak in the main steam vent line.
PORVs and Safety Valves Summary No PORVs or Safety Valves were challenged during this reporting period.
l
i -
i l
l
)
l I
S3JTH TEXAS PROJECT l ELECTRIC GENERATING STATION I UNIT 1 MONTHLY OPERATING REPORT FOR AUGUST 1 - 24 HOUSTON LIGHTING AND POWER CO.
NRC DOCKET NO. 50-498 LICDISE NO. NPF-76 Prepared by: SS #f(Z 9 b Lead Phrformar/ce Tp6hnician 'Da t e Reviewed by: 9 /8/88 Performance Technician Supervisor Date Reviewed B TI
@ p seft n neering nager / Ifate Reviewed By: o 9 9 V[
Plant upe inte ndent Dath i A
( (
Approved By: _. .h M
'P1' ant Marlager Ddteh 1
'l OPERATING DATA REPORT DOCKET NO. 50-498 UNIf 1 DATE August 11. ]_988 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 OPERATING STATUS 1.
REPORTING PERIOD: 08/01-08/24 GROSS HOURS IN REPORTING PERIOD: 576
- 2. CURRENTLY AUTHORIZED POWER LEVEL (HWt): 3817 MAX. DEPEND. CAPACITY (HVe-Net): 1250.6 DESIGN ELECTRICAL RATING (HWe-Net):1250.6 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY)(HWe-Net): See Item 4
- 4. PPJETN3 FOR RESTRICTION (IF A!!Y): Unit in power ascension testing phase.
THIS MONTH YR TO DATE CUNULATIVE
- 5. NUMBER OF HOURS REACTOR VAS CRITICAL...... 460.7 2303.84 2303.84
- 6. REACTOR RESERVE SHUTDOWN HOURS............. 0 0 0
- 7. HOURS GENERATOR ON LINE.................... 397.0 2030.18 2030.18
- 8. UNIT RESERVE SHUTDOWN HOURS................ 0 1
0 0
- 9. GROSS THERMAL ENERGY GENERATED (HVH). . . 1,238,131.2 3,966,352.6 3,966,352.6
- 10. GROSS ELECTRICAL ENERGY GENERATED (MVH) . . . . 406,360 1,204,902.8 1,204,902.8
- 11. NET ELECTRICAL ENERGY GENERATED (HVH)..... 370,011 998,930 998,930
- 12. REACTOR SERVICE FACTOR..................... N/A N/A N/A
- 13. REACTOR AVAILABILITY FACTOR................ N/A N/A N/A 14 UNIT SERVICE FACT 0R........................ N/A N/A N/A
- 15. UNIT AVAILABILITY FACTOR................... N/A N/A N/A
- 16. UNIT CAPACITY FACTOR (Using HDC)..........._N/A _N/A N/A
- 17. UNIT CAPACITY FACTOR (Using Dasign HWe).... N/A ..
N/A N/A
- 18. UNIT FO*"ED OUTAGE RATE.................... N/A N/A N/A
- 19. SHUTD(
, SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Schede
,d 14 day outage to begin September 23, 1988 and February 1, 1989 for Bottom Mounted Instrumentation Inspection.
- 20. IF S.!U1 bCVH AT END OF REPORT PERIOD, ESTIMATED DATE OF STARIUP: N/A 21.
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 03/08/88 03/08/88 INITIAL ELECTRICITY 03/30/88 _03/30/88, COMMERCIAL OPERATION 08/25/88 08/25/88 NL.NRC.R.APR.AT (C68)
N UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 '
UNIT NAME 1 -
DATE Aucust i1. 1988 COMPLETED BY A.P. Kent
- TELEPHONE 512-972-7786 REPORT MONTH August l
No. Date Type Duration Reason Method of Licensee Systga Compongnt Cause & Corrective (Hours) Shutting 3
Event Code Code Action to l Down Reactor Report # Prevent Recurrence '
i 88-17 880728 5 2.8 B 4 N/A N/A N/A Performed React.or Trip Test at 100%
Power Plateau.
88-18 880807 F 0 D 5 N/A N/A N/A Reluced reactor power to comply with Tech.
Spec. action requirement for out of tolerance nuclear enthalpy rise hot channel factor.
88-19 880808 5 0 3 5 N/A N/A N/A Performed Large Load Reduction Test.
s UNIT SHUTDOWNS AND POW 1.R REDUCTIONS DOCKET NO. 50-.98
- UNIT NAME I DATE Anonc:t 11_ 1988 ,
COMPLETED BY A.P. Kent -
TELEPHONE 512-972-7786 REPORT MONTH August i
1 2 No. Date Type Duration Reason Method of Licensee Cause & Corrective Systga Compongnt (Hours) Shutting Event .Me Ne Acdon to 3
Down Reactor Report # Prevent Recurrence 1
88-20 880808 F 122.1 B 1 N/A N/A N/A Feed regulator valve steam leak repair.
88-21 880816 F 54.1 A 3 88-048 SB V Turbine / Reactor trip I due to Stator Cooling System transient experienced during pump switch over. A low flow condition was created by a faulty check valve.
I F: Forced Reason tiethod: IEEE 805-1983 St Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram.
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction 5 4-Cont, of Existing IEEE 803A-1983 E-Opern9r Training & License Examination Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)
AVERAGE DAILY UNIT POWER LIVIL DOCKET NO. 50-498 UNIT 1 DATE Aucunt 11. 1988 COMPLETED BY A.P. Kent TELEPHONE 512-972-7786 MONTH August l
DAY AVERAGE DAILY POWER LEVIL DAY l
AVERAGE DAILY POWEP LEVEL I (MWe-Net) (HWe-Net) 1 55 17 0 2 410 18 0 3 1139 19 591 4 1237 20 1184 5 1239 21 1219 6 1165 22 1214 7 983 23 1211 '
8 777 24 1208 9 0 25 N/A 10 0 26 N/A 11 0 27 N/A 12 0 28 N/A 13 0 29 N/A 14 507 30 ,
N/A 15 1079 31 N/A 16 522 NL.NRC.R.APR.AT (C68)
Monthly Summary Following successful completion of the Reactor Trip at 100%
Power Test ending the July report period, STP Unit 1 again reached the 100% power plateau August 2.
From August 8 through 13 the unit reduced power to 0% to repack several regulator valves in the feedwater system and complete other specific maintenance tasks. The ascension toward 100% power began August 14 at a rate of approximately 3% per hour.
On August 16 the unit tripped during a Stator Cooling System pump switchover as preparations were being made for preventive maintenance on one of the pumps. Following a check of the Estimated Critical Conditions calculations, power ascension resumed and 100%
power was achieved August 20 marking the start of the 100-Hour NSSS Acceptance Test. The acceptance test was successfully completed August 24 ending the Initial Startup testing program.
On August 25. STP Unit I was declared commercially operable.
l
. =,
PORVs and Safety Valves Summary No PORVs or Safety Valves were challenged during this reporting period.
The Light company " " " . " " ' "I,{001.,,,g)22g9211
(
llouston IJghting &: Power J , _
September 12. 1988 ST-HL-AE-2791 File No.: G02 10CFR50.71 U. S. Nuclear Regulatory Commission Attention: Document Control Desk washington, DC 20555 South Texas Project Electric Generating Station Unit 1 i Docket No. STN 50-498 Honthly Ope:*ating Reports for August 1988 Pursuant to 10CFR50.71(a) and the South Texas Project Electric Generating Station (STPEGS) Unit 1 Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for August, 1988. Unit I was declared to be in commercial operation on August 25, 1988 at 0001 houra. As such, two reports are submitted for the month of August covering the conclusion of the startup phase (August 1 to 24) and the beginning of commercial operation (August 25 to 31). The data has teen "rezerced", as of the commercial operation initiation, in the later report.
If you should have any questions on this matter, please contact Mr. C.A. Ayala at (512) 972-8628.
. r Manager, Operations Support Licensing MAH/CAA/n1 Attachments: (1) STPEGS Unit 1 Monthly Operating Report - August 1-24, 1988 (2) STPEGS Unit 1 Monthly Operating Report - August 25-31, 1988 NL.NRC.R.AUG.LT A " U " """""" ""#"' ' I"
e flouston 1.ighting & lher Comluny ST-HL-AE-2791 File No.: G02 Page 2 CCI Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associated General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Cempany Arlington, TX 76011 P. O. Box 1700 Houston, TX 77001 George Dick U. S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 Circle 75 Parkway Jack E. Bess Atlanta, Ga. 30339-3064 Resident Inspector /Operationr c/o U. S. Nuclear Regul tory Commission Dr. Joseph M. Hendrie P. O. Box 910 50 Be11oort Lane Bay City, TX 77414 3ellport, NY 11713 J. I. Tapia Senior Resident Inspector / Construction c/o U. S. Nuclear Regulatory Commission P. O. Box 910 Bay City, TX 77414 J. R. Newman, Esquire Newman & Holtzinger, P.C.
1615 L Street, N.W.
Washington, DC 20036 t
R. L. Range /R. P. Verret Central Power & Light Company P. O. Box 2121 Corpus Christi, TX 78403 R. John Miner (2 copies)
Chief Operating Officer City of Austin Electric Utility 721 Barton Springs Rord Austin, TX 78704 R. J. Costello/M. T. Hardt City Public Service Board P. O. Box 1771 San Antonio, TX 78296 Revised 08/24/88 NL.DIST l
, , ____