ML20149F343

From kanterella
Revision as of 15:18, 11 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requests Response to Orise Rept & Addl Info on Final Termination Survey Rept of Univ of Utah AGN-201M Research Reactor,Per
ML20149F343
Person / Time
Site: 05000072
Issue date: 08/05/1994
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gehmlick D
UTAH, UNIV. OF, SALT LAKE CITY, UT
Shared Package
ML20149F347 List:
References
NUDOCS 9408100076
Download: ML20149F343 (4)


Text

..

jsd Mf G UNIT E D ST ATES

.#' ,% NUCLEAR REGULATORY COMMISSIOh!

.:' s  ;

, %f HEGION IV 3 g

$ 611 RY AN PLAZA DRIVE, SUIT E 400

< s ,,

[ M[ AR LINGTON, T E XAS 76011 8064

.....'P Au3 - S 1994 l

Docket: 50-72 License: R-25 University of Utah ATTN: D. K. Gehmlick Reactor Administrator Merrill Engineering Building, Room 3209 Department of Mechanical Engineering Salt Lake City, Utah 84112

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION ON THE FINAL TERMINATION SURVEY REPORT OF THE UNIVERSITY OF UTAH AGN-20lM RESEARCH REACTOR This concerns your letter dated April 13, 1994, and the enclosed report on the final termination survey of your AGN-20lM research reactor license. A technical review of the survey report was initiated by the NRC's contract support laboratory, Oak Ridge Institute for Science and Education (0 RISE). Enclosed is the letter and attached comments dated July 26, 1994, summarizing the initial ORISE review of your survey report.

l We have reviewed the ORISE report, and the questions and comments provided were the subject of a telephone conversation held July 27, 1994, between Dr. David M. Slaughter of your organization, and Dr. D. Blair Spitzberg of my staff. During this conversation, we discussed the need for additional information to address the ORISE comments and questions. We request that you provide this office your response to the ORISE report and the additional information requested therein, so that we can continue our review.

Should you have any questions concerning this letter, please contact Dr. Spitzberg at (817) 860-8191.

Sincerely, M/

Samuel J. Collins, Director Division of Radiation Safety ,

and Safeguards

Enclosure:

bb t j

'A 9408100076 940005 PDR P

ADOCK 05000072 PDR

')i \

l l

l l

University of Utah cc w/ enclosure: {

University of Utah ATTN: R. J. Pugmire Associate Vice President of Research i 210 Park Building Salt Lake City, Utah 84112 University of Utah l ATTN: G. M. Sandquist, Director Nuclear Engineering Laboratory Department of Mechanical Engineering l Merrill Engineering Building, Room 3209 Salt Lake City, Utah 84112 University of Utah I ATTN: D. M. Slaughter, Reactor Supervisor Department of Mechanical Engineering Merrill Engineering Building, Room 3209 i Salt Lake ffty, Utah 84112 l 1

University of Utah i ATTN: K. J. Schiager i Radiation Safety Officer Radiological Health Department f i

100 Orson Spencer Hall l Salt Lake City, Utah 84112 l l

Utah Department of Health ATTN: Radiation Control Program Director Bureau of Radiation Control P.O. Box 16690 Salt Lake City, Utah 84116-0609 I

I 1

.J

University of Utah bec to DMB (IE01) bcc:

L. J. Callan, RA D. B. Spitzberg, DRSS/ RIB DRP DRS MIS Coordinator RIV File RIB File (Hodges)

Lisa Shea, RM/ALF (MS 4503)

A. Adams, NRR Project Manager (MS 11 B20)

J. L. Caldwell, NRR (MS 10 D22) l RIV:FIPS'D W C:FIPS k[ ,DP:DRSS/[ D:DRSS DBSpitzberg:nh BMurray NAScabo SJCods 7 /17/94 k / \/94 / g /94 ((/94 l

I l

Jniversity of Utah . bcc to DMB (IE01) l bcc:

L. J. Callan, RA D. B. Spitzberg, DRSS/ RIB l DRP DRS MIS Coordinator RIV file RIB File (Hodges)

Lisa Shea, RM/ALF (MS 4503)

A. Adams, llRR Project Manager (MS 11 B20)

J. L. Caldwell, NRR (MS 10 D22) l l

i RIV:FIPS W - C:FIPS k( ,DD:DRSS/[ D:DRSS DBSpitzberg:nh BMurray NAScabo SJColds l

/

7 ?-7/94 k / \/94 _[ / /94 ['///94 l

l l - . - - - -. .

. -- --. ._ - -