ML20210H637

From kanterella
Jump to navigation Jump to search
Lists Change in Telephone Number for R Carter,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address
ML20210H637
Person / Time
Site: 05000072, University of Utah
Issue date: 03/26/1986
From: Berkow H
Office of Nuclear Reactor Regulation
To: Brophy J
UTAH, UNIV. OF, SALT LAKE CITY, UT
References
NUDOCS 8604030119
Download: ML20210H637 (3)


Text

/

PDn Docket Nos. 50-72/407 AR 2 61986 Mr. James J. Brophy, Vice President of Resea ch University of Utah Salt Lake City, Utah 84112

Dear Mr. Brophy:

SUBJECT:

RE0RGANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facility, Robert Carter, as been changed. Mr. Carter can now be reached at (301) 492-8206.

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Carter or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Connission Washington, D.C. 20555 Attn: Document Control Desk Sincerely, PGdual .ugu.a un Herbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page

, DISTRIBUTION:

' Central File-SSPD ~ Read fiig" PNoonan RCarter DTondi HBerkow pRh:SSPD D :SSPD DPWRL-8:SSPD D SSPD an:cw R DTondi T He

/EN6g/86 86 /86 0 03/)i/ 03 8604030119 B60326 2 DR ADOCK 0

/ 'o

~,, UNITED STATES 8 o NUCLEAR REGULATORY COMMISSION y 5 g WASHINGTON, D. C. 20555

~%...../ MAR 2 61986 Docket Nos. 50-72/407 Mr. James J. Brophy, Vice President of Research University of Utah Salt Lake City, Utah 84112

Dear Mr. Brophy:

SUBJECT:

REOP.GANIZATION OF THE OFFICE OF NUCLEAR REACTOR REGULATION As a result of the recent reorganization of the Office of Nuclear Reactor Regulation, the telephone number of our Project Manager for your facility, Robert Carter, as been changed. Mr. Carter can now be reached at (301) 492-8206.

Our new Section Leader for the Non-Power Reactors and Safeguards Licensing Section is Dominic Tondi. He can be reached at (301) 492-8251. If neither Mr. Carter or Mr. Tondi can be reached, I can be contacted at (301) 492-8795.

All correspondence should still be addressed as follows:

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attn: Document Control Desk' Si cerely, f

7/&A erbert N. Berkow, Director Standardization and Special Projects Directorate Division of PWR Licensing-B cc: See next page l

. 1 i' University of Utah Docket Nos. 50-72/407 cc: Mayor of Salt Lake City Salt Lake City, Utah 84112 State Planning Coordinator State Capital Building Room 118 Salt Lake City, Utah 84114 Dr. K. L. DeVries Professor and Associate Dean College of Engineering Merrill Engineering Building Salt Lake City, Utah 84112 Attorney General State Capitol Salt Lake City, Utah 84114 Mr. Gary M. Sandquist Director Nuclear Engineering Laboratory University of Utah Salt Lake City, Utah 84112 i

, . . . - . . - - - _ - - . - - - . . - - . - - - - - - - - - - . _ . - -- - - - - - ,,n.- - , - - , - - . -