ML20067D451
| ML20067D451 | |
| Person / Time | |
|---|---|
| Site: | 05000072 |
| Issue date: | 02/07/1991 |
| From: | Bennion J UTAH, UNIV. OF, SALT LAKE CITY, UT |
| To: | Alexander Adams NRC |
| References | |
| NUDOCS 9102130078 | |
| Download: ML20067D451 (1) | |
Text
_.......
nieN UNIVERSITY OFUTAli-h-h
{
7 February 1991 Mr. Alexander Adams,Jr.
U.S. Nuclear Regulatory Commission PDNP M.S. I1-B-20 Washington, D.C.- 20555
Dear Mr. Adams:
The University of Utah shipped the AGN reactor fuel (NRC license R-25) to the Y-12 Plant at Oak Ridge at approximately 4:00 p.m. MST on 5 February 1991. The material was shipped as two separate shipments using Tri-State Motor Transit and is scheduled to arrive at Oak Ridge at 8:30 EST on 8 February 1991, if you require any additional information, please call Dr. Gary Sandquist at (801) 581-7372 or myself at (801) 581-4188.
Sincerely yours, C
Jo m S. Bennion Nuclear Engineering Laboratory hh Department nf Mechanica? ngineering l
9102130078 910207 sait t.akeftlivft$h 8-1112 PDR ADOCK 05000072 18011 581 6141 P
POR FAX l 8015MIMM