Forwards Insp Rept 50-461/99-10 on 990422-0610.Four Violations Being Treated as Noncited Violations
ML20210A440
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/16/1999
From: Dapas M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mcelwain J
ILLINOIS POWER CO.
Shared Package
ML20210A445 List:
References
50-461-99-10, NUDOCS 9907220108
Download: ML20210A440 (2)


See also: IR 05000461/1999010

Text

{{#Wiki_filter:E ..

 .
   '
       ,-
                                                             UNITE 0 dTATEs
       [ffpEstg(                                NUCLEAR REOULATORY COMMISSION
                                                                REGION 111
       *~              .0
       U                "                                801 WARRENVILLE ROAD
                                                       .USLE, ILLINOIS 60532-4351
       %g*****
                                                           July 16, 1999
   T
                Mr. John P. McElwain -
                Chief Nuclear Officer
                Clinton Power Station
             , Illinois Power Company
                Mall Code V-275'
                P. O. Box '678
                Clinton,IL 61727
                SUBJECT:          CLINTON POWER STATION RESTART INSPECTION
                                  REPORT 50-461/99010(DRP)
                Dear Mr. McElwain:
                On June 10,1999, the NRC completed an inspection of Clinton Power Station restart activities
                following an outage which began on September 5,1996. The enclosed report presents the
                results of that inspection.-
                The inspection was initiated on April 22, continued through May 2, when initial control rod pulls
                to criticality began, through June 2, when the plant reached 100 percent power, and ended on
     '
              - June 10, when the results of the inspection were discussed with you. The inspection consisted
                of approximately 700 hours of control room observations and additional observations of in-plant
                activities. During the period covered by this inspection, your conduct of activities was generally
                characterized by adequate implementation of operational programs and procedures. Plant
                operators methodically and cautiously conducted plant restart activities and, in most cases,
                exhibited conservative decision-making when challenging situations were encountered. For
                example, operators manually scrammed the plant after a startup feedwater flow control valve
                malfunctioned and stopped their approach to criticality when unusual reactor period readings
                were observed.
                While overall operator performance during the plant restart was acceptable, NRC inspectors
                identified several instances where plant management's expectations for the conduct of
                operations were not clearly understond by all operators, occasions where suspect plant
                conditions were either not recognize a or were not thoroughly evaluated by the operators, and
                instances where procedural requirements were not followed. In addition, the engineering
                organization's support to plant operations in response to technical issues that arose during
                startup activities was weak.
                                                                                                                    /
                 Based on the results of the inspection, the NRC has determined that four violations of MRC
                 requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),
                 consin, tent with Appendix C of toe Enforcement Policy. These NCVs are described in the
                 subject inspection report. If you contest the violations or severity level of these NCVs, you
                 should provide a response within 30 days of the date of this inspection report, with the basis for
                 yo'Jr denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
                 Washington, D.C. 20555-001, with copies to the Regional Administrator, Region 111, and the
                                                                                                 DCl      t ud'
                                .
                                     .
                                                 AJcf. Nizrc psy,.
                                                  "
                                                                                                     j      f
           9907220108 990716
           PDR      ADOCK 05000461
           0                        PDR
                                                                                                                    l
 .
                                                                                                                    ,
                                                                                                                    1
   J. McElwain                                                 -2-

1

   Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
   D.C. 20555-001.
                                                                                                                    1
   in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, the
   enclosure, and your response (if you choose to provide one) will be placed in the NRC Public
   Document Room.

'

                                                            Sincerely,

,

                                                              Original signed by

1

                                                            Marc L. Dapas, Deputy Director
                                                            Division of Reactor Projects
   Docket No. 50-401
   License No. NPF-62
   Enclosure:       Inspection Report 50-461/99010(DRP)
   cc w/ encl:      P. Hinnenkamp, Plant Manager
                    R. Phares, Manager, Nuclear Safety
                      and Performance Improvement
                    J. Sipek, Director - Licensing
                    M. Aguilar, Assistant Attorney General
                    G. Stramback, Regulatory Licensing
                      Services Project Manager
                      General Electric Company
                    Chairman, DeWitt County Board
                    State Liaison Officer
                    Chairman, liiinois Commerce Commission
   DOCUMENT NAME: G:\ CLIN \CLl99010.DRP

'

   v. e.iv. . c r ., thi. + coin.... inac. in in. e.x c = c.py wi. .W.nci 'E" = Copy with .ett.nel 'N' = No copy
    OFFICE       Rill             l4               M -                                                           l
    NAME         Kozak:co 4 Dapas/[[./M
                                I
    DATE         07/ito/99             07//(a/99
                                               OFFICIAL RECORD COPY
                                                                                                                   a
                       - . . _ _ . _ . . . . . . . . . . . . . . . . . . . . .  .                      ,
       *.                            t
 .
           J. McElwain ['                                                      -3-
           Distribution:
           RPC (E-Mail)
           Project Mgr., NRR w/enci
          . J. Caldwell, Rlil w/enci
           B. Clayton, Rlll w/enci
           SRI Clinton w/enci
           DRP w/enci
           DRS w/ encl
           Rlli PRR w/enci
           PUBLIC IE-01 w/enci '
           Docket File w/enci
           GREENS
           LEO (E-Mail)
           DOCDESK (E-Mail)
   c..
                                                                                                      .
                                                                                   e
                  44 m -
                                                                                     ,
                                                                                       .l [ } (4' -
            EE000A
                                                   hLclll /d FP Dsn                     ,  l
                                                                                                    a

. }}