U-600939, Responds to Generic Ltr 87-06, Periodic Verification of Pressure Isolation Valves. Tech Spec Listing of Valves, Associated Integrity Tests & Test Frequencies Provided

From kanterella
Revision as of 10:40, 27 July 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to Generic Ltr 87-06, Periodic Verification of Pressure Isolation Valves. Tech Spec Listing of Valves, Associated Integrity Tests & Test Frequencies Provided
ML20214W357
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/08/1987
From: Spangenberg F
ILLINOIS POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-87-06, GL-87-6, U-600939, NUDOCS 8706150226
Download: ML20214W357 (2)


Text

e

  • U-600939 L30-87 (06-08)-L 1A.120 ILLIN0/S POWER COMPANY CLihToN POWER STATION P.o. BOX 678. CLINTON. ILLINOIS 61727 June 8, 1987 Docket No. 50-461 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Clinton Power Station Response to Generic Letter 87-06, Periodic Verification of Pressure Isolation Valves, dated March 13, 1987

Dear Sir:

Generic Letter 87-06 was sent to all operating license holders in order for the NRC Staff to obtain the methods used to assure the leak-tight integrity of pressure isolation valves for protecting against reactor coolant pressure boundary leakage and failure. The pressure isolation valves function as independent barriers for the reactor coolant pressure boundary and their integrity must be ensured. This letter is in response to the March 13, 1987 Generic Letter. The requested Technical Specification listing of all pressure isolation valves, associated integrity tests, and the test frequencies are provided.

1 List of all the P1Vs Table 3.4.3.2-1

2. Periodic tests or other measures Section 3.4.3.2/

performed to assure the integrity 4.4.3.2.2 of the valves as an independent barrier at the RCPB

3. Operational Limits and acceptance Section 3.4.3.2 criteria
4. Test frequency Section 4.4.3.2.2 If you have any questions on this data or need any additional information, please contact me.

Sincerely yours, Q

F. A. Sp nge erg j Manager - Licensing and Safety JDW/cke 8706150226 870608 0 PDR ADOCK 05000461 D P PDR A (,s O -