NRC Generic Letter 87-06, Periodic Verification of Leak Tight Integrity of Pressure Isolation Valves
text
WASHINGTON, D.C. 20655
March 13, 1987
TO: All Holders of Operating Licenses
Gentlemen:
SUBJECT: PERIODIC VERIFICATION OF LEAK TIGHT INTEGRITY OF PRESSURE ISOLATION VALVES (GENERIC LETTER 87- 06)
Pursuant to 10 CFR 50.54(f), NRC is seeking to verify the methods, if any, by which each operating reactor licensee is assuring the leak-tight integrity of all pressure isolation valves as independent barriers against abnormal leakage, rapidly propagating failure, and gross rupture of the reactor coolant pressure boundary.
Pressure isolation valves (PIVs) are defined for each interface as any two valves in series within the reactor coolant pressure boundary which separate the high pressure reactor coolant system (RCS) from an attached low pressure system. These valves are normally closed during power operation. The reactor coolant pressure boundary (RCPB) is defined in 10 CFR 50.2 and generally includes all PIVs.
Periodic tests or verifications of the leak tight integrity of all pressure isolation valves are necessary in order to assure the integrity of the RCPB in accordance with 10 CFR 50, Appendices A and B. General Design Criterion (GDC) 14 of 10 CFR 50, Appendix A requires that "The reactor coolant pressure boundary shall be designed, fabricated, erected and tested so as to have an extremely low probability of abnormal leakage, of rapidly propagating failure and of gross rupture." GDC 30 requires that "The reactor coolant pressure boundary shall be designed, fabricated, erected, and tested to the highest quality standards practical . . ." GDC 32 states that "Components which are part of the reactor coolant pressure boundary shall be designed to permit
- (1) periodic inspection and testing of important areas and features to assess their structural and leak tight integrity . . ."
Further, as outlined in Appendix B to 10 CFR 50, each licensee's quality assurance program must include planned and systematic actions which will provide adequate confidence that these components will perform satisfactorily in service.
All plants licensed since 1979 have all PIVs listed in the Technical Specifications along with testing intervals, acceptance criteria and limiting conditions for operation. Certain older plants were required to periodically leak test, on an individual basis, only those PIVs which were listed in an order dated April 20, 1981 (Event V Order). That order was sent to 32 operating PWR's and 2 operating BWR's. Other older plants have had no specific requirements imposed to individually leak test any of their PIVs.
A number of events have occurred in LWRs involving leakage past pressure isolation valves, failures of the valves, inadvertent actuation of the valves, or mispositioning of the valves. NRC is therefore seeking assurances that the RCPB is being protected.-2-
Accordingly, you are requested to submit a list of all pressure isolation valves in your plant. For each valve, describe the periodic tests or other measures performed to assure the integrity of the valve as an independent barrier at the RCPB along with the acceptance criteria for leakage, if any, operational limits, if any, and frequency of test performance. This information is required to be submitted within 90 days of this letter. If current plant Technical Specifications require leak rate testing of all of the PIVs in the plant, your reply to that effect will be sufficient.
This request is covered by Office of Management and Budget Clearance Number 3150-0111 which expires September 30, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Room 3208, New Executive Office Building, Washington, DC 20503.
Our review of your submittal of information in response to this letter is not subject to fees under the provision of 10CFR170.
Sincerely,
Harold R. Denton, Director Office of Nuclear Reactor Regulation