B12595, Responds to NRC Verbal Request for Addl Info Supporting 861124 Application Amend to DPR-61 Extending License to 40 Yrs from Date of Issuance of Ol.Info Re Nonradiological Impacts Associated W/Extension of OL Encl

From kanterella
Revision as of 10:29, 26 July 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC Verbal Request for Addl Info Supporting 861124 Application Amend to DPR-61 Extending License to 40 Yrs from Date of Issuance of Ol.Info Re Nonradiological Impacts Associated W/Extension of OL Encl
ML20235L740
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 07/09/1987
From: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
B12595, NUDOCS 8707160808
Download: ML20235L740 (3)


Text

_ .__-_-_______-_________-__- - - -

s

+

CONNECTICUT YANKEE ATOMIC POWER COMPANY B E R L I N. CONNECTICUT P.O. box 270

  • HARTFORD, CONNECTICUT 06141-0270 203-665-5000 July 9 1987 8

Docket No. 50-213 B12595 Re: 10CFR50.51 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Haddam Neck Plant Additional Information Forty-Year License Amendment By letter dated November 24, 1986,(I) Connecticut Yankee Atomic Power 5 Company (CYAPCO) requested an amendment to the Haddam Neck Plant Operating License in order to extend the duration of the license to forty years from the date of issuance of the operating license.

In response to an NRC verbal request, CYAPCO hereby offers the following additional information regarding non-radiological impacts associated with the extension of the Haddam Neck Plant Operating License. The attached information is presented in tabular form as requested.

Should you have any questions, please feel free to contact us.

Very truly yours, CONNECTICUT YANKEE ATOMIC POWER COMPANY M /

E. Ypdroczka [/

Senior Vice President cc: W. T. Russell, Region I Administrator F. M. Akstulewicz, NRC Project Manager, Haddam Neck Plant P. D. Swetland, Resident Inspector, Haddam Neck Plant (1) 3. F. Opeka letter to C. I. Grimes, "Haddam Neck Plant, Proposed Amendment to Facility Operating License, Extension of Facility Operating i icense," dated November 24, 1986.

D 0 hfu@mGA7f709 og REna

p tf,

/ .

1 Docket No. 50-213 B12595 1

i I

l Attachment Haddam Neck Plant i

Additional Information for 40-Year License Arnendment

)

l

, i l )

l

)i

)

1 1

1 i

1 1 l l July,1987 1

E___________

y

,A l

l Non radiological impacts associated with the extension of the expiration date for lladdam Neck Plant, Facility Operating 1.icense Nature Type of monitoring CYITS itemarks of impact program section* j 1

i 1.and use None 2.2, 5.1, 8 No adverse impact due to license extension. j I

i Water use None 5.2, 8 No adverse impact due to license extension. A Air quality None 5.6, 6.5, 8 No air quality per se is monitored, but local atmospheric j conditions continuously recorded during plant operation. J Noise None 5.6, 5.7 No adverse impact due to license extension. 1 Terrestrial Nene 5.3, 6, 8 No adverse impact due to license extension. j llistorical, archco- None 2.3, R No adverse impact due to license extension. I logical Socioeconomic None 5.6, 8 Impact expected to be positive due to increased employ- {

ment and net economic benefits. ,

h fliccide/ chemical Monitor chemicals in 5.3, 6, 8 Various chemical parameters monitored daily, weekly, or l cffluents plant discharge during their release as per the NPDF.S permit. j u

Thermal, entrain- None 2.5, 5.3, 6, 8, 14 I;ish return system installed in 1983 further minimized g ment, impingement impingement mortalities. y i

i USAEC 1973. Final environmental statement related to the lladdam Neck (Connecticut Yankee)

Nuclear Power Plant. Connecticut Yankee Atomic Power Company. Docket No. 50-213.  ;

4 I

i l

l l

l l

i

)

l

(

l 1

l 1

i

)