MONTHYEARML20217D5911999-05-17017 May 1999
[Table view]Forwards Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990329-0401 & 0412-15 at Surry Power Station ML20249A8021998-03-16016 March 1998 Discusses Re Review of Topical Programs ML20249A8001998-03-0909 March 1998 Forwards Ltr from VEPCO & WOG Requesting Waiver of Fee for Staff Review of Certain Submittals Re Pilot Program Effort risk-informed Inservice Insp Program ML18153A2541997-12-0808 December 1997 Forwards Matls Analysis Rept NESML-Q-333, Unit 2 Let Down Orifice Insp, for Use ML20211B9461997-08-0606 August 1997 Notifies of First Meeting of Plant on risk-informed ISI on 970814 in Surry,Va W/Listed Attendees to Discuss Categorization of Piping Segments & PRA Analyses & Results ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML18153B1391994-11-0404 November 1994 Forwards Surry Power Station Underground Oil Release Site Characterization Rept ML20057B1491993-09-14014 September 1993 Forwards Documents on Proposed rules,10CFR2 & 72 Re Interim Storage of Spent Fuel in Independent Spent Fuel Storage Installation & site-specific License to Qualified Applicant ML20057B1891993-09-14014 September 1993 Requests Commission Approval of Proposed Rulemaking to Eliminate Requirement of Prior Commission Approval for Specific License for ISFSI Under 10CFR2 & 72.Notice of Proposed Rulemaking & Addl Info Encl ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20245F6541989-08-10010 August 1989 Submits Daily Highlight.Notifies of 890816 Meeting W/Util to Discuss Proposed Mods to Svc Water Sys at Plant ML20245G3101989-07-31031 July 1989 Notification of 890807 Mgt Meeting W/Util in Atlanta,Ga to Discuss self-assessment Conducted at Facility ML20154N8361988-09-13013 September 1988 Notification of 880916 Significant Licensee Meeting in Region II Ofc in Atlanta,Ga to Discuss Circumstance Re Partial Loss of Level in Unit 1 Refueling Cavity on 880517 ML20196G4631988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector. Events Where Recovery of Stuck Detector & Cleaning of Thimble Tubes Led to Personnel Hazard,Discussed ML20196G4051988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1 ML20237B2681987-12-11011 December 1987 Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche ML20153E9181987-11-16016 November 1987 Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement Representatives ML20238B3081987-08-27027 August 1987 Notification of 870825 Meeting W/Util in Silver Spring,Md to Discuss New Nuclear Assurance Corp Cask Design & Util Part 72 License Amend Submittal ML20245B3651987-05-27027 May 1987 Forwards C Mccracken 870514 Memo on NRR Review Plan & Schedule for Info Requested from Licensees Re Responses to Facility Feedwater Pipe Rupture ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B3681987-05-14014 May 1987 Forwards Proposed Course of Action & Projected Schedule for Handling Info Received in Response to Facility Pipe Rupture Bulletin,Per J Sniezek 870507 request.SECY-86-97 Also Encl to Provide Reporting Format That Will Be Followed ML20215B6241987-04-20020 April 1987 Forwards EDO Principle Correspondence Including Question by Asselstine Re Enforcement Action Following Pipe Break ML20215H8851987-04-13013 April 1987 Requests Description of NRC Approach to Problem of Corrosion & Erosion in Feedrings & J-tubes Based on 870312 Nucleonics Wk Article Re French Investigation Into Pipe Wall Thinning. Rationale for Not Citing Util for Poor GDC-1 Also Requested ML20245A4951987-03-0909 March 1987 Forwards Regional Ofcs Response to NRC Request for Survey of Licensee Programs for Monitoring Secondary Pipe Thinning,Per IE Info Notice 86-106, Feedwater Line Break. Survey Conducted During Wk of 870207.Draft IE Bulletin Encl ML20210M9631987-02-0303 February 1987 Summarizes 870130 Telcon W/M Specter of Washington Post Re Plant Pipe Failure & AEOD/E416, Erosion in Nuclear Power Plants. AEOD Procedure for Distribution of Repts,Nrc Actions & Whether Rept Sent to Util Discussed ML20207Q6961987-01-0909 January 1987 Notification of 870115 Meeting W/Technical Experts in Washington,Dc to Discuss Parameters W/Significant Role in Pipe Failure & Development of Generic Guidance to Predict & Mitigate erosion-corrosion Piping Damage Effects ML20215B3581986-12-29029 December 1986 Informs Augmented Insp Team (AIT) of Activities During Jan 1987 in Order to Conclude AIT Insp & Issuance of Insp Rept. Insp Rept Based on 861217 Draft Executive Summary Requested by 870109.AIT Will Reconvene During Wk of 870112 ML20214J6961986-11-21021 November 1986 Notification of 861124 Meeting W/Util in Bethesda,Md to Discuss Util Request to Amend Licenses for 40-yr Operation from Date of Issuance of OLs ML20210K0781986-04-0303 April 1986 Forwards FEMA Rept on 851004 Emergency Exercise.State Supplied Schedule of Corrective Actions Will Be Forwarded When Received.Overall Capability of Offsite Authorities Acceptable & 44CFR350 Approval Remains in Effect ML20134N7891985-08-21021 August 1985 Forwards Investigation Rept 2-84-015 to Be Provided to Ofc of Investigations Region II for Release to Licensee & Pdr. Part 21 Related ML20127F3061985-06-18018 June 1985 Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed ML20128H7661985-06-0505 June 1985 Discusses Substantive Changes in 850416 Rev to Radiological Emergency Plans.Revs Meet Requirements of 10CFR50.54(q) & 50.47(b) ML20210P6381984-03-0808 March 1984 Comments on Statement That NRC Has Already Authorized Three Utils to Load & Use Fuel Intended for Burnup,Per 840222 Memo.Authorization Not Yet Granted.Forwards Paper Presented at ANS Meeting ML20197G2791984-03-0707 March 1984 Forwards SER for Radiological Consequences of Accidents for Extended Burnup.Calculated Dose to Thyroid for Fuel Handling Accident Indicates Plant Design Adequate.Salp Also Encl ML20080D5321983-10-17017 October 1983 Informs of 831015 Fatal Accident Involving Wc Jones. Expansion Joint Ruptured During High Pressure Drain Pump Valve Operation ML20244C1011983-02-16016 February 1983 Forwards Engineering Evaluation of 811128 Event Involving Svc Water Valve Pit Flooding.Licensee Has Installed Dikes & Lights & Upgraded Maint Procedures to Preclude Future Occurrences.No Further Action Necessary ML20127A3681982-08-18018 August 1982 Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl ML20062E0791982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA ML20062D3291982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA ML20126L2271981-05-0101 May 1981 Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities1980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20134L4961980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20128Q7331980-07-28028 July 1980 Discusses Proposed Rev to IE Bulletin 79-14,per 800528 Memo. Region II Requested to Identify Design Organizations Which Did Static Analyses for Plant Resistance Temp Detector Lines.Reanalysis Necessary ML20128Q7131980-05-28028 May 1980 Discusses Proposed Rev to IE Bulletin 79-14 as Result of Overstressed Resistance Temp Detectors Found at Plants. Bulletin Should Be Revised to Include Small Bore Piping Under 2.5 Inches ML20125E4221980-01-15015 January 1980 Accepts Integrated Startup Program for Facility.Baseline Eddy Current Insp of Tubing Should Be Performed After Field Hydrostatic Test & Be Considered Preservice Insp as Defined in Westinghouse STS ML20133N1661979-03-27027 March 1979 Submits Info Re Cost of Replacement Power While Facilities Shut Down.Info Will Aid in Responding to Senate Appropriations Subcommittee 790313 Question ML20133M2111979-03-14014 March 1979 Submits Schedule for S&W to Complete Calculations.Ofc of Policy Evaluation Should Prepare Paper Re Impact on Each Region of Shutdown,Degree of Relaxation from Stds Allowable & If Mods Can Be Done Over Extended Period by 790415 1999-05-17 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20217D5911999-05-17017 May 1999
[Table view]Forwards Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990329-0401 & 0412-15 at Surry Power Station ML20249A8021998-03-16016 March 1998 Discusses Re Review of Topical Programs ML20249A8001998-03-0909 March 1998 Forwards Ltr from VEPCO & WOG Requesting Waiver of Fee for Staff Review of Certain Submittals Re Pilot Program Effort risk-informed Inservice Insp Program ML18153A2541997-12-0808 December 1997 Forwards Matls Analysis Rept NESML-Q-333, Unit 2 Let Down Orifice Insp, for Use ML20216B2411997-08-28028 August 1997 Staff Requirements Memo Re SECY-97-182, Proposed Enforcement Action Against VA Electric & Power Co for Violations of Maint Rule at Surry Power Station ML20211B9461997-08-0606 August 1997 Notifies of First Meeting of Plant on risk-informed ISI on 970814 in Surry,Va W/Listed Attendees to Discuss Categorization of Piping Segments & PRA Analyses & Results ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20134D7161996-10-24024 October 1996 Requests That Encl Internet Mail Received from PM Blanch,Dtd Through 960930,be Placed in Pdr.No Distribution Outside of PDR Necessary ML20136C8201995-10-10010 October 1995 Provides Summary of Discussion & Staff Actions Re 950921 Plant Performance Review.List of Participants,Changes to Mip & Matrix Trend Charts Encl ML20137R9521995-03-22022 March 1995 Informs That Plant Performance Review of Listed Plants Was Held on 950316 ML18153B1391994-11-0404 November 1994 Forwards Surry Power Station Underground Oil Release Site Characterization Rept ML20057B1491993-09-14014 September 1993 Forwards Documents on Proposed rules,10CFR2 & 72 Re Interim Storage of Spent Fuel in Independent Spent Fuel Storage Installation & site-specific License to Qualified Applicant ML20057B1891993-09-14014 September 1993 Requests Commission Approval of Proposed Rulemaking to Eliminate Requirement of Prior Commission Approval for Specific License for ISFSI Under 10CFR2 & 72.Notice of Proposed Rulemaking & Addl Info Encl ML20248E9391989-09-29029 September 1989 Forwards AEOD Technical Review Rept on Debris in Containment Recirculation Pumps.No Occurrences Found to Involve Actual Accumulation of Debris in Containment Sumps.Immediate Corrective Actions Completed ML20245F6541989-08-10010 August 1989 Submits Daily Highlight.Notifies of 890816 Meeting W/Util to Discuss Proposed Mods to Svc Water Sys at Plant ML20245G3101989-07-31031 July 1989 Notification of 890807 Mgt Meeting W/Util in Atlanta,Ga to Discuss self-assessment Conducted at Facility ML20154N8361988-09-13013 September 1988 Notification of 880916 Significant Licensee Meeting in Region II Ofc in Atlanta,Ga to Discuss Circumstance Re Partial Loss of Level in Unit 1 Refueling Cavity on 880517 ML20196G4631988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector. Events Where Recovery of Stuck Detector & Cleaning of Thimble Tubes Led to Personnel Hazard,Discussed ML20196G4051988-06-23023 June 1988 Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1 ML20237B2681987-12-11011 December 1987 Requests That Encl 10CFR50.App I Evaluations,For Listed Facilities Not Already Covered by Repts in Dcs,Be Entered Into DCS Sys on Microfiche ML20153E9181987-11-16016 November 1987 Forwards Oct 1987 Significant Intergovernmental Activities & Issues Rept.Rept Represents Combined Efforts of NRC Regional State Liaison Officers,State,Local & Indian Tribes Programs Staff & Regional State Agreement Representatives ML20238B3081987-08-27027 August 1987 Notification of 870825 Meeting W/Util in Silver Spring,Md to Discuss New Nuclear Assurance Corp Cask Design & Util Part 72 License Amend Submittal ML20245B3651987-05-27027 May 1987 Forwards C Mccracken 870514 Memo on NRR Review Plan & Schedule for Info Requested from Licensees Re Responses to Facility Feedwater Pipe Rupture ML20214L5831987-05-21021 May 1987 Summarizes 870519 Operating Reactors Events Meeting 87-15 to Brief Senior Managers from Nrr,Res,Aeod & Regional Ofcs on Events Which Occurred Since 870512 Meeting.Events Discussed & Significant Elements of Events Encl ML20245B3681987-05-14014 May 1987 Forwards Proposed Course of Action & Projected Schedule for Handling Info Received in Response to Facility Pipe Rupture Bulletin,Per J Sniezek 870507 request.SECY-86-97 Also Encl to Provide Reporting Format That Will Be Followed ML20215B6241987-04-20020 April 1987 Forwards EDO Principle Correspondence Including Question by Asselstine Re Enforcement Action Following Pipe Break ML20215H8851987-04-13013 April 1987 Requests Description of NRC Approach to Problem of Corrosion & Erosion in Feedrings & J-tubes Based on 870312 Nucleonics Wk Article Re French Investigation Into Pipe Wall Thinning. Rationale for Not Citing Util for Poor GDC-1 Also Requested ML20207R2651987-03-11011 March 1987 Staff Requirements Memo Re 870225 Commission Briefing Concerning 861209 Feedwater Line Rupture Event at Facility. Commission Requested Info on Completion Dates for Generic Issue Re Check Valves & on Other Listed Items ML20245A4951987-03-0909 March 1987 Forwards Regional Ofcs Response to NRC Request for Survey of Licensee Programs for Monitoring Secondary Pipe Thinning,Per IE Info Notice 86-106, Feedwater Line Break. Survey Conducted During Wk of 870207.Draft IE Bulletin Encl ML20210M9631987-02-0303 February 1987 Summarizes 870130 Telcon W/M Specter of Washington Post Re Plant Pipe Failure & AEOD/E416, Erosion in Nuclear Power Plants. AEOD Procedure for Distribution of Repts,Nrc Actions & Whether Rept Sent to Util Discussed ML20207Q6961987-01-0909 January 1987 Notification of 870115 Meeting W/Technical Experts in Washington,Dc to Discuss Parameters W/Significant Role in Pipe Failure & Development of Generic Guidance to Predict & Mitigate erosion-corrosion Piping Damage Effects ML20215B3581986-12-29029 December 1986 Informs Augmented Insp Team (AIT) of Activities During Jan 1987 in Order to Conclude AIT Insp & Issuance of Insp Rept. Insp Rept Based on 861217 Draft Executive Summary Requested by 870109.AIT Will Reconvene During Wk of 870112 ML20214J6961986-11-21021 November 1986 Notification of 861124 Meeting W/Util in Bethesda,Md to Discuss Util Request to Amend Licenses for 40-yr Operation from Date of Issuance of OLs ML20210K0781986-04-0303 April 1986 Forwards FEMA Rept on 851004 Emergency Exercise.State Supplied Schedule of Corrective Actions Will Be Forwarded When Received.Overall Capability of Offsite Authorities Acceptable & 44CFR350 Approval Remains in Effect ML20134N7891985-08-21021 August 1985 Forwards Investigation Rept 2-84-015 to Be Provided to Ofc of Investigations Region II for Release to Licensee & Pdr. Part 21 Related ML20127F3061985-06-18018 June 1985 Forwards Tabular Summary of Key Results from Regional Survey of plant-specific Info Re Potential for Uncontrolled Radiation Exposures in PWR Cavities,Per Jg Partlow 850315 Request.No Further Generic Action Needed ML20128H7661985-06-0505 June 1985 Discusses Substantive Changes in 850416 Rev to Radiological Emergency Plans.Revs Meet Requirements of 10CFR50.54(q) & 50.47(b) ML20210P6381984-03-0808 March 1984 Comments on Statement That NRC Has Already Authorized Three Utils to Load & Use Fuel Intended for Burnup,Per 840222 Memo.Authorization Not Yet Granted.Forwards Paper Presented at ANS Meeting ML20197G2791984-03-0707 March 1984 Forwards SER for Radiological Consequences of Accidents for Extended Burnup.Calculated Dose to Thyroid for Fuel Handling Accident Indicates Plant Design Adequate.Salp Also Encl ML20080D5321983-10-17017 October 1983 Informs of 831015 Fatal Accident Involving Wc Jones. Expansion Joint Ruptured During High Pressure Drain Pump Valve Operation ML20244C1011983-02-16016 February 1983 Forwards Engineering Evaluation of 811128 Event Involving Svc Water Valve Pit Flooding.Licensee Has Installed Dikes & Lights & Upgraded Maint Procedures to Preclude Future Occurrences.No Further Action Necessary ML20127A3681982-08-18018 August 1982 Forwards List of Plants for Which Leak Test Repts Were Selected for Review by Ornl.Leak Testing Criteria Will Be Prepared from Review.W/O Encl ML20062D3291982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Effects of Fire Protection Sys Actuation on safety-related Equipment & Seismic Qualification of safety-related Sys for Transmission to NEA ML20062E0791982-07-29029 July 1982 Forwards Incident Reporting Sys Repts Re Spill of Contaminated Water & Contamination of Personnel in Auxiliary Bldg & Failure of Control Rod Guide Tube Support Pins for Transmittal to NEA ML20126L2271981-05-0101 May 1981 Forwards Summary of 810429 Meeting W/Pwr Owners Group Re Thermal Shock to Reactor Vessels IA-85-516, Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities1980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20134L4961980-12-31031 December 1980 Forwards Results of Regional Evaluations of Salp.Items Identified Added to Outstanding Items List for Facilities ML20128Q7331980-07-28028 July 1980 Discusses Proposed Rev to IE Bulletin 79-14,per 800528 Memo. Region II Requested to Identify Design Organizations Which Did Static Analyses for Plant Resistance Temp Detector Lines.Reanalysis Necessary ML20128Q7131980-05-28028 May 1980 Discusses Proposed Rev to IE Bulletin 79-14 as Result of Overstressed Resistance Temp Detectors Found at Plants. Bulletin Should Be Revised to Include Small Bore Piping Under 2.5 Inches ML20125E4221980-01-15015 January 1980 Accepts Integrated Startup Program for Facility.Baseline Eddy Current Insp of Tubing Should Be Performed After Field Hydrostatic Test & Be Considered Preservice Insp as Defined in Westinghouse STS 1999-05-17 |
Text
.
- e. , .
From: Goutam Bagchi To TWD2.TWP9(MEP1)
Date: 3/16/98 1:42pm
-Subjects- WOG LTR DATED 2/9/98re REVIEW OF TOPICAL AND SURRY RI-ISI PROGRAMS -Reply This.is an action for Projects. Dr. Gordon Edison is the PM for Surry. He is writing a letter to the CFO giving NRR recommendation regarding fee waiver. I believe that the public meeting is to be canceled.
Thank you, Goutam
'>>> M. Ellen Potest 03/16/98 01:32pm >>>
Mr. Bagchi, What is the status of the request from WOG regarding an exemption from Fees for the review of Surry, Unit 1, RI-ISI pilot program? Have you have the public meeting? If not, do you have a date for the meeting?
Thanks, Ellen CC: TWD2.TWP9(bsj), GEE
~
9906190258 990612 POR ADOCK 05000280 8 PDR
{.:=-