November A, 1994 Mr. J. Meade R. Anderson, P.G.
Department of Environmental Quality Piedmont Water Regional Office P.O. Box 6030 Glen Allen, VA 23058 e
SPS/ENV 43/SUBSURF OIL RE:
PC# 94-3824 SURRY POWER STATION UNDERGROUND OIL RELEASE SITE CHARACTERIZATION REPORT
Dear Mr. Anderson:
Enclosed is the Site Characterization Report for the underground oil release at Surry Power Station, PC# 94-3824.
The report was initially due July 8 1994; however, we requested and received an extension until November 7, 1994.
The report includes the SCR checklist.
In keeping with the risk based approach for determination of remedial action, Virginia Power believes that there is adequate evidence to demonstrate that natural in-situ passive degredation is the appropriate corrective action for the site.
Therefore, we request the DEQ to render a Case Closed decision for PC# 94-3824.
Please contact Wes Sprouse at 273-3552 if you have any questions.
Sincerely, B. M. Marshall, P.E.
Manager, Water Quality Attachment cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta St., NW Suite 2900 Atlanta, GA 30323 Re:
Surry Units 1 & 2 Docket Nos. 50-280/50281 License Nos. DPR-32/DPR-37 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Re:
Surry Units 1 & 2 Docket Nos. 50-280/50281 License Nos. DPR-32/DPR-37 1150117 u
-fi...
Mr. M. W. Branch NRC Senior Resident Surry Power Station Inspe~~_gr _____________________ _
9411160246 941104 PDR ADOCK 05000280 601
_} I D P
..:-~
\\_.
be:
Mr. D.
Mr. fv'r.
Mr. J.
Mr. T.
Mr. w.
A.
L.
A.
B.
R.
Christian -
SPS Bowling -
IN 2SE Price -
SPS Sowers -
SPS Benthall -
SPS - w/enclosure Mr.
Thornton -
IN 2SE
- w. A.
Mr. A. R. Fletcher -
SPS - w/enclosure Mr. B. R. Belsches -
SPS - w/enclosure Mr. J. W. White Mr. M. F. Kadlubowski Mr. D. L. James Jtc;;1~1fr Mr. W. A. Sprouse, Jr~
w/enclosure Power Operations Management -
IN GW - w/enclosure Concurrences Mr. D. A. Christian Yr,+L.w/B~B Mr. M. L. Bowling ~sr faLi ~ ~~*v14LJ1-/):y,fi-Mr. B. R. Belsches °ti;J ri,L,_,,)zW Action Plan
- 1.
Respond to comments from Virginia Department of Environmental Quality as appropriate.
Verification of Accuracy The information in the subject Site Characterization Report was furnished by station personnel, Water Quality Dept. personnel, and the consultant.
The consultant analyzed the site data and information, and prepared the report.
Commitments Carry out Action Plan Requirements or changes to UFSAR or QA Topical Report None.