ML20196G405

From kanterella
Jump to navigation Jump to search
Forwards AEOD Technical Review Rept T809, Blocked Thimble Tubes/Stuck Incore Detector, for Consideration Due to Recent Events at Braidwood Unit 1
ML20196G405
Person / Time
Site: Beaver Valley, Salem, Kewaunee, Sequoyah, Braidwood, Surry, North Anna, Ginna, 05000000, Trojan
Issue date: 06/23/1988
From: Rosenthal J
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Berlinger C
Office of Nuclear Reactor Regulation
Shared Package
ML20196G410 List:
References
AEOD-T809, NUDOCS 8807050517
Download: ML20196G405 (2)


Text

F-JUN E3 15N)

MEMORANDUM FOR: Carl H. Berlinger, Chief Generic Comunications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation FROM:

Jack E. Rosenthal, Chief Reactor Operations Analysis Branch Division of Safety Programs Office for Analysis and Evaluation of Operational Data

SUBJECT:

AE0D/T809:

BLOCKED THIMBLE TUBES / STUCK INCORE DETECTOR Enclosed is a technical review report on blocked thimble tubes / stuck detectors. You may wish to consider this subject for an information notice because of the recent events at Braidwood 1 and their potential for occurring at other PWRs.

M 88vowf by Jack E. Rosenthal, Chief Reactor Operations Analysis Branch Division of Safety Programs Office for Analysis and Evaluation of Operational Data

Enclosure:

As Stated

Contact:

Mary S. Wegner 492-7818 Distribution:

R0AB R/F MTaylor, EDO JRosenthal JPartlow, OSP MChiramal CHel temtes MWegner Edordan VBenaroya MWilliams KBlack

  • SEE PREVIOUS CONCURRENCES Ib

'i.b 4

  • R0AB:DSP:AE0D
  • ROAB:DSP:AE0D AB:DSP:AE0D DSP:AE0D MWegner MChiramal Rosenthal VBenaroya 6/ /88 6/ /88 6//$88 6/J1188 gg7ioB!lSki' P

MEMORANDUM FOR: Carl H. Berlinger, Chief Generic Comunications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation FROM:

Jack E. Rosenthal, Chief Reactor Operations Analysis Branch Division of Safety Programs Office for Analysis and Evaluation of Operational Data

SUBJECT:

AE00/T809: -BLOCKED THIMBLE TUBES / STUCK INCORE DETECTOR s

Enclosed is a technical review report on blocked thimble tubes / stuck detectors. You may wish to consider this subject for an information notice because of the recent events at Braidwood 1 and their potential for occurr.ing at other PWRs.

Jack E. Rosenthal, Chief Reactor Operations Analysis Branch Division of Sa'fety Programs Office for Analysis and Evaluation of Operational Data

Enclosure:

As Stated

Contact:

Mary S. Wegner 492-7818 I

Distribution:

ROAB R/F JRosenthal MChiramal MWegner fy:w'jk js d R0AB G;;':?.EnD ROAB:DSP:AE00 R0AB:DSP:AE00

/i""P MWeg/8'g MChiramal\\w JRosenthal ner 6/,s 6/g/88 6/ /88

.-