Accepts Integrated Startup Program for Facility.Baseline Eddy Current Insp of Tubing Should Be Performed After Field Hydrostatic Test & Be Considered Preservice Insp as Defined in Westinghouse STS
ML20125E422
Person / Time
Site: Surry Dominion icon.png
Issue date: 01/15/1980
From: Noonan V
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8002120708
Download: ML20125E422 (1)


Text

,.

r,,

f 7

-,-..m.,,,,

s,.

/ 4 M.

QI.IXh(k[l JAN 161980 g.SllI.ATORY 00Ch EE CDPP MR 1

MEMORA!;DUI' FOR:

A. Schwencer, Chief, ORG1, 00R 1

FRoti:

V. Iloonan, Chief. Engineering 3 ranch, 00R

SUBJECT:

SURRYUtlIT2ItifEGRATEDSTARTUPTESTPROGRAMFOLLOUII;G STEAlt GE!:ERATOR REPLACE!'ENT (TAC 11517)

As requested, the Engineering Granch, DOR, has reviewed the Integrated Startup 4

Test Program to be completed prior to returning Surry Unit 2 to operation following the completion of the steam generator replacement program. We re-viewed the VEPC0 submittal dated August 13, 1979, and their responsas to our questions telecopies to us on January 14, 1980.

'.le used Regulatory Guiae 1.GG, Revision 2, as a basis for our review.

a We find tha Integrated Startup Test Program acceptablo. !!owever, it siiculd be noted that the baseline eddy current inspection of 1005 of the tubing performed prior to installation cannot be considered a preservice inspecticn as dafined in the Westinahouse standard technical specificaticns.

In order to be considered a preservice inspection, it should be performed after the field hydrostatic test.

Therefore, the first inservice inspection must include all three staan generators.

t Vincent S. 'iconan, Chief Engineerino Cranch Division of Cperating Reactors

Contact:

1. LaGrange X07C29 cc: D.'Cisenhut L. Shao G. D. Liau J. 3. ::ci hbors i'.. LaGrango l

l r

T!"N

.......E B..:.D.g+... E..B..:.00..R..

d

.4.............

..RI.4 Grange.mb..@.U.e.......... Mpn An..........

. / /..f../. 80.......

....I.n g/.s..o.........

1./...../. 9 0.......

1 3.c m m m =cu.=

1,...........

8002130 708

'